ML103230252: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 18, 2010 | {{#Wiki_filter:November 18, 2010 Mr. Ramon Lugo, III Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH 44135 | ||
Mr. Ramon Lugo, III Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH | |||
==SUBJECT:== | ==SUBJECT:== | ||
NASA PLUM BROOK REACTOR FACILITY MASTER INSPECTION PLAN - FISCAL YEAR 2011 | NASA PLUM BROOK REACTOR FACILITY MASTER INSPECTION PLAN - FISCAL YEAR 2011 | ||
==Dear Mr. Lugo:== | ==Dear Mr. Lugo:== | ||
In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, | In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Plum Brook Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for fiscal year (FY) 2011, which is from October 2010 through September 2011. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities. | ||
Because the FY 2011 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2011, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY 2011 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Plum Brook Reactor FY 2011 MIP. | |||
Because the FY 2011 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2011, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY 2011 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Plum Brook Reactor FY 2011 MIP. | We currently project the region will conduct two inspections at the Plum Brook Reactor during FY 2011. We are planning the inspections to coincide with the decontamination activities and final status surveys related to the reactor building, hot lab, primary pump house and remaining open land areas. Additional inspections may be warranted, depending on decommissioning activities. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. | ||
Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors | |||
We currently project the region will conduct two inspections at the Plum Brook Reactor during FY 2011. We are planning the inspections to coincide with the decontamination activities and final status surveys related to the reactor building, hot lab, primary pump house and remaining open land areas. Additional inspections may be warranted, depending on decommissioning activities. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. | |||
Inspection Procedure | |||
R. Lugo In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. | |||
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. Jeremy Tapp of my staff at (630) 829-9862. | |||
Sincerely, | |||
/RA/ | |||
Brian J. Kemker, Acting Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 50-30 and 50-185 License Nos.: TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health (ODH) | |||
S. Helmer, ODH M. Rubadue, ODH Ohio Environmental Protection Agency, Division of Planning K. Peecook, NASA, Plum Brook Station | |||
DOCUMENT NAME: | R. Lugo In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. | ||
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. Jeremy Tapp of my staff at (630) 829-9862. | |||
Sincerely, | |||
/RA/ | |||
Brian J. Kemker, Acting Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 50-30 and 50-185 License Nos.: TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health (ODH) | |||
S. Helmer, ODH M. Rubadue, ODH Ohio Environmental Protection Agency, Division of Planning K. Peecook, NASA, Plum Brook Station DISTRIBUTION: | |||
P. Michalak, FSME C. Glenn, FSME N. Orlando, FSME S. West, RIII S. Reynolds, RIII C. Lipa, RIII A. Barker, RIII H. Logaras, RIII V. Mitlyng, RIII P. Chandrathil, RIII MCID Distribution DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - NASA Plum Brook Reactor Facility FY2011.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII E NAME JTapp BKemker DATE 11/17/2010 11/18/10 OFFICIAL RECORD COPY}} |
Latest revision as of 05:54, 13 November 2019
ML103230252 | |
Person / Time | |
---|---|
Site: | Plum Brook |
Issue date: | 11/18/2010 |
From: | Brian Kemker NRC/RGN-III/DNMS/DB |
To: | Lugo R US National Aeronautics & Space Admin (NASA), John H. Glenn Research Ctr at Lewis Field |
References | |
Download: ML103230252 (3) | |
Text
November 18, 2010 Mr. Ramon Lugo, III Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH 44135
SUBJECT:
NASA PLUM BROOK REACTOR FACILITY MASTER INSPECTION PLAN - FISCAL YEAR 2011
Dear Mr. Lugo:
In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Plum Brook Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for fiscal year (FY) 2011, which is from October 2010 through September 2011. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.
Because the FY 2011 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2011, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY 2011 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Plum Brook Reactor FY 2011 MIP.
We currently project the region will conduct two inspections at the Plum Brook Reactor during FY 2011. We are planning the inspections to coincide with the decontamination activities and final status surveys related to the reactor building, hot lab, primary pump house and remaining open land areas. Additional inspections may be warranted, depending on decommissioning activities. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors
R. Lugo In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
/RA/
Brian J. Kemker, Acting Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 50-30 and 50-185 License Nos.: TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health (ODH)
S. Helmer, ODH M. Rubadue, ODH Ohio Environmental Protection Agency, Division of Planning K. Peecook, NASA, Plum Brook Station
R. Lugo In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
/RA/
Brian J. Kemker, Acting Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 50-30 and 50-185 License Nos.: TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health (ODH)
S. Helmer, ODH M. Rubadue, ODH Ohio Environmental Protection Agency, Division of Planning K. Peecook, NASA, Plum Brook Station DISTRIBUTION:
P. Michalak, FSME C. Glenn, FSME N. Orlando, FSME S. West, RIII S. Reynolds, RIII C. Lipa, RIII A. Barker, RIII H. Logaras, RIII V. Mitlyng, RIII P. Chandrathil, RIII MCID Distribution DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - NASA Plum Brook Reactor Facility FY2011.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII E NAME JTapp BKemker DATE 11/17/2010 11/18/10 OFFICIAL RECORD COPY