| {{#Wiki_filter:State of Nefv jrrorg DEPARTMENT OF ENVIRONMENTAL PROTECTION CHRIS CHRISTIE Division of Environmental Safety and Health BOB MARTIN Governor Radiation Protection and Release Prevention Element Commissioner KIM GUADAGNO Bureau of Nuclear Engineering Lt. Governor' P. 0. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 Aprili9, 2010 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 | | {{#Wiki_filter:State of Nefv jrrorg DEPARTMENT OF ENVIRONMENTAL PROTECTION CHRIS CHRISTIE Division of Environmental Safety and Health BOB MARTIN Governor Radiation Protection and Release Prevention Element Commissioner KIM GUADAGNO Bureau of Nuclear Engineering Lt. Governor' P. 0. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 Aprili9, 2010 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 |
|
| |
|
| ==Dear Commissioners:== | | ==Dear Commissioners:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| . | | . Hope Creek Generating Station Docket No. 50-354 License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies (Isotope Generation Pilot Program) |
| Hope Creek Generating Station Docket No. 50-354 License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies (Isotope Generation Pilot Program)PSEG Nuclear LLC submitted the proposed change to the Hope Creek Operating License by letter to the NRC dated December 21, 2009. The proposed change modifies License Condition 2.B.(6) and creates new License Conditions 1 .J and 2.B.(7) as part of a pilot programto irradiate Cobalt (Co)-59 targets to produce Co-60 in the Hope. Creek reactor during power operation. | | PSEG Nuclear LLC submitted the proposed change to the Hope Creek Operating License by letter to the NRC dated December 21, 2009. The proposed change modifies License Condition 2.B.(6) and creates new License Conditions 1.J and 2.B.(7) as part of a pilot programto irradiate Cobalt (Co)-59 targets to produce Co-60 in the Hope. Creek reactor during power operation. |
| The NJ DEP met with PSEG personnel and management responsible for this program to better understand the changes involved. | | The NJ DEP met with PSEG personnel and management responsible for this program to better understand the changes involved. We will review the results of the cycle specific analyses that have not been completed and are committed to be provided by July 8,2010. We also recommend that the following sentence be added to the proposed revision to Technical Specification Section 5.3.1 for completeness: Details of the GE14i assemblies are contained in NEDC-33529P, "Safety Analysis Report to Support Introduction of GE l4i Isotope Test Assemblies (ITAs) in Hope Creek Generating Station," Revision 0, dated* December 200.9. |
| We will review the results of the cycle specific analyses that have not been completed and are committed to be provided by July 8,2010. We also recommend that the following sentence be added to the proposed revision to Technical Specification Section 5.3.1 for completeness: | | If you need to. discuss this subject further,,please contact Elliot Rosenfeld at (609),984-7548., |
| Details of the GE14i assemblies are contained in NEDC-33529P, "Safety Analysis Report to Support Introduction of GE l4i Isotope Test Assemblies (ITAs) in Hope Creek Generating Station," Revision 0, dated* December 200.9.If you need to. discuss this subject further,,please contact Elliot Rosenfeld at (609),984-7548.,-..,Sincerely, Patrick Mulligan, Manager Bureau of Nuclear Engineering New Jersey is an Equal Opportunity Employer i Printed on Recycled Paper and Recyclable Distribution Dr. Jill Lipoti, DEP Paul Baldauf, DEP Elliot Rosenfeld, DEP Nancy McNamara, NRC Region 1 Rick Ennis, NRC Licensing Project Manager Christine Neely, Director -Regulatory Assurance, PSEG Nuclear LLC Michael Gaffney, Regulatory Assurance Manager, Hope Creek Generating Station}} | | - ..,Sincerely, Patrick Mulligan, Manager Bureau of Nuclear Engineering New Jersey is an Equal OpportunityEmployer i Printedon Recycled Paperand Recyclable |
| | |
| | Distribution Dr. Jill Lipoti, DEP Paul Baldauf, DEP Elliot Rosenfeld, DEP Nancy McNamara, NRC Region 1 Rick Ennis, NRC Licensing Project Manager Christine Neely, Director - Regulatory Assurance, PSEG Nuclear LLC Michael Gaffney, Regulatory Assurance Manager, Hope Creek Generating Station}} |
Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARRS-09-074, License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies2009-06-26026 June 2009 License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Project stage: Request ML1013903182009-11-15015 November 2009 Calculation 80096650, Revision 0, Leakage Reduction Program Calculation, Attachment 6 to LR-N10-0163 Project stage: Request RS-09-171, Supplemental Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Lsotope Test Assemblies2009-12-14014 December 2009 Supplemental Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Lsotope Test Assemblies Project stage: Supplement ML0936401982009-12-21021 December 2009 Hope Creek Generating Station - License Amendment Request Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Other LR-N09-0290, NEDO-33529, Rev. 0, Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (Itas) in Hope Creek Generating Station2009-12-31031 December 2009 NEDO-33529, Rev. 0, Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (Itas) in Hope Creek Generating Station Project stage: Request ML1002800042010-01-28028 January 2010 Acceptance Review for TAC ME2949 - Hope Creek - License Amendment Request Regarding Use of ITAs for Cobalt-60 Production Project stage: Acceptance Review ML1002907322010-01-28028 January 2010 Draft Request for Additional Information Project stage: Draft RAI ML1002607732010-02-0404 February 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML1009205472010-03-16016 March 2010 Comment (1) of William E. Morris on Pseg'S Plan to Produce Cobalt-60 Which Can Be Used to Promote and Maintain Human Health Project stage: Request ML1009205482010-03-25025 March 2010 Comment (2) of William H. Day Supporting Proposal to Produce Cobalt-60 at Hope Creek Project stage: Request ML1009205492010-03-26026 March 2010 Comment (4) of David A. Lochbaum on Behalf of Union of Concerned Scientists on the Proposal of PSEG to Load Cobalt-60 Producing Rods in Reactor Core at Hope Creek Project stage: Request ML1009701262010-03-31031 March 2010 Comment (3) of 243 Individuals Regarding Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Project stage: Request ML1009500372010-04-0101 April 2010 Comment (5) of Leigh Davis, Dena Jaborska, Wenonah Hauter, Amy Goldsmith, Jeff Tittel, William Kibler, Jennifer Coffey & Norm Cohen on Behalf of Food & Water Watch Opposing Proposal of PSEG to Start a Pilot Project to Produce Cobalt-60 at H Project stage: Request ML1009904032010-04-0808 April 2010 Draft Request for Additional Information Project stage: Draft RAI ML1011701132010-04-0909 April 2010 License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies Project stage: Request LR-N10-0163, Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-05-11011 May 2010 Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Response to RAI ML1013303612010-06-0303 June 2010 Letter Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N10-0210, Response to Request for Additional Information, License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies2010-06-10010 June 2010 Response to Request for Additional Information, License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies Project stage: Response to RAI LR-N10-0217, Supplemental Safety Analysis Report Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-06-24024 June 2010 Supplemental Safety Analysis Report Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Supplement ML1017600102010-06-24024 June 2010 Draft Request for Additional Information Project stage: Draft RAI ML1016600492010-07-0202 July 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML1018303302010-07-14014 July 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N10-0289, Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-07-28028 July 2010 Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Response to RAI ML1024400262010-08-18018 August 2010 Letter in Regard to License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies (Isotope Generation Pilot Program) Project stage: Request ML1023903302010-09-0909 September 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML1023903432010-09-0909 September 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N10-0341, Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-09-10010 September 2010 Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Supplement LR-N10-0357, Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-09-17017 September 2010 Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Supplement ML1027100322010-09-28028 September 2010 Transmittal of Draft Safety Evaluation for Proposed Amendment Use of Isotope Test Assemblies for Cobalt-60 Production Project stage: Draft Approval ML1027002712010-10-0707 October 2010 License Amendment, Use of Isotope Test Assemblies for Cobalt-60 Production Project stage: Acceptance Review ML1027101562010-10-0707 October 2010 Safety Evaluation, Related to Amendment No. 184 to Facility Operating License No. NPF-057 Project stage: Approval 2010-04-08
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary 2024-09-05
[Table view] |
Text
State of Nefv jrrorg DEPARTMENT OF ENVIRONMENTAL PROTECTION CHRIS CHRISTIE Division of Environmental Safety and Health BOB MARTIN Governor Radiation Protection and Release Prevention Element Commissioner KIM GUADAGNO Bureau of Nuclear Engineering Lt. Governor' P. 0. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 Aprili9, 2010 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Commissioners:
Subject:
. Hope Creek Generating Station Docket No. 50-354 License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies (Isotope Generation Pilot Program)
PSEG Nuclear LLC submitted the proposed change to the Hope Creek Operating License by letter to the NRC dated December 21, 2009. The proposed change modifies License Condition 2.B.(6) and creates new License Conditions 1.J and 2.B.(7) as part of a pilot programto irradiate Cobalt (Co)-59 targets to produce Co-60 in the Hope. Creek reactor during power operation.
The NJ DEP met with PSEG personnel and management responsible for this program to better understand the changes involved. We will review the results of the cycle specific analyses that have not been completed and are committed to be provided by July 8,2010. We also recommend that the following sentence be added to the proposed revision to Technical Specification Section 5.3.1 for completeness: Details of the GE14i assemblies are contained in NEDC-33529P, "Safety Analysis Report to Support Introduction of GE l4i Isotope Test Assemblies (ITAs) in Hope Creek Generating Station," Revision 0, dated* December 200.9.
If you need to. discuss this subject further,,please contact Elliot Rosenfeld at (609),984-7548.,
- ..,Sincerely, Patrick Mulligan, Manager Bureau of Nuclear Engineering New Jersey is an Equal OpportunityEmployer i Printedon Recycled Paperand Recyclable
Distribution Dr. Jill Lipoti, DEP Paul Baldauf, DEP Elliot Rosenfeld, DEP Nancy McNamara, NRC Region 1 Rick Ennis, NRC Licensing Project Manager Christine Neely, Director - Regulatory Assurance, PSEG Nuclear LLC Michael Gaffney, Regulatory Assurance Manager, Hope Creek Generating Station