IR 05000443/2011201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11178A324
| number = ML11178A324
| issue date = 06/30/2011
| issue date = 06/30/2011
| title = Seabrook Station, Unit 1 - NRC Security Inspection Report 05000443/2011201 - Cover Letter
| title = NRC Security Inspection Report 05000443/2011201 - Cover Letter
| author name = West G
| author name = West G
| author affiliation = NRC/NSIR/DSO
| author affiliation = NRC/NSIR/DSO
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:une 30, 2011
[[Issue date::June 30, 2011]]


Mr. Paul Freeman, Vice President NextEra Energy, Seabrook, LLC Seabrook Station, Unit 1 626 Lafayette Road Seabrook, NH 03874
==SUBJECT:==
SEABROOK STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000443/2011201


SUBJECT: SEABROOK STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000443/2011201
==Dear Mr. Freeman:==
On May 19, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Seabrook Station, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 19, 2011, with you and other members of your staff.


==Dear Mr. Freeman:==
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
On May 19, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Seabrook Station, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 19, 2011, with you and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings of significance were identified.
Based on the results of this inspection, no findings of significance were identified.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
 
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
Sincerely,/RA M. Buckley for/
 
Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-443 License No.: NPF-86


===Enclosure:===
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
As stated


cc w/encl: J. Tucker, NextEra Energy, Seabrook, LLC C. Pope, State of New Hampshire J. Giarrusso, Massachusetts Emergency Management Agency
Sincerely,
/RA M. Buckley for/
Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-443 License No.: NPF-86 Enclosure:
As stated cc w/encl: J. Tucker, NextEra Energy, Seabrook, LLC C. Pope, State of New Hampshire J. Giarrusso, Massachusetts Emergency Management Agency
}}
}}

Latest revision as of 18:08, 12 November 2019

NRC Security Inspection Report 05000443/2011201 - Cover Letter
ML11178A324
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/30/2011
From: West G
Division of Security Operations
To: Freeman P
NextEra Energy Seabrook
Shared Package
ML11178A313 List:
References
IR-11-201
Download: ML11178A324 (2)


Text

une 30, 2011

SUBJECT:

SEABROOK STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000443/2011201

Dear Mr. Freeman:

On May 19, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Seabrook Station, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 19, 2011, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA M. Buckley for/

Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-443 License No.: NPF-86 Enclosure:

As stated cc w/encl: J. Tucker, NextEra Energy, Seabrook, LLC C. Pope, State of New Hampshire J. Giarrusso, Massachusetts Emergency Management Agency