ML111120321: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/22/2011
| issue date = 04/22/2011
| title = Draft RAIs for Pbaps RR-I4R-52
| title = Draft RAIs for Pbaps RR-I4R-52
| author name = Hughey J D
| author name = Hughey J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Loomis T
| addressee name = Loomis T
Line 14: Line 14:
| page count = 1
| page count = 1
| project = TAC:ME5394, TAC:ME5395
| project = TAC:ME5394, TAC:ME5395
| stage = Draft Other
| stage = Draft RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Hughey, John Sent: Friday, April 22, 2011 1:58 PM To: 'thomas.loomis@exeloncorp.com'  
{{#Wiki_filter:From:                       Hughey, John Sent:                       Friday, April 22, 2011 1:58 PM To:                         'thomas.loomis@exeloncorp.com'


==Subject:==
==Subject:==
Draft RAIs For PBAPS RR-I4R-52 Attachments: DRAFT RAI.docx Attached are Draft RAIs related to the PBAPS Unit 2 and 3 Relief Request I4R-52 submitted on 01/24/2011 (ME5394/ME5395). The RAIs are being sent to you to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. Please inform me by COB on Friday, 4/29/2011, if DNC desires to have a teleconference regarding the attached draft RAIs. If I don't hear from you by COB on 04/29/2011, then I will issue the RAIs with a response due date of 05/27/2011.  
Draft RAIs For PBAPS RR-I4R-52 Attachments:                 DRAFT RAI.docx Attached are Draft RAIs related to the PBAPS Unit 2 and 3 Relief Request I4R-52 submitted on 01/24/2011 (ME5394/ME5395). The RAIs are being sent to you to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. Please inform me by COB on Friday, 4/29/2011, if DNC desires to have a teleconference regarding the attached draft RAIs. If I dont hear from you by COB on 04/29/2011, then I will issue the RAIs with a response due date of 05/27/2011.
: Thanks, John John Hughey Peach Bottom & Millstone Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov}}
: Thanks, John John Hughey Peach Bottom & Millstone Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov}}

Latest revision as of 01:38, 13 November 2019

Draft RAIs for Pbaps RR-I4R-52
ML111120321
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/22/2011
From: John Hughey
Plant Licensing Branch 1
To: Tom Loomis
Exelon Corp
References
TAC ME5394, TAC ME5395
Download: ML111120321 (1)


Text

From: Hughey, John Sent: Friday, April 22, 2011 1:58 PM To: 'thomas.loomis@exeloncorp.com'

Subject:

Draft RAIs For PBAPS RR-I4R-52 Attachments: DRAFT RAI.docx Attached are Draft RAIs related to the PBAPS Unit 2 and 3 Relief Request I4R-52 submitted on 01/24/2011 (ME5394/ME5395). The RAIs are being sent to you to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. Please inform me by COB on Friday, 4/29/2011, if DNC desires to have a teleconference regarding the attached draft RAIs. If I dont hear from you by COB on 04/29/2011, then I will issue the RAIs with a response due date of 05/27/2011.

Thanks, John John Hughey Peach Bottom & Millstone Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov