ML110630414: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Page 1 of 1 Summer 03/04/2011 06:58:15 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 10 1 02/28/2011 03/04/2011 IP 7111121 Component Design Bases Inspection PSB1-RP - OCCUPATIONAL RP RAD HAZARDS ONLY 2 1 04/18/2011 04/22/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EB3 ISI - INSERVICE INSPECTION 1 1 04/25/2011 04/29/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP 3 1 06/27/2011 07/01/2011 IP 71124.02 Occupational ALARA Planning and Controls 1 06/27/2011 07/01/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 06/27/2011 07/01/2011 IP 71124.04 Occupational Dose Assessment 1 06/27/2011 07/01/2011 IP 71124.05 Radiation Monitoring Instrumentation 1 06/27/2011 07/01/2011 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 3 1 08/08/2011 08/12/2011 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL EXAM PREP 3 1 08/22/2011 08/26/2011 V23356 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 09/12/2011 09/16/2011 V23356 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 09/19/2011 09/23/2011 V23356 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1 09/26/2011 09/30/2011 IP 7111401 Exercise Evaluation 1 09/26/2011 09/30/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/26/2011 09/30/2011 IP 71151 Performance Indicator Verification TI-177 - TI-177 4 1 01/23/2012 01/27/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities. | ||
-06/30/2012 Unit | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} | ||
Revision as of 02:26, 13 November 2019
| ML110630414 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/04/2011 |
| From: | Division Reactor Projects II |
| To: | |
| Shared Package | |
| ML110630404 | List: |
| References | |
| Download: ML110630414 (1) | |
Text
Page 1 of 1 Summer 03/04/2011 06:58:15 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 10 1 02/28/2011 03/04/2011 IP 7111121 Component Design Bases Inspection PSB1-RP - OCCUPATIONAL RP RAD HAZARDS ONLY 2 1 04/18/2011 04/22/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EB3 ISI - INSERVICE INSPECTION 1 1 04/25/2011 04/29/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP 3 1 06/27/2011 07/01/2011 IP 71124.02 Occupational ALARA Planning and Controls 1 06/27/2011 07/01/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 06/27/2011 07/01/2011 IP 71124.04 Occupational Dose Assessment 1 06/27/2011 07/01/2011 IP 71124.05 Radiation Monitoring Instrumentation 1 06/27/2011 07/01/2011 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 3 1 08/08/2011 08/12/2011 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL EXAM PREP 3 1 08/22/2011 08/26/2011 V23356 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 09/12/2011 09/16/2011 V23356 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 09/19/2011 09/23/2011 V23356 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1 09/26/2011 09/30/2011 IP 7111401 Exercise Evaluation 1 09/26/2011 09/30/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/26/2011 09/30/2011 IP 71151 Performance Indicator Verification TI-177 - TI-177 4 1 01/23/2012 01/27/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.