ML102220042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:DC Cook 2010 NRC Examination ES-301                          Administrative Topics Outline                                Form ES-301-1 Facility:        DC Cook                                          Date of Examination:      6/21/10 Examination Level: RO            SRO                              Operating Test Number:      2010 NRC Administrative Topic            Type                    Describe activity to be performed (see Note)                Code*
NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations                  D-R            K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})
NRC2010-A1b-RO Determination of Reactor Shutdown K/A SYS 001 A4.11 Conduct of Operations                  D-R                3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)
NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control                      D-R NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control                      N-S                            Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected) 4/29/2010                                                                                  Revision 0
 
DC Cook 2010 NRC Examination ES-301                          Administrative Topics Outline                                Form ES-301-1 Facility:        DC Cook                                          Date of Examination:      6/21/10 Examination Level: RO            SRO                              Operating Test Number:      2010 NRC Administrative Topic            Type                    Describe activity to be performed (see Note)                Code*
NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations                  D-R            K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})
NRC2010-A1b-SRO SRO Review - Determination of Reactor Shutdown Conduct of Operations                  D-R          Margin. K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)
NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control                      D-R NRC2010-A3 N-S          Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 NRC2010-A4-SRO D-R        Prepare Prompt NRC Notification Worksheet (SI, safety Emergency Procedures/Plan stuck open)
KA: 2.4.30 2.7/4.1 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected) 4/29/2010                                                                                  Revision 0}}

Latest revision as of 15:52, 13 November 2019

DC Cook, 2010 Initial License Exam, Admin JPM Outline
ML102220042
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/21/2010
From:
Division of Nuclear Materials Safety III
To:
References
Download: ML102220042 (2)


Text

DC Cook 2010 NRC Examination ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic Type Describe activity to be performed (see Note) Code*

NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations D-R K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})

NRC2010-A1b-RO Determination of Reactor Shutdown K/A SYS 001 A4.11 Conduct of Operations D-R 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)

NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control D-R NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control N-S Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected) 4/29/2010 Revision 0

DC Cook 2010 NRC Examination ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic Type Describe activity to be performed (see Note) Code*

NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations D-R K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})

NRC2010-A1b-SRO SRO Review - Determination of Reactor Shutdown Conduct of Operations D-R Margin. K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)

NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control D-R NRC2010-A3 N-S Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 NRC2010-A4-SRO D-R Prepare Prompt NRC Notification Worksheet (SI, safety Emergency Procedures/Plan stuck open)

KA: 2.4.30 2.7/4.1 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected) 4/29/2010 Revision 0