=Text=
=Text=
{{#Wiki_filter:O Westinghouse Westinghouse Non-Proprietary Class 3 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -System Design Specification WNA-DS-01667-WBT-NP, Rev. 1 June 2010 APPROVALS Function Name and Signature Author Digish R. Shah*Engineer, Operating Plant Safety System 1 Reviewer Allen C. Denyer*Principal Engineer, Operating Plant Safety System 1 David R. Ellis, Jr.*
{{#Wiki_filter:(8 O Westinghouse Westinghouse Westinghouse      Non-Proprietary Class 3 Westinghouse Non-Proprietary RRAS Watts Bar 2 NSSS              NSSS Completion Completion Program I&C Projects Post Accident Accident Monitoring    Monitoring System --. System                            System Design Specification  Specification WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP,              .
Project Manager, Common Q PAMS Approver Mesut B. Uzman*Product Manager, FPGA Platform Engineering
Rev. I1 June 2010 2010 APPROVALS Function Function                                      Name N arne and Signature Author              Digish R. Shah*
& Systems*Electronically approved records are authenticated in the electronic document management system.© 2010 Westinghouse Electric Company LLC All Rights Reserved (8 Westinghouse Westinghouse Non-Proprietary Class 3 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -. System Design Specification WNA-DS-01667-WBT-NP . , Rev. I June 2010 APPROVALS Function N arne and Signature Author Digish R. Shah* Engineer, Operating Plant Safety System 1 Reviewer Allen C. Denyer* Principal Engineer, Operating Plant Safety System 1 David R. Ellis, Jr.
Engineer, Operating Operating Plant Safety System System 11 Reviewer Reviewer            Allen C. Denyer*
* Project Manager, Common Q P AMS Approver Mesut B. Uzman* Product Manager, FPGA Platfonn Engineering
Principal Engineer, Operating Operating Plant Safety System System 11 David R. Ellis, Jr.*
& Systems *Electronically approved records are authenticated in the electronic document management system. © 2010 Westinghouse Electric Company LLC All Rights Reserved Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects LIST OF CONTRIBUTORS Document Number Revision Name and Title WNA-DS-01667-WBT A Shawn M. Downey Principal Engineer, I&C BOP Safety & Display Systems WNA-DS-01667-WBT A, 0, 1. Jenna L. TygerEditorial Specialist, Technical Communications WNA-DS-01667-WBT-NP I Jenna L. Tyger Editorial Specialist, Technical Communications Template Version 2.0 WNA-DS-01667-WBT-NP, Rev. 1 i RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System Design Specification LIST OF CONTRIBUTORS Document Number Revision Name and Title WNA-DS-01667-WBT A Shawn M. Downey Principal Engineer, I&C BOP Safety & Display Systems WNA-DS-01667-WBT A, 0,1. Jenna L. Tyger Editorial Specialist, Technical Communications WNA-DS-OI667-WBT-NP 1 Jenna L. Tyger Editorial Specialist Technical Communications Template Version 2.0 WNA-DS-01667-WBT-NP, Rev. 1 Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects REVISION HISTORYRECORD OF CHANGES Document Number Revision Author Description Completed WNA-DS- A Digish R. Shah Draft created for customer review and 06/09 01667-WBT comments WNA-DS- 0 Digish R. Shah Original Issue 08/09 01667-WBT WNA-DS-01667-WBT 1 Digish R. Shah a,c 01/10WNA-DS-01667-WBT-NP, Rev.
Jr.
1 ii RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -System Design Specification REVISION HISTORY RECORD OF CHANGES Document Number Revision Author Description Completed WNA-DS-A Digish R. Shah Draft created for customer review and 06/09 01667-WBT comments WNA-DS-0 Digish R. Shah Original Issue 08/09 01667-WBT WNA-DS-1 Digish R. Shah r-a, 01110 01667-WBT WNA-DS-01667-WBT-NP, Rev. 1 ii Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Document Number Revision Author Description a,c Completed WNA-DS- 1 Added brackets to indicate Proprietary See 01667-WBT-NP Information.
* Manager, Common Q Project Manager,              Q PPAMS AMS Approver Approver            Mesut B. Uzman*
EDMS Deleted References 8 and 9.DOCUMENT TRACEABILITY
Product Manager, Product Manager, FPGA FPGA Platform      Engineering &
& COMPLIANCE Created to Support the Following Document(s)
Platfonn Engineering      Systems
Document Number Post Accident Monitoring System -System Requirements Specifications W)NA-DS-01617-WBT OPEN ITEMS Item Description Status I None WNA-DS-01667-WBT-NP, Rev. 1 iii RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -
                                                                            & Systems
  *Electronically approved records
  *Electronically approved        are authenticated records are authenticated inin the  electronic document the electronic  document management  system.
management system.
                              © 2010 Westinghouse Westinghouse Electric Electric Company Company LLC LLC All All Rights Reserved
 
Post Accident Monitoring    System -
Monitoring System-RRAS Watts Bar 2 NSSS Completion Program Program I&C Projects                                          Specification System Design Specification LIST OF CONTRIBUTORS CONTRIBUTORS Document Number        Revision                              Name and Title WNA-DS-01667-WBT WNA-DS-01667-WBT            A        Shawn M. Downey Principal Engineer, I&C BOP Safety Principal                      Safety & Display Systems Systems WNA-DS-01667-WBT WNA-DS-01667-WBT        A, 0,  1.
0,1. Jenna L. Tyger Jenna    Tyger Editorial Specialist, Technical Communications Technical Communications WNA-DS-01667-WBT-NP WNA-DS-OI667-WBT-NP          1I      Jenna Jenna L. Tyger Tyger Editorial Specialist, Technical Editorial Specialist  Technical Communications Template Version 2.0 2.0 WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                              i
 
Post Accident Accident Monitoring Monitoring System System -
RRAS Watts RRAS Watts Bar Bar 22 NSSS NSSS Completion Completion Program Program I&C I&C Projects                    System
 
===System Design===
Design Specification Specification REVISION HISTORY REVISION RECORD RECORD OF OF CHANGES CHANGES Document Document Number Number        Revision Revision      Author Author                    Description Description                    Completed Completed WNA-DS-WNA
[As per TVA requirement, the two cabinets for Train A and Train B shall be numbered 2-R-179 and 2-R-180 respectively.]
[As per TVA requirement, the two cabinets for Train A and Train B shall be numbered 2-R-179 and 2-R-180 respectively.]
4.3 MTP/OM CONFIGURATION SDS4.3-1 a,c [ ] R4.3-1 a,c [ ] 4.3.1 Keylock Switches SDS4.3.1-1 a,c I[ ] SDS4.3.1-2 a,c [ ] R4.3.1-1 a,c [ ] R4.3.1-2 a,c WNA-DS-01667-WBT-NP, Rev. 1 4-11 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -System Design Specification R4.3.1-3 I a,c I WNA-DS-01667-WBT-NP, Rev. 1 4-12 Post Accident Monitoring System -RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification
4.3       MTP/OM CONFIGURATION CONFIGURATION SDS4.3-1 SDS4.3-1                                                                                                 a,c a,c
[ ] R4.3.1-3 a,c [ ] WNA-DS-01667-WBT-NP, Rev. 1 4-12 I Post Accident Monitoring System -RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification 4.4 HARDWARE DESCRIPTION R4.4-1[The Common Qualified Platform (Common Q) line of qualified hardware shall be used to implement theWatts Bar Unit 2 PAMS subsystems, cabinets, cablings, and other related equipment.]As appropriate, additional detailed hardware design requirement documents are provided for individualhardware components.
[ R4.3-1
4.4.1 Common Q Qualified Hardware The following standard Common Q hardware is used for the Watts Bar Unit 2 PAMS: " Cabinet* AC160 Modules* F0 Termination Units* FPD System" Power Supply System 4.4.1.1 Cabinet R4.4.1.1-1
                                                                                                            ]
[A Westinghouse standard nuclear grade instrumentation and control (I&C) cabinet, Reference 10, shall be used for the Watts Bar Unit 2 PAMS. (SysRSR3.1.1-3), (SysRSR3.1.6-1)]
a,c a,c
4.4.1.2 AC160 Modules SDS4.4.1.2-1 a,c K SDS4.4.1.2-2 a,c SDS4.4.1.2-3 a,c WNA-DS-01667-WBT-NP, Rev. 1 4-13 RRAS Watts Bar 2 NSSS Completion Program I&C Projects 4.4 HARDWARE DESCRIPTION R4.4-1 Post Accident Monitoring System -System Design Specification
[                                                                                                           ]
[The Common Qualified Platform (Common Q) line of qualified hardware shall be used to implement the Watts Bar Unit 2 PAMS subsystems, cabinets, cablings, and other related equipment.]
4.3.1             Switches Keylock Switches SDS4.3.1-1                                                                                               a,c I[                                                                                                         ]
As appropriate, additional detailed hardware design requirement documents are provided for individual hardware components.
SDS4.3.1-2 SDS4.3.1-2                                                                                               a,c a,c
4.4.1 Common Q Qualified Hardware The following standard Common Q hardware is used for the Watts Bar Unit 2 PAMS:
[                                                                                                           ]
* Cabinet*
R4.3.1-1                                                                                                 a,c a,c
* AC160 Modules
[K
* 110 Termination Units
                                                                                                            ]
* FPD System
I R4.3.1-2                                                                                                 a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                     4-11
* Power Supply System 4.4.1.1 Cabinet R4.4.1.1-1
 
[A Westinghouse standard nuclear grade instrumentation and control (I&C) cabinet, Reference 10, shall be used for the Watts Bar Unit 2 PAMS. (SysRS R3.1.1-3), (SysRS R3. 1. 6-1)] 4.4.1.2 AC160 Modules SDS4.4.1.2-1
Post Accident Accident Monitoring Monitoring System -
[ SDS4.4;1.2-2 SDS4.4.1.2-3 I[ WNA-DS-OI667-WBT-NP, Rev. 1 4-13 a,c ] a,c a,c ]
Completion Program I&C Projects RRAS Watts Bar 2 NSSS Completion                             System Design Specification Specification
Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-4 a,c.R4.4.1.2-1 I Table 4.4-1.a,c I I a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-14 RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-4 .R4.4.1.2-1
----------------------~------~~--------~------------------~------~~------~a,c
[ Table 4.4-1. [ WNA-DS-01667-WBT-NP, Rev. 1 4-14 Post Accident Monitoring System Design Specification a,c a,c ] a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-1.SDS4.4.1.2-5 R4.4.1.2-2 R4.4.1.2-3 I I 8,C a,c a,c a,c I I a,c WNA-DS-01667-WBT-NP, Rev. 1 4-15 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-1. [ SDS4.4.1.2-5 R4.4.1.2-2
[                                                                                         ]
R4.3.1-3                                                                                 a,c
[I                                                                                        ]I WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                 4-12 4-12
 
IPost Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects                       System Design Specification Specification 4.4       HARDWARE DESCRIPTION HARDWARE R4.4-1
[The Common Qualified Platform Platform (Common Q) line of qualified hardware shall be used to implement implement the Watts Bar Unit 2 PAMS subsystems, subsystems, cabinets, cablings, and other related equipment.]
As appropriate, additional detailed hardware design requirement requirement documents documents are provided provided for individual individual hardware components.
hardware  components.
4.4.1 4.4.1    Common Q Qualified Qualified Hardware hardware is used for the Watts Bar Unit 2 PAMS:
The following standard Common Q hardware
    *"   Cabinet Cabinet*
    *AC160 Modules
    **   F0 Termination 110 Termination Units
    *FPD System System
    *" Power Supply System System 4.4.1.1   Cabinet Cabinet R4.4.1.1-1 Westinghouse standard nuclear grade instrumentation
[A Westinghouse                         instrumentation and control (I&C) cabinet, Reference Reference 10, shall be used for the Watts Bar Unit 2 PAMS. (SysRS (SysRSR3.1.1-3),
R3.1.1-3), (SysRSR3.1.6-1)]
(SysRS R3. 1. 6-1)]
4.4.1.2   AC160 Modules SDS4.4.1.2-1                                                                                                 a,c a,c
[K                                                                                                             ]
SDS4.4.1.2-2 SDS4.4;1.2-2                                                                                                a,c a,c SDS4.4.1.2-3                                                                                                 a,c a,c SDS4.4.1.2-3 I[                                                                                                            ]
WNA-DS-01667-WBT-NP, WNA-DS-OI667-WBT-NP, Rev. 1                       4-13 4-13
 
Post Accident Monitoring System-Accident Monitoring System -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects       System        Specification System Design Specification SDS4.4.1.2-4 SDS4.4.1.2-4                                                                               a,c a,c
.R4.4.1.2-1
.R4.4.1.2-1                                                                                 a,c
[
I
                                                                                              ]I 4.4-1. [
Table 4.4-1.                                                     I a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                   4-14 4-14
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar Bar 22 NSSS Completion Program Program I&C Projects       System Design Specification Specification Table 4.4-1. [                                                    I8,C a,c SDS4.4.1.2-5 SDS4.4.1.2-5                                                                                a,c a,c R4.4.1.2-2 R4.4.1.2-2                                                                                 a,c
[ R4.4.1.2-3
[ R4.4.1.2-3
[ . WNA-DS-OI667-WBT-NP, Rev. 1 4-15 Post Accident Monitoring System -System Design Specification a,c a,c a,c ]
                                                                                              ]I R4.4.1.2-3 I
Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-2. [a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-16 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-2. [ WNA-DS-01667-WBT-NP, Rev. 1 4-16 Post Accident Monitoring System Design Specification a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-3. [IaRc a,c WNA-DS-01667-WBT-NP, Rev. 1 4-17 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-3. [ WNA-DS-01667-WBT-NP, Rev. 1 4-17 Post Accident Monitoring System Design Specification
[                                                                                     I a,c WNA-DS-01667-WBT-NP, Rev. 1
]s,c a,c RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-6 R4.4.1.2-4 R4.4.1.2-5 Il SDS4.4.1.2-7 SDS4.4.1.2-8 Post Accident Monitoring System -System Design Specification a,c a,I a,c IC a,c WNA-DS-01667-WBT-NP, Rev. 1 4-18 RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-6 R4.4.1.2-4
. WNA-DS-OI667-WBT-NP,                          4-15 4-15
[ R4.4.1.2-5
 
[ SDS4.4.1.2-7
Post Accident Monitoring System -
[ SDS4.4.1.2-8 WNA-DS-01667-WBT-NP, Rev. 1 4-18 Post Accident Monitoring System -System Design Specification a,c a,c ] a,c ] ]S,C a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-4.Table 4.4-5.I a,c a,c I a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-19 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-4. [ Table 4.4-5. [ WNA-DS-01667-WBT-NP, Rev. 1 4-19 Post Accident Monitoring System -System Design Specification a,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-9 a,c a,c]R4.4.1.2-6 K Table 4.4-6.a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-20 RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-9 R4.4.1.2-6
Monitoring System-RRAS Watts Bar 2 NSSS Completion Program Program I&C Projects                     Specification System Design Specification Table 4.4-2.
[ Table 4.4-6. [ WNA-DS-01667-WBT-NP, Rev. 1 4-20 Post Accident Monitoring System Design Specification a,c a,c ] a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-6. [Iac a,c WNA-DS-01667-WBT-NP, Rev. 1 4-21 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-6. [ WNA-DS-01667-WBT-NP, Rev. 1 4-21 Post Accident Monitoring System -System Design Specification a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-10 R4.4.1.2-7 a,c a,c Table 4.4-7A. [I aIc Item Designator Name Description ac WNA-DS-01667-WBT-NP, Rev. 1 4-22 RRAS Watts Bar 2 NSSS Completion Program I&C Projects SDS4.4.1.2-10 I I R4.4.1.2-7 I[ Table 4.4-7 A. Item Designator Name WNA-DS-01667-WBT-NP, Rev. 1 4-22 Post Accident Monitoring System -System Design Specification
4.4-2. [                                                     a,c a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                        4-16 4-16
]a,c Description a,c a,c ] ac Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-7B. [j ac Item Designator Name Description a,c WNA-DS-01667-WBT-NP, Rev. 1 4-23 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-7B. [ Item Designator Name WNA-DS-01667-WBT-NP, Rev. 1 4-23 Post Accident Monitoring System Design Specification Description , ]a,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.2-8 a,c Table 4.4-8A. [I a~c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-24 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.2-S I[ Table 4.4-SA. [ WNA-DS-01667-WBT-NP, Rev. 1 4-24 Post Accident Monitoring System -System Design Specification a,c ] ]a,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-8B. [I a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-25 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-SB. [ WNA-DS-01667-WBT-NP, Rev. 1 4-25 Post Accident Monitoring System -System Design Specification a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.2-9 ac Table 4.4-9A. [I ac a,c I WNA-DS-01667-WBT-NP, Rev. 1 4-26 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.2-9 i[ Table 4.4-9A. [ WNA-DS-01667-WBT-NP, Rev. 1 4-26 Post Accident Monitoring System Design Specification a,c ] ]s,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-9B. f I a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-27 RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-9B. [
 
Rev. 1 4-27 Post Accident Monitoring System Design Specification a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.2-10 a,c Table 4.4-10A. [I ac a,c WNA-DS-01667-WBT-NP, Rev. 1 4-28 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.2-10 I[ Table 4.4-10A. [ WNA-DS-01667-WBT-NP, Rev. 1 4-28 Post Accident Monitoring System -System Design Specification a,c ] Js,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-10B. [I a,c a,c 4.4.1.3 I/O Termination Units R4.4.1.3-1
Post Accident Monitoring System System- -
[The Watts Bar Unit 2 PAMS shall utilize the standard Common Q I/O termination units.]4.4.1.4 FPD System SDS4.4.1.4-1 a,c I WNA-DS-01667-WBT-NP, Rev. 1 4-29 I I RRAS Watts Bar 2 NSSS Completion Program I&C Projects Table 4.4-10B. [ 4.4.1.3 1/0 Termination Units R4.4.1.3-1 Post Accident Monitoring System -System Design Specification
RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects       System Design  Specification Design Specification Table 4.4-3.
[The Watts Bar Unit 2 PAMS shall utilize the standard Common Q I/O: tennination units.] 4.4.1.4 FPD System SDS4.4.1.4-1
4.4-3. [                                                  ]s,c IaRc a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                        4-17 4-17
[ WNA-DS-01667-WBT-NP, Rev. 1 4-29 a,c / a,c J Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects 4.4.1.5 Power Supply System R4.4.1.5-1 SDS4.4.1.5-1 I SDS4.4.1.5-2 R4.4.1.5-2 I SDS4.4.1.5-3 R4.4.1.5-3 R4.4.1.5-4 R4.4.1.5-5 R ER4.4.1.5-6 a,c I a,c I a,c a,c I a,c I a,c a,c a,c I a,c I WNA-DS-01667-WBT-NP, Rev. 1 4-30 RRAS Watts Bar 2 NSSS Completion Program I&C Projects 4.4.1.S Power Supply System R4.4.1.S-1
 
[ SDS4.4.1.S-1
Post Accident Accident Monitoring System -
[ SDS4.4.1.S-2 R4.4.1.S-2
RRAS Watts Bar 2 NSSS Completion Program I&C Projects RRAS                                                        System Design Specification Specification SDS4.4.1.2-6 SDS4.4.1.2-6                                                                              a,c a,I R4.4.1.2-4 R4.4.1.2-4                                                                                a,c
[ SDS4.4.1.S-3 R4.4.1.S-3
[                                                                                            ]
[ R4.4.1.S-4
a,c R4.4.1.2-5 R4.4.1.2-5                                                                               a,c
[ R4.4.1.S-S
[
[ R4.4.1.S-6
Il
[ WNA-DS-01667-WBT-NP, Rev. 1 4-30 Post Accident Monitoring System Design Specification a,c ] a,c ] a,c a,c ] a,c Ja,c Ja,c a,c ] a,c ] \
                                                                                            ]
Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.5-7 a,c R4.4.1.5-8
SDS4.4.1.2-7 SDS4.4.1.2-7                                                                              IC
[I a,C a,c Figure 4.4-1. [a,c SDS4.4.1.5-12 a,c WNA-DS-O 1667-WeT-NP, Rev. 1 4-31 WNA-DS-01667-WBT-NP, Rev. I 4-31 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.1.S-7 R4.4.1.S-8
[                                                                                    ]S,C a,c SDS4.4.1.2-8 SDS4.4.1.2-8                                                                              a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                 4-18 4-18
[ SDS4.4.1.S-12 Figure 4.4-1. [ WNA-DS-01667-WBT-NP, Rev. 1 4-31 Post Accident Monitoring System -System Design Specification a,c a,c a,c RRAS Watts Bar 2 NSSS Completion Program I&C Projects I Post Accident Monitoring System -System Design Specification a,c SDS4.4.1.5-13 SDS4.4.1.5-14 R4.4.1.5-7 4.4.2 PAMS Standard Hardware Subassemblies a,c I a,c I a,c 4.4.2.1 IRP SDS4.4.2.1-1 K SDS4.4.2.1-2 a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 4-32 RRAS Watts Bar 2 NSSS Completion Program I&C Projects [ SDS4.4.1.5-13 I[ SDS4.4.1.5-14
 
[ R4.4.1.5-7 4.4.2 PAMS Standard Hardware Subassemblies 4.4.2.1 IRP SDS4.4.2.1-1 SDS4.4.2.1-2 WNA-DS-01667-WBT-NP, Rev. 1 4-32 Post Accident Monitoring System -System Design Specification a,c ] a,c ] a,c ] a,c a,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects I SDS4.4.2.1-3 R4.4.2.1-1 R4.4.2.1-2 R4.4.2.1-3 4.4.2.2 Cabinet Temperature Sensors R4.4.2.2-1 R4.4.2.2-2 4.4.2.3 Field Terminal Blocks R4.4.2.3-1 I a,c I a,c I a,c I I a,c a,c a,c ac I I a,c R4.4.2.3-2 a,c WNA-DS-01667-WBT-NP, Rev. 1 4-33 RRAS Watts Bar 2 NSSS Completion Program I&C Projects [ SDS4.4.2.1-3
Post Accident Monitoring Monitoring System -
[ R4.4.2.1-1 I[ R4.4.2.1-2
RRAS Watts Bar Bar 22 NSSS Completion Completion Program Program I&C Projects       System Design Specification Specification Table 4.4-4. [
[ R4.4.2.1-3 4.4.2.2 Cabinet Temperature Sensors R4.4.2.2-1 R4.4.2.2-2
Table                                                                  I a,c        a,c a,c Table 4.4-5. [                                                         I a,c        a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                   4-19 4-19
[ 4.4.2.3 Field Terminal Blocks R4.4.2.3-1
 
[ R4.4.2.3-2 WNA-DS-01667-WBT-NP, Rev. 1 4-33 Post Accident Monitoring System -System Design Specification a,c ] a,c ] a,c ] a,c a,c a,c ] a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects E 4.4.2.4 Input Power Distribution Breaker Panel (AC)R4.4.2.4-1 a,c I R4.4.2.4-2 R4.4.2.4-3 4.4.2.5 DC Distribution Breaker Assembly R2.2.1.11-1 4.4.2.6 Auxiliary Power Supply R4.4.2.6-1 a,c I a,c'ac a,c a,c I WNA-DS-01667-WBT-NP, Rev. 1 4-34 RRAS Watts Bar 2 NSSS Completion Program I&C Projects [ 4.4.2.4 Input Power Distribution Breaker Panel (AC) [4 0 4 0 2.4-1 R4.4.2.4-2
Post Accident Accident Monitoring System-System -
[ R4.4.2.4-3 4.4.2.5 DC Distribution Breaker Assembly R2.2.1.11-1 4.4.2.6 Auxiliary Power Supply R4.4.2.6-1
RRAS Watts Bar 2 NSSS Completion Program I&C Projects       System Design Specification Specification SDS4.4.1.2-9 SDS4.4.1.2-9                                                                            a,c a,c R4.4.1.2-6 R4.4.1.2-6                                                                              a,c a,c
[ WNA-DS-01667-WBT-NP, Rev. 1 4-34 Post Accident Monitoring System -System Design Specification a,c ] a,c ] a,c J 'a,c a,c a,c ]
[
Post Accident Monitoring System -RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification R4.4.2.6-2 ac R4.4.2.6-3 a,c I. I R4.4.2.6-4 R4.4.2.6-5
K Table Table 4.4-6.
[ R4.4.2.6-6 a,c K I 4.4.2.7 Primary Subrack -USA and USB Feeds R4.4.2.7-1 a,c R4.4.2.7-2 a,c£ I 4.4.2.8 Extension Subrack -USA and USB Feeds R4.4.2.8-1 a,c It WNA-DS-01667-WBT-NP, Rev. 1 4-35 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.2.6-2
4.4-6. [                                                      a,c
[ R4.4.2.6-3 R4.4.2.6-4
                                                                                          ]] a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                       4-20 4-20
[ R4.4.2.6-5
 
[ R4.4.2.6-6 4.4.2.7 Primary Subrack -USA and USB Feeds R4.4.2.7-1 R4.4.2.7-2 I 4.4.2.8 Extension Subrack -USA and USB Feeds R4.4.2.8-1
Post Accident Monitoring System Accident Monitoring  System -
'[ WNA-DS-01667-WBT-NP, Rev. 1 4-35 Post Accident Monitoring System -System Design Specification a,c a,c a,c a,c, a,c ]
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects       System        Specification System Design Specification Table Table 4.4-6. [                                                        Iac a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                         4-21
Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects I R4.4.2.8-2 4.4.2.9 DP Cell Power Supplies R4.4.2.9-1 4.4.2.10 DIN Rail/TC514/Connection Units R4.4.2.10-1 IR.R4.4.2.10-2-a,c I a,c a,c I I a,c a,c 4.4.3 Cabling R4.4.3-1 R4.4.3-2 R4.4.3-3 I R4.4.3-4[a,c I] 8,C Ia,c I a,C WNA-DS-01667-WBT-NP, Rev. 1 4-36 Post Accident Monitoring System -RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification
 
[ R4.4.2.8-2 4.4.2.9 DP Cell Power Supplies R4.4.2.9-1
Post Accident Accident Monitoring System -
[ 4.4.2.10 DIN RaillTC514/Connection Units R4.4.2.10-1
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects             System System Design  Specification Design Specification SDS4.4.1.2-10 SDS4.4.1.2-10                                                                                    a,c I
[ R4.4.2.10-2 4.4.3 Cabling ] a,c a,c ] a,c R4.4.3-1 a,c [ ] R4.4.3-2 [ ]8,C R4.4.3-3 [ ]8,C R4.4.3-4 [ ]8,C WNA-DS-01667-WBT-NP, Rev. 1 4-36 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.3-5 R4.4.3-6 R4.4.3-7 K R4.4.3-8 I SDS4.4.3-1 K R4.4.3-9 K4.4.3-10 R4.4.3-11 R R4.4.3-12 ER4.4.3-12 I R4.4.3-13 Post Accident Monitoring System -System Design Specification a,c I a,c a,c a,c I a,c I ac ac~a,c axc I axc I a,c WNA-DS-01667-WBT-NP, Rev. 1 4-37 RRAS Watts Bar 2 NSSS Completion Program I&C Projects R4.4.3-5 [ R4.4.3-6 [ R4.4.3-7 [ [4<4<3-8 SDS4.4.3-1
I R4.4.1.2-7 R4.4.1.2-7                                                                                      a,c I[
[ R4.4.3-9 [ R4.4.3-10
Table 4.4-7A.
Table 4.4-7 A. [                                    I]a,c aIc
                                                                                                    ]
ac ac Item Designator Designator      Name                          Description Description WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 11                  4-22 4-22
 
Post Accident Monitoring System System- -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects           System Design Specification Specification
                                                                  ,
Table 4.4-7B.
4.4-7B. [                                 j]a,c ac a,c a,c Item Designator Designator          Name Name                        Description Description WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                         4-23
 
Post Accident Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects       System Design Specification Specification R4.4.1.2-S R4.4.1.2-8                                                                                a,c I[
Table 4.4-8A.
4.4-SA. [                               I]a,c a~c
                                                                                            ]
a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 11                4-24 4-24
 
Post Accident Monitoring System System -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects                     Specification System Design Specification 4.4-SB. [
Table 4.4-8B.                                 Ia,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                        4-25 4-25
 
Post Accident Monitoring System -
Monitoring System-RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects                       Specification System Design Specification R4.4.1.2-9 R4.4.1.2-9                                                                                a,c ac i[                Table 4.4-9A.
4.4-9A. [                                ]s,c Iac
                                                                                            ]
a,c I
WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                 4-26
 
Post Accident            System -
Accident Monitoring System-RRAS Watts Bar 2 NSSS Completion Program I&C Projects       System Design Specification Specification 4.4-9B. [f Table 4.4-9B.                                 I a,c a,c a,c WNA-DS-01667-WBT-NP, WNA-DS~01667-WBT-NP,    Rev. 1               4-27
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar 22 NSSS Completion Program I&C Projects       System Design Specification Specification R4.4.1.2-10 R4.4.1.2-10                                                                                  a,c a,c I[
Table 4.4-10A.
4.4-10A. [                               IJs,c ac
                                                                                              ]
a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                          4-28
 
Monitoring System -
Post Accident Monitoring RRAS Watts Bar 2 NSSS Completion   Program I&C Projects Completion Program                                                  Specification System Design Specification Table 4.4-10B.
4.4-10B. [                                             I a,c a,c a,c I
I
                                                                                                                  /
4.4.1.3 4.4.1.3  I/O Termination 1/0 Termination Units R4.4.1.3-1 R4.4.1.3-1 Common Q
[The Watts Bar Unit 2 PAMS shall utilize the standard Common  Q I/O  termination units.]
I/O: tennination 4.4.1.4   FPD System System SDS4.4.1.4-1                                                                                            a,c
[                                                                                                          JI WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                       4-29 4-29
 
Post Accident            System -
Accident Monitoring System-RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects       System        Specification System Design Specification 4.4.1.5 4.4.1.S  Power Power Supply System System R4.4.1.5-1 R4.4.1.S-1                                                                              a,c a,c
[                                                                                          ]
I SDS4.4.1.S-1 SDS4.4.1.5-1                                                                            a,c a,c
[
I
                                                                                            ]I SDS4.4.1.S-2 SDS4.4.1.5-2                                                                             a,c a,c R4.4.1.5-2 R4.4.1.S-2                                                                              a,c
[I                                                                                          ]I a,c SDS4.4.1.5-3 SDS4.4.1.S-3                                                                            a,c R4.4.1.5-3 R4.4.1.S-3
[                                                                   Ja,c I a,c R4.4.1.5-4 R4.4.1.S-4
[                                                                               Ja,c a,c
                                                                                                \
R4.4.1.5-5 R4.4.1.S-S                                                                                a,c a,c
[                                                                                            ]
ER4.4.1.5-6 R
R4.4.1.S-6                                                                              a,c a,c I
[                                                                                           I]
WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                         4-30 4-30
 
Accident Monitoring System --
Post Accident RRAS Watts Bar 2 NSSS Completion Program I&C Projects       System Design Specification System        Specification R4.4.1.5-7 R4.4.1.S-7                                                                              a,c R4.4.1.5-8 R4.4.1.S-8
[[                                                                                Ia,C a,c 4.4-1. [
Figure 4.4-1.                               a,c SDS4.4.1.5-12 SDS4.4.1.S-12                                                                            a,c Rev. 1               4-31 WNA-DS-O  1667-WeT-NP, Rev. 1I WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP,                         4-31
 
Accident Monitoring Post Accident Monitoring System -
Completion Program I&C Projects RRAS Watts Bar 2 NSSS Completion                            System Design Specification Specification a,c a,c
[I                                                                                        ]
SDS4.4.1.5-13 SDS4.4.1.5-13                                                                            a,c a,c I[                                                                                         ]I SDS4.4.1.5-14 SDS4.4.1.5-14                                                                            a,c a,c
[                                                                                          ]I R4.4.1.5-7                                                                              a,c 4.4.2     PAMS Standard Standard Hardware    Subassemblies Hardware Subassemblies 4.4.2.1   IRP SDS4.4.2.1-1 SDS4.4.2.1-1                                                                            a,c K
SDS4.4.2.1-2 SDS4.4.2.1-2                                                                            a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                        4-32
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects        System Design Specification Specification a,c
[I                                                                                            I
                                                                                                ]
SDS4.4.2.1-3 SDS4.4.2.1-3                                                                                a,c
[
R4.4.2.1-1 I]
a,c a,c I[R4.4.2.1-2 R4.4.2.1-2 I]
[                                                           I a,c R4.4.2.1-3 R4.4.2.1-3                                                                                  a,c 4.4.2.2  Cabinet Cabinet Temperature Temperature Sensors R4.4.2.2-1                                                                                  a,c R4.4.2.2-2 R4.4.2.2-2                                                                                  a,c ac
[                                                                                             ]I 4.4.2.3    Field Terminal Blocks R4.4.2.3-1 R4.4.2.3-1 I[                                                                               I a,c R4.4.2.3-2 R4.4.2.3-2                                                                                  a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                          4-33
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Program I&C Projects RRAS                                                          System Design Specification System        Specification a,c
[E                                                                                            ]I 4.4.2.4    Input Power Distribution Distribution Breaker Breaker Panel (AC)
[4    42.4-1 R4.4.2.4-1 0  0 a,c
                                                                                                ]I R4.4.2.4-2 R4.4.2.4-2                                                                                   a,c
[                                                                                          J R4.4.2.4-3 R4.4.2.4-3                                                                                'ac
                                                                                            'a,c 4.4.2.5   DC Distribution Breaker Assembly Assembly R2.2.1.11-1 R2.2.1.11-1                                                                                  a,c 4.4.2.6    Auxiliary Power Supply R4.4.2.6-1                                                                                 a,c a,c
[
WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                     4-34 4-34 I]
 
Accident Monitoring Post Accident Monitoring System -
RRAS Watts Bar 2 NSSS Completion Program I&C Projects Projects            System Design Specification Specification R4.4.2.6-2 R4.4.2.6-2 ac
[
R4.4.2.6-3 R4.4.2.6-3 I.                                                                   I a,c R4.4.2.6-4 R4.4.2.6-4
[
R4.4.2.6-5
[
[
a,*
R4.4.2.6-6 R4.4.2.6-6                                                                                  a,c K 4.4.2.7  Primary Primary Subrack - USA and USB USB Feeds I
R4.4.2.7-1                                                                                  a,c
&#xa3;  R4.4.2.7-2 R4.4.2.7-2 I
a,c, a,c I 4.4.2.8    Extension Subrack - USA and USB USB Feeds Feeds R4.4.2.8-1 R4.4.2.8-1                                                                                  a,c
'[It                                                                                            ]
WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                  4-35
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects        System          Specification System Design Specification
--------------------~----~~------~----------------~----~~~----~a,c
                                                                                              -a,c
[I                                                                                              I]
R4.4.2.8-2 R4.4.2.8-2                                                                                   a,c a,c 4.4.2.9                Supplies DP Cell Power Supplies R4.4.2.9-1                                                                                   a,c
[
4.4.2.10 DIN RaillTC514/Connection Rail/TC514/Connection Units I]
R4.4.2.10-1 R4.4.2.10-1
[
IR.                                                                              Ia,c R4.4.2.10-2                                                                                  a,c 4.4.3      Cabling
                                                                                                ]I R4.4.3-1                                                                                      a,c
[R4.4.3-2 R4.4.3-2
[                                                                          ]]8,C 8,C R4.4.3-3 R4.4.3-3 I
[                                                                                       ]8,C Ia,c R4.4.3-4
[                                                                                      ]8,C I a,C WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                         4-36 4-36
 
Post Accident            System -
Accident Monitoring System-RRAS Watts Bar 2 NSSS Completion Program I&C Projects        System Design Specification Specification R4.4.3-5                                                                                a,c
[                                                                                          ]
I R4.4.3-6 R4.4.3-6                                                                                a,c
[                                                                                          ]
R4.4.3-7                                                                                  a,c a,c
[K                                                                                          J
[4<4<3-8 I
R4.4.3-8 I]
a,c
[K SDS4.4.3-1 SDS4.4.3-1                                                                              a,c a,c I
R4.4.3-9 R4.4.3-9 J
ac a,c
[K4.4.3-10
                                                                                            ]
R4.4.3-10                                                                              a,c ac
[ R4.4.3-11
[ R4.4.3-11
[ R4.4.3-12
                                                                                ~a,c        ]
[ R4.4.3-12
R4.4.3-11 R
[ R4.4.3-13 I [ WNA-DS-01667-WBT-NP, Rev. 1 4-37 Post Accident Monitoring System Design Specification a,c ] a,c ] a,c J a,c ] a,c J a,c ] a,c ] a,c ] a,c ]
[
RRAS Watts Bar 2 NSSS Completion Program I&C Projects I R4.43-14 II R4.4.3-15 I R4.4.3-16 I*Post Accident Monitoring System-System Design Specification a,c I I a,c I a,C I a,C R4.4.3-17 R4.4.3-18 a,c a,c R4.4.3-19 R4.4.3-20 R4.4.3-21 I a,c a,c I a,c WNA-DS-01667-WBT-NP, Rev. 1 4-38 RRAS Watts Bar 2 NSSS Completion Program I&C Projects [ R4.4.3-14
R4.4.3-12                                                                               axc a,c
[ R4.4.3-1S
[ER4.4.3-12 R4.4.3-12
[ R4.4.3-16
                                                                                            ]I R4.4.3-12                                                                               axc a,c
[ R4.4.3-17 R4.4.3-1S
[
[ R4.4.3-19
I
[ R4.4.3-20
                                                                                              ]I R4.4.3-13 R4.4.3-13 I[                                                                       a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                 4-37 4-37
[ R4.4.3-21 I [ WNA-DS-01667-WBT-NP, Rev. 1 4-38 Post Accident Monitoring System Design Specification a,c ] a,c a,c ] a,c ] a,c ] t*e Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects 5.1 SDS5.1-1 SECTION 5 INTERFACES AND COMMUNICATIONS MTP DATA LINK AF100 BUS COMMUNICATION a,c 5.2 SDS5.2-1 SDS5.2-2 I SDS5.2-3 a,c a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 5-1 RRAS Watts Bar 2 NSSS Completion Program I&C Projects SECTION 5 Post Accident Monitoring System -System Design Specification INTERFACES AND COMMUNICATIONS 5.1 MTP DATA LINK SDSS.1-1 a,c 5.2 AF100 BUS COMMUNICATION SDSS.2-1 a,c a,c ] SDSS.2-3 a;c WNA-DS-01667-WBT-NP, Rev. 1 5-1 RRAS Watts Bar 2 NSSS Completion Program I&C Projects K Post Accident Monitoring System -System Design Specification a,c a,c Figure 5.2-1. [a,c WNA-DS-01667-WBT-NP, Rev. 1 5-2 RRAS Watts Bar 2 NSSS Completion Program I&C Projects [ Figure 5.2-1. [ WNA-DS-01667-WBT-NP, Rev. 1 5-2 Post Accident Monitoring System -System Design Specification a,e ] a,e Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects R5.2-1 K R5.2-2 R5.2-3 a,c a,c a,c R5.2-4 a,c WNA-DS-01667-WBT-NP, Rev. 1 5-3 RRAS Watts Bar 2 NSSS Completion Program I&C Projects RS.2-1 RS.2-2 RS.2-3 RS.2-4 WNA-DS-01667-WBT-NP, Rev. 1 5-3 Post Accident Monitoring System -System Design Specification a,c a,c a,c a,c Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects R5.2-5 L a,c(Last Page of Section 5)WNA-DS-01667-WBT-NP, Rev. 1 5-4 RRAS Watts Bar 2 NSSS Completion Program I&C Projects RS.2-S I[ (Last Page of Section 5) WNA-DS-01667-WBT-NP, Rev. 1 5-4 Post Accident Monitoring System Design Specification a,c ]
 
Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects SECTION 6 GROUNDING AND COOLING REQUIREMENTS 6.1 EARTHING SCHEME R6.1-1[The Watts Bar Unit 2 PAMS cabinet shall be provided with a high quality ground bus with a connectionto the plant ground grid.]I R6.1-2 I R6.1-3 ac I a,c I] a,c R6.1-1 a,c 6.2CABINET/COMPONENT COOLING R6.2-1 a,c WNA-DS-01667-WBT-NP, Rev. 1 6-1 RRAS Watts Bar 2 NSSS Completion Program I&C Projects SECTION 6 Post Accident Monitoring System -System Design Specification GROUNDING AND COOLING REQUIREMENTS 6.1 EARTHING SCHEME R6.1-1 [The Watts Bar Unit 2 PAMS cabinet shall be provided with a high quality ground bus with a connection to the plant ground grid.] [ R6.1-2 [ R6.1-3 [ 18,c R6.1-1 6.2 CABINET/COMPONENT COOLING a,c ] a,c ] a,c R6.2-1 a,c WNA-DS-OI667-WBT-NP, Rev. 1 6-1 Post Accident Monitoring System -System Design Specification RRAS Watts Bar 2 NSSS Completion Program I&C Projects ac R6.2-2 K a,c (Last Page of Section 6)WNA-DS-01667-WBT-NP, Rev. 1 6-2 Post Accident Monitoring System -
Post Accident
________
                                                              *PostAccident Monitoring System-System-RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects               System        Specification System Design Specification a,c
a,e R6.2-2 a,e (Last Page of Section 6) WNA-DS-01667-WBT-NP, Rev. 1 6-2 Enclosure 3 Application For Withholding Proprietary Information From Public Disclosure CAW-10-2877 Dated June 30, 2010  
[I                                                                                                  ]I R4.43-14 R4.4.3-14
[                                                  I a,c II R4.4.3-15 R4.4.3-1S
[I                                                        Ia,C R4.4.3-16 R4.4.3-16 I[                                                                        I a,C R4.4.3-17 R4.4.3-17                                                                                          a,c R4.4.3-18 R4.4.3-1S                                                                                          a,c
[                                                                                                    ]
R4.4.3-19 R4.4.3-19                                                                                         a,c a,c
[                                                                                                   ]
R4.4.3-20                                                                                         a,c
[                                                                                                   ]I R4.4.3-21 I [I                                                                                        t*a,ce WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                 4-38 4-38
 
Post Accident Accident Monitoring System -
System RRAS Watts Bar 22 NSSS Completion Program I&C Projects Completion Program                       System Design Design Specification Specification SECTION 5 SECTION INTERFACES AND COMMUNICATIONS INTERFACES            COMMUNICATIONS 5.1     MTP DATA LINK LINK SDS5.1-1 SDSS.1-1                                                                                   a,c 5.2 5.2      AF100 BUS COMMUNICATION COMMUNICATION SDS5.2-1 SDSS.2-1                                                                                   a,c a,c SDS5.2-2                                                                                    a,c I
                                                                                              ]
SDS5.2-3 SDSS.2-3                                                                                   a,c a;c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                          5-1
 
Post Accident Accident Monitoring System System -
RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects       System Design Specification Specification a,e a,c
[K                                                                                        ]  a,e a,c Figure 5.2-1.
Figure 5.2-1. [                     a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                   5-2 5-2
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar       Completion Program I&C Projects Bar 2 NSSS Completion                            System Design Specification Specification K
R5.2-1 RS.2-1                                                                                  a,c a,c R5.2-2 RS.2-2                                                                                  a,c R5.2-3 RS.2-3                                                                                  a,c R5.2-4 RS.2-4                                                                                  a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                   5-3 5-3
 
Post Accident Monitoring System -
Monitoring System-RRAS Watts Bar 2 NSSS Completion Program I&C Projects                 System Design Specification Specification R5.2-5 RS.2-S                                                                                            a,c I[L                                                                                                  ]
(Last Page of Section 5) 5)
WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                     5-4 5-4
 
Post Accident Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Program I&C Projects                       System Design Specification Specification SECTION 6 GROUNDING AND GROUNDING    AND COOLING REQUIREMENTS REQUIREMENTS 6.1       EARTHING SCHEME SCHEME R6.1-1
[The Watts Bar Unit 2 PAMS cabinet shall be provided with a high quality ground bus with a connection connection to the plant ground grid.]
ac a,c
[
I
                                                                                                            ]
I R6.1-2                                                                                                   a,c a,c
[
I
                                                                                                            ]I R6.1-3
[                                                                                  18,c
                                                                                    ]a,c R6.1-1                                                                                                   a,c 6.2        CABINET/COMPONENT COOLING CABINET/COMPONENT           COOLING R6.2-1                                                                                                   a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-OI667-WBT-NP,                             6-1 6-1
 
Post Accident Monitoring Monitoring System -
RRAS Watts Bar 2 NSSS Completion Program I&C Projects _ _ _ _ _ _ _ _Sy~s_t_em_D_es_ig~n_S~p_ec_i_fi_c_at_io_n--a R_RA_..::.S_W_a_tt...:.s_B_a_r....:2...:.N~S...::.S...:.S_C_o_m....:.!:..p...:.le_tI....:*o_n_P_r_0..!Og!::.r_a_m_I_&_C_P_r_o~je_c_t_s
_                                                                                                                                                System Design Specification a,e ac K
R6.2-2                                                                                                                                                                       a,e a,c (Last Page of Section 6)             6)
WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                                                                                         6-2 6-2
 
Enclosure Enclosure 3 Application For Withholding Withholding Proprietary Proprietary Information Information From Public Disclosure  CAW-10-2877 Disclosure CAW-10-2877 Dated June      2010 June 30, 2010


==Subject:==
==Subject:==
WNA-DS-01667-WBT-P, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Project Post Accident Monitoring System -System Design Specification" (Proprietary)
WNA-DS-01667-WBT-P, WNA-DS-01667-WBT-P, Revision 1, "RRAS                  NSSS "RRAS Watts Bar 2 NSSS Completion Program I&C Project Post Accident Completion Program                              Monitoring System -
Enclosure 3 Application For Withholding Proprietary Information From Public Disclosure CAW-10-2877 Dated June 30, 2010  
Accident Monitoring System Design Specification"   (Proprietary)
Specification" (Proprietary)
 
(8WWestinghouse S)Weustinghouse    esin ho s                                                                    NuclearServices Nuclear ElectricCompany WestinghouseElectric Westinghouse Services P.O. Box 355 P.O. Box 355 Company Pittsburgh, Pennsylvania 15230-0355 Pittsburgh, Pennsylvania 15230-0355 USA USA U.S.              Regulatory Commission Nuclear Regulatory U.S. Nuclear                    Commission                                    Direct Directtel:
tel:    (412) 374-4643 (412)  374-4643 Document Control Desk Document      Control    Desk                                                  Direct  fax:
Directfu.x:      (412)  374-3846 (412)374-3846 Washington, DC Washington,      DC 20555-0001 20555-0001                                                  e-mail:
e-mail:    greshaja@westinghouse.com greshaja@westinghouse.com Proj  letter: WBIT-D-2095 Proj letter:      W8T-D-2095 CAW-10-2877 CA W -J 0-2877 June   30, 2010 June 30,    20 I 0 APPLICATION FOR APPLICATION                  WITHHOLDING PROPRIETARY FOR WITHHOLDING              PROPRIETARY INFORMATION INFORMAIJ.0NERQM      FROM PUBLIC PUBLIC DISCLOSURE DISCLOSURE


==Subject:==
==Subject:==
WNA-DS-01667-WBT-P, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Project Post Accident Monitoring System -System Design Specification" (Proprietary)
WNA-DS-01667-WBT-P, Rev.
S)Weustinghouse W esin ho s Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (412) 374-3846 Washington, DC 20555-0001 e-mail: greshaja@westinghouse.com Proj letter: WBIT-D-2095 CAW-10-2877 June 30, 2010 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE


==Subject:==
==Subject:==
WNA-DS-01667-WBT-P, Rev. 1,'"RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -System Design Spccification"' (Proprietary)
WNA-DS-01667-WBT-P,                   Rev. 1,'"RRAS 1, "RRAS WattsWatts Bar Bar 22 NSSS        Completion Program NSSS Completion             Program I&C I&C Projects Post Projects   Post Accident Accident Monitoring       System -- System Monitoring System                  Design Spccification"'
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-t0-2877 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.
System Design        Specification" (Proprietary)
Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.
(Proprietary)
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-] 0-2877, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.Very truly your s, J A. Gresham, Manager Regulatory Compliance and Plant Licensing Enclosures (8 Westinghouse U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA Direct tel: (412) 374-4643 Directfu.x:
The    proprietary information The proprietary       information for     which withholding for which                      being requested withholding isis being    requested in  in the    above-referenced report the above-referenced         report isis further   identified in Affidavit CAW-t0-2877         signed   by the owner   of the further identified in Affidavit CA W-IO-2877 signed by the owner ofthe proprietary infonnation,proprietary     information, Westinghouse        Electric Company Westinghouse Electric         Company LLC.        The affidavit, LLC. The     affidavit, which     accompanies this which accompanies                  letter, sets this letter,  sets forth forth the the basis basis on which the infonnation may be withheld from public disclosure by the Commission and addresses with on  which  the  information   may   be withheld   from   public   disclosure   by   the   Commission         and addresses   with specificity the specificity        considerations listed the considerations     listed in  paragraph (b)(4) in paragraph             of 10 (b)(4) of   10 CFR   Section 2.390 CPR Section         2.390 of   the Commission's ofthe  Commission's regulations.
(412)374-3846 e-mail: greshaja@westinghouse.com Proj letter: W8T-D-2095 CA W -J 0-2877 June 30, 20 I 0 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMAIJ.0NERQM PUBLIC DISCLOSURE
regulations.
Accordingly. this Accordingly,       this letter authorizes the letter authorizes        utilization of the utilization  ofthe  accompanying affidavit the accompanying          aftidavit by      Tennessee Valley by Tennessee       Valley Authority.
Authority.
Correspondence with Correspondence         with respect respect to to the proprietary aspects the proprietary    aspects of   the application of the  application for        withholding or for withholding     or the the Westinghouse       affidavit should reference   this letter, CAW-]     0-2877,   and     should Westinghouse affidavit should reference this letter, CA W- J 0-2877, and should be addressed to        be addressed     to J.J. A. Gresham,     Manager,   Regulatory   Compliance       and Plant   Licensing, A. Gresham, Manager, Regulatory Compliance alld Plant Licensing. Westinghouse EleCtric  Westinghouse         Electric Company LLC, Company      LLC, P.O.
P.O. Box         Pittsburgh, Pennsylvania 355, Pittsburgh, Box355,                                    15230-0355.
Pennsylvania15230-0355.
Very Very truly truly your s, yours,
                                                              ;~4,~
JJ. A. Gresham, Manager A. Gresham,     Manager Regulatory    Compliance and Regulatory Compliance             and Plant Plant Licensing Licensing Enclosures Enclosures


==Subject:==
CAW-10-2877 CAW-l 0-2877 AFFIDAVIT AFFIDAVIT COMMONWEALTH OF COMMONWEALTH              OF PENNSYLVANIA:
WNA-DS-01667-WBT-P, Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -System Design Specification" (Proprietary)
PENNSYLVANIA:
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CA W-IO-2877 signed by the owner ofthe proprietary infonnation, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the infonnation may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 ofthe Commission's regulations.
55 s5
Accordingly.
. COUNTY COUNTY OF ALLEGHENY:
this letter authorizes the utilization of the accompanying aftidavit by Tennessee Valley Authority.
ALLEGHENY:
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CA W -J 0-2877, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance alld Plant Licensing.
Before me, Before  me, the the undersigned undersigned authority, authority, personally  appeared J.J. A. Gresham, personillly appeared                  who, being by me Gresham, who,                   duly meduJy according to law, deposes and sworn according sworn                                  aild says              authorized to execute this Affidavit on says that he is authorized                            on behalf behalf of of Westinghouse Electric Westinghouse    Electric Company Company LLC .LLC (Westinghouse),                    averments of (Westinghouse), and that the averments        fact set forth in this offact tl~ue and correct to Affidavit are true Affidavit                        to the best of his kno\.vledge,   infonnation, and belief:
Westinghouse EleCtric Company LLC, P.O. Box355, Pittsburgh, Pennsylvania15230-0355.
knowledge, information, 4A. Gresham, Manager Licensing Compliance and Plant Licensing Regulatory Compliance Sworn to and subscribed before me this 30th day of June 20    \0 2010 Nofary Public PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA COMMONWEALTH NOTARIAL SEAL NOTARIAL    SEAL Renee Giampole.
Very truly yours, J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Enclosures CAW-10-2877 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
Renee              Notary Public Giampole, NotaryPublic Penn Township, Penn            Westmoreland County Township, WestmorellllndCounty My CommlsSlon'Explres My  Cornmlulon.Exples September  25, 20*13 September 25.2013
s5 COUNTY OF ALLEGHENY:
                                                                                                                            )2
Before me, the undersigned authority, personally appeared J. A. Gresham, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company .LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief: 4A. Gresham, Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed before me this 30th day of June 2010Nofary Public COMMONWEALTH OF PENNSYLVANIA NOTARIAL SEAL Renee Giampole, Notary PublicPenn Township, Westmoreland County My Cornmlulon.Exples September 25, 2 CAW-l 0-2877 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
 
55 . COUNTY OF ALLEGHENY:
2                                        CAW- 10-2877 CAW-I  0-2877 (1) I am Manager, Manager, Regulatory Regulatory Compliance and Plant Licensing, in Nuclear Services, WestinghouseWestinghouse Electric Company            (Westinghouse), and as such, JI have been specifically Company LLC (Westinghouse),                                       specifically delegated delegated the the function of reviewing reviewing the proprietary proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing connection                                licensing and rule making making proceedings, and am authorized authorized to apply for its withholding on behalf behalf of Westinghouse.
Before me, the undersigned authority, personillly appeared J. A. Gresham, who, being by meduJy sworn according to law, deposes aild says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments offact set forth in this Affidavit are and correct to the best of his kno\.vledge, infonnation, and belief: Sworn to and subscribed before me this 30th day of June 20 \0 COMMONWEALTH OF PENNSYLVANIA NOTARIAL SEAL Renee Giampole.
(2)
NotaryPublic Penn Township, WestmorellllndCounty My CommlsSlon'Explres September 25.2013 Regulatory Compliance and Plant Licensing )
(2) I1am making this Affidavit Affidavit in conformance conformance with the provisioilsof provisions of 10 Cf'R CFR Section 2.390 of the Commission's regulations Commission's    regulations and in conjunction with the Westinghouse Westinghouse Application for Withholding Withholding Information from Public Disclosure Proprietary Information                                accompanying this Affidavit.
2 CAW- 10-2877 (1) I am Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure inconnection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
Disclosure accompanying (3) I1have personal knowledge of the criteria and procedures procedures utilized by Westinghouse Westinghouse in designating designating information as a trade secret, privileged privileged or as confidential    commercial or financial information.
(2) 1 am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
confidential commercial (4)
(3) 1 have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph      (b)(4) paragraph (b)(  4) of Section 2.390 of the Commission's Commission's regulations, regulations, the following is furnished for consideration consideration bythe by the Commission in determining whetherwhether the information sought to be withheld from public disclosure disclosure should be withheld.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations,the following is furnished for consideration bythe Commission in determining whether the information sought to be withheld from public disclosure should be withheld.(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
(i)
The application of that system and the substanceOf that system constitutes Westinghouse policy and provides the rational basis required.Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 2 CAW-I 0-2877 (1) I am Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, J have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(i)     The information sought soughttoto be withheld from public disclosure is owned and has been held in confidence confidence by Westinghouse.
(2) I am making this Affidavit in conformance with the provisioilsof 10 Cf'R Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(ii)
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(ii)           information is of a type customarily The infomtation                  customarily held in confidence confidence by Westinghouse Westinghollse and not customarily disclosed customarily    disclosed to the public. Westinghouse has a rational basis for determining determining the types of infon11ation information customarily cllstomarily held in confidence confidence by it and, in that connection, connection, utilizes a system to determine determine when and whether to hold certaincertain types of information   in information in substance Of that confidence. The application of that system and the substanceOf            that system constitutes Westinghouse Westinghouse policy and provides the rational basis required.
(4) Pursuant to the provisions of paragraph (b)( 4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld. (i) The information soughtto be withheld from public disclosure is owned and has been held in confidence by Westinghouse. (ii) The infomtation is of a type customarily held in confidence by Westinghollse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of infon11ation cllstomarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
Under Under that system, system, information information is held in confidence confidence if it falls in one or more of several types, the release of which which might result in the loss of an existing or potential competitive competitive advantage, advantage, as follows:
The application of that system and the substance Of that system constitutes Westinghouse policy and provides the rational basis required.
(a)
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 3 3 ~CAW-1 0-2877 Westinghouse's competitors without license f-rom Westinghouse constitutes a competitive economic advantage over other companies.(b) It consists of supporting data,. including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization. or improved marketability.(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product, (d) It reveals cost or price information,.
(a)      The information reveals reveals the distinguishing aspects of a process (or component, component, structure, structure, tool, method, etc.)
production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.(e) It reveals aspects of past, present, or future Westinghouse or customer fu~nded development plans and programs of potential commercial value to Westinghouse.
etc.) where prevention prevention of its use by any of of
() It contains patentable ideas, for which patent protection may be desirable.
 
There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse
3                                                    ~CAW-1 3CAW-l 0-2877 0-2877 competitors without license f-rom Westinghouse's competitors Westinghouse's                                          from Westinghouse     constitutes a Westinghouse constitutes competitive                  advantage over economic advantage competitive economic                      over other other companies.
: a. competitive advantage over its competitors.
companies.
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.(C) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our. expense..3 CAW-l 0-2877 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, c.g., by optimization or improved marketability. (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. (d) It reveals cost or price infonnation, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers. (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse. (t) It contains patentable ideas, for which patent protection may be desirable.
(b)                                                            data, relative to a data,. including test data, ItIt consists of supporting data,                                        a process (or component, structure, tool, method,method, etc.), the application              data secures a application of which data advantage, e.g.,
There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors.
competitive economic advantage,                      optimization or improved c.g., by optimization. improved marketability.
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position. (b) It is infonnation that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the itifomlation. (c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
(c)
4 CAW-10-2877 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
(c)    Its use by a                                        expenditure of competitor would reduce his expenditure a competitor                                      ofresources  or improve his resources or competitive position in                      manufacture, shipment, installation, assurance in the design, manufacture,                              assurance of quality, or                  similar product, or licensing aa similar    product.
If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.(iii) The information is being transmitted to the Commission in confidence and,.under the provisions of 10 CFR Section 2.390; it is to be received in confidence by the Commission.(iv) The information sought to be protected is not available inpublic sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WNA-DS-01667-WBT-P, Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -System Design Specification" (Proprietary) dated June 2010, for submittal to the Commission.
(d)
being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the NRC review of the Post Accident Monitoring System (PAMS) being designed for Watts Bar Unit 2 and may be used only for that purpose.4 CAW-IO-2877 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
(d)     It reveals cost or price infonnation,          production capacities, budget levels, or information,. production commercial strategies of Westinghouse, commercial                                           customers or suppliers.
If competitors acquire components of proprietary information, anyone component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage. (e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries. (t) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage. (iii) The information is being transmitted to the Commission in confidence and, under the provisions of] 0 CFR Section 2.390; it is to be received in confidence by the Commission. (iv) The information sought to be protected is not available in public sources or available infomlation has not been previ<:?usly employed in the same original manner or method to the hestof our knowledge and belief. (v) The proprietaryinfomlation sought to be withheld in this submittal is that which is appropriately marked in WNA-DS-OI667-WBT-P, Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program J&C Projects Post Accident Monitoring System -System Design Specification" (Proprietary) dated June 2010, for submittalto the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Infomlation from Public Disclosure, to the Document Control Desk. The proprietary infomlation as submitted by Westinghouse is that associated with the NRC review ofthe Post Accident Monitoring System (PAMS) being designed for Watts Bar Unit 2 and may be used only for that purpose.
Westinghouse, its customers (e)
5 CAW-1.0-2877 This information is part of that which will enable Westinghouse to: (a) Assist the customer in providing requested technical licensing information to the NRC that is required for approval of the Common Q Post Accident Monitoringsystem (PAMS).
(e)     It reveals aspects of past, present, or future Westinghouse or customer funded      fu~nded development plans and programs of potential commercial  commercial value to to Westinghouse.
Further this information has substantial commercial value as follows: (a) Westinghouse plans to sell the use of similar information to its customers for purpose of other plant-specific applications.(b) Its use by a competitor would improve his competitive position in the design and licensing of a similar product.(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
(t) () It contains patentable ideas, for which patent protection may be desirable.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar instrumentation
There are sound policy reasons behind the Westinghouse system which include the following:
& control systemsand licensing defense services for commercial power reactors without commensurate expenses.
(a)
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without-purchasing the right to use the information.
(a)    The use of such information by Westinghouse gives Westinghouse aa.competitive advantage over its competitors. It        It is, is,therefore, withheld from disclosure to protect the Westinghouse competitive position.
The development of the technology described in part by the information is the result of applying the results of many years of experience.
(b)
in an intensive Westinghouse effort and the expenditure of a considerable sum of money.In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and asignificant manpower effort, having the requisite talent and experience, would have to be expended.Further the deponent sayeth not.
(b)    It isis infonnation information that isis marketable in many ways. The extent to which such information is  is available to competitors diminishes the Westinghouse ability to      to products and sell products      and services services involving                    information.
5 CA W 2877 This information is part ofthat which will enable Westinghouse to: (a) Assist the customer in providing requested technical licensing information to the NRC that is required for approval of the Common Q Post AcCident Monitoring system (PAMS). Further this information has substantial commercial value as follows: (a) Westinghouse plans to selLthe use ofsiiriilar infonnation to itsclIstomers for purpose of other plant-specific applications. (b) Its tisehy a competitor would improve his competitive position in the design and licensing of a similar product. (c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
involving the use of the itifomlation.
Public disclosure of this proprietary infon11ation is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar instrumentation
(C)
& control systems and licensing defense services for commerc.ial power reactors without commensurate expenses; Also, public disclosure of the information would enable others to use the inforination to meetNRC requirements for licensing documentation witholltpurchasing the right to usethe infonnation.
(c)    Use    by our competitor would put Westinghouse at aacompetitive disadvantage by Use by                                                                                    by expenditure of resources at our reducing his expenditure                            our.expense.
The development ofthe technology described in part by the information is the result of applyingthe results of many years of experience in an intensive Westinghouse effort and* the expenditure of a considerable sum of money. In order for con'lpetitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and asignificantmanpower effort,having the requisite talent and experience, would have to be expended.
expense..
 
4                                        CAW-10-2877 CAW-IO-2877 (d)
(d)      Each Each component component of proprietary proprietary information pertinent pertinent to a particular competitive competitive advantage advantage is potentially as valuable valuable as the total competitive competitive advantage. If  If competitors competitors acquire components components of proprietary    information, anyone proprietary information, any one component component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive competitive advantage.
(e)
(e)     Unrestricted disclosure would jeopardize jeopardize the position of prominence prominence ofof Westinghouse Westinghouse in the world market, and thereby thereby give a market advantage to thethe competition of those countries.
competition (f)
(t)           Westinghouse capacity to invest corporate The Westinghouse                       corporate assets in research research and development depends upon the success in obtaining and maintaining a development competitive advantage.
competitive (iii)
(iii) The information information is being transmitted to the Commission          confidence and, Commission in confidence      and,.under under the provisions provisions of of]100 CFR Section Section 2.390; it is is to be received in confidence confidence by the Commission.
(iv)
(iv)  The information sought to be protected protected is not available  inpublic available in public sources or available information has not been previ<:?usly infomlation                previously employed in the same original manner or method to the best of our knowledge hestof                      belief.
knowledge and belief.
(v)   The proprietaryinfomlation proprietary information sought to be withheld in this submittal is that which is appropriately appropriately marked in WNA-DS-OI667-WBT-P, WNA-DS-01667-WBT-P, Rev. 1,         1, "RRAS "RRAS Watts Bar 22 NSSS Completion Completion Program I&C J&C Projects Projects Post Accident Accident Monitoring Monitoring System - System Design Specification" (Proprietary)
Specification"  (Proprietary) dated June 2010, for submittalto submittal to the Commission, Commission. being transmitted by Tennessee Valley Authority letter and Application Application for Withholding Withholding Proprietary Proprietary Information Infomlation from Public Disclosure, to the Document ControlControl Desk. The proprietary  information as submitted proprietary infomlation      submitted by Westinghouse is that associated with the NRC review of  the Post Accident ofthe                  Monitoring System (PAMS)
Accident Monitoring              (PAMS) being designed for Watts Bar Unit 2 and may be used only for that purpose.
 
55                                          CAW-1.0-2877 CA W- 10-2877 information is This information       part of is part          which will that which ofthat                        Westinghouse to:
enable Westinghouse will enable (a)
(a)                  customer in Assist the customer    in providing                technical licensing providing requested technical                  information to the licensing information NRC that is required                            Common Q Post approval of the Common required for approval                                AcCident Monitoring Post Accident  Monitoring system (PAMS).
(PAMS).
information has substantial Further this information Further                                        commercial value as substantial commercial              as follows:
(a)
(a)      Westinghouse plans to Westinghouse            to sell the use of selLthe        ofsiiriilar infonnation to its similar information          customers for itsclIstomers purpose of other    plant-specific applications.
other plant-specific      applications.
(b)
(b)     Its use tisehy                                          competitive position in the design and by a competitor would improve his competitive                                  and licensing of a similar product.
licensing (c)
(c)           information requested The information                         withheld reveals requested to be withheld                                    aspects of a reveals the distinguishing aspects methodology which was developed by Westinghouse.
disclosure of this Public disclosure      this proprietary proprietary infon11ation                        substantial harm to the information is likely to cause substantial because it would enhance the ability of Westinghouse because competitive position of Westinghouse competitive                                                                            of competitors to provide competitors      provide similar instrumentation                    systemsand instrumentation & control systems        and licensing licensing defense commerc.ial power services for commercial services                            reactors without commensurate power reactors                                expenses. Also, public commensurate expenses; disclosure of the information would enable disclosure                                  enable others to use the inforination      meet NRC information to meetNRC witholltpurchasing the right to usethe documentation without-purchasing requirements for licensing documentation requirements                                                                          use the information.
infonnation.
The development oftheof the technology described in part by the information is the result of      of applying the results of many years of experience applyingthe                                                                Westinghouse effort and experience. in an intensive Westinghouse            and*
considerable sum of money.
the expenditure of a considerable Westinghouse to duplicate competitors of Westinghouse In order for con'lpetitors                                          information, similar technical duplicate this information, effort, having the asignificant manpower effort,having programs would have to be performed and asignificantmanpower experience, would have to be expended.
requisite talent and experience, sayeth not.
Further the deponent sayethnot.
Further the deponent sayethnot.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary informnation has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
 
The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f)located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information.
PROPRIETARY          INFORMATION NOTICE PROPRIETARY INFORMATION                   NOTICE Transmitted herewith Transmitted    herewith are     proprietary and/or are proprietary            non-proprietary versions andlor non-proprietary    versions of  documents furnished of documents                   the NRC furnished to the   NRC connection with in connection in              with requests         generic and/or requests for generic            plant-specific review and approval.
These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(t) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).
andlor plant-specific                approval.
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance,denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
In order order to conform confonn*to    the requirements to the   requirements of     CFR 2.390 of of 10 CFR                Commission's regulations ofthe Commission's                   concerning the regulations concerning       the protection of proprietary protection                                      submitted to the NRC, information so submitted proprietary information                            NRC, the information                proprietary in the information which is proprietary proprietary versions proprietary                contained within versions is contained             brackets, and where the proprietary within brackets,                                informnation has been deleted proprietary intonnation                deleted the non-proprietary in the                     versions, only non-proprietary versions,               brackets remain only the brackets               infonnation that was remain (the information               contained within was contained   within the the brackets in the brackets    the proprietary proprietary versions versions having having been been deleted).
With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose.
deleted). The justification justification for claiming claiming the information information designated as proprietary so designated                        indicated in both versions proprietary is indicated            versions byby means of lower case    lehers (a) case letters (a) through through (f)
Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
(t) located as a superscript located                      immediately following the superscript immediately                  the brackets enclosing   each item of information enclosing each            information being being identified as proprietary or identified                                                        infonnation. These margin opposite such information.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary andlor non-proprietary versions of documents furnished to the NRC in connection with requests for generic andlor plant-specific review and approval.
or in the margin                                          lower case letters refer to the These lower types of infommtion information Westinghouse         customarily holds in confidence Westinghouse customarily                              identified in Sections confidence identified      Sections (4)(ii)(a) through (4)(ii)( f) of the affidavit (4)(ii)(t)        affidavit accompanying accompanying this transmittal transmittal pursuant    10 CFR pursuant to 10   CFR 2.390(b)(1).
In order to confonn*to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary intonnation has been deleted in the non-proprietary versions, only the brackets remain (the infonnation that was contained within the brackets in the proprietary versions having been deleted).
2.390(b)( 1).
The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case lehers (a) through (t) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such infonnation.
COPYRlGHT COPYRIGHT NOTICE transmitted herewith each The reports transmitted                 each bear a Westinghouse     copyright notice. The NRC is pernlitted Westinghouse copyright                              permitted to make the number of copies of the information contained                                          necessary for its contained in these reports which are necessary plant-specific reviews and approvals as well as the issuance, connection with generic and plant-specific internal use in connection renewal, modification, amendment, transfer, renewal, denial, amendment,                                                        revocation, or violation modification, suspension, revocation,         violation of a license, regulation subject to the requirement" permit, order, or regulation                                                       regarding restrictions requirements of 10 CFR 2.390 regarding         restrictions on public public proprietary by Westinghouse, disclosure to the extent such information has been identified as proprietary                                 copyright Westinghouse,copyright of non-proprietary versions of these reports, the NRC protection notwithstanding. With respect to the non-proprietary protection                                                                                                    NRC is pennitted to make the number of copies beyond those necessary permitted                                                      necessary for its internal use which are necessary necessary in order to have one copy available available for public viewing in the appropriate docket files in the public document document room in Washington, DC and in local public document rooms as may be required by NRC regulations if                       if insufficient for this purpose. Copies made by the NRC mllst the number of copies submitted is insufficient                                                            must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}}
These lower case letters refer to the types of infommtion Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)( f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)( 1 ). COPYRlGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is pernlitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirement" of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse,copyright protection notwithstanding.
With respect to the non-proprietary versions of these reports, the NRC is pennitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC mllst include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}}

Revision as of 16:42, 13 November 2019

WNA-DS-01667-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - Design Specification
ML102040482
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/30/2010
From: Shah D
Westinghouse
To:
Office of Nuclear Reactor Regulation
References
WNA-DS-01667-WBT-NP, Rev 1
Download: ML102040482 (70)


Text

{{#Wiki_filter:(8 O Westinghouse Westinghouse Westinghouse Non-Proprietary Class 3 Westinghouse Non-Proprietary RRAS Watts Bar 2 NSSS NSSS Completion Completion Program I&C Projects Post Accident Accident Monitoring Monitoring System --. System System Design Specification Specification WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, . Rev. I1 June 2010 2010 APPROVALS Function Function Name N arne and Signature Author Digish R. Shah* Engineer, Operating Operating Plant Safety System System 11 Reviewer Reviewer Allen C. Denyer* Principal Engineer, Operating Operating Plant Safety System System 11 David R. Ellis, Jr.* Jr.

  • Manager, Common Q Project Manager, Q PPAMS AMS Approver Approver Mesut B. Uzman*

Product Manager, Product Manager, FPGA FPGA Platform Engineering & Platfonn Engineering Systems

                                                                           & Systems
  *Electronically approved records
  *Electronically approved         are authenticated records are authenticated inin the  electronic document the electronic  document management  system.

management system.

                             © 2010 Westinghouse Westinghouse Electric Electric Company Company LLC LLC All All Rights Reserved

Post Accident Monitoring System - Monitoring System-RRAS Watts Bar 2 NSSS Completion Program Program I&C Projects Specification System Design Specification LIST OF CONTRIBUTORS CONTRIBUTORS Document Number Revision Name and Title WNA-DS-01667-WBT WNA-DS-01667-WBT A Shawn M. Downey Principal Engineer, I&C BOP Safety Principal Safety & Display Systems Systems WNA-DS-01667-WBT WNA-DS-01667-WBT A, 0, 1. 0,1. Jenna L. Tyger Jenna Tyger Editorial Specialist, Technical Communications Technical Communications WNA-DS-01667-WBT-NP WNA-DS-OI667-WBT-NP 1I Jenna Jenna L. Tyger Tyger Editorial Specialist, Technical Editorial Specialist Technical Communications Template Version 2.0 2.0 WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, i

Post Accident Accident Monitoring Monitoring System System - RRAS Watts RRAS Watts Bar Bar 22 NSSS NSSS Completion Completion Program Program I&C I&C Projects System

System Design

Design Specification Specification REVISION HISTORY REVISION RECORD RECORD OF OF CHANGES CHANGES Document Document Number Number Revision Revision Author Author Description Description Completed Completed WNA-DS-WNA-DS- A Digish Digish R. Shah Draft Draft created created for customer review and and 06/09 01667-WBT 01667-WBT comments comments WNA-DS-WNA-DS- 0 Digish Digish R. Shah Shah Original Original Issue 08/09 01667-WBT 01667-WBT r-a, a,c WNA-DS-WNA-DS- 1 Digish Digish R. Shah Shah 01/10 01110 01667-WBT 01667-WBT WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 ii ii

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design Specification Specification Document Document Number Revision Author Description Description a,c Completed a,c Completed WNA-DS- 1 Added brackets brackets to indicate Proprietary Proprietary See See o1667-WBT-NP 01667-WBT-NP Information. EDMS Deleted References References 88 and 9. DOCUMENT TRACEABILITY TRACEABILITY & COMPLIANCE COMPLIANCE Created to Support the Following Document(s) Created Document Number Document Number Revision Post Accident Monitoring System - System Requirements Requirements W)NA-DS-01617-WBT

                                                              *WNA-DS-01617-WBT                     1 Specifications Specifications OPEN OPEN ITEMS I I::: I Item None Description Description                                          Status WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                             iii

Post Accident Monitoring System-Accident Monitoring System - RRAS Watts Bar 22 NSSS Completion Completion Program Program I&C Projects Projects System Design Specification Specification TABLE OF CONTENTS Section Section Title Page LIST O FC OF ON TRIBU TO R S .......................................................................................

                           *CONTRIBUTORS                          ......................................................................................              i RE REVISION HISTORy ................................................................................................ ii VISIO   N   H   ISTO      R  Y   ................................................................................................

TA TABLEBLE OF CON CONTENTS TEN TS .....................................

                                                          ......................................................................................
...................................................... iv LIST O F TA OF TABLESB LE S ......................................................................................................
                                              ..............................................................................................                          vi LIST O  OF   FIGURES F FIG      U RE S ...............................................................................................
                                                ...............................................................................................              i, **** vi ACRONYMS ACRONYMS AND          AND TRADEMARKS TRADEMARKS ........................................................................
                                                                                  ...............................                                                     vii GLO    SSA RY OF TERMS GLOSSARY                   TERM S ...........................................................................................
                                                           ......................................................................................                     ix R  E FERE NC E S ......................................................................................................

REFERENCES ........................................................................................................... x REQUIREMENTS R E QU IR E MEN T S ......................................... ,.............................................................

                                              ......................................................................................               ............... xi SECTION SECTION 1     IN  TR O DU CTIO N ..............

INTRODUCTION ~ ................ , ...................................................................... 1-1

                                              .....................................................................................................

1.1 PU RP O SE ............................................................................................. PURPOSE ...................... 1-1

                               ...................................................................................................................                     1-1 1.2           SC O P E ......................................................................................................................

SCOPE ...................................................................................................................... .;. 1-1 1-1 1.3 FORM FORMAT AT OF THE DOCUMENT DOCUM ENT ....................

                                                                             .......................................................................
..................................................*:I.....
                                                                                                                                                              ..... 1-11-1 1.3.1         R  equirem ent Compliance Requirement         C ompliance ............................................................................................
                                                          ...........................................................................................                  1-1 1-1 1.3.2         Requirem Requirements ents Specification Specification Format      Form at ............................................................................
                                                                              ............................................................................ 1-1         1-1 1.3.3         D  esign Statem Design   Statement    ent Format.

Form at ............................................................................................

                                                           ........................................................................................... 11-2             -2 SECTION SECTION 2     PAMS ARCHITECTURE ARCHITECTURE DESCRIPTION             DESCRIPTION ...............................................................
                                                                                              .'.................................... ;........................ 2-1 2.1           PAMS OVERViEW                      .......                                                                   I................................... 2-1 OVERVIEW ....................................................................................................

2.2 PA PAMS M S ARCHITECTURE ARCH ITECTU RE ..........................................................................................

                                                             .........................................................................................                2-1 SECTION SECTION 33    PAMS FUNCTIONALITY FUNCTIONALITY ....................................................................................
                                                               ......................................                                                                 3-1
... 3-1*

3.1 PAMS FUNCTIONALITY FUNCTIONALITY OVERVIEW OVERVIEW ..................................................................

                                                                                         ..................................................................           3-1 3-1 3.2           MTP FUNCTIONALITy FUNCTIONALITY ...........................................................................................
                                                                                          .......................................                                     3-1 3-1

. 3.3 O OM M FUNCTIONALITY FUN C TIO N A LITY ............................................................

                                                        ............................................................           :I................................
                                                                                                                                 ................................ 3-1 3-1 SECTION SECTION 4     PAMS     HARDWARE CONFIGURATION PAMS HARDWARE                        CONFIGURATION .....................................
                                                                                            ...............................................................
.......................... 4-1 4J1 4;1 PAMS HARDWARE CONFIGURATION PAMS HARDWARE CONFIGURATION OVERVIEW ..................

OVERVIEW .......................................... 4-1 4.2 PA M S C A B IN E T ....................................................................................................... PAMS CABINET ....................................................................................................... 4-3 4-3 4 .2 .1 4.2.1 C abinet L Cabinet ayout ................................................................. Layout ............................................................................................................

.......................................... 4-3 4.2.1.1 Common Q Power Common Pow er Supply Layout Layout................................................................................
                                                                              ............................................................................ 4-5 4.2.1.2-4.2.1.2-               ~rimary RF616 Prim        ary    Subrack         Layout          ...............................................................................
                                                                        ...................................... :........................................... 4-5 4.2.1.3       MTP Layout ................................................................................................................
                                  ................................................                                                                                    4-9 4-9 4.2.1.4       RF620 Extension Subrack     Subrack Layout .........         ..........................................
..................................................................... 4-10 4-10 4.2.2 Numbering ................................................

Cabinet Numbering.; ................................................................................ ;.................. 4-11 4-11 4.3 MTP/OM CON MTP/OM FIGURA TION ................................................................................... CONFIGURATION ................................................................................... 4-11 4-11 4.3.1 K eylock Sw Keylock itches ........................................................................................................ Switches ....................................................................................................... 4-11 4-11 WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 iv

Post Post Accident Accident Monitoring Monitoring SystemSystem - RRAS RRAS Watts Watts Bar NSSS Completion Bar 22 NSSS Completion Program Program I&C Projects Projects System Design System Design Specification Specification 4.4 4.4 HARDWARE HARDWARE DESCRIPTION ................................................................................... 4-13 DESCRIPTION................................................................................... 4-13 4.4.1 4.4.1 Common Q Qualified Common Qualified Hardware ................................................................................. 4-13 Hardware ................................................................................ 4-13

   .4 .1.1 44.4.1.1           C             ........................................................................................................................ 44-13 ab inet ........................................................................................................................

Cabinet -13 4.4.1.2 AAC160 C 160 M Modules .......................................................................................................... 4-13 odules .......................................................................................................... 4-13 4.4.1.3 VO 11O T erm ination U Termination ................................................................................................. 4-29 nits ................................................................................................ Units 4-29 4.4.1.4 System ................................................................................................................. FPD System ................................................ 4-29 4-29 4.4.1.5 Pow Power er Supply System .; ................................................................................................ 4-30 System ................................................................................................. 4-30 4.4.2 PAMS StandardStandard HardwareHardware Subassemblies ................................................................. 4-32 Subassemblies ................................................................. 4-32 4.4.2.1 IR IRP . . ........................... P ...............................................................................................................................

                           ..........................................................................                                                             . . ...... 4-32 4-32 4.4.2.2           Cabinet Temperature Cabinet       Temperature Sensors                      .............................................................. ~ ...................... 4-33 Sensors ....................................                                                                       4~33 4.4.2.3           Field T     erm inal B Terminal          Blocks       ................................................................................................\ 4-33 locks ...............................................................................................                     4-33 4.4.2.4           Input Power Input      Power Distribution Distribution Breaker    Breaker Panel   Panel (AC)           ............................................................

(AC) ............................................................ 4-34 4-34 4.4.2.5 DC DC Distribution Distribution Breaker Breaker Assembly ........................................................ ;................... 4-34 Assembly ............................................................................ 4-34 4.4.2.6 Auxiliary A uxiliary Pow Power er Supply ................................... *............................................................ 4-34

                                                                ..............................................................................................               4-34

. 4.4.2.7 Primary SubrackSubrack - USA .................................................................... 4-35 USA and USB Feeds ................................................................... 4-35 4.4.2.8 Extension Subrack ................................................................. Subrack - USA and USB Feeds ................................................................. 4-35 4-35 4.4.2.9 D DP PC ell Power Cell Pow er Supp1ies Supplies ...... ~ .......................................................................................

                                                                ...................................................               .................................... 4-36  4-36 4.4.2.10          DIN Rail/TC514/Connection RaillTC514/Connection Units                             ............................................................................ 4-36 Units ............................................................................                 4-36 4.4.3 4 .4 .3           C  ab lin g ........................................................................................................................

Cabling ........................................................................................................................ 4-3 6 4-36 SECTION 55 SECTION INTERFACES AND COMMUNICATIONS INTERFACES ............................................................. 5-1 COMMUNICATIONS ............................................................. 5-1 5.1 ..................................... MTP DATA LINK ...................................................................................................... ...... 5-1 5-1 5.2 AF100 AFI00 BUS COMMUNICATION ............................................................................. COMMUNICATION ................................ , ............................................ 5-1 5-1 SECTION 6 GROUNDING AND COOLING REQUIREMENTS GROUNDING ................................................ REQUIREMENTS ................................................ 6-1 6.1 EA RT H IN G SC EARTHING HEM E .......................................... SCHEME .................................................... 6-1

                                                               ...............................................................................................               6-1' 6.2                                                                                      ......................................................................

CABINET/COMPONENT COOLING ...................................................................... CABINET/COMPONENT 6-1 WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, vV

Post Accident Monitoring System Syst~m - RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design SpecificationSpecification TABLE OF CONTENTS CONTENTS (coot.) (cont.) LIST OF TABLES Table Title Page 4.4-1. Table 4.4-1. t,e .......................... 4-14

                                                                                                             ]a,c .......................... 4 -14
                                                                                                             ]ac .......................... 4 -16 Table 4.4-2.                                                                                                  ]a,e .......................... 4-16 Table 4.4-3.                                                                                                 t,e  ...........................
                                                                                                            ]aC ........................... 4-17 4-17 Table 4.4-4.                                                                                                      t,e ...................... 4-19
                                                                                                                 ]a,c  ...................... 4-19
                                                                                                                 ]a,c ...................... 4-19 Table 4.4-5.                                                                                                      ]a,e  ...................... 4-19 Table 4.4-6.                                                                                                       t,e .....................
                                                                                                                   ]a,c ..................... 4-20 4-20 Table 4.4-7A. [                                                            t,e .........................................................
                                                                         ]a,c ......................................................... 4 -2 2
                                                                               .........................................................

4-22 4 -2 3 Table 4.4-7B. [ t,e .........................................................

                                                                         ]a,c ...................................... ............... 4724 4-23
                                                                                                                                                      .a.c Table 4.4-8A. [[                                                           ]",e ........................................ ,................ 4~24
                                                                         ]a,c ......................................................... 4 -2 5 Table 4.4-8B. [                                                           ]a,e ......................................................... 4-25
                                                                         ]ac ......................................................... 4 -2 6 Table 4.4-9A. [                                                            t,e .........................................................
                                                                         ]a, ................... ;..................................... 4 -2 7 4-26 Table 4.4-9B.

4.4-9B. [ ]",e ................... ;..................................... 4-27

                                                                            ]a,c ....................................................... 4 -2 8 4.4-10A.

Table 4.4-1 OA. [ ]a,e ....................................................... 4-28 Table 4.4-10B. [ Table . ]",e ..........................................: ............ 44-29

                                                                            ]f c .......................................................         -2 9 LIST OF FIGURES Figure                                                  Title                                                                                   Page 2.1-1.

Figure 2.1-1. [ ]",e

                              ] c ..................................................................................................
                                   .................................................................................................. 2         2-2
                                                                                                                                                 -2
                                                              ]a,c...................................................... .......... 4 -2 4.1-1.

Figure 4.1-1. [ ]",e .................................................................... 4-2 Figure 4.2-1. 4.2-1. [ ]"'........................................

                                                                                ]a,e ....................................................
............ 44-4
                                                                                                                                                 -4
                                                                                        ]a,c .............. t.............................. 4 -8 Figure 4.2-2. [                                                                          ]a,e .............................................. 4_8 Figure 4.4-1. [                                                         ]",e ............................................................ 4'31
                                                                       ]ac  ........................................................            4~31
                                                       ]ac ......................................................................... 5 -2 Figure 5.2-1.

5.2-1. [ ]",e ......................................................................... 5-2 WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 vi Ai

Post Post Accident Accident Monitoring Monitoring System System -- RRAS Watts RRAS Watts Bar Bar 22 NSSS Completion Program NSSS Completion Program I&C Projects Projects System

System Design

Design Specification Specification ACRONYMS ACRONYMS AND AND TRADEMARKS TRADEMARKS Acronyms used in the document Acronyms used document are are defined defined in WNA-PS-0001 6-GEN, "Standard WNA-PS-OOOl6-GEN, "Standard Acronyms Acronyms andand Definitions" (Reference 4), or included Definitions" (Refereqce 4), included below to ensure unambiguous understanding ensure unambiguous understanding ofof their use use within within this document. Acronyms Acronyms Definition Definition AC Alternating Alternating Current AI Analog Analog Input AO Analog Analog Output Output d/p dip Differential Differential Pressure DC Direct Current Current DI Digital Input Input DO Digital Output Output DP Differential Pressure Transducer Differential Pressure Transducer ESFAS Engineering Safety Feature Engineering Feature Actuation Actuation System System FE Function Function Enable Enable FOM Fiber Optic Modem Optic Modem FPD FPD. Flat Panel Display HISCH Hydraulic Hydraulic Isolator Isolator Status Contact (Head) (liead) HISCHL Hydraulic Isolator Status Contact (Hot Leg) Hydraulic Isolator HISCS Hydraulic Isolator Status Contact (Seal Hydraulic (Seal Table) HMI Human Machine Interface Human Machine Interface ICC Inadequate Inadequate Core Cooling IRP Interposing Relay Panel Interposing Panel MTP Maintenance and Test Panel Maintenance Panel OM Operator's Module Module PAMS Post Accident Monitoring System System PS Power Power Supply RCS Reactor Coolant System RTD Detector Resistance Temperature Detector RVLIS Reactor Vessel Level Instrumentation Instrumentation System SLE Software Load Enable Software TC Thermocouple thermocouple TRBL Trouble TU Termination Unit WDT Watchdog TimerTimer Advantis a registered trademark of ABB Process Automation Corporation. Advant IBM is a trademark of International IBM Machines Corporation in the United States, other International Business Machines other countries, or both. QNX is a registered trademark of QNX Software Systems GmbH & QNX & Co. KG ("QSSKG") ("QSSKG") and is used under license by QSS. ,WNA-DS-01667-WBT-NP, Rev. 1 'WNA-DS-01667-WBT-NP, vii

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design Specification Specification ACRONYMS AND ACRONYMS TRADEMARKS (coot.) AND TRADEMARKS (cont.) All other product product and corporate corporate names used in this document document may be trademarks or registered trademarks of other companies, and are used only /or for explanation explanation and to the owners' owners' benefit, without without intent to infringe. WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 viii

Post Accident Monitoring Monitoring System - RRAS Watts Bar 22 NSSS NSSS Completion Program I&C Projects System Design Specification Specification GLOSSARY OF TERMS Standard Standard terms tenns used in the document document are defined defined in WNA-PS-0001 6-GEN, "Standard WNA-PS-00016-GEN, "Standard Acronyms and Definitions" (Reference Definitions" (Reference 4), or included included below to ensure unambiguous understanding of their use within unambiguous understanding within this document. Term Definitions None. WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 ix ix

Post Accident Accident Monitoring System - Monitoring System-RRAS Watts Bar 22 NSSS Completion ProgramI&C Program I&C Projects System Design Specification Specification REFERENCES Following is a list of refe~ences references used throughout throughout, this document. 1.

1. WNA-DS-0 1617-WBT, Rev. 1, WNA-DS-01617-WBT, 1, "Post "Post Accident Monitoring Monitoring System - System System Requirements Specification,"

Specification," Westinghouse Westinghouse Electric Company LLC.

2. 00000-ICE-30155, 00000-ICE-30155, Rev. 9, "System "System Requirements Specification for the Common Q Generic Flat Requirements Specification Panel Display," Westinghouse Electric Display," Westinghouse Company LLC.

Electric CompanytLC.

3. 00000-ICE-30159, Rev. 02, "Hardware 00000-ICE-30159, "Hardware Requirements Specification for the Common Requirements Specification Common Q QPower Power Supply System,"

System," Westinghouse Westinghouse Electric Company LLC. I 4. WNA-PS-00016-GEN, Rev. 4, "Standard WNA-PS-00016-GEN, "Standard Acronyms and Definitions," Definitions," Westinghouse Westinghouse Electric Company LLC.

5. Regulatory Regulatory Guide 1.75, Rev. 02, "Physical "Physical Independence Independence of Electrica1 Electrical Systems,"

Systems," Nuclear Nuclear Regulatory Commission.

6. IEEE 384-1992, "Standard Criteria for Independence 384-1992, "Standard Independence of Class IE 1E Equipment Circuits,"

Equipment and Circuits," Institute of Electrical Electrical and Electronics Electronics Engineers, 1992. 1992.

7. IEEE 383-2003, "Standard for Type Test of Class IE Electric 383-2003, "Standard Electric Cables, Field Splices, and Connections for Nuclear Power Generating Stations,"

Generating Stations," Institute of Electrical Electrical and Electronics Electronics Engineers, Engineers, 2003. 2003.

8. Deleted
9. Deleted
                                                                                                    ,

10.

10. 2E10022, Rev. 2, "Safety 2El0022, "Safety System Standard 7721 Seismic Cabinet,"

Cabinet," Westinghouse Westinghouse Electric Company LLC. WNA..*DSV-01A7.-WRTNP DRv WNA-DS-01667-WBT-NP, Rev. 1 vvxz*

  • vavvt ***a-zx9 xl*v, 1 x x

Accident Monitoring System - Post Accident RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design Specification Design Specification REQUIREMENTS REQUIREMENTS Design and/or other requirements document. Following is a list of the requirements have been identified in this docufne!1t. requirement numbers and the document requirement document page on which the requirement requirement is identified.

            ................ 2-1 SDS2.2-1 ................                                                        ................. 4-11 R4.3.1-1 .................       4-11 SD S3.1-1 ................

SDS3.l-1 ................ 3-1 3-1 R4.3.1-2 .................

                                                                                ................. 4-11 SD S3.2-1 ................

SDS3.2-1 3-1

            ................ 3-1                                                ................. 4-12 R4.3.1-3 .................       4-12 SD S3.3-1 ................

SDS3.3-1 3-1

            ................ 3-1                                   R4.4-1 ....................      4-13
                                                                            .................... 4-13 SDS4.2.1 -1 .............

SDS4.2.1-1 ............. 4-3 R4.4.1.1-1 .............. 4-13 R4.4.l.1-1 .............. 4-13 SDS4.2.1-2 .............

                ............. 4-3                                   SDS4.4.1.2-1 ..........

SDS4.4.1.2-1.. 4-13

                                                                                           ........ 4-13 SDS4.2.1-3 .............
                ............. 4-3                                   SDS4.4.1.2-2 ..........         4-13
                                                                                         .......... 4-13 SDS4.2.1-4 .............
                ............. 4-3                                   SDS4.4.1.2-3 ..........         4-13
                                                                                         .......... 4-13 SDS4.2.1-5 .............
                ............. 4-3                                   SDS4.4.1.2-4 ..........         4-14
                                                                                         .......... 4-14 SDS4.2.1-6.............

SDS4.2.1-6 ............. 4-3 R4.4.1.2-1 .............. 4-14 R4.4.1.2-1 .............. 4-14 R4.2.1.1-1 ........... 4~5 R4.2.1.1-1 ............... 4-5 SDS4.4.1.2-5 .......... 4-15

                                                                                         .......... 4-15 SDS4.2.1.1-1 ..........         4-5
                    ......... .4-5                                 R4.4.1.2-2..............

R4.4.1.2-2 .............. 4-15 4-15 SDS4.2.1.1-2 ..........

                    .......... 4-5                                 R4.4.1.2-3       .......

R4.4.1.2-3 .............. 4-15 4-15 SDS4.2.1.1-3 .......... 4-5

                    ......... .4-5                                  SDS4.4.1.2-6 ..........         4-18
                                                                                         .......... 4-18 SDS4.2.1.1-4 ..........
                    .......... 4-5                                 R4.4.1.2-4 R4.4.1.2-4 ..............       4-18
                                                                                    .............. 4-18 SDS4.2.1.1-5 ..........
                    .......... 4-5                                 R4.4.1.2-5       .............. 4-18 R4.4.1.2-5 ..............       4-18 R4.2.1.2-1    ............... 4-5 R4.2.1.2-1 ...............                                           SDS4.4.1.2-7 ..........         4-18
                                                                                         .......... 4-18 R4.2.1.2-2...............

R4.2.1.2-2 ............... 4-5 SDS4.4.1.2-8 .......... 4-18

                                                                                         .......... 4-18 R4.2.1.2-3    ............... 4-5 R4.2.1.2-3 ...............                                           SDS4.4.1.2-9 ..........
                                                                                         .......... 4-20 R4.2.1.2-4    ............... 4-6 R4.2.1.2-4 ...............                                           R4.4.1.2-6 ................

R4.4.1.2-6  :........... 4-20 R4.2.1.2-5 ...............

             ............... 4-6                                    SDS4.4.1.2-10 ........

SDS4.4.1.2-10 ........ 4-22 SDS4.2.1.2-1 ..........

                    .......... 4-6                                 R4.4.1.2-7       .............. 4-22 R4.4.1.2-7 ..............

SDS4.2.1.2-2 ..........

                    .......... 4-6                                                  .............. 4-24 R4.4.1.2-8 ..............
                    .......... 4-9 SDS4.2.1.3-1 ..........                                              R4.4.1.2-9 ..............
                                                                                    .............. 4-26
                    .......... 4-9 SDS4.2.1.3-2 ..........                                              R4.4.1.2-10 R4.4.             ......

(2-10 ............ 4-28 R4.2.1.3-1 ............... 4-9 R4.2.1.3-1 ............... .............. 4-29 R4.4.1.3-1 .............. SDS4.2.1.3-3 .......... SDS4.2.1.3-3 .......... 4-9 SDS4.4.1.4-1 .......... SDS4.4.1.4-1 .......... 4-29 4-29 R4.2.1.3-2 4-9

             ............... 4-9 R4.2.1.3-2 ...............                                                           .............. 4-30 R4.4.1.5-1 ..............       4-30 R4.2.1.3-3    ............... 4-9 R4.2.1.3-3 ...............      4-9                                                       .......... 4-30 SDS4.4.1.5-1 ..........

SDS4.4.1.5-1 4-30 R4.2.1.3-4 ...............

             ............... 4-9 4-9                                  SDS4.4.1.5-2         .......... 4-30 SDS4.4.1.5~2 ..........         4-30 R4.2.1.3-5 ...............
             ............... 4-9 4-9                                                  .............. 4-30 R4.4.1.5-2 ..............       4-30 R4.2.1.4-1 ...............
             ............... 4-10 4-10                                                      .......... 4-30 SDS4.4.1.5-3 ..........         4-30 R4.2.1.4-2 ...............
             ............... 4-10 4-10                                                 .............. 4-30 R4.4.1.5-3 ..............       4-30
              ............... 4-10 R4.2.1.4-3 ...............      4-10                                                 .............. 4-30 R4.4.1.5-4 ..............       4-30 R4.2'1.4-4 ...............

R4.2~1.4-4 ............... 4-10 4-10 R4.4.1.5-5 .............. 4-30

                                                                                    .............. 4-30
              .............. 4-10 R4.2.1.4-5 ...............      4-10                                                 .............. 4-30 R4.4.1.5-6 ..............       4-30
          .................. 4-11 R4.2.2-1 .................. 4-11                                 R4.4.1.5-7 ..............
                                                                                    .............. 4-31
            ................ 4-11 SDS4.3-1 ................       4-11                                                 .............. 4-31 R4.4.1.5-8 ..............

R4.3-1 ..................... 4-11 R4.3-1 ..................... 4-11 SDS4.4.1.5-12 SDS4.4.1.5-12 ........ ........ 4-31 SDS4.3.1-1 ............. 4-1.1 SDS4.3.1-1 ............. 4-11 SDS4.4.1.5-13 SDS4.4.1.5-13 ........ ........ 4-32 4-32 SDS4.3.1-2 ............. 4-11 SDS4.3.1-2 ............. 4-11 SDS4.4.1.5-14 ........ SDS4.4.1.5-14 ........ 4-32 4-32 WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, Ai xi

Post Accident Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification R4.4.1.5-7 ............... R4.4.1.5-7 ....... 4-32 4-32 R4.4.3-17 ............... R4.4.3-17 ............... 4-38 SDS4.4.2.1-1 .......... SDS4.4.2.1-1 .......... 4-32 4-32 R4.4.3-18 ............... 4-38 R4.4.3-18 ............... SDS4.4.2.1-2 .......... 4-32

                     .......... 4-32                R4.4.3-19      ............... 4-38 R4.4.3-19 ...............

SDS4.4.2.1-3 .......... SDS4.4.2.1-3 .......... 4-33 R4.4.3-20 ............... R4.4.3-20 ............... 4-38 . 1R4.4.2.1-1 ............... 4-33 R4.4.2.1-1 ............... R4.4.3-21 ............... R4.4.3-21 4-38

                                                                   ............... 4-38 R4.4.2.1-2    ............... 4-33 R4.4.2.1-2 ...............                                      ................ 5-1 SDS5.1-1 ................       5-1 R4.4.2.1-3    ............... 4-33 R4.4.2.1-3 ...............                         SDS5.2-1..      .............. 5-1 SDS5.2-1 ................       5-1 R4.4.2.2-1    ............... 4-33 R4.4.2.2-1 ...............                         SDS5.2-2 ................       5-1
                                                                 ................ 5-1 R4.4.2.2-2    ............... 4-33 R4.4.2.2-2 ...............                         SDS5.2-3 ................       5-1
                                                                 ................ 5-1 R4.4.2.3-1    ............... 4-33 R4.4.2.3-1 ...............                         R5.2-1 ....................

R5.2-1 ................... 5-3 R4.4.2.3-2 ............... 4-33 R4.4.2.3-2 ............... R5.2-2 ....................

                                                           .................... 5-3 5-3
                                     *1 R4.4.2.4-1    ............... 4-34 R4.4.2.4-1 ............... 4-34                R5.2-3 ....................
                                                           .................... 5-3 5-3 R4.4.2.4-2    ............... 4-34 R4.4.2.4-2 ............... 4-34                R5.2-4 ...................... 5-3
................. 5-3 R4.4.2.4-3 ............... 4-34 R4.4.2.4-3 ............... 4-34 R5.2-5 ....................
                                                           .................... 5-4 5-4 R.2.2.1.11-1     ............ 4-34 R2.2.1.11-1 .............      4-34                R6.1-1 .................... 6-1 R6.1-1 ....................

R4.4.2.6-1 R4.4.2.6-1 .................. 4-34

                  ,........... 4-34                 R6.1-2 .....................
                                                           .................... 6-1 R4.4.2.6-2    ............... 4-35 R4.4.2.6-2 ...............                         R6.1-3 ....................
                                                           .................... 6-1 R4.4.2.6-3    ............... 4-35 R4.4.2.6-3 ...............                         R6.1-1 ....................
                                                           .................... 6-1 R4.4.2.6-4    ............... 4-35 R4.4.2.6-4 ...............                         R6.2-1 ....................
                                                           .................... 6-1 R4.4.2.6-5    ............... 4-35 R4A2.6-5 ...............                           R6.2-2 ....................
                                                           .................... 6-2 6-2 R4.4.2.6-6    ............... 4-35 R4.4.2.6-6 ...............

R4.4.2.7-1 ............... 4-35 R4.4.2. 7-1 ............... 4-35 R4.4.2.7-2 ............... 4-35 R4.4.2.7-2 ............... R4.4.2.8-1 ............... 4-35 R4.4.2.8-1 ............... R4.4.2.8-2 ............... R4.4.2.8-2 ............... 4-36 4-36 R4.4.2.9-1 ............... 4-36 R4.4.2.9-1 ............... 4-36 R4.4.2.10-1 ............. 4-36 R4.4.2.10-1 ............. 4-36 R4.4.2.10-2 ............. 4-36 R4.4.2.10-2 ............. 4-36 R4.4.3-1 .................. 4-36 R4.4.3-1 .................. R4.4.3-2 .................. 4-36 R4.4.3-2 .................. R4.4.3-3 ..................

           .................. 4-36 4-36
           .................. 4-36 R4.4.3-4 .................. 4-36
           .................. 4-37 R4.4.3-5 .................. 4-37
           ........

R4.4.3-6 .................. 4-37 4-37

           .................. 4-37 R4.4.3-7 ..................

R4.4.3-8 ..................

           .................. 4-37 4-37 SDS4.4.3-1 .............       4-37
                 ............. 4-37
           .................. 4-37' R4.4.3-9 .................. 4-37 R4.4.3-10 ..............       4-37
             .............. ;.4-37
             ............. :.. 4-37 R4.4.3-11 ............

R4.4.3-11 R4.4.3-12 R4.4.3-12 ................ 4-37

             ................ 4-37 R4.4.3-12 R4.4.3-12 ................ 4-37
             ................ 4-37 k4.4.3-13..........

R4.4.3-13.: 4-37

                .............. 4-37 R4.4.3-14 R4.4.3-14 ................ 4-38
             ................ 4-38 R4.4.3-15 ................ 4-38
             ................ 4-38 R4.4.3-16 R4.4.3-16 ................ 4-38
             ................ 4-38 WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                   xii

Post Accident Monitoring System Accident Monitoring System- - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Specification System Design Specification SECTION 1 INTRODUCTION INTRODUCTION 1.1 PURPOSE PURPOSE The purpose purpose of this document document is to define the hardware hardware design design requirements requirements and provide a high-level high-level hardware description for the hardware description the Watts Bar Unit 2 Post Accident Monitoring Monitoring System (PAMS). The hardware design requirements requirements are necessary necessary for the PAMS implementation implementation specified in in WNA-DS-01617-WBT, "Post Accident Monitoring WNA-DS-01617-WBT, Monitoring System - System Requirements Requirements Specification" Specification" (Reference 1). (Reference 1). 1.2 SCOPE document defines the physical hardware configuration This document configuration necessary necessary to implement the requirements requirements provided provided in Reference Reference 1.1. 1.3 1.3 .FORMAT FORMAT OF THE DOCUMENT DOCUMENT 1.3.1 1.3.1 Requirement Requirement Compliance When showing compliance compliance to a higher tiered requirement, requirement, the specified document requirement document and requirement number are presented presented in () associated design specification ( ) following the associated specification text. The following references references are used through this document: (SysRS R#### - ##) or (SysRS Section ###) is Reference Reference 1,1, WNA-DS-01617-WBT, WNA-DS-01617-WBT, Rev. 1, "Post Accident Accident Monitoring Monitoring System - System Requirements Requirements Specification," Specification," Westinghouse Electric Company Company LLC. (FPDR#### - ##) or (FPD (FPD (FPDSection###) Section###) is Reference 2, 00000-ICE-30155, 00000-ICE-30155, Rev. 9, "System "System Requirements Specification for the Common Q Generic Specification Generic Flat Panel Display," Westinghouse Westinghouse Electric Company Company LLC. (PS Section###) is Reference 3, (PS Section###) 3, 00000-ICE-30159, 00000-ICE-30159, Rev. 02, 02, "Hardware "Hardware Requirements Requirements Specification Specification for the Common Q Power the Common Q Power Supply System," Westinghouse System," Westinghouse Electric Company Company LLC. 1.3.2 Requirements Specification Requirements Specification Format Format System requirements are specified throughout this document document and are presented in the following format to clearly distinguish .clearly distinguish them from other text. R### --## R### ## [Requirement text.] [Requirement Guidance: Guidance Guidance text. WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-OI667-WBT-NP, 1-1

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects Specification System Design Specification Rationale: Rationale text. requirement is uniquely Each requirement uniquely numbered, although although the numbers numbers may not necessarily necessarily be in order. It is the intent intent that, in future revisions of this document, requirements retain their original original number. New requirements requirements are assigned a new, unique number. Some requirements are new design requirements originating in this document Some requirements document and hence do not need requirement requirement traceability. Other requirements that may need traceability traceability are referenced referenced in the following format. (Reference X R###) or (Reference (Reference X Section ###) 1.3.3 1.3.3 Design Statement Format Format Design statements statements are specified throughout this document document and are presented in the following format to clearly clearly distinguish them from other text. SDS### --## SDS### ## [Design statement text (Requirement (Requirement ID or Section).] Section).] Guidance: Guidance text. Guidance: Guidance Rationale: Rationale text. Each design statement is uniquely numbered, although the numbers numbers may not necessarily be in order. It is the intent that, in future revisions revisions of this document, design statements statements retain their original number. New design statements are assigned a new, unique number. All the design statements are traced to their requirement statements in the following format. (SysRS R#### R#### - ##), (SysRS Section ###),

                                       ###), (FPD (FPD R####

R#### - ##), (FPD Section###), (PS (FPD Section###), Section###) (PS Section###) (Reference XR###) (Reference (Reference XSection X R###) or (Reference X Section ###) (Last Page Page of Section Section 1) WNA-DS-01667-WBT-NP, Rev. I1 WNA-DS-01667-WBT-NP, 1-2

Post Accident Monitoring System - Accident Monitoring RRAS Watts Bar 2 NSSS Completion Program I&C Projects Projects System Design Specification Specification SECTION 2 PAMS ARCHITECTURE DESCRIPTION PAMS ARCHITECTURE 2.1 PAMS OVERVIEW PAMS OVERVIEW Unit 22 PAMS The Watts Bar Unit PAMS consists two separate of two consists of Class 1E separate Class IE trains that are trains that on an built on are built Advant an Advant Controller 160 (AC160) (ACI60) platform. Each train ofPAMS of PAMS has a flat panel display (FPD) for its operator's operator's module (OM) and maintenance maintenance and test panel (MTP). The system requirements specification specification for the FPD is provided provided in 00000-ICE-30155, OOOOO-ICE-30155, Rev. 9, "System "System Specification for the Common Q Requirements Specification Q Generic Generic Flat Panel Display," Display," Westinghouse Westinghouse Electric Company LLC. (Reference (Reference 2). Each train is mounted mounted in a dedicated cabinet, with identical hardware. Therefore, the following discussion addresses the hardware hardware requirements requirements of a single PAMS PAMS train. Any differences differences in the hardware configuration for Train A and Train B will be described described explicitly. 2.2 PAMS ARCHITECTURE PAMS ARCHITECTURE SDS2.2-1 [The major subsystems included in each train of the Watts Bar Unit 2 PAMS are as follows (SysRS R3.1.2-2), (SysRS R3.j.3-1), R3. 1.3-1), (SysRS R3.3.2-1), (SysRS3.3.2-2): (SysRS 3.3.2-2):

1. AC160 rack
1. rack-- Two per train
2. MTP - One per traintrain 3.
3. OM - One per train]

Guidance: Figure 2.1-1, Guidance: "PAMS 2.1-1, "P Architecture," shows the basic architecture of the Watts Bar Unit 2 AMS Architecture," PAMS. WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 2-1

Post Accident Accident Monitoring System System- - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Design Specification Specification a,c a,c Figure 2.1-1. [1 Figure 2.1-1. Ia,c (Last Page Page of Section Section 2) WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1I 2-2 2-2

Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Projects Completion Program I&C Projects* System Specification System Design Specification SECTION 3 SECTION 3 PAMS FUNCTIONALITY PAMS FUNCTIONALITY 3.1 3.1 PAMS FUNCTIONALITY OVERVIEW PAMS FUNCTIONALITY OVERVIEW SDS3.1-1 SDS3.1-1 [The PAMS PAMS performs performs post accident monitoring monitoring functions such as reactor vessel level monitoring, monitoring, subcooled margin monitoring, and core exit thermocouple thermocouple (CET) R2.3. 1-1)] (CET) monitoring. (SysRS R2.3.1-1)] 3.2 MTP FUNCTIONALITY FUNCTIONALITY SDS3.2-1 SDS3.2-1 [The MTP, located located in each P AMS train, provides the human machine interface PAMS interface (HMI) that is used for for maintenance, test, and internal alarm ~nctions. maintenance, functions. (SysRS R2.6.1-4), R2.6.1-4), (SysRS R2.B-l)] R2.8-1)] Guidance: TheThe MTP provides displays in support of the following activities:

   **    Surveillance Surveillance testing displays to verify verify PAMS operability operability
   **    Maintenance displays Maintenance   displays to support corrective corrective maintenance maintenance activities
  • Setpoint displays to provide provide the capability to monitor, change, change, load, and save setpoints (adjustable parameters) parameters)
    *0                                                PAMS status and diagnostics information System status displays to provide detailed pAMS                                information
     "
  • System health displays to provide provide diagnostic monitoring monitoring information for the AC160AC 160 processor processor module, communication interface module, input modules, modules, and output modules
     "
  • Operational displays to monitor PAMS operational operational status 3.3 3.3 OM FUNCTIONALITY FUNCTIONALITY SDS3.3-1 SDS3.3-1

[The OM, located located in each each PAMS train and mounted mounted in the control room, performs performs all the functions performed by the MTP except for the maintenance functions. (SysRS R2.6.2.1-1)] R2. 6.2.1-1)] (Last Page of Section Section 3) 3) WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 3-1 3-1

                                  "

Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Program Program I&C Projects Projects System Design Specification Specification SECTION 4 PAMS HARDWARE PAMS CONFIGURATION HARDWARE CONFIGURATION 4.1 HARDWARE CONFIGURATION PAMS HARDWARE CONFIGURATION OVERVIEW OVERVIEW The Watts Bar Unit 2 PAMS cabinet includes includes the following hardware as shown in Figure 4.1-1. 4.1-1. WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-1 4-1

Post Post Accident Accident Monitoring Monitoring System System - Watts Bar RRAS Watts RRAS NSSS Completion Bar 22 NSSS Program I&C Completion Program I&C Projects SystemDesign System -Design Specification Specification a,c ac Figure 4.1-1. [[ Ia,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 11 4-2

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System System Design Specification Specification 4.2 PAMS CABINET PAMS CABINET The PAMS cabinet ThePAMS cabinet shall have the following features. 4.2.1 Cabinet Layout Layout SDS4.2.1-1 SDS4.2.1-1 [The Watts Bar Bar Unit 2 PAMS is housed in a standard Westinghouse cabinet cabinet that is seismically qualified. (Reference 0(4), (SysRS (Reference 10, G04), (SysRSR3.1.7-1)] R3.1. 7-1)} Guidance: The overall dimension dimension of the Watts Bar Unit 2 PAMS cabinet is 87"h X 28"w X 29"d. 29"d. The height of the cabinet includes a 4 inch base. A basic layout of the Watts Bar Unit 2 PAMS cabinet cabinet is depicted in Figure 4.2-1. 4.2-1. SDS4.2.1-2 SDS4.2.1-2 [The (the Watts Bar Unit 2 P PAMS AMS cabinet is designed to accommodate accommodate top cable entry. (SysRS R3.1.1 ~6)] R3.1.1-6)] SDS4.2.1-3 a,c a,c [I ] SDS4.2.1-4 SDS4.2.1-4 a,c [ ] SDS4.2.1-5 SDS4.2.1-5 a,c a,c SDS4.2.1-6 a,c a,c SDS4.2.1-6 WNA-DS-01667-WBT-NP, WNA"DS-01667-WBT-NP, Rev. 1 4-3 4-3

Post Accident Accident Monitoring Monitoring System System- - RRAS Watts RRAS Bar 22 NSSS Completion Watts Bar Program I&C Completion Program I&C Projects System Design Specification System Specification a,c a,c 4.2-1. [ Figure 4.2-1. Ia,c WNA-DS-01667-WBT-NP, Rev. 11 WNA-DS-01667-WBT-NP, 4-4 4-4

Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Specification System Design Specification 4.2.1.1 Common Q Power Supply Layout Common R4.2.1.1-1 R4.2.1.1-1 I[ ]a,c a,c SDS4.2.1.1-1 a,c a,c CDS402oJOJ_J

                                                                                             ]

SDS4.2.1.1-2 rDS402o10J-2 I] a,c a,c SDS4.2.1.1-3 a,c SDS4.2.1.1-3 a,c [ ] K K SDS4.2.1.1-4 [ SDS4.2.1.1-3

                                                                                       ]a,c Iac a,c SDS4.2.1.1-5 SDS4.2.1.1-5                                                                                a,c

[ ]I 4.2.1.2 RF616 Primary Subrack Subrack Layout Layout a,c R4.2.1.2-1 a,c [ K

                                                                                               ]

R4.2.1.2-2 a,c [K ] a,c R4.2.1.2-3 a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-5 4-5

Post Accident Monitoring System - Completion Program RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification R4.2.1.2-4 a,c R4.2.1.2-5 R4.2.1.2-5 a,c SDS4.2.1.2-1 SDS4.2.1.2-1 a,c a,c [ ] a,c a,c SDS4.2.1.2-2 SDS4.2.1.2-2 I WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-6 4-6

Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-7 4-7

Post Monitoring System AccidentMonitoring Post Accident System- - RRAS Watts RRAS NSSS Completion Bar 22 NSSS Watts Bar I&C Projects Program I&C Completion Program Projects Design Specification

System Design

System Specification a,c a,c I1 4.2-2. [ Figure 4.2-2. Figure I a,c Rev. 11 WNA-DS-01667-WBT-NP, Rev. WNA-DS-01667-WBT-NP, 4-8 4-8

I Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Design Specification Specification 4.2.1.3 MTP Layout Layout SDS4.2.1.3-1 a,c [ ]I SDS4.2.1.3-2 SDS4.2.1.3-2 a,c [I ] I R4.2.1.3-1 a,c SDS4.2.1.3-3 a,c [ ] I R4.2.1.3-2 R4.2.1.3-2 a,c a,c R4.2.1.3-3 R4.2.1.3-3 a,c a,c [ K R4.2.1.3-4 R4.2.1.3-4

                                                                                           ]

[ t,ea,c R4.2.1.3':'S R4.2.1.3-5 a,c [ I] WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-9 4-9

Post Accident Accident Monitoring System -- RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design Specification Design Specification 4.2.1.4 RF620 Extension Extension Subrack Layout Layout R4.2.1.4-1 a,c L R4.2.1.4-2 R4.2.1.4-2 [ I a,c R4.2.1.4-3 R4.2.1.4-3 a,c R4.2.1.4-4 R4.2.1.4-4 a,c [ I

                                                                                           ]

I R4.2.1.4-5 R4.2.1.4-5 a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-10 4-10

Post Accident Accident Monitoring Monitoring System -- RRAS Watts Bar 22 NSSS Completion Completion Program I&C Projects Projects System Design Specification Specification 4.2.2 Cabinet Numbering Numbering R4.2.2-1 [As per TVA requirement, the two cabinets for Train A and Train B shall be numbered 2-R-179 and 2-R-180 respectively.] 4.3 MTP/OM CONFIGURATION CONFIGURATION SDS4.3-1 SDS4.3-1 a,c a,c [ R4.3-1

                                                                                                           ]

a,c a,c [ ] 4.3.1 Switches Keylock Switches SDS4.3.1-1 a,c I[ ] SDS4.3.1-2 SDS4.3.1-2 a,c a,c [ ] R4.3.1-1 a,c a,c [K

                                                                                                           ]

I R4.3.1-2 a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-11

Post Accident Accident Monitoring Monitoring System - Completion Program I&C Projects RRAS Watts Bar 2 NSSS Completion System Design Specification Specification

----------------------~------~~--------~------------------~------~~------~a,c

[ ] R4.3.1-3 a,c [I ]I WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-12 4-12

IPost Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design Specification Specification 4.4 HARDWARE DESCRIPTION HARDWARE R4.4-1 [The Common Qualified Platform Platform (Common Q) line of qualified hardware shall be used to implement implement the Watts Bar Unit 2 PAMS subsystems, subsystems, cabinets, cablings, and other related equipment.] As appropriate, additional detailed hardware design requirement requirement documents documents are provided provided for individual individual hardware components. hardware components. 4.4.1 4.4.1 Common Q Qualified Qualified Hardware hardware is used for the Watts Bar Unit 2 PAMS: The following standard Common Q hardware

    *"   Cabinet Cabinet*
    **  AC160 Modules
    **   F0 Termination 110 Termination Units
    **  FPD System System
    *"  Power Supply System System 4.4.1.1   Cabinet Cabinet R4.4.1.1-1 Westinghouse standard nuclear grade instrumentation

[A Westinghouse instrumentation and control (I&C) cabinet, Reference Reference 10, shall be used for the Watts Bar Unit 2 PAMS. (SysRS (SysRSR3.1.1-3), R3.1.1-3), (SysRSR3.1.6-1)] (SysRS R3. 1. 6-1)] 4.4.1.2 AC160 Modules SDS4.4.1.2-1 a,c a,c [K ] SDS4.4.1.2-2 SDS4.4;1.2-2 a,c a,c SDS4.4.1.2-3 a,c a,c SDS4.4.1.2-3 I[ ] WNA-DS-01667-WBT-NP, WNA-DS-OI667-WBT-NP, Rev. 1 4-13 4-13

Post Accident Monitoring System-Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Specification System Design Specification SDS4.4.1.2-4 SDS4.4.1.2-4 a,c a,c .R4.4.1.2-1 .R4.4.1.2-1 a,c [ I

                                                                                             ]I 4.4-1. [

Table 4.4-1. I a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-14 4-14

Post Accident Monitoring Monitoring System - RRAS Watts Bar Bar 22 NSSS Completion Program Program I&C Projects System Design Specification Specification Table 4.4-1. [ I8,C a,c SDS4.4.1.2-5 SDS4.4.1.2-5 a,c a,c R4.4.1.2-2 R4.4.1.2-2 a,c [ R4.4.1.2-3

                                                                                              ]I R4.4.1.2-3 I

[ I a,c WNA-DS-01667-WBT-NP, Rev. 1 . WNA-DS-OI667-WBT-NP, 4-15 4-15

Post Accident Monitoring System - Monitoring System-RRAS Watts Bar 2 NSSS Completion Program Program I&C Projects Specification System Design Specification Table 4.4-2. 4.4-2. [ a,c a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-16 4-16

Post Accident Monitoring System System- - RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects System Design Specification Design Specification Table 4.4-3. 4.4-3. [ ]s,c IaRc a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-17 4-17

Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects RRAS System Design Specification Specification SDS4.4.1.2-6 SDS4.4.1.2-6 a,c a,I R4.4.1.2-4 R4.4.1.2-4 a,c [ ] a,c R4.4.1.2-5 R4.4.1.2-5 a,c [ Il

                                                                                            ]

SDS4.4.1.2-7 SDS4.4.1.2-7 IC [ ]S,C a,c SDS4.4.1.2-8 SDS4.4.1.2-8 a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-18 4-18

Post Accident Monitoring Monitoring System - RRAS Watts Bar Bar 22 NSSS Completion Completion Program Program I&C Projects System Design Specification Specification Table 4.4-4. [ Table I a,c a,c a,c Table 4.4-5. [ I a,c a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-19 4-19

Post Accident Accident Monitoring System-System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification SDS4.4.1.2-9 SDS4.4.1.2-9 a,c a,c R4.4.1.2-6 R4.4.1.2-6 a,c a,c [ K Table Table 4.4-6. 4.4-6. [ a,c

                                                                                         ]] a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP,                        4-20 4-20

Post Accident Monitoring System Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Specification System Design Specification Table Table 4.4-6. [ Iac a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-21

Post Accident Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System System Design Specification Design Specification SDS4.4.1.2-10 SDS4.4.1.2-10 a,c I I R4.4.1.2-7 R4.4.1.2-7 a,c I[ Table 4.4-7A. Table 4.4-7 A. [ I]a,c aIc

                                                                                                   ]

ac ac Item Designator Designator Name Description Description WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 11 4-22 4-22

Post Accident Monitoring System System- - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Design Specification Specification

                                                                  ,

Table 4.4-7B. 4.4-7B. [ j]a,c ac a,c a,c Item Designator Designator Name Name Description Description WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-23

Post Accident Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Design Specification Specification R4.4.1.2-S R4.4.1.2-8 a,c I[ Table 4.4-8A. 4.4-SA. [ I]a,c a~c

                                                                                           ]

a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 11 4-24 4-24

Post Accident Monitoring System System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects Specification System Design Specification 4.4-SB. [ Table 4.4-8B. Ia,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-25 4-25

Post Accident Monitoring System - Monitoring System-RRAS Watts Bar 2 NSSS Completion Completion Program Program I&C Projects Specification System Design Specification R4.4.1.2-9 R4.4.1.2-9 a,c ac i[ Table 4.4-9A. 4.4-9A. [ ]s,c Iac

                                                                                            ]

a,c I WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-26

Post Accident System - Accident Monitoring System-RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification 4.4-9B. [f Table 4.4-9B. I a,c a,c a,c WNA-DS-01667-WBT-NP, WNA-DS~01667-WBT-NP, Rev. 1 4-27

Post Accident Monitoring Monitoring System - RRAS Watts Bar 22 NSSS Completion Program I&C Projects System Design Specification Specification R4.4.1.2-10 R4.4.1.2-10 a,c a,c I[ Table 4.4-10A. 4.4-10A. [ IJs,c ac

                                                                                              ]

a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-28

Monitoring System - Post Accident Monitoring RRAS Watts Bar 2 NSSS Completion Program I&C Projects Completion Program Specification System Design Specification Table 4.4-10B. 4.4-10B. [ I a,c a,c a,c I I

                                                                                                                  /

4.4.1.3 4.4.1.3 I/O Termination 1/0 Termination Units R4.4.1.3-1 R4.4.1.3-1 Common Q [The Watts Bar Unit 2 PAMS shall utilize the standard Common Q I/O termination units.] I/O: tennination 4.4.1.4 FPD System System SDS4.4.1.4-1 a,c [ JI WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-29 4-29

Post Accident System - Accident Monitoring System-RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Specification System Design Specification 4.4.1.5 4.4.1.S Power Power Supply System System R4.4.1.5-1 R4.4.1.S-1 a,c a,c [ ] I SDS4.4.1.S-1 SDS4.4.1.5-1 a,c a,c [ I

                                                                                           ]I SDS4.4.1.S-2 SDS4.4.1.5-2                                                                             a,c a,c R4.4.1.5-2 R4.4.1.S-2                                                                               a,c

[I ]I a,c SDS4.4.1.5-3 SDS4.4.1.S-3 a,c R4.4.1.5-3 R4.4.1.S-3 [ Ja,c I a,c R4.4.1.5-4 R4.4.1.S-4 [ Ja,c a,c

                                                                                                \

R4.4.1.5-5 R4.4.1.S-S a,c a,c [ ] ER4.4.1.5-6 R R4.4.1.S-6 a,c a,c I [ I] WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-30 4-30

Accident Monitoring System -- Post Accident RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification System Specification R4.4.1.5-7 R4.4.1.S-7 a,c R4.4.1.5-8 R4.4.1.S-8 [[ Ia,C a,c 4.4-1. [ Figure 4.4-1. a,c SDS4.4.1.5-12 SDS4.4.1.S-12 a,c Rev. 1 4-31 WNA-DS-O 1667-WeT-NP, Rev. 1I WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, 4-31

Accident Monitoring Post Accident Monitoring System - Completion Program I&C Projects RRAS Watts Bar 2 NSSS Completion System Design Specification Specification a,c a,c [I ] SDS4.4.1.5-13 SDS4.4.1.5-13 a,c a,c I[ ]I SDS4.4.1.5-14 SDS4.4.1.5-14 a,c a,c [ ]I R4.4.1.5-7 a,c 4.4.2 PAMS Standard Standard Hardware Subassemblies Hardware Subassemblies 4.4.2.1 IRP SDS4.4.2.1-1 SDS4.4.2.1-1 a,c K SDS4.4.2.1-2 SDS4.4.2.1-2 a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-32

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Design Specification Specification a,c [I I

                                                                                               ]

SDS4.4.2.1-3 SDS4.4.2.1-3 a,c [ R4.4.2.1-1 I] a,c a,c I[R4.4.2.1-2 R4.4.2.1-2 I] [ I a,c R4.4.2.1-3 R4.4.2.1-3 a,c 4.4.2.2 Cabinet Cabinet Temperature Temperature Sensors R4.4.2.2-1 a,c R4.4.2.2-2 R4.4.2.2-2 a,c ac [ ]I 4.4.2.3 Field Terminal Blocks R4.4.2.3-1 R4.4.2.3-1 I[ I a,c R4.4.2.3-2 R4.4.2.3-2 a,c a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-33

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects RRAS System Design Specification System Specification a,c [E ]I 4.4.2.4 Input Power Distribution Distribution Breaker Breaker Panel (AC) [4 42.4-1 R4.4.2.4-1 0 0 a,c

                                                                                               ]I R4.4.2.4-2 R4.4.2.4-2                                                                                   a,c

[ J R4.4.2.4-3 R4.4.2.4-3 'ac

                                                                                            'a,c 4.4.2.5    DC Distribution Breaker Assembly Assembly R2.2.1.11-1 R2.2.1.11-1                                                                                  a,c 4.4.2.6     Auxiliary Power Supply R4.4.2.6-1                                                                                  a,c a,c

[ WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-34 4-34 I]

Accident Monitoring Post Accident Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects Projects System Design Specification Specification R4.4.2.6-2 R4.4.2.6-2 ac [ R4.4.2.6-3 R4.4.2.6-3 I. I a,c R4.4.2.6-4 R4.4.2.6-4 [ R4.4.2.6-5 [ [ a,* R4.4.2.6-6 R4.4.2.6-6 a,c K 4.4.2.7 Primary Primary Subrack - USA and USB USB Feeds I R4.4.2.7-1 a,c £ R4.4.2.7-2 R4.4.2.7-2 I a,c, a,c I 4.4.2.8 Extension Subrack - USA and USB USB Feeds Feeds R4.4.2.8-1 R4.4.2.8-1 a,c '[It ] WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-35

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Specification System Design Specification

--------------------~----~~------~----------------~----~~~----~a,c
                                                                                             -a,c

[I I] R4.4.2.8-2 R4.4.2.8-2 a,c a,c 4.4.2.9 Supplies DP Cell Power Supplies R4.4.2.9-1 a,c [ 4.4.2.10 DIN RaillTC514/Connection Rail/TC514/Connection Units I] R4.4.2.10-1 R4.4.2.10-1 [ IR. Ia,c R4.4.2.10-2 a,c 4.4.3 Cabling

                                                                                                ]I R4.4.3-1                                                                                      a,c

[R4.4.3-2 R4.4.3-2 [ ]]8,C 8,C R4.4.3-3 R4.4.3-3 I [ ]8,C Ia,c R4.4.3-4 [ ]8,C I a,C WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 4-36 4-36

Post Accident System - Accident Monitoring System-RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification R4.4.3-5 a,c [ ] I R4.4.3-6 R4.4.3-6 a,c [ ] R4.4.3-7 a,c a,c [K J [4<4<3-8 I R4.4.3-8 I] a,c [K SDS4.4.3-1 SDS4.4.3-1 a,c a,c I R4.4.3-9 R4.4.3-9 J ac a,c [K4.4.3-10

                                                                                           ]

R4.4.3-10 a,c ac [ R4.4.3-11

                                                                               ~a,c        ]

R4.4.3-11 R [ R4.4.3-12 axc a,c [ER4.4.3-12 R4.4.3-12

                                                                                           ]I R4.4.3-12                                                                               axc a,c

[ I

                                                                                             ]I R4.4.3-13 R4.4.3-13 I[                                                                       a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1                 4-37 4-37

Post Accident

                                                              *PostAccident Monitoring System-System-RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects               System         Specification System Design Specification a,c

[I ]I R4.43-14 R4.4.3-14 [ I a,c II R4.4.3-15 R4.4.3-1S [I Ia,C R4.4.3-16 R4.4.3-16 I[ I a,C R4.4.3-17 R4.4.3-17 a,c R4.4.3-18 R4.4.3-1S a,c [ ] R4.4.3-19 R4.4.3-19 a,c a,c [ ] R4.4.3-20 a,c [ ]I R4.4.3-21 I [I t*a,ce WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 4-38 4-38

Post Accident Accident Monitoring System - System RRAS Watts Bar 22 NSSS Completion Program I&C Projects Completion Program System Design Design Specification Specification SECTION 5 SECTION INTERFACES AND COMMUNICATIONS INTERFACES COMMUNICATIONS 5.1 MTP DATA LINK LINK SDS5.1-1 SDSS.1-1 a,c 5.2 5.2 AF100 BUS COMMUNICATION COMMUNICATION SDS5.2-1 SDSS.2-1 a,c a,c SDS5.2-2 a,c I

                                                                                              ]

SDS5.2-3 SDSS.2-3 a,c a;c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-01667-WBT-NP, 5-1

Post Accident Accident Monitoring System System - RRAS Watts Bar 2 NSSS Completion Completion Program I&C Projects System Design Specification Specification a,e a,c [K ] a,e a,c Figure 5.2-1. Figure 5.2-1. [ a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 5-2 5-2

Post Accident Monitoring Monitoring System - RRAS Watts Bar Completion Program I&C Projects Bar 2 NSSS Completion System Design Specification Specification K R5.2-1 RS.2-1 a,c a,c R5.2-2 RS.2-2 a,c R5.2-3 RS.2-3 a,c R5.2-4 RS.2-4 a,c a,c WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 5-3 5-3

Post Accident Monitoring System - Monitoring System-RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification R5.2-5 RS.2-S a,c I[L ] (Last Page of Section 5) 5) WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 5-4 5-4

Post Accident Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects System Design Specification Specification SECTION 6 GROUNDING AND GROUNDING AND COOLING REQUIREMENTS REQUIREMENTS 6.1 EARTHING SCHEME SCHEME R6.1-1 [The Watts Bar Unit 2 PAMS cabinet shall be provided with a high quality ground bus with a connection connection to the plant ground grid.] ac a,c [ I

                                                                                                            ]

I R6.1-2 a,c a,c [ I

                                                                                                           ]I R6.1-3

[ 18,c

                                                                                    ]a,c R6.1-1                                                                                                   a,c 6.2        CABINET/COMPONENT COOLING CABINET/COMPONENT           COOLING R6.2-1                                                                                                   a,c WNA-DS-01667-WBT-NP, Rev. 1 WNA-DS-OI667-WBT-NP,                             6-1 6-1

Post Accident Monitoring Monitoring System - RRAS Watts Bar 2 NSSS Completion Program I&C Projects _ _ _ _ _ _ _ _Sy~s_t_em_D_es_ig~n_S~p_ec_i_fi_c_at_io_n--a R_RA_..::.S_W_a_tt...:.s_B_a_r....:2...:.N~S...::.S...:.S_C_o_m....:.!:..p...:.le_tI....:*o_n_P_r_0..!Og!::.r_a_m_I_&_C_P_r_o~je_c_t_s _ System Design Specification a,e ac K R6.2-2 a,e a,c (Last Page of Section 6) 6) WNA-DS-01667-WBT-NP, WNA-DS-01667-WBT-NP, Rev. 1 6-2 6-2

Enclosure Enclosure 3 Application For Withholding Withholding Proprietary Proprietary Information Information From Public Disclosure CAW-10-2877 Disclosure CAW-10-2877 Dated June 2010 June 30, 2010

Subject:

WNA-DS-01667-WBT-P, WNA-DS-01667-WBT-P, Revision 1, "RRAS NSSS "RRAS Watts Bar 2 NSSS Completion Program I&C Project Post Accident Completion Program Monitoring System - Accident Monitoring System Design Specification" (Proprietary) Specification" (Proprietary)

(8WWestinghouse S)Weustinghouse esin ho s NuclearServices Nuclear ElectricCompany WestinghouseElectric Westinghouse Services P.O. Box 355 P.O. Box 355 Company Pittsburgh, Pennsylvania 15230-0355 Pittsburgh, Pennsylvania 15230-0355 USA USA U.S. Regulatory Commission Nuclear Regulatory U.S. Nuclear Commission Direct Directtel: tel: (412) 374-4643 (412) 374-4643 Document Control Desk Document Control Desk Direct fax: Directfu.x: (412) 374-3846 (412)374-3846 Washington, DC Washington, DC 20555-0001 20555-0001 e-mail: e-mail: greshaja@westinghouse.com greshaja@westinghouse.com Proj letter: WBIT-D-2095 Proj letter: W8T-D-2095 CAW-10-2877 CA W -J 0-2877 June 30, 2010 June 30, 20 I 0 APPLICATION FOR APPLICATION WITHHOLDING PROPRIETARY FOR WITHHOLDING PROPRIETARY INFORMATION INFORMAIJ.0NERQM FROM PUBLIC PUBLIC DISCLOSURE DISCLOSURE

Subject:

WNA-DS-01667-WBT-P, Rev.

Subject:

WNA-DS-01667-WBT-P, Rev. 1,'"RRAS 1, "RRAS WattsWatts Bar Bar 22 NSSS Completion Program NSSS Completion Program I&C I&C Projects Post Projects Post Accident Accident Monitoring System -- System Monitoring System Design Spccification"' System Design Specification" (Proprietary) (Proprietary) The proprietary information The proprietary information for which withholding for which being requested withholding isis being requested in in the above-referenced report the above-referenced report isis further identified in Affidavit CAW-t0-2877 signed by the owner of the further identified in Affidavit CA W-IO-2877 signed by the owner ofthe proprietary infonnation,proprietary information, Westinghouse Electric Company Westinghouse Electric Company LLC. The affidavit, LLC. The affidavit, which accompanies this which accompanies letter, sets this letter, sets forth forth the the basis basis on which the infonnation may be withheld from public disclosure by the Commission and addresses with on which the information may be withheld from public disclosure by the Commission and addresses with specificity the specificity considerations listed the considerations listed in paragraph (b)(4) in paragraph of 10 (b)(4) of 10 CFR Section 2.390 CPR Section 2.390 of the Commission's ofthe Commission's regulations. regulations. Accordingly. this Accordingly, this letter authorizes the letter authorizes utilization of the utilization ofthe accompanying affidavit the accompanying aftidavit by Tennessee Valley by Tennessee Valley Authority. Authority. Correspondence with Correspondence with respect respect to to the proprietary aspects the proprietary aspects of the application of the application for withholding or for withholding or the the Westinghouse affidavit should reference this letter, CAW-] 0-2877, and should Westinghouse affidavit should reference this letter, CA W- J 0-2877, and should be addressed to be addressed to J.J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, A. Gresham, Manager, Regulatory Compliance alld Plant Licensing. Westinghouse EleCtric Westinghouse Electric Company LLC, Company LLC, P.O. P.O. Box Pittsburgh, Pennsylvania 355, Pittsburgh, Box355, 15230-0355. Pennsylvania15230-0355. Very Very truly truly your s, yours,

                                                             ;~4,~

JJ. A. Gresham, Manager A. Gresham, Manager Regulatory Compliance and Regulatory Compliance and Plant Plant Licensing Licensing Enclosures Enclosures

CAW-10-2877 CAW-l 0-2877 AFFIDAVIT AFFIDAVIT COMMONWEALTH OF COMMONWEALTH OF PENNSYLVANIA: PENNSYLVANIA: 55 s5 . COUNTY COUNTY OF ALLEGHENY: ALLEGHENY: Before me, Before me, the the undersigned undersigned authority, authority, personally appeared J.J. A. Gresham, personillly appeared who, being by me Gresham, who, duly meduJy according to law, deposes and sworn according sworn aild says authorized to execute this Affidavit on says that he is authorized on behalf behalf of of Westinghouse Electric Westinghouse Electric Company Company LLC .LLC (Westinghouse), averments of (Westinghouse), and that the averments fact set forth in this offact tl~ue and correct to Affidavit are true Affidavit to the best of his kno\.vledge, infonnation, and belief: knowledge, information, 4A. Gresham, Manager Licensing Compliance and Plant Licensing Regulatory Compliance Sworn to and subscribed before me this 30th day of June 20 \0 2010 Nofary Public PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA COMMONWEALTH NOTARIAL SEAL NOTARIAL SEAL Renee Giampole. Renee Notary Public Giampole, NotaryPublic Penn Township, Penn Westmoreland County Township, WestmorellllndCounty My CommlsSlon'Explres My Cornmlulon.Exples September 25, 20*13 September 25.2013

                                                                                                                           )2

2 CAW- 10-2877 CAW-I 0-2877 (1) I am Manager, Manager, Regulatory Regulatory Compliance and Plant Licensing, in Nuclear Services, WestinghouseWestinghouse Electric Company (Westinghouse), and as such, JI have been specifically Company LLC (Westinghouse), specifically delegated delegated the the function of reviewing reviewing the proprietary proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing connection licensing and rule making making proceedings, and am authorized authorized to apply for its withholding on behalf behalf of Westinghouse. (2) (2) I1am making this Affidavit Affidavit in conformance conformance with the provisioilsof provisions of 10 Cf'R CFR Section 2.390 of the Commission's regulations Commission's regulations and in conjunction with the Westinghouse Westinghouse Application for Withholding Withholding Information from Public Disclosure Proprietary Information accompanying this Affidavit. Disclosure accompanying (3) I1have personal knowledge of the criteria and procedures procedures utilized by Westinghouse Westinghouse in designating designating information as a trade secret, privileged privileged or as confidential commercial or financial information. confidential commercial (4) (4) Pursuant to the provisions of paragraph (b)(4) paragraph (b)( 4) of Section 2.390 of the Commission's Commission's regulations, regulations, the following is furnished for consideration consideration bythe by the Commission in determining whetherwhether the information sought to be withheld from public disclosure disclosure should be withheld. (i) (i) The information sought soughttoto be withheld from public disclosure is owned and has been held in confidence confidence by Westinghouse. (ii) (ii) information is of a type customarily The infomtation customarily held in confidence confidence by Westinghouse Westinghollse and not customarily disclosed customarily disclosed to the public. Westinghouse has a rational basis for determining determining the types of infon11ation information customarily cllstomarily held in confidence confidence by it and, in that connection, connection, utilizes a system to determine determine when and whether to hold certaincertain types of information in information in substance Of that confidence. The application of that system and the substanceOf that system constitutes Westinghouse Westinghouse policy and provides the rational basis required. Under Under that system, system, information information is held in confidence confidence if it falls in one or more of several types, the release of which which might result in the loss of an existing or potential competitive competitive advantage, advantage, as follows: (a) (a) The information reveals reveals the distinguishing aspects of a process (or component, component, structure, structure, tool, method, etc.) etc.) where prevention prevention of its use by any of of

3 ~CAW-1 3CAW-l 0-2877 0-2877 competitors without license f-rom Westinghouse's competitors Westinghouse's from Westinghouse constitutes a Westinghouse constitutes competitive advantage over economic advantage competitive economic over other other companies. companies. (b) data, relative to a data,. including test data, ItIt consists of supporting data, a process (or component, structure, tool, method,method, etc.), the application data secures a application of which data advantage, e.g., competitive economic advantage, optimization or improved c.g., by optimization. improved marketability. (c) (c) Its use by a expenditure of competitor would reduce his expenditure a competitor ofresources or improve his resources or competitive position in manufacture, shipment, installation, assurance in the design, manufacture, assurance of quality, or similar product, or licensing aa similar product. (d) (d) It reveals cost or price infonnation, production capacities, budget levels, or information,. production commercial strategies of Westinghouse, commercial customers or suppliers. Westinghouse, its customers (e) (e) It reveals aspects of past, present, or future Westinghouse or customer funded fu~nded development plans and programs of potential commercial commercial value to to Westinghouse. (t) () It contains patentable ideas, for which patent protection may be desirable. There are sound policy reasons behind the Westinghouse system which include the following: (a) (a) The use of such information by Westinghouse gives Westinghouse aa.competitive advantage over its competitors. It It is, is,therefore, withheld from disclosure to protect the Westinghouse competitive position. (b) (b) It isis infonnation information that isis marketable in many ways. The extent to which such information is is available to competitors diminishes the Westinghouse ability to to products and sell products and services services involving information. involving the use of the itifomlation. (C) (c) Use by our competitor would put Westinghouse at aacompetitive disadvantage by Use by by expenditure of resources at our reducing his expenditure our.expense. expense..

4 CAW-10-2877 CAW-IO-2877 (d) (d) Each Each component component of proprietary proprietary information pertinent pertinent to a particular competitive competitive advantage advantage is potentially as valuable valuable as the total competitive competitive advantage. If If competitors competitors acquire components components of proprietary information, anyone proprietary information, any one component component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive competitive advantage. (e) (e) Unrestricted disclosure would jeopardize jeopardize the position of prominence prominence ofof Westinghouse Westinghouse in the world market, and thereby thereby give a market advantage to thethe competition of those countries. competition (f) (t) Westinghouse capacity to invest corporate The Westinghouse corporate assets in research research and development depends upon the success in obtaining and maintaining a development competitive advantage. competitive (iii) (iii) The information information is being transmitted to the Commission confidence and, Commission in confidence and,.under under the provisions provisions of of]100 CFR Section Section 2.390; it is is to be received in confidence confidence by the Commission. (iv) (iv) The information sought to be protected protected is not available inpublic available in public sources or available information has not been previ<:?usly infomlation previously employed in the same original manner or method to the best of our knowledge hestof belief. knowledge and belief. (v) The proprietaryinfomlation proprietary information sought to be withheld in this submittal is that which is appropriately appropriately marked in WNA-DS-OI667-WBT-P, WNA-DS-01667-WBT-P, Rev. 1, 1, "RRAS "RRAS Watts Bar 22 NSSS Completion Completion Program I&C J&C Projects Projects Post Accident Accident Monitoring Monitoring System - System Design Specification" (Proprietary) Specification" (Proprietary) dated June 2010, for submittalto submittal to the Commission, Commission. being transmitted by Tennessee Valley Authority letter and Application Application for Withholding Withholding Proprietary Proprietary Information Infomlation from Public Disclosure, to the Document ControlControl Desk. The proprietary information as submitted proprietary infomlation submitted by Westinghouse is that associated with the NRC review of the Post Accident ofthe Monitoring System (PAMS) Accident Monitoring (PAMS) being designed for Watts Bar Unit 2 and may be used only for that purpose.

55 CAW-1.0-2877 CA W- 10-2877 information is This information part of is part which will that which ofthat Westinghouse to: enable Westinghouse will enable (a) (a) customer in Assist the customer in providing technical licensing providing requested technical information to the licensing information NRC that is required Common Q Post approval of the Common required for approval AcCident Monitoring Post Accident Monitoring system (PAMS). (PAMS). information has substantial Further this information Further commercial value as substantial commercial as follows: (a) (a) Westinghouse plans to Westinghouse to sell the use of selLthe ofsiiriilar infonnation to its similar information customers for itsclIstomers purpose of other plant-specific applications. other plant-specific applications. (b) (b) Its use tisehy competitive position in the design and by a competitor would improve his competitive and licensing of a similar product. licensing (c) (c) information requested The information withheld reveals requested to be withheld aspects of a reveals the distinguishing aspects methodology which was developed by Westinghouse. disclosure of this Public disclosure this proprietary proprietary infon11ation substantial harm to the information is likely to cause substantial because it would enhance the ability of Westinghouse because competitive position of Westinghouse competitive of competitors to provide competitors provide similar instrumentation systemsand instrumentation & control systems and licensing licensing defense commerc.ial power services for commercial services reactors without commensurate power reactors expenses. Also, public commensurate expenses; disclosure of the information would enable disclosure enable others to use the inforination meet NRC information to meetNRC witholltpurchasing the right to usethe documentation without-purchasing requirements for licensing documentation requirements use the information. infonnation. The development oftheof the technology described in part by the information is the result of of applying the results of many years of experience applyingthe Westinghouse effort and experience. in an intensive Westinghouse and* considerable sum of money. the expenditure of a considerable Westinghouse to duplicate competitors of Westinghouse In order for con'lpetitors information, similar technical duplicate this information, effort, having the asignificant manpower effort,having programs would have to be performed and asignificantmanpower experience, would have to be expended. requisite talent and experience, sayeth not. Further the deponent sayethnot.

PROPRIETARY INFORMATION NOTICE PROPRIETARY INFORMATION NOTICE Transmitted herewith Transmitted herewith are proprietary and/or are proprietary non-proprietary versions andlor non-proprietary versions of documents furnished of documents the NRC furnished to the NRC connection with in connection in with requests generic and/or requests for generic plant-specific review and approval. andlor plant-specific approval. In order order to conform confonn*to the requirements to the requirements of CFR 2.390 of of 10 CFR Commission's regulations ofthe Commission's concerning the regulations concerning the protection of proprietary protection submitted to the NRC, information so submitted proprietary information NRC, the information proprietary in the information which is proprietary proprietary versions proprietary contained within versions is contained brackets, and where the proprietary within brackets, informnation has been deleted proprietary intonnation deleted the non-proprietary in the versions, only non-proprietary versions, brackets remain only the brackets infonnation that was remain (the information contained within was contained within the the brackets in the brackets the proprietary proprietary versions versions having having been been deleted). deleted). The justification justification for claiming claiming the information information designated as proprietary so designated indicated in both versions proprietary is indicated versions byby means of lower case lehers (a) case letters (a) through through (f) (t) located as a superscript located immediately following the superscript immediately the brackets enclosing each item of information enclosing each information being being identified as proprietary or identified infonnation. These margin opposite such information. or in the margin lower case letters refer to the These lower types of infommtion information Westinghouse customarily holds in confidence Westinghouse customarily identified in Sections confidence identified Sections (4)(ii)(a) through (4)(ii)( f) of the affidavit (4)(ii)(t) affidavit accompanying accompanying this transmittal transmittal pursuant 10 CFR pursuant to 10 CFR 2.390(b)(1). 2.390(b)( 1). COPYRlGHT COPYRIGHT NOTICE transmitted herewith each The reports transmitted each bear a Westinghouse copyright notice. The NRC is pernlitted Westinghouse copyright permitted to make the number of copies of the information contained necessary for its contained in these reports which are necessary plant-specific reviews and approvals as well as the issuance, connection with generic and plant-specific internal use in connection renewal, modification, amendment, transfer, renewal, denial, amendment, revocation, or violation modification, suspension, revocation, violation of a license, regulation subject to the requirement" permit, order, or regulation regarding restrictions requirements of 10 CFR 2.390 regarding restrictions on public public proprietary by Westinghouse, disclosure to the extent such information has been identified as proprietary copyright Westinghouse,copyright of non-proprietary versions of these reports, the NRC protection notwithstanding. With respect to the non-proprietary protection NRC is pennitted to make the number of copies beyond those necessary permitted necessary for its internal use which are necessary necessary in order to have one copy available available for public viewing in the appropriate docket files in the public document document room in Washington, DC and in local public document rooms as may be required by NRC regulations if if insufficient for this purpose. Copies made by the NRC mllst the number of copies submitted is insufficient must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}}