CP-200900615, Transmittal of Year 2008 Radioactive Effluent Release Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Rafael Flores Senior Vice President& Chief Nuclear Officer Rafael.flores  
{{#Wiki_filter:Rafael Flores                           Luminant Power Senior Vice President                   P 0 Box 1002
@ Luminant.com Luminant Power P 0 Box 1002-6322 North FM 56 Glen Rose, TX 76043 Lum inant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-200900615
                                                                & Chief Nuclear Officer               -6322 North FM 56 Rafael.flores @ Luminant.com           Glen Rose, TX 76043 Lum inant                                                                                               T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-200900615                                                                             Ref. # Tech. Spec. 5.6.3'
'Log # TXX-09066 Ref. # Tech. Spec. 5.6.3'April 30, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555  
  'Log # TXX-09066 April 30, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF YEAR 2008 RADIOACTIVE EFFLUENT RELEASE REPORT  
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF YEAR 2008 RADIOACTIVE EFFLUENT RELEASE REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Comanche Peak Steam Electric Station Unit 1 and 2 Technical specifications (TS) 5.6.3 and Section 6.9.1.4 of the Comanche Peak Offsite Dose Calculation Manual (ODCM), enclosed is the Radioactive Effluent Release Report which covers the reporting period from January 1, 2008 through December 31, 2008.The tabular summaries of radioactive liquid and gaseous releases are provided in the format defined in Appendix B of Regulatory Guide 1.21, Rev. 1, dated June, 1974.During this reporting period there was one revision to the ODCM. This revision is discussed in the report and is denoted by change bars in the copy of the ODCM provided in Enclosure 2.If there are any questions regarding this' report, please contact Steve Dixon at (254) 897-5482 or Terry Marsh at (254) 897-8222.Sincerely, Luminant Generation Company LLC Rafael Flores By: &2(7 Fred W. Madden Director, Oversight  
 
& Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak
In accordance with Comanche Peak Steam Electric Station Unit 1 and 2 Technical specifications (TS) 5.6.3 and Section 6.9.1.4 of the Comanche Peak Offsite Dose Calculation Manual (ODCM), enclosed is the Radioactive Effluent Release Report which covers the reporting period from January 1, 2008 through December 31, 2008.
The tabular summaries of radioactive liquid and gaseous releases are provided in the format defined in Appendix B of Regulatory Guide 1.21, Rev. 1, dated June, 1974.
During this reporting period there was one revision to the ODCM. This revision is discussed in the report and is denoted by change bars in the copy of the ODCM provided in Enclosure 2.
If there are any questions regarding this' report, please contact Steve Dixon at (254) 897-5482 or Terry Marsh at (254) 897-8222.
Sincerely, Luminant Generation Company LLC Rafael Flores By:         &2(7 Fred W. Madden Director, Oversight & Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance i~J4~I Callaway Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde -San Onofre
* Palo Verde - San Onofre
* South Texas Project Wolf Creek i~J4~I~A~LQ~
* South Texas Project     Wolf Creek
U. S. Nuclear Regulatory Commission TXX-09066 Page 2 04/30/2009 Enclosures  
                                                                                                                              ~A~LQ~
-1. 2008 Radiological Effluent Release Report 2. Comanche Peak Steam Electric Station Offsite Dose Calculation Manual (ODCM)Unit 1 and 2, Revision 28 c -E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak (w/o Encl 2)}}
 
U. S. Nuclear Regulatory Commission TXX-09066 Page 2 04/30/2009 Enclosures         -       1. 2008 Radiological Effluent Release Report
: 2. Comanche Peak Steam Electric Station Offsite Dose Calculation Manual (ODCM)
Unit 1 and 2, Revision 28 c-         E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak (w/o Encl 2)}}

Latest revision as of 07:08, 14 November 2019

Transmittal of Year 2008 Radioactive Effluent Release Report
ML091280373
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/30/2009
From: Flores R, Madden F
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-200900615, TXX-09066, FOIA/PA-2009-0260
Download: ML091280373 (2)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer -6322 North FM 56 Rafael.flores @ Luminant.com Glen Rose, TX 76043 Lum inant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-200900615 Ref. # Tech. Spec. 5.6.3'

'Log # TXX-09066 April 30, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF YEAR 2008 RADIOACTIVE EFFLUENT RELEASE REPORT

Dear Sir or Madam:

In accordance with Comanche Peak Steam Electric Station Unit 1 and 2 Technical specifications (TS) 5.6.3 and Section 6.9.1.4 of the Comanche Peak Offsite Dose Calculation Manual (ODCM), enclosed is the Radioactive Effluent Release Report which covers the reporting period from January 1, 2008 through December 31, 2008.

The tabular summaries of radioactive liquid and gaseous releases are provided in the format defined in Appendix B of Regulatory Guide 1.21, Rev. 1, dated June, 1974.

During this reporting period there was one revision to the ODCM. This revision is discussed in the report and is denoted by change bars in the copy of the ODCM provided in Enclosure 2.

If there are any questions regarding this' report, please contact Steve Dixon at (254) 897-5482 or Terry Marsh at (254) 897-8222.

Sincerely, Luminant Generation Company LLC Rafael Flores By: &2(7 Fred W. Madden Director, Oversight & Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance i~J4~I Callaway Comanche Peak

  • Diablo Canyon
  • Palo Verde - San Onofre
  • South Texas Project Wolf Creek

~A~LQ~

U. S. Nuclear Regulatory Commission TXX-09066 Page 2 04/30/2009 Enclosures - 1. 2008 Radiological Effluent Release Report

2. Comanche Peak Steam Electric Station Offsite Dose Calculation Manual (ODCM)

Unit 1 and 2, Revision 28 c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak (w/o Encl 2)