ML083510257: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML083510257 | | number = ML083510257 | ||
| issue date = 11/24/2008 | | issue date = 11/24/2008 | ||
| title = FEMA Region | | title = FEMA Region VI, Radiological Emergency Preparedness (Rep), South Texas Project (REP) Combined License Review, List of 55 RAIs | ||
| author name = | | author name = | ||
| author affiliation = US Dept of Homeland Security, US Federal Emergency Mgmt Agency (FEMA) | | author affiliation = US Dept of Homeland Security, US Federal Emergency Mgmt Agency (FEMA) | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:FEMA Region VI Radiological Emergency Preparedness (REP).- | {{#Wiki_filter:FEMA Region VI Radiological Emergency Preparedness (REP). | ||
-_____ South Texas Project (REP) Combined License Review State/ County RAI Number RAI Description STP 001 | |||
==Subject:== | ==Subject:== | ||
Primary and support roles for response organizations Basis: NUREG 0654, Criterion C. .a SRP Acceptance Criterion: | Primary and support roles for response organizations Basis: NUREG 0654, Criterion C. .a SRP Acceptance Criterion: Requirement H Texas Emergency Management Plan (TEMP), Annex Texas D, Tab 1: Identify or provide clear references to the, key official(s) authorized to request Federal assistance. | ||
Requirement H Texas Emergency Management Plan (TEMP), Annex Texas D, Tab 1: Identify or provide clear references to the, key official(s) authorized to request Federal assistance. | STP 002 | ||
STP 002 | |||
==Subject:== | ==Subject:== | ||
Primary and support roles for response organizations Basis: NUREG 0654, Criterion C. 1.b SRP Acceptance Criterion: | Primary and support roles for response organizations Basis: NUREG 0654, Criterion C. 1.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide an estimated time of Texas arrival for federal assets that may be requested, either directly.or through mutual assistance plans, such as SMRAP, during an emergency. | ||
Requirement H TEMP, Annex D: Provide an estimated time of Texas arrival for federal assets that may be requested, either directly.or through mutual assistance plans, such as SMRAP, during an emergency. | STP 003 | ||
STP 003 | |||
==Subject:== | ==Subject:== | ||
Primary and support roles for response organizations Basis: NUREG 0654, Criterion C.l.b SRP Acceptance Criterion: | Primary and support roles for response organizations Basis: NUREG 0654, Criterion C.l.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide capabilities and Texas availability of the primary laboratory in the plan and an updated cross-reference in Tab 5 of Annex D to indicate the location of the information. | ||
Requirement H TEMP, Annex D: Provide capabilities and Texas availability of the primary laboratory in the plan and an updated cross-reference in Tab 5 of Annex D to indicate the location of the information. | STP Units 3 & 4 RAI: Rev 0 Page I November 24, 2008 | ||
STP Units 3 & 4 RAI: Rev 0 Page I November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/County STP 006 | |||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/County STP 006 | |||
==Subject:== | ==Subject:== | ||
Primary and support roles for response organizations Basis: NUREG 0654, Criterion E.7 SRP Acceptance Criterion: | Primary and support roles for response organizations Basis: NUREG 0654, Criterion E.7 SRP Acceptance Criterion: Requirement H Texas TEMP, Annex D: Provide details related to the drafting of information or provide draft messages that would inform the public of protective actions consistent with the applicant's classification scheme. | ||
Requirement H Texas TEMP, Annex D: Provide details related to the drafting of information or provide draft messages that would inform the public of protective actions consistent with the applicant's classification scheme.If this information is present in the current plan provided with this application, provide an appropriately updated cross-reference that indicates the location of the information. | If this information is present in the current plan provided with this application, provide an appropriately updated cross-reference that indicates the location of the information. | ||
STP 007 | STP 007 | ||
==Subject:== | ==Subject:== | ||
Public Education and Information Basis: NUREG 0654, Criterion G. 1 SRP Acceptance Criterion: | Public Education and Information Basis: NUREG 0654, Criterion G. 1 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information regarding the dissemination of information to the public concerning Texas notification, protective actions, and special needs. | ||
Requirement H TEMP, Annex D: Provide information regarding the dissemination of information to the public concerning Texas notification, protective actions, and special needs.populations and indicate by what method the information may be disseminated. | populations and indicate by what method the information may be disseminated. | ||
STP 008 | STP 008 | ||
==Subject:== | ==Subject:== | ||
Public Education and Information Basis: NUREG 0654, Criterion G. 1 SRP Acceptance Criterion: | Public Education and Information Basis: NUREG 0654, Criterion G. 1 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Include a statement that describes Texas who supplies information to the transient populations and the method for distribution of the information in the plan. | ||
Requirement H TEMP, Annex D: Include a statement that describes Texas who supplies information to the transient populations and the method for distribution of the information in the plan.STP Units 3 &84 RAI: Rev 0 Page 2 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 009 | STP Units 3 &84 RAI: Rev 0 Page 2 November 24, 2008 | ||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 009 | |||
==Subject:== | ==Subject:== | ||
Emergency Facilities and Equipment Texas Basis: NUREG 0654, Criterion H. 10 SRP Acceptance Criterion: | Emergency Facilities and Equipment Texas Basis: NUREG 0654, Criterion H. 10 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Specify frequency of operational checks of instrumentation in plans and/or implementing procedures or provide appropriate cross-reference location. Identify reserve equipment that will be used to supplement equipment that is out of calibration. | ||
Requirement H TEMP, Annex D: Specify frequency of operational checks of instrumentation in plans and/or implementing procedures or provide appropriate cross-reference location. | STP 010 | ||
Identify reserve equipment that will be used to supplement equipment that is out of calibration. | |||
STP 010 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.9 SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.9 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a statement of the method Texas by which PARs will be provided to local decision makers. Clarify the organization that is responsible for decision making for the ingestion exposure pathway. | ||
Requirement H TEMP, Annex D: Provide a statement of the method by which PARs will be provided to local decision makers. Clarify the organization that is responsible for decision making for the ingestion exposure pathway.Describe the process and timeframe for making initial PADs. | Describe the process and timeframe for making initial Matagorda PADs. County STP Units 3 & 4 RAI: Rev 0 Page 3 November 24, 2008 | ||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 011 | |||
==Subject:== | ==Subject:== | ||
Protective Response I Texas Basis: NUREG 0654, Criterion J.10.e SRP Acceptance Criterion: | Protective Response I Texas Basis: NUREG 0654, Criterion J.10.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Identify a specific quantity of KI as well as a method and location for storage and distribution of KI. The process for notification of counties regarding the decision to authorize the use of KI for emergency workers and institutionalized individuals should be clearly stated in the plan. | ||
Requirement H TEMP, Annex D: Identify a specific quantity of KI as well as a method and location for storage and distribution of KI. The process for notification of counties regarding the decision to authorize the use of KI for emergency workers and institutionalized individuals should be clearly stated in the plan.Include a trigger point for issuing authorization of KI for the institutionalized and other members of the public who cannot be evacuated. | Include a trigger point for issuing authorization of KI for the institutionalized and other members of the public who cannot be evacuated. This trigger point should be consistent with current federal guidance for members of the public. | ||
This trigger point should be consistent with current federal guidance for members of the public.Matagorda County Basic Emergency Management Plan (MCBEMP), Annex W: Identify a specific quantity of KI necessary to supply the county emergency workers as well as a method and location for storage and distribution of KI. Indicate the means by which the county receives notification from the state. | Matagorda County Basic Emergency Management Matagorda Plan (MCBEMP), Annex W: Identify a specific County quantity of KI necessary to supply the county emergency workers as well as a method and location for storage and distribution of KI. Indicate the means by which the county receives notification from the state. | ||
STP 012 | |||
==Subject:== | ==Subject:== | ||
Radiological Emergency Response Training Basis: NUREG 0654, Criterion O.4.d, O.4.f, 0.4.g.O.4.h, 0.4.j SRP Acceptance Criterion: | Radiological Emergency Response Training Basis: NUREG 0654, Criterion O.4.d, O.4.f, 0.4.g. | ||
Requirement H TEMP, Annex D: Provide information in the plan that will address the scope, nature, and frequency of training for the applicable elements of Planning Standard 0.4. Provide more specific references with regard to the response specific training that is in accordance with referenced NRP guidelines. | O.4.h, 0.4.j SRP Acceptance Criterion: Requirement H Texas TEMP, Annex D: Provide information in the plan that will address the scope, nature, and frequency of training for the applicable elements of Planning Standard 0.4. Provide more specific references with regard to the response specific training that is in accordance with referenced NRP guidelines. | ||
MCBEMP, Annex W Include appropriate sections of the plan that address the scope, nature, and frequency of training in the plan cross-reference. | MCBEMP, Annex W Include appropriate sections of Matagorda the plan that address the scope, nature, and frequency County of training in the plan cross-reference. | ||
STP Units 3 & 4 RAI: Rev 0 Page 4 November 24, 2008 | |||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 013 | |||
==Subject:== | ==Subject:== | ||
Emergency Communications Basis: NUREG 0654, Criterion F. 1.d SRP Acceptance Criterion: | Emergency Communications Basis: NUREG 0654, Criterion F. 1.d SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide clear descriptions of the Texas provisions for communication with the applicant. Update the plan cross-reference to remove references to Section V of Procedure 13 and include other references which may be applicable. | ||
Requirement H TEMP, Annex D: Provide clear descriptions of the Texas provisions for communication with the applicant. | Matagorda MCBEMP, Annex W: Provide a clear description of the communication system that will be used by the county to County communicate with the EOF. | ||
Update the plan cross-reference to remove references to Section V of Procedure 13 and include other references which may be applicable. | STP 014 | ||
MCBEMP, Annex W: Provide a clear description of the | |||
==Subject:== | ==Subject:== | ||
Emergency Communications Basis: NUREG 0654, Criterion F. 1.e SRP Acceptance Criterion: | Emergency Communications Basis: NUREG 0654, Criterion F. 1.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Indicate in the plan cross- Texas reference the portions of the plan that address primary and back-up methods for alerting and activating emergency personnel. | ||
Requirement H TEMP, Annex D: Indicate in the plan cross- Texas reference the portions of the plan that address primary and back-up methods for alerting and activating emergency personnel. | STP 015 | ||
STP 015 | |||
==Subject:== | ==Subject:== | ||
Emergency Communications Basis: NUREG 0654, Criterion F.2 SRP Acceptance Criterion: | Emergency Communications Basis: NUREG 0654, Criterion F.2 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide reference to primary and Texas back-up communication methods with medical support facilities. | ||
Requirement H TEMP, Annex D: Provide reference to primary and Texas back-up communication methods with medical support facilities. | MCBEMP, Annex W: Provide updates to the county Matagorda plan with corrected lettering in referenced section of County the plan and update the cross-reference accordingly. | ||
MCBEMP, Annex W: Provide updates to the county Matagorda plan with corrected lettering in referenced section of County the plan and update the cross-reference accordingly. | STP Units 3 & 4 RAI: Rev 0 Page 5 November 24, 2008 | ||
STP Units 3 & 4 RAI: Rev 0 Page 5 November 24, 2008 tEMA Regiofi VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 016 | |||
tEMA Regiofi VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 016 | |||
==Subject:== | ==Subject:== | ||
Radiological Exposure Control Basis: NUREG 0654, Criterion K.3.a SRP Acceptance Criterion: | Radiological Exposure Control Basis: NUREG 0654, Criterion K.3.a SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information in plans or Texas procedures that indicate quantities and storage locations for dosimetry (both permanent record and self-reading). | ||
Requirement H TEMP, Annex D: Provide information in plans or Texas procedures that indicate quantities and storage locations for dosimetry (both permanent record and self-reading). | MCBEMP, Annex W: Identify a reference to state guidelines that specify frequencies at which Matagorda dosimeters will be read. Provide details regarding the County quantities of dosimetry that should be maintained and locations where dosimeters will be stored (both permanent record and self-reading). | ||
MCBEMP, Annex W: Identify a reference to state guidelines that specify frequencies at which Matagorda dosimeters will be read. Provide details regarding the County quantities of dosimetry that should be maintained and locations where dosimeters will be stored (both permanent record and self-reading). | STP 017 | ||
STP 017 | |||
==Subject:== | ==Subject:== | ||
Radiological Exposure Control Basis: NUREG 0654, Criterion K.3.b SRP Acceptance Criterion: | Radiological Exposure Control Basis: NUREG 0654, Criterion K.3.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide specific requirements on Texas specific time intervals in which dosimeters must be read. | ||
Requirement H TEMP, Annex D: Provide specific requirements on Texas specific time intervals in which dosimeters must be read.MCBEMP, Annex W: Indicate the location of the Matagorda specific state guidance that the county will use for County reading and recording dosimeters STP 020 | MCBEMP, Annex W: Indicate the location of the Matagorda specific state guidance that the county will use for County reading and recording dosimeters STP 020 | ||
==Subject:== | ==Subject:== | ||
Medical and Public Health Support Basis: NUREG 0654, Criterion L.4 SRP Acceptance Criterion: | Medical and Public Health Support Basis: NUREG 0654, Criterion L.4 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide references to the plans or Texas procedures which describe the provisions for transporting radiologically contaminated injured individuals. | ||
Requirement H TEMP, Annex D: Provide references to the plans or Texas procedures which describe the provisions for transporting radiologically contaminated injured individuals. | STP Units 3 & 4 RAI: Rev 0 Page 6 November 24, 2008 | ||
STP Units 3 & 4 RAI: Rev 0 Page 6 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 022 | |||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 022 | |||
==Subject:== | ==Subject:== | ||
Exercises and Drills Basis: NUREG 0654, Criteria N.3.c,N.3.d, N.3.e, N.3.f SRP Acceptance Criterion: | Exercises and Drills Basis: NUREG 0654, Criteria N.3.c,N.3.d, N.3.e, N.3.f SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a statement in the plan Texas that indicates that simulated events, exercise timelines, and narrative summaries will be addressed in the scenario developed for exercises and drills. In addition, provide a statement that advanced materials will be provided to official observers. | ||
Requirement H TEMP, Annex D: Provide a statement in the plan Texas that indicates that simulated events, exercise timelines, and narrative summaries will be addressed in the scenario developed for exercises and drills. In addition, provide a statement that advanced materials will be provided to official observers. | STP 024 | ||
STP 024 | |||
==Subject:== | ==Subject:== | ||
Public Education and Information Basis: NUREG 0654, Criterion G.4.c SRP Acceptance Criterion: | Public Education and Information Basis: NUREG 0654, Criterion G.4.c SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide an update to the cross- Texas reference to include the section of the plan that indicates what organization is responsible for answering public inquiries and the method for contacting that organization. | ||
Requirement H TEMP, Annex D: Provide an update to the cross- Texas reference to include the section of the plan that indicates what organization is responsible for answering public inquiries and the method for contacting that organization. | STP 025 | ||
STP 025 | |||
==Subject:== | ==Subject:== | ||
Public Education and Information Basis: NUREG 0654, Criterion G.5 SRP Acceptance Criterion: | Public Education and Information Basis: NUREG 0654, Criterion G.5 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information describing Texas the State's participation in providing training to the media on emergency plans, radiation, and points of contact for emergency public information. | ||
Requirement H TEMP, Annex D: Provide information describing Texas the State's participation in providing training to the media on emergency plans, radiation, and points of contact for emergency public information. | STP Units 3 & 4 RAI: Rev 0 Page 7 November 24, 2008 | ||
STP Units 3 & 4 RAI: Rev 0 Page 7 November 24, 2008 FEMA Regiofi VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 027 | |||
FEMA Regiofi VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 027 | |||
==Subject:== | ==Subject:== | ||
Accident Assessment Basis: NUREG 0654, Criterion 1.11 SRP Acceptance Criterion: | Accident Assessment Basis: NUREG 0654, Criterion 1.11 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information that clearly Texas states if the state will take peak plume measurements or will rely on the applicant or federal resources to get these measurements. Any written agreements that are in place with regard to taking these measurements should also be provided. | ||
Requirement H TEMP, Annex D: Provide information that clearly Texas states if the state will take peak plume measurements or will rely on the applicant or federal resources to get these measurements. | STP 028 | ||
Any written agreements that are in place with regard to taking these measurements should also be provided.STP 028 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.10.a SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.10.a SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide maps that identify Matagorda locations of reception centers and shelters and specify County the frequency at which all maps included in the plan are to be updated. | ||
Requirement H MCBEMP, Annex W: Provide maps that identify Matagorda locations of reception centers and shelters and specify County the frequency at which all maps included in the plan are to be updated.STP 029 | STP 029 | ||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.10.b SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.10.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a map from current Texas census data that identifies special populations such as day care facilities and schools. | ||
Requirement H TEMP, Annex D: Provide a map from current Texas census data that identifies special populations such as day care facilities and schools.MCBEMP, Annex W: Update cross reference to Matagorda include references to maps that identify special County populations. | MCBEMP, Annex W: Update cross reference to Matagorda include references to maps that identify special County populations. | ||
STP Units 3 & 4 RAI: Rev 0 Page 8 November 24, 2008 FEMA Regioh VI.Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 030 | STP Units 3 & 4 RAI: Rev 0 Page 8 November 24, 2008 | ||
FEMA Regioh VI. | |||
Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 030 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.10.b SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.10.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: This RAI is identical to those Texas. | ||
Requirement H TEMP, Annex D: This RAI is identical to those Texas.provided for standards E.6 and E.7. Provide information that establishes administrative and physical means and the time required to notify and provide prompt instruction to the public within the plume exposure pathway EPZ. Also, Provide details related to the drafting of information or provide draft messages that would inform the public of protective actions consistent with the applicant's classification scheme. If this information is present in the current plan provided with this application, provide an appropriately updated cross-reference that indicates the location of the information. | provided for standards E.6 and E.7. Provide information that establishes administrative and physical means and the time required to notify and provide prompt instruction to the public within the plume exposure pathway EPZ. Also, Provide details related to the drafting of information or provide draft messages that would inform the public of protective actions consistent with the applicant's classification scheme. If this information is present in the current plan provided with this application, provide an appropriately updated cross-reference that indicates the location of the information. | ||
STP 031 | STP 031 | ||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, CriterionJ.10.d SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, CriterionJ.10.d SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information or Matagorda appropriate cross-reference in the county plan County describing protective measures such as the method for alerting, providing emergency information, and transporting mobility dependent or impaired individuals from schools, hospitals, and prisons. | ||
Requirement H MCBEMP, Annex W: Provide information or Matagorda appropriate cross-reference in the county plan County describing protective measures such as the method for alerting, providing emergency information, and transporting mobility dependent or impaired individuals from schools, hospitals, and prisons.STP 033 | STP 033 | ||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.10.j SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.10.j SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide references to the ETE Texas study, which includes potential need for alternate routs, in the state plan. | ||
Requirement H TEMP, Annex D: Provide references to the ETE Texas study, which includes potential need for alternate routs, in the state plan.Matagorda MCBEMP, Annex W: Provide information that County describes the equipment and resources that will be utilized to set up traffic control points.STP Units 3 & 4 RAI: Rev 0 Page 9 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 034 | Matagorda MCBEMP, Annex W: Provide information that County describes the equipment and resources that will be utilized to set up traffic control points. | ||
STP Units 3 & 4 RAI: Rev 0 Page 9 November 24, 2008 | |||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 034 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J. 11 SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J. 11 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Identify the individual, by title or Texas position that is authorized to make ingestion phase PADs. Provide information that describes how agribusiness will be notified of PADs. Include appropriate references in the cross-reference that describe the method for identifying areas of concern where sampling and monitoring should occur. | ||
Requirement H TEMP, Annex D: Identify the individual, by title or Texas position that is authorized to make ingestion phase PADs. Provide information that describes how agribusiness will be notified of PADs. Include appropriate references in the cross-reference that describe the method for identifying areas of concern where sampling and monitoring should occur.STP 035 | STP 035 | ||
==Subject:== | ==Subject:== | ||
Radiological Exposure Control Basis: NUREG 0654, Criterion K.4 SRP Acceptance Criterion: | Radiological Exposure Control Basis: NUREG 0654, Criterion K.4 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information or a Texas reference to the information that describes the risk to emergency workers who volunteer to exceed .dose limits as well as limits for special conditions such as a pregnant emergency worker. | ||
Requirement H TEMP, Annex D: Provide information or a Texas reference to the information that describes the risk to emergency workers who volunteer to exceed .dose limits as well as limits for special conditions such as a pregnant emergency worker.MCBEMP, Annex W: Provide information Matagorda describing the actions to be taken when an County emergency worker exceeds exposure limits as well as information regarding the risk for those emergency workers who volunteer to receive higher exposures. | MCBEMP, Annex W: Provide information Matagorda describing the actions to be taken when an County emergency worker exceeds exposure limits as well as information regarding the risk for those emergency workers who volunteer to receive higher exposures. | ||
STP 036 | STP 036 | ||
==Subject:== | ==Subject:== | ||
Radiological Exposure Control Basis: NUREG 0654, Criterion K.5.a SRP Acceptance Criterion: | Radiological Exposure Control Basis: NUREG 0654, Criterion K.5.a SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the procedure for monitoring of personnel County or equipment, controlling the spread of contamination, and identify instruments that are expected to be used for this task. | ||
Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the procedure for monitoring of personnel County or equipment, controlling the spread of contamination, and identify instruments that are expected to be used for this task.STP Units 3 & 4 RAI: Rev 0 Page 10 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Description State/ County STP 037 | STP Units 3 & 4 RAI: Rev 0 Page 10 November 24, 2008 | ||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Description State/ County STP 037 | |||
==Subject:== | ==Subject:== | ||
Radiological Exposure Control Basis: NUREG 0654, Criterion K.5.b SRP Acceptance Criterion: | Radiological Exposure Control Basis: NUREG 0654, Criterion K.5.b SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the procedure for monitoring and County decontamination of persons or equipment and documentation of contamination readings on people or equipment. Also, provide the criteria used to determine when a person should be sent for medical treatment. | ||
Requirement H MCBEMP, Annex W: Provide information that describes the procedure for monitoring and decontamination of persons or equipment and documentation of contamination readings on people or equipment. | STP 038 | ||
Also, provide the criteria used to determine when a person should be sent for medical treatment. | |||
==Subject:== | ==Subject:== | ||
Exercises and Drills Basis: NUREG 0654, Criteria N.2.d and N.2.e SRP Acceptance Criterion: | Exercises and Drills Basis: NUREG 0654, Criteria N.2.d and N.2.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide revised plans that include Texas radiological monitoring drills as required by Planning Standards N.2.d and N.2.e STP 039 | ||
Requirement H TEMP, Annex D: Provide revised plans that include Texas radiological monitoring drills as required by Planning Standards N.2.d and N.2.e STP 039 | |||
==Subject:== | ==Subject:== | ||
Exercises and Drills Basis: NUREG 0654, Criteria N.2.d and N.2.e SRP Acceptance Criterion: | Exercises and Drills Basis: NUREG 0654, Criteria N.2.d and N.2.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a statement in the plan Texas that indicates that objectives will be addressed in the scenario developed for exercises and drills. | ||
Requirement H TEMP, Annex D: Provide a statement in the plan Texas that indicates that objectives will be addressed in the scenario developed for exercises and drills.STP 040 | STP 040 | ||
==Subject:== | ==Subject:== | ||
Radiological Emergency Response Training Basis: NUREG 0654, Criterion O.4.c SRP Acceptance Criterion: | Radiological Emergency Response Training Basis: NUREG 0654, Criterion O.4.c SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information in the plan Texas that will address the scope, nature, and frequency of training for monitoring teams and accident assessment personnel. | ||
Requirement H TEMP, Annex D: Provide information in the plan Texas that will address the scope, nature, and frequency of training for monitoring teams and accident assessment personnel. | STP Units 3 & 4 RAI: Rev 0 Page 11 November 24, 2008 | ||
STP Units 3 & 4 RAI: Rev 0 Page 11 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 042 | |||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 042 | |||
==Subject:== | ==Subject:== | ||
Planning Basis: NUREG 0654, Criterion P.5 SRP Acceptance Criterion: | Planning Basis: NUREG 0654, Criterion P.5 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a list of organizations or Texas individuals to whom the plan and procedures will be distributed and include a statement that indicates that revised pages will be dated and marked to show where changes are made. | ||
Requirement H TEMP, Annex D: Provide a list of organizations or Texas individuals to whom the plan and procedures will be distributed and include a statement that indicates that revised pages will be dated and marked to show where changes are made.STP 043 | STP 043 | ||
==Subject:== | ==Subject:== | ||
Planning Basis: NUREG 0654, Criterion P.6 SRP Acceptance Criterion: | Planning Basis: NUREG 0654, Criterion P.6 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a list-of supporting plans Texas and their source. | ||
Requirement H TEMP, Annex D: Provide a list-of supporting plans Texas and their source.MCBEMP, Annex W: Provide a list Of supporting Matagorda plans and their source. County STP 044 | MCBEMP, Annex W: Provide a list Of supporting Matagorda plans and their source. County STP 044 | ||
==Subject:== | ==Subject:== | ||
Planning Basis: NUREG 0654, Criterion P.7 SRP Acceptance Criterion: | Planning Basis: NUREG 0654, Criterion P.7 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide an updated index of Texas procedures that indicates the section of the plan to be implemented by each procedure and refer to the index in the plan's NUREG-0654 cross-reference. | ||
Requirement H TEMP, Annex D: Provide an updated index of Texas procedures that indicates the section of the plan to be implemented by each procedure and refer to the index in the plan's NUREG-0654 cross-reference. | STP 045 | ||
STP 045 | |||
==Subject:== | ==Subject:== | ||
Planning Basis: NUREG 0654, Criterion P.1 SRP Acceptance Criterion: | Planning Basis: NUREG 0654, Criterion P.1 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information on the Matagorda training program and requirements for emergency County planners that are responsible for the development, maintenance, and distribution of emergency plans. | ||
Requirement H MCBEMP, Annex W: Provide information on the Matagorda training program and requirements for emergency County planners that are responsible for the development, maintenance, and distribution of emergency plans.STP Units 3 & 4 RAI: Rev 0 Page 12 November 24, 2008 FEMA Regisfi VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 046 | STP Units 3 & 4 RAI: Rev 0 Page 12 November 24, 2008 | ||
FEMA Regisfi VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 046 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.10.f SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.10.f SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide details in the county Matagorda plans that describe the decision making process for County administering radioprotective drugs during rapidly developing emergencies. | ||
Requirement H MCBEMP, Annex W: Provide details in the county Matagorda plans that describe the decision making process for County administering radioprotective drugs during rapidly developing emergencies. | STP 047 | ||
STP 047 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J. 10.k SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J. 10.k SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the resources available (manpower and County equipment) for dealing with traffic impediments and rerouting traffic. | ||
Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the resources available (manpower and County equipment) for dealing with traffic impediments and rerouting traffic.STP 048 | STP 048 | ||
==Subject:== | ==Subject:== | ||
Emergency Facilities and Equipment Basis: NUREG 0654, Criterion H.4 SRP Acceptance Criterion: | Emergency Facilities and Equipment Basis: NUREG 0654, Criterion H.4 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide an updated cross- Matagorda reference to include the portions of the county plan County that fully address this planning standard. | ||
Requirement H MCBEMP, Annex W: Provide an updated cross- Matagorda reference to include the portions of the county plan County that fully address this planning standard.STP 049 | STP 049 | ||
==Subject:== | ==Subject:== | ||
Emergency Facilities and Equipment Basis: NUREG 0654, Criterion H. 11 SRP Acceptance Criterion: | Emergency Facilities and Equipment Basis: NUREG 0654, Criterion H. 11 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide references to specific Matagorda procedures or sections of procedures that address this County planning standard. | ||
Requirement H MCBEMP, Annex W: Provide references to specific Matagorda procedures or sections of procedures that address this County planning standard.STP Units 3 & 4 RAI: Rev 0 Page 13 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 050 | STP Units 3 & 4 RAI: Rev 0 Page 13 November 24, 2008 | ||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 050 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J. 10.k SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J. 10.k SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the resources available (manpower and County equipment) for dealing with traffic impediments and rerouting traffic. | ||
Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the resources available (manpower and County equipment) for dealing with traffic impediments and rerouting traffic.STP 051 | STP 051 | ||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.10.1 SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.10.1 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide estimated evacuation Matagorda times for the movement of school children and other County special populations. | ||
Requirement H MCBEMP, Annex W: Provide estimated evacuation Matagorda times for the movement of school children and other County special populations. | STP 052 | ||
STP 052 | |||
==Subject:== | ==Subject:== | ||
Protective Response Basis: NUREG 0654, Criterion J.12 SRP Acceptance Criterion: | Protective Response Basis: NUREG 0654, Criterion J.12 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide a procedure or a Matagorda description in the plan of the method for monitoring, County contamination control, and layout of the reception center. | ||
Requirement H MCBEMP, Annex W: Provide a procedure or a Matagorda description in the plan of the method for monitoring, County contamination control, and layout of the reception center.STP 053 | STP 053 | ||
==Subject:== | ==Subject:== | ||
Planning Basis: NUREG 0654, Criterion P.10 SRP Acceptance Criterion: | Planning Basis: NUREG 0654, Criterion P.10 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Identify the individual, by Matagorda title, which is responsible for performing the review County and update of the county procedures that include the. | ||
Requirement H MCBEMP, Annex W: Identify the individual, by Matagorda title, which is responsible for performing the review County and update of the county procedures that include the.call lists.'STP Units 3 & 4 RAI: Rev 0 Page 14 November 24, 2008 FEMA Region VI Radiological Emergency Preparedness (REP).South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 055 | call lists.' | ||
STP Units 3 & 4 RAI: Rev 0 Page 14 November 24, 2008 | |||
FEMA Region VI Radiological Emergency Preparedness (REP). | |||
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 055 | |||
==Subject:== | ==Subject:== | ||
Exercises and Drills Basis: NUREG 0654, Criterion N.2.c SRP Acceptance Criterion: | Exercises and Drills Basis: NUREG 0654, Criterion N.2.c SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda addresses the items outlined in Guidance County Memorandum (GM) MS-i, Medical Services. | ||
Requirement H MCBEMP, Annex W: Provide information that Matagorda addresses the items outlined in Guidance County Memorandum (GM) MS-i, Medical Services.STP Units 3 & 4 RAI: Rev 0 Page 15 November 24, 2008}} | STP Units 3 & 4 RAI: Rev 0 Page 15 November 24, 2008}} |
Latest revision as of 11:24, 14 November 2019
ML083510257 | |
Person / Time | |
---|---|
Site: | South Texas ![]() |
Issue date: | 11/24/2008 |
From: | US Dept of Homeland Security, Federal Emergency Management Agency |
To: | Office of Nuclear Security and Incident Response, South Texas |
Moody R , NSIR/DPR 415-1737 | |
References | |
Download: ML083510257 (15) | |
Text
FEMA Region VI Radiological Emergency Preparedness (REP).
-_____ South Texas Project (REP) Combined License Review State/ County RAI Number RAI Description STP 001
Subject:
Primary and support roles for response organizations Basis: NUREG 0654, Criterion C. .a SRP Acceptance Criterion: Requirement H Texas Emergency Management Plan (TEMP), Annex Texas D, Tab 1: Identify or provide clear references to the, key official(s) authorized to request Federal assistance.
STP 002
Subject:
Primary and support roles for response organizations Basis: NUREG 0654, Criterion C. 1.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide an estimated time of Texas arrival for federal assets that may be requested, either directly.or through mutual assistance plans, such as SMRAP, during an emergency.
STP 003
Subject:
Primary and support roles for response organizations Basis: NUREG 0654, Criterion C.l.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide capabilities and Texas availability of the primary laboratory in the plan and an updated cross-reference in Tab 5 of Annex D to indicate the location of the information.
STP Units 3 & 4 RAI: Rev 0 Page I November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/County STP 006
Subject:
Primary and support roles for response organizations Basis: NUREG 0654, Criterion E.7 SRP Acceptance Criterion: Requirement H Texas TEMP, Annex D: Provide details related to the drafting of information or provide draft messages that would inform the public of protective actions consistent with the applicant's classification scheme.
If this information is present in the current plan provided with this application, provide an appropriately updated cross-reference that indicates the location of the information.
STP 007
Subject:
Public Education and Information Basis: NUREG 0654, Criterion G. 1 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information regarding the dissemination of information to the public concerning Texas notification, protective actions, and special needs.
populations and indicate by what method the information may be disseminated.
STP 008
Subject:
Public Education and Information Basis: NUREG 0654, Criterion G. 1 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Include a statement that describes Texas who supplies information to the transient populations and the method for distribution of the information in the plan.
STP Units 3 &84 RAI: Rev 0 Page 2 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 009
Subject:
Emergency Facilities and Equipment Texas Basis: NUREG 0654, Criterion H. 10 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Specify frequency of operational checks of instrumentation in plans and/or implementing procedures or provide appropriate cross-reference location. Identify reserve equipment that will be used to supplement equipment that is out of calibration.
STP 010
Subject:
Protective Response Basis: NUREG 0654, Criterion J.9 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a statement of the method Texas by which PARs will be provided to local decision makers. Clarify the organization that is responsible for decision making for the ingestion exposure pathway.
Describe the process and timeframe for making initial Matagorda PADs. County STP Units 3 & 4 RAI: Rev 0 Page 3 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 011
Subject:
Protective Response I Texas Basis: NUREG 0654, Criterion J.10.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Identify a specific quantity of KI as well as a method and location for storage and distribution of KI. The process for notification of counties regarding the decision to authorize the use of KI for emergency workers and institutionalized individuals should be clearly stated in the plan.
Include a trigger point for issuing authorization of KI for the institutionalized and other members of the public who cannot be evacuated. This trigger point should be consistent with current federal guidance for members of the public.
Matagorda County Basic Emergency Management Matagorda Plan (MCBEMP), Annex W: Identify a specific County quantity of KI necessary to supply the county emergency workers as well as a method and location for storage and distribution of KI. Indicate the means by which the county receives notification from the state.
STP 012
Subject:
Radiological Emergency Response Training Basis: NUREG 0654, Criterion O.4.d, O.4.f, 0.4.g.
O.4.h, 0.4.j SRP Acceptance Criterion: Requirement H Texas TEMP, Annex D: Provide information in the plan that will address the scope, nature, and frequency of training for the applicable elements of Planning Standard 0.4. Provide more specific references with regard to the response specific training that is in accordance with referenced NRP guidelines.
MCBEMP, Annex W Include appropriate sections of Matagorda the plan that address the scope, nature, and frequency County of training in the plan cross-reference.
STP Units 3 & 4 RAI: Rev 0 Page 4 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 013
Subject:
Emergency Communications Basis: NUREG 0654, Criterion F. 1.d SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide clear descriptions of the Texas provisions for communication with the applicant. Update the plan cross-reference to remove references to Section V of Procedure 13 and include other references which may be applicable.
Matagorda MCBEMP, Annex W: Provide a clear description of the communication system that will be used by the county to County communicate with the EOF.
STP 014
Subject:
Emergency Communications Basis: NUREG 0654, Criterion F. 1.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Indicate in the plan cross- Texas reference the portions of the plan that address primary and back-up methods for alerting and activating emergency personnel.
STP 015
Subject:
Emergency Communications Basis: NUREG 0654, Criterion F.2 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide reference to primary and Texas back-up communication methods with medical support facilities.
MCBEMP, Annex W: Provide updates to the county Matagorda plan with corrected lettering in referenced section of County the plan and update the cross-reference accordingly.
STP Units 3 & 4 RAI: Rev 0 Page 5 November 24, 2008
tEMA Regiofi VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 016
Subject:
Radiological Exposure Control Basis: NUREG 0654, Criterion K.3.a SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information in plans or Texas procedures that indicate quantities and storage locations for dosimetry (both permanent record and self-reading).
MCBEMP, Annex W: Identify a reference to state guidelines that specify frequencies at which Matagorda dosimeters will be read. Provide details regarding the County quantities of dosimetry that should be maintained and locations where dosimeters will be stored (both permanent record and self-reading).
STP 017
Subject:
Radiological Exposure Control Basis: NUREG 0654, Criterion K.3.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide specific requirements on Texas specific time intervals in which dosimeters must be read.
MCBEMP, Annex W: Indicate the location of the Matagorda specific state guidance that the county will use for County reading and recording dosimeters STP 020
Subject:
Medical and Public Health Support Basis: NUREG 0654, Criterion L.4 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide references to the plans or Texas procedures which describe the provisions for transporting radiologically contaminated injured individuals.
STP Units 3 & 4 RAI: Rev 0 Page 6 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 022
Subject:
Exercises and Drills Basis: NUREG 0654, Criteria N.3.c,N.3.d, N.3.e, N.3.f SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a statement in the plan Texas that indicates that simulated events, exercise timelines, and narrative summaries will be addressed in the scenario developed for exercises and drills. In addition, provide a statement that advanced materials will be provided to official observers.
STP 024
Subject:
Public Education and Information Basis: NUREG 0654, Criterion G.4.c SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide an update to the cross- Texas reference to include the section of the plan that indicates what organization is responsible for answering public inquiries and the method for contacting that organization.
STP 025
Subject:
Public Education and Information Basis: NUREG 0654, Criterion G.5 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information describing Texas the State's participation in providing training to the media on emergency plans, radiation, and points of contact for emergency public information.
STP Units 3 & 4 RAI: Rev 0 Page 7 November 24, 2008
FEMA Regiofi VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 027
Subject:
Accident Assessment Basis: NUREG 0654, Criterion 1.11 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information that clearly Texas states if the state will take peak plume measurements or will rely on the applicant or federal resources to get these measurements. Any written agreements that are in place with regard to taking these measurements should also be provided.
STP 028
Subject:
Protective Response Basis: NUREG 0654, Criterion J.10.a SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide maps that identify Matagorda locations of reception centers and shelters and specify County the frequency at which all maps included in the plan are to be updated.
STP 029
Subject:
Protective Response Basis: NUREG 0654, Criterion J.10.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a map from current Texas census data that identifies special populations such as day care facilities and schools.
MCBEMP, Annex W: Update cross reference to Matagorda include references to maps that identify special County populations.
STP Units 3 & 4 RAI: Rev 0 Page 8 November 24, 2008
FEMA Regioh VI.
Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 030
Subject:
Protective Response Basis: NUREG 0654, Criterion J.10.b SRP Acceptance Criterion: Requirement H TEMP, Annex D: This RAI is identical to those Texas.
provided for standards E.6 and E.7. Provide information that establishes administrative and physical means and the time required to notify and provide prompt instruction to the public within the plume exposure pathway EPZ. Also, Provide details related to the drafting of information or provide draft messages that would inform the public of protective actions consistent with the applicant's classification scheme. If this information is present in the current plan provided with this application, provide an appropriately updated cross-reference that indicates the location of the information.
STP 031
Subject:
Protective Response Basis: NUREG 0654, CriterionJ.10.d SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information or Matagorda appropriate cross-reference in the county plan County describing protective measures such as the method for alerting, providing emergency information, and transporting mobility dependent or impaired individuals from schools, hospitals, and prisons.
STP 033
Subject:
Protective Response Basis: NUREG 0654, Criterion J.10.j SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide references to the ETE Texas study, which includes potential need for alternate routs, in the state plan.
Matagorda MCBEMP, Annex W: Provide information that County describes the equipment and resources that will be utilized to set up traffic control points.
STP Units 3 & 4 RAI: Rev 0 Page 9 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 034
Subject:
Protective Response Basis: NUREG 0654, Criterion J. 11 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Identify the individual, by title or Texas position that is authorized to make ingestion phase PADs. Provide information that describes how agribusiness will be notified of PADs. Include appropriate references in the cross-reference that describe the method for identifying areas of concern where sampling and monitoring should occur.
STP 035
Subject:
Radiological Exposure Control Basis: NUREG 0654, Criterion K.4 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information or a Texas reference to the information that describes the risk to emergency workers who volunteer to exceed .dose limits as well as limits for special conditions such as a pregnant emergency worker.
MCBEMP, Annex W: Provide information Matagorda describing the actions to be taken when an County emergency worker exceeds exposure limits as well as information regarding the risk for those emergency workers who volunteer to receive higher exposures.
STP 036
Subject:
Radiological Exposure Control Basis: NUREG 0654, Criterion K.5.a SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the procedure for monitoring of personnel County or equipment, controlling the spread of contamination, and identify instruments that are expected to be used for this task.
STP Units 3 & 4 RAI: Rev 0 Page 10 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Description State/ County STP 037
Subject:
Radiological Exposure Control Basis: NUREG 0654, Criterion K.5.b SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the procedure for monitoring and County decontamination of persons or equipment and documentation of contamination readings on people or equipment. Also, provide the criteria used to determine when a person should be sent for medical treatment.
STP 038
Subject:
Exercises and Drills Basis: NUREG 0654, Criteria N.2.d and N.2.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide revised plans that include Texas radiological monitoring drills as required by Planning Standards N.2.d and N.2.e STP 039
Subject:
Exercises and Drills Basis: NUREG 0654, Criteria N.2.d and N.2.e SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a statement in the plan Texas that indicates that objectives will be addressed in the scenario developed for exercises and drills.
STP 040
Subject:
Radiological Emergency Response Training Basis: NUREG 0654, Criterion O.4.c SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide information in the plan Texas that will address the scope, nature, and frequency of training for monitoring teams and accident assessment personnel.
STP Units 3 & 4 RAI: Rev 0 Page 11 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 042
Subject:
Planning Basis: NUREG 0654, Criterion P.5 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a list of organizations or Texas individuals to whom the plan and procedures will be distributed and include a statement that indicates that revised pages will be dated and marked to show where changes are made.
STP 043
Subject:
Planning Basis: NUREG 0654, Criterion P.6 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide a list-of supporting plans Texas and their source.
MCBEMP, Annex W: Provide a list Of supporting Matagorda plans and their source. County STP 044
Subject:
Planning Basis: NUREG 0654, Criterion P.7 SRP Acceptance Criterion: Requirement H TEMP, Annex D: Provide an updated index of Texas procedures that indicates the section of the plan to be implemented by each procedure and refer to the index in the plan's NUREG-0654 cross-reference.
STP 045
Subject:
Planning Basis: NUREG 0654, Criterion P.1 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information on the Matagorda training program and requirements for emergency County planners that are responsible for the development, maintenance, and distribution of emergency plans.
STP Units 3 & 4 RAI: Rev 0 Page 12 November 24, 2008
FEMA Regisfi VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 046
Subject:
Protective Response Basis: NUREG 0654, Criterion J.10.f SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide details in the county Matagorda plans that describe the decision making process for County administering radioprotective drugs during rapidly developing emergencies.
STP 047
Subject:
Protective Response Basis: NUREG 0654, Criterion J. 10.k SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the resources available (manpower and County equipment) for dealing with traffic impediments and rerouting traffic.
STP 048
Subject:
Emergency Facilities and Equipment Basis: NUREG 0654, Criterion H.4 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide an updated cross- Matagorda reference to include the portions of the county plan County that fully address this planning standard.
STP 049
Subject:
Emergency Facilities and Equipment Basis: NUREG 0654, Criterion H. 11 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide references to specific Matagorda procedures or sections of procedures that address this County planning standard.
STP Units 3 & 4 RAI: Rev 0 Page 13 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 050
Subject:
Protective Response Basis: NUREG 0654, Criterion J. 10.k SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda describes the resources available (manpower and County equipment) for dealing with traffic impediments and rerouting traffic.
STP 051
Subject:
Protective Response Basis: NUREG 0654, Criterion J.10.1 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide estimated evacuation Matagorda times for the movement of school children and other County special populations.
STP 052
Subject:
Protective Response Basis: NUREG 0654, Criterion J.12 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide a procedure or a Matagorda description in the plan of the method for monitoring, County contamination control, and layout of the reception center.
STP 053
Subject:
Planning Basis: NUREG 0654, Criterion P.10 SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Identify the individual, by Matagorda title, which is responsible for performing the review County and update of the county procedures that include the.
call lists.'
STP Units 3 & 4 RAI: Rev 0 Page 14 November 24, 2008
FEMA Region VI Radiological Emergency Preparedness (REP).
South Texas Project (REP) Combined License Review RAI Number RAI Description State/ County STP 055
Subject:
Exercises and Drills Basis: NUREG 0654, Criterion N.2.c SRP Acceptance Criterion: Requirement H MCBEMP, Annex W: Provide information that Matagorda addresses the items outlined in Guidance County Memorandum (GM) MS-i, Medical Services.
STP Units 3 & 4 RAI: Rev 0 Page 15 November 24, 2008