(One intermediate revision by the same user not shown) |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:DC Cook 2010 NRC Examination ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic Type Describe activity to be performed (see Note) Code* |
| | NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations D-R K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3}) |
| | NRC2010-A1b-RO Determination of Reactor Shutdown K/A SYS 001 A4.11 Conduct of Operations D-R 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon) |
| | NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control D-R NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control N-S Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required. |
| | * Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes) |
| | (N)ew or (M)odified from bank ( 1) |
| | (P)revious 2 exams ( 1; randomly selected) 4/29/2010 Revision 0 |
| | |
| | DC Cook 2010 NRC Examination ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic Type Describe activity to be performed (see Note) Code* |
| | NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations D-R K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3}) |
| | NRC2010-A1b-SRO SRO Review - Determination of Reactor Shutdown Conduct of Operations D-R Margin. K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon) |
| | NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control D-R NRC2010-A3 N-S Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 NRC2010-A4-SRO D-R Prepare Prompt NRC Notification Worksheet (SI, safety Emergency Procedures/Plan stuck open) |
| | KA: 2.4.30 2.7/4.1 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required. |
| | * Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes) |
| | (N)ew or (M)odified from bank ( 1) |
| | (P)revious 2 exams ( 1; randomly selected) 4/29/2010 Revision 0}} |
Latest revision as of 15:52, 13 November 2019
Similar Documents at Cook |
---|
Category:License-Operator
MONTHYEARIR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML20364A2132020-08-13013 August 2020 2018 Donald C. Cook Nuclear Power Plant Exam Administered Scenarios ML20210M4202020-07-29029 July 2020 Operator Licensing Examination Approval ML19353A0252019-12-18018 December 2019 Confirmation of Initial License Examination AEP-NRC-2019-26, Response to RIS 2019-022019-05-30030 May 2019 Response to RIS 2019-02 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20364A2132020-08-13013 August 2020 2018 Donald C. Cook Nuclear Power Plant Exam Administered Scenarios ML20210M4202020-07-29029 July 2020 Operator Licensing Examination Approval ML19353A0252019-12-18018 December 2019 Confirmation of Initial License Examination AEP-NRC-2019-26, Response to RIS 2019-022019-05-30030 May 2019 Response to RIS 2019-02 ML20365A0662018-08-13013 August 2018 2018 Donald C. Cook Nuclear Power Plant Exam Form ES-201-1 2024-09-05
[Table view] |
Text
DC Cook 2010 NRC Examination ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic Type Describe activity to be performed (see Note) Code*
NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations D-R K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})
NRC2010-A1b-RO Determination of Reactor Shutdown K/A SYS 001 A4.11 Conduct of Operations D-R 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)
NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control D-R NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control N-S Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected) 4/29/2010 Revision 0
DC Cook 2010 NRC Examination ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic Type Describe activity to be performed (see Note) Code*
NRC2010-A1a Calculate Reactor Vessel Void Vent Time Conduct of Operations D-R K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})
NRC2010-A1b-SRO SRO Review - Determination of Reactor Shutdown Conduct of Operations D-R Margin. K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)
NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Equipment Control D-R NRC2010-A3 N-S Perform Monthly Rad Liquid And Gaseous Monitor Radiation Control Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0 NRC2010-A4-SRO D-R Prepare Prompt NRC Notification Worksheet (SI, safety Emergency Procedures/Plan stuck open)
KA: 2.4.30 2.7/4.1 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected) 4/29/2010 Revision 0