ML102980074: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/24/2010
| issue date = 09/24/2010
| title = 2010 LaSalle County Station Initial License Examination Form ES-201-1
| title = 2010 LaSalle County Station Initial License Examination Form ES-201-1
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:E S-201, Rev. 9 Examination Preparation Checklist Form ES-201-1 Facility:    LaSalle County Station                         Date of Examination: 09/13/2010 Developed by: Written - Facility NRC       //   Operating - Facility NRC Target Date* Task Description (Reference)
{{#Wiki_filter:ES-201, Rev. 9                           Examination Preparation Checklist                             Form ES-201-1 Facility:    LaSalle County Station                                 Date of Examination: 09/13/2010 Developed by: Written - Facility                     NRC         // Operating - Facility           NRC Chief Target Task Description (Reference)                                 Examiner=s Date*
Chief Examiner=s Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) drm -120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) drm -120 3. Facility contact briefed on security and other requirements (C.2.c) drm -120 4. Corporate notification letter sent (C.2.d) drm [-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)]
Initials
drm  {-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d) drm  {-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)}
    -180         1. Examination administration date confirmed (C.1.a; C.2.a and b)                       drm
drm  {-45} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d) drm  -30 9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) drm  -14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) drm  -14 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) drm  -14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) drm -7 13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) drm  -7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 4; ES-202, C.2.e; ES-204) drm  -7 15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) drm  -7 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) drm
    -120         2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                           drm
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.  
    -120         3. Facility contact briefed on security and other requirements (C.2.c)                   drm
    -120         4. Corporate notification letter sent (C.2.d)                                           drm
[-90]         [5. Reference material due (C.1.e; C.3.c; Attachment 2)]                                 drm
: 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-
{-75}              3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and                 drm ES-401-4, as applicable (C.1.e and f; C.3.d)
{7. Examination outline(s) reviewed by NRC and feedback provided to facility
{-70}                                                                                                    drm licensee (C.2.h; C.3.e)}
: 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms
{-45}                                                                                                    drm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
: 9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g;
    -30                                                                                                    drm ES-202)
: 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;
    -14                                                                                                    drm ES-202)
: 11. Examination approved by NRC supervisor for facility licensee review
    -14                                                                                                    drm (C.2.h; C.3.f)
    -14         12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)               drm
: 13. Written examinations and operating tests approved by NRC supervisor
      -7                                                                                                    drm (C.2.i; C.3.h)
: 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm
      -7              qualifications / eligibility; and examination approval and waiver letters sent       drm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)
: 15. Proctoring/written exam administration guidelines reviewed
      -7                                                                                                    drm with facility licensee (C.3.k)
: 16. Approved scenarios, job performance measures, and questions
      -7                                                                                                    drm distributed to NRC examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 07:21, 13 November 2019

2010 LaSalle County Station Initial License Examination Form ES-201-1
ML102980074
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/24/2010
From: Mcneil D
Operations Branch III
To:
Exelon Nuclear
Shared Package
ML102510205 List:
References
50-373/10-301, 50-374/10-301, ES-201, Rev 9, ES-201-1 50-373/10-301, 50-374/10-301
Download: ML102980074 (1)


Text

ES-201, Rev. 9 Examination Preparation Checklist Form ES-201-1 Facility: LaSalle County Station Date of Examination: 09/13/2010 Developed by: Written - Facility NRC // Operating - Facility NRC Chief Target Task Description (Reference) Examiner=s Date*

Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) drm

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) drm

-120 3. Facility contact briefed on security and other requirements (C.2.c) drm

-120 4. Corporate notification letter sent (C.2.d) drm

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)] drm

6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-

{-75} 3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and drm ES-401-4, as applicable (C.1.e and f; C.3.d)

{7. Examination outline(s) reviewed by NRC and feedback provided to facility

{-70} drm licensee (C.2.h; C.3.e)}

8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms

{-45} drm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g;

-30 drm ES-202)

10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;

-14 drm ES-202)

11. Examination approved by NRC supervisor for facility licensee review

-14 drm (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) drm

13. Written examinations and operating tests approved by NRC supervisor

-7 drm (C.2.i; C.3.h)

14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm

-7 qualifications / eligibility; and examination approval and waiver letters sent drm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)

15. Proctoring/written exam administration guidelines reviewed

-7 drm with facility licensee (C.3.k)

16. Approved scenarios, job performance measures, and questions

-7 drm distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.