ML111290772: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/05/2011
| issue date = 05/05/2011
| title = Notification of NRC Initial Operator Licensing Examination 05000528/2012301; 05000529/2012301; 05000530/2012301
| title = Notification of NRC Initial Operator Licensing Examination 05000528/2012301; 05000529/2012301; 05000530/2012301
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000528/2012301]]
See also: [[see also::IR 05000528/2012301]]


=Text=
=Text=
{{#Wiki_filter:May 5, 2011  
{{#Wiki_filter:UNITED STATES
  Randall K. Edington, Executive  
                                  NUC LE AR RE G ULATO RY C O M M I S S I O N
   Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034  
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
  SUBJECT: PALO VERDE NUCLEAR GENERATING STATION,, UNITS 1, 2 AND 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000528/2012301; 05000529/2012301; 05000530/2012301
                                          AR LI N GTON , TEXAS 76011-4125
Dear Mr. Edington:  
                                                    May 5, 2011
Randall K. Edington, Executive
   Vice President, Nuclear/CNO
Arizona Public Service Company
P.O. Box 52034, Mail Stop 7602
Phoenix, AZ 85072-2034
SUBJECT:       PALO VERDE NUCLEAR GENERATING STATION,, UNITS 1, 2 AND 3 -
                NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
                05000528/2012301; 05000529/2012301; 05000530/2012301
Dear Mr. Edington:
In a telephone conversation on April 20, 2011 between Messrs. Warren Potter and Gabriel
Apger, Chief Examiner, arrangements were made for the administration of licensing
examinations at Palo Verde Nuclear Generating Station, Units 1, 2 and 3 during the week of
March 19, 2012.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by January 6, 2012. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by January 20, 2012.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,
examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of February 13, 2012.


In a telephone conversation on April 20, 2011 between Messrs. Warren Potter and Gabriel Apger, Chief Examiner, arrangements were made for the administration of licensing examinations at Palo Verde Nuclear Generating Station, Units 1, 2 and 3 during the week of March 19, 2012.  
Palo Verde Nuclear Generating Station          2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should
be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.


As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  The NRC's regional office will
Palo Verde Nuclear Generating Station         3
discuss with your staff any changes that might be necessary before the examinations are administered.
Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 6, 2012.  The written examinations, operating tests, and supporting
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
reference materials identified in Attachment 3 to ES-201 will be due by January 20, 2012.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examinations and
procedures and guidelines, please contact Mr. Apger at 817-276-6508, or myself at 817-860-
reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of February 13, 2012. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
8159.
Palo Verde Nuclear Generating Station 2
                                              Sincerely,
  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302,
                                              /RA/
your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
                                              Mark S. Haire, Chief
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
                                              Operations Branch
effect while the written examinations and operating tests are being administered.
                                              Division of Reactor Safety
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement
Dockets: 50-528; 50-529; 50-530
may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
Licenses: NPF-41; NPF-51; NPF-74
This letter contains information collections that are subject to the Paperwork Reduction Act of
DISTRIBUTION:
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
Distribution via ListServ for Palo Verde Nuclear Generating Station
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.     
Palo Verde Nuclear Generating Station 3  
Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Apger at 817-276-6508, or myself at 817-860-
8159.  
      Sincerely,
        /RA/  
      Mark S. Haire, Chief Operations Branch       Division of Reactor Safety  
Dockets:   50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74  


  DISTRIBUTION:
Palo Verde Nuclear Generating Station   4
File located:                                                     ML
Distribution via ListServ for Palo Verde Nuclear Generating Station
SUNSI Rev Compl.     6 Yes   No   ADAMS     6 Yes No     Reviewer Initials   GWA
   
Publicly Avail       6 Yes   No   Sensitive   Yes 6 No   Sens. Type Initials
Palo Verde Nuclear Generating Station 4  
OE:OB               C:OB
   
GApger             MSHaire
   
/RA/               /RA/
    File located:   ML SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GWAPublicly Avail Yes No Sensitive Yes No Sens. Type Initials   OE:OB C:OB   GApger MSHaire  
5/5/11             5/5/11
/RA/ /RA/ 5/5/11 5/5/11   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax
OFFICIAL RECORD COPY                             T=Telephone       E=E-mail     F=Fax
}}
}}

Latest revision as of 00:58, 13 November 2019

Notification of NRC Initial Operator Licensing Examination 05000528/2012301; 05000529/2012301; 05000530/2012301
ML111290772
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/05/2011
From: Mark Haire
Operations Branch IV
To: Edington R
Arizona Public Service Co
References
05-530/12-301, 50-528/12-301, 50-529/12-301
Download: ML111290772 (4)


See also: IR 05000528/2012301

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

May 5, 2011

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Arizona Public Service Company

P.O. Box 52034, Mail Stop 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION,, UNITS 1, 2 AND 3 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000528/2012301; 05000529/2012301; 05000530/2012301

Dear Mr. Edington:

In a telephone conversation on April 20, 2011 between Messrs. Warren Potter and Gabriel

Apger, Chief Examiner, arrangements were made for the administration of licensing

examinations at Palo Verde Nuclear Generating Station, Units 1, 2 and 3 during the week of

March 19, 2012.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by January 6, 2012. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by January 20, 2012.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,

examinations, and tests before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of February 13, 2012.

Palo Verde Nuclear Generating Station 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Palo Verde Nuclear Generating Station 3

Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Apger at 817-276-6508, or myself at 817-860-

8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-528; 50-529; 50-530

Licenses: NPF-41; NPF-51; NPF-74

DISTRIBUTION:

Distribution via ListServ for Palo Verde Nuclear Generating Station

Palo Verde Nuclear Generating Station 4

File located: ML

SUNSI Rev Compl. 6 Yes No ADAMS 6 Yes No Reviewer Initials GWA

Publicly Avail 6 Yes No Sensitive Yes 6 No Sens. Type Initials

OE:OB C:OB

GApger MSHaire

/RA/ /RA/

5/5/11 5/5/11

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax