ML11206B151: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                                    NUCLEAR REGULATORY COMMISSION
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                                  REGION II
ATLANTA, GEORGIA 30303
                                245 PEACHTREE CENTER AVENUE NE, SUITE 1200
-1257 July 20, 2011
                                        ATLANTA, GEORGIA 30303-1257
  Mr. Dennis R. Madison Vice President
                                              July 20, 2011
Southern Nuclear Operating Company, Inc.
Mr. Dennis R. Madison
Edwin I. Hatch Nuclear Plant
Vice President
11028 Hatch Parkway North
Southern Nuclear Operating Company, Inc.
Baxley, GA 31513
Edwin I. Hatch Nuclear Plant
  SUBJECT: UPDATE OF NUCLEAR REGULATORY COMMISSION (NRC) DISTRIBUTION  
11028 Hatch Parkway North
LIST FOR DOCUMENTS CONTAINING SAFEGUARDS (SGI), OFFICIAL USE ONLY (OUO), AND ROUTINE INFORMATION  
Baxley, GA 31513
- (EDWIN I. HATCH NUCLEAR PLANT) Dear Mr. Madison:
SUBJECT:         UPDATE OF NUCLEAR REGULATORY COMMISSION (NRC) DISTRIBUTION
 
                  LIST FOR DOCUMENTS CONTAINING SAFEGUARDS (SGI), OFFICIAL USE
I am writing to request current information on those individuals authorized to receive documents containing Safeguards (SGI), Official Use Only (OUO), and Routine information on issues  
                  ONLY (OUO), AND ROUTINE INFORMATION - (EDWIN I. HATCH NUCLEAR
relating to your facility. Safeguards information is a special category of sensitive unclassified information authorized by Section 147 of the Atomic Energy Act of 1954, as amended (the Act), to be protected. While SGI is considered sensitive unclassified information, it is handled and protected more like classified confidential information than like other sensitive unclassified  
                  PLANT)
information (e.g., privacy and proprietary information).
Dear Mr. Madison:
  Access to SGI is controlled by a valid n
I am writing to request current information on those individuals authorized to receive documents
eed-to-know basis. It is the responsibility of the NRC to maintain the integrity of SGI distribution, therefore we are currently in the process of verifying the identity, and contact information of individuals designated to receive documents with SGI, OUO, and Routine information for your facility.  
containing Safeguards (SGI), Official Use Only (OUO), and Routine information on issues
  You are requested to provide an updated distribution list of those persons who should receive documents containing SGI, OUO, and Routine information within 20 days of the date of this  
relating to your facility. Safeguards information is a special category of sensitive unclassified
letter to: ATTN: Document Control Desk, Washington, D.C. 20555
information authorized by Section 147 of the Atomic Energy Act of 1954, as amended (the Act),
-0001; with a copy to the Regional Administrator Region II, so that we can verify and/or update our distribution  
to be protected. While SGI is considered sensitive unclassified information, it is handled and
information.
protected more like classified confidential information than like other sensitive unclassified
  Please ensure that each list clearly specifies the individuals who are authorized to receive matter specific correspondence. To facilitate this request, I have enclosed a copy of the NRC's official distribution list on file, which has been organized by category. Additionally, you will find NRC Regulatory Issue Summary 2005
information (e.g., privacy and proprietary information).
-26 defining control of sensitive unclassified non
Access to SGI is controlled by a valid need-to-know basis. It is the responsibility of the NRC to
-safeguards information related to nuclear power reactors, and NRC Regulatory Issue Summary  
maintain the integrity of SGI distribution, therefore we are currently in the process of verifying
2003-08, Summary of Safeguards Information Requirements.  
the identity, and contact information of individuals designated to receive documents with SGI,
     
OUO, and Routine information for your facility.
SNC 2   In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading
You are requested to provide an updated distribution list of those persons who should receive
-rm/adams.html
documents containing SGI, OUO, and Routine information within 20 days of the date of this
(the Public Electronic Room).
letter to: ATTN: Document Control Desk, Washington, D.C. 20555-0001; with a copy to the
 
Regional Administrator Region II, so that we can verify and/or update our distribution
information.
Please ensure that each list clearly specifies the individuals who are authorized to receive
matter specific correspondence. To facilitate this request, I have enclosed a copy of the NRCs
official distribution list on file, which has been organized by category. Additionally, you will find
NRC Regulatory Issue Summary 2005-26 defining control of sensitive unclassified non-
safeguards information related to nuclear power reactors, and NRC Regulatory Issue Summary
2003-08, Summary of Safeguards Information Requirements.
 
SNC                                               2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-
rm/adams.html (the Public Electronic Room).
Should you have any questions concerning this letter, please contact us.
Should you have any questions concerning this letter, please contact us.
  Sincerely,
                                              Sincerely,
      /RA/   Michael E. Ernstes, Chief
                                              /RA/
Plant Support Branch 2
                                              Michael E. Ernstes, Chief
Division of Reactor Safety
                                              Plant Support Branch 2
  Docket No.:  
                                              Division of Reactor Safety
50-321, 50-366 License No.:  
Docket No.: 50-321, 50-366
DPR-57, NPF-5 Enclosures:
License No.: DPR-57, NPF-5
1. Current Official Distribution List
Enclosures:
2. NRC Regulatory Issue
1. Current Official Distribution List
Summary 2005
2. NRC Regulatory Issue Summary 2005-26
-26 3. NRC Regulatory Issue Summary 2003
3. NRC Regulatory Issue Summary 2003-08
-08    
 
 
_________________________                X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
OFFICE            RII:DRS        RII: DRS        RII: DRP
SIGNATURE        RA              RA              RA
NAME              J. CALLOWAY    M. ERNSTES      S.SHAEFFER
DATE                07/15/2011      07/20/2011      07/18/2011
E-MAIL COPY?        YES      NO  YES        NO  YES        NO  YES      NO  YES      NO   YES      NO YES      NO
 
                              OFFICIAL DISTRIBUTION LIST
                                HATCH NUCLEAR STATION
ROUTINE DISTRIBUTION:
cc w/encl:                                    J. L. Pemberton
B. D. McKinney, Jr.                            SVP & General Counsel-Ops & SNC
Regulatory Response Manager                    Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.      Electronic Mail Distribution
Electronic Mail Distribution
                                              Steven B. Tipps
Jeffrey T. Gasser                              Hatch Principal Engineer - Licensing
Chief Nuclear Officer                          Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc.      Electronic Mail Distribution
Electronic Mail Distribution
                                              Mr. Ken Rosanski
M. J. Ajluni                                  Resident Manager
Nuclear Licensing Director                    Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc.      Oglethorpe Power Corporation
Electronic Mail Distribution                  Electronic Mail Distribution
T. D. Honeycutt                                Chris Clark
Regulatory Response Supervisor                Commissioner
Southern Nuclear Operating Company, Inc.      Georgia Department of Natural Resources
Electronic Mail Distribution                  Electronic Mail Distribution
L. Mike Stinson                                Lee Foley
Vice President                                Manager of Contracts Generation
Joseph M. Farley Nuclear Plant                Oglethorpe Power Corporation
Southern Nuclear Operating Company, Inc.      Electronic Mail Distribution
Electronic Mail Distribution
                                              Senior Resident Inspector
L. P. Hill                                    U.S. Nuclear Regulatory Commission
Licensing Supervisor                          Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc.      U.S. NRC
Electronic Mail Distribution                  11030 Hatch Parkway N
                                              Baxley, GA 30334
Paula Marino
Vice President                                Arthur H. Domby, Esq.
Engineering                                    Troutman Sanders
Southern Nuclear Operating Company, Inc.      Electronic Mail Distribution
Electronic Mail Distribution
                                              James C. Hardeman
R. E. Varnadore                                Environmental Radiation Program Manager
Site Support Manager                          Environmental Protection Division
Edwin I. Hatch Nuclear Plant                  Georgia Department of Natural Resources
Electronic Mail Distribution                  Electronic Mail Distribution
R. L. Gladney                                  Ted V. Jackson
Licensing Engineer                            Emergency Response and Radiation
Southern Nuclear Operating Company, Inc.      Program Manager
Electronic Mail Distribution                  Environmental Protection Division
                                              Georgia Department of Natural Resources
                                              Electronic Mail Distribution
                                                                              Enclosure 1
 
                                OFFICIAL DISTRIBUTION LIST
                                  HATCH NUCLEAR STATION
ROUTINE DISTRIBUTION:
cc w/encl: (Continued)
F. Allen Barnes
Director
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
Cynthia A. Sanders
Radioactive Materials Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
James A. Sommerville
Program Coordination Branch Chief
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
L. L. Crumpton
Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Mr. Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution
Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
Chairman
Appling County Commissioners
County Courthouse
69 Tippins Street, Suite 201
Baxley, GA 31513
Amy Whaley
Engineer
Nuclear Generation Development and
Construction
Electronic Mail Distribution
                                                            Enclosure 1


                            OFFICIAL DISTRIBUTION LIST
                              HATCH NUCLEAR STATION
OFFICIAL USE ONLY (OUO) DISTRIBUTION
cc w/encl
Jeffrey T. Gasser
Chief Nuclear Officer
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL 35242
W. L. Bargeron
Plant General Manager
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
Keith Wooten
Project Manager
Nuclear Fleet Security
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL 35242
David Burford
Manager
Nuclear Fleet Security
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL 35242
                                                        Enclosure 1


_________________________
                              OFFICIAL DISTRIBUTION LIST
  X SUNSI REVIEW COMPLETE
                                HATCH NUCLEAR STATION
X FORM 665 ATTACHED
SAFEGUARDS (SGI) DISTRIBUTION:
OFFICE RII:DRS RII: DRS RII: DRP    SIGNATURE RA RA RA    NAME J. CALLOWAY
cc w/encl
M. ERNSTES
L. Mike Stinson                               David Burford
S.SHAEFFER
Vice President                                 Manager
    DATE 07/15/2011
Joseph M. Farley Nuclear Plant                 Nuclear Fleet Security
07/20/2011
Southern Nuclear Operating Company, Inc.       Southern Nuclear Operating Company, Inc.
07/18/2011
Farley Nuclear Plant                           40 Iverness Center Parkway
    E-MAIL COPY?
P.O. Drawer 470                                Birmingham, AL 35242
    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
BIN B500
OFFICIAL DISTRIBUTION LIST
Ashford, AL 36312                              Lee Foley
HATCH NUCLEAR STATION
                                              Manager of Contracts Generation
  Enclosure 1
J. L. Pemberton                               Oglethorpe Power Corporation
ROUTINE DISTRIBUTION:
SVP & General Counsel-Ops & SNC               2100 East Exchange Place
cc w/encl:
Southern Nuclear Operating Company, Inc.       P.O. Box 1349
B. D. McKinney, Jr.
40 Inverness Center Parkway                   Tucker, GA 30085-1349
Regulatory Response Manager
BIN B022
Southern Nuclear Operating Company, Inc.
Birmingham, AL 35242                          F. Allen Barnes
Electronic Mail Distribution
                                              Director
  Jeffrey T. Gasser
Chairman                                      Environmental Protection Division
Chief Nuclear Officer
Appling County Commissioners                  Georgia Department of Natural Resources
Southern Nuclear Operating Company, Inc.
County Courthouse                              2 Martin Luther King Jr. Drive.
Electronic Mail Distribution
69 Tippins Street, Suite 201                   Suite 1152 East Floyd Tower
  M. J. Ajluni
Baxley, GA 31513                               Atlanta, GA 30334-9000
Nuclear Licensing Director
cc w/Inspection Summary:                      Cynthia A. Sanders
Southern Nuclear Operating Company, Inc.
Jeffrey T. Gasser                             Radioactive Materials Program Manager
Electronic Mail Distribution
Chief Nuclear Officer                         Environmental Protection Division
  T. D. Honeycutt
Southern Nuclear Operating Company, Inc.       Georgia Department of Natural Resources
Regulatory Response Supervisor
40 Iverness Center Parkway                    4220 International Parkway
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Birmingham, AL 35242                           Suite 100
 
                                              Atlanta, GA 30354-3906
L. Mike Stinson
Vice President
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
  L. P. Hill
Licensing Supervisor
Southern Nuclear Operating Company, Inc.
Electronic Mail
Distribution
  Paula Marino
Vice President
Engineering
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
  R. E. Varnadore
Site Support Manager
Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
  R. L. Gladney
Licensing Engineer
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
  J. L. Pemberton
SVP & General Counsel
-Ops & SNC Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
  Steven B. Tipps
Hatch Principal Engineer
- Licensing Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
  Mr. Ken Rosanski
Resident Manager
Edwin I. Hatch Nuclear Plant
Oglethorpe Power Corporation
Electronic Mail Distribution
  Chris Clark
Commissioner
Georgia Department of Natural Resources
Electronic Mail Distribution 
Lee Foley Manager of Contracts Generation
Oglethorpe Power Corporation
Electronic Mail Distribution
  Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Edwin I. Hatch Nuclear Plant
U.S. NRC 11030 Hatch Parkway N
Baxley, GA   30334
  Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
  James C. Hardeman
Environmental Radiation Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
  Ted V. Jackson
Emergency Response and Radiation Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
 
OFFICIAL DISTRIBUTION LIST
HATCH NUCLEAR STATION
  Enclosure 1
  ROUTINE DISTRIBUTION:
cc w/encl: (Continued)
  F. Allen Barnes
Director Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
  Cynthia A. Sanders
Radioactive Materials Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
  James A. Sommerville
Program Coordination Branch Chief
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
  L. L. Crumpton
Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
  Mr. Steven
M. Jackson
Senior Engineer
- Power  Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution
  Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
  Chairman Appling County Commissioners
County Courthouse
69 Tippins Street, Suite 201
Baxley, GA   31513
  Amy Whaley
Engineer Nuclear Generation Development and Construction
Electronic Mail Distribution
 
OFFICIAL DISTRIBUTION LIST
HATCH NUCLEAR STATION
  Enclosure 1
OFFICIAL USE ONLY (OUO) DISTRIBUTION
  cc w/encl Jeffrey T. Gasser
Chief Nuclear Officer
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL   35242
  W. L. Bargeron
Plant General Manager
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA   31513
 
Keith Wooten
Keith Wooten
Project Manager
Project Manager                               Mr. Ken Rosanski
Nuclear Fleet Security
Nuclear Fleet Security                         Resident Manager
Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.       Edwin I. Hatch Nuclear Plant
40 Iverness Center Parkway
40 Iverness Center Parkway                     Oglethorpe Power Corporation
Birmingham, AL  35242
Birmingham, AL 35242                           11028 Hatch Parkway North
  David Burford
                                              Baxley, GA 31513
Manager Nuclear Fleet Security
Paula Marino
Southern Nuclear Operating Company, Inc.
Vice President                                 Senior Engineer
40 Iverness Center Parkway
Engineering                                   Power Supply
Birmingham, AL  35242
Southern Nuclear Operating Company, Inc.       Municipal Electric Authority of Georgia
 
P.O. Box 1295                                 1470 Riveredge Parkway NW
OFFICIAL DISTRIBUTION LIST
Birmingham, AL 35201-1295                     Atlanta, GA 30328-4684
HATCH NUCLEAR STATION
Arthur H. Domby, Esq.                         Reece McAlister
  Enclosure 1
Troutman Sanders                               Executive Secretary
SAFEGUARDS (SGI) DISTRIBUTION
Nations Bank Plaza                             Public Service Commission
: cc w/encl L. Mike Stinson
600 Peachtree Street, NE, Suite 5200           244 Washington Street, SW
Vice President
Atlanta, GA 30308-2216                         Atlanta, GA 30334
Joseph M. Farley Nuclear Plant
                                                                                Enclosure 1
Southern Nuclear Operating Company, Inc.
 
Farley Nuclear Plant
                            OFFICIAL DISTRIBUTION LIST
P.O. Drawer 470
                              HATCH NUCLEAR STATION
BIN B500 Ashford, AL  36312
SAFEGUARDS (SGI) DISTRIBUTION:
  J. L. Pemberton
cc w/encl - Continued
SVP & General Counsel
W. L. Bargeron
-Ops & SNC Southern Nuclear Operating Company, Inc.
Plant General Manager
40 Inverness Center Parkway
Edwin I. Hatch Nuclear Plant
BIN B022 Birmingham, AL   35242
11028 Hatch Parkway North
  Chairman Appling County Commissioners
Baxley, GA 31513
County Courthouse
Jonathan M. Merritt
69 Tippins Street, Suite 201
Site Security Manager
Baxley, GA   31513
Edwin I. Hatch Nuclear Plant
 
11028 Hatch Parkway North
cc w/Inspection Summary:
Baxley, GA 31513
Jeffrey T. Gasser
                                                        Enclosure 1
Chief Nuclear Officer
 
Southern Nuclear Operating Company, Inc.
                                        UNITED STATES
40 Iverness Center Parkway
                            NUCLEAR REGULATORY COMMISSION
Birmingham, AL  35242
                        OFFICE OF NUCLEAR REACTOR REGULATION
  Keith Wooten
                                WASHINGTON, D.C. 20555-0001
Project Manager
                                        November 7, 2005
Nuclear Fleet Security
                  NRC REGULATORY ISSUE SUMMARY 2005-26
Southern Nuclear Operating Company, Inc. 40 Iverness Center Parkway
        CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUARDS
Birmingham, AL  35242
        INFORMATION RELATED TO NUCLEAR POWER REACTORS
  Paula Marino
ADDRESSEES
Vice President
All holders of operating licenses for nuclear power reactors and holders of and applicants for
Engineering
certificates for reactor designs.
Southern Nuclear Operating Company, Inc.
INTENT
P.O. Box 1295
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)
Birmingham, AL   35201
to inform the addressees of the appropriate handling of information that warrants controls
-1295 Arthur H. Domby, Esq.
because of continuing concerns about terrorist attacks against the critical infrastructure of the
Troutman Sanders
United States. The NRC intends to balance its responsibility to preserve public access to
Nations Bank Plaza
information and support meaningful participation in NRCs regulatory processes against its
responsibility to withhold information that might unnecessarily compromise the security of
600 Peachtree Street, NE, Suite 5200
nuclear facilities. Licensees for operating nuclear power plants and reactor facility designers
Atlanta, GA   30308
may need to assess their document control procedures to ensure they protect sensitive
-2216 David Burford
information. Although no specific action or written response is required, the NRC encourages
Manager Nuclear Fleet Security
the addressees for this RIS, vendors and contractors, and others who may possess sensitive
Southern Nuclear Operating Company, Inc.
information to destroy, mark, or otherwise control the information to avoid inadvertently
40 Iverness Center Parkway
providing assistance to those who might use the information for malevolent acts.
Birmingham, AL  35242
BACKGROUND INFORMATION
  Lee Foley Manager of Contracts Generation
NRC traditionally has given the public access to a significant amount of information about the
Oglethorpe Power Corporation
facilities and materials the agency regulates. Openness has been and remains a cornerstone
2100 East Exchange Place
of NRCs regulatory philosophy. The Atomic Energy Act, subsequent legislation, and various
NRC regulations have given the public the right to participate in the licensing and oversight
P.O. Box 1349
process for nuclear power reactors and other NRC licensees. To participate in a meaningful
Tucker, GA  30085
way, the public must have access to information about the design and operation of regulated
-1349 
facilities and use of nuclear materials. However, NRC and other Government agencies have
F. Allen Barnes
always withheld some information from public disclosure for reasons of security, personal
Director Environmental Protection Division
privacy, or commercial or trade secret protection. In light of increased terrorist activity
Georgia Department of Natural Resources
worldwide, NRC reexamined its document disclosure policies.
2 Martin Luther King Jr. Drive.
Suite 1152 East Floyd Tower
Atlanta, GA   30334
-9000  Cynthia A. Sanders
Radioactive Materials Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
4220 International Parkway
Suite 100 Atlanta, GA  30354
-3906 
Mr. Ken Rosanski
Resident Manager
Edwin I. Hatch Nuclear Plant
Oglethorpe Power Corporation
11028 Hatch Parkway North
Baxley, GA  31513
  Senior Engineer
Power Supply
Municipal Electric Authority of Georgia
1470 Riveredge Parkway NW
Atlanta, GA  30328
-4684  Reece McAlister
Executive Secretary
Public Service Commissi
on
244 Washington Street, SW
Atlanta, GA  30334
 
OFFICIAL DISTRIBUTION LIST
HATCH NUCLEAR STATION
Enclosure 1  SAFEGUARDS (SGI) DISTRIBUTION
: cc w/encl - Continued W. L. Bargeron
Plant General Manager
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA   31513
  Jonathan M. Merritt
Site Security Manager
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA   31513
 
ML051430228
ML051430228
UNITED STATES
                                                                                            Enclosure 2
NUCLE AR RE GULATOR Y COM MISS ION OFFICE OF NUC LEAR REAC TOR REGU LATION WASHINGTON, D.C. 20555-0001
 
November 7, 2005 NRC REGUL AT ORY ISSUE SUMMA
                                                                                    RIS 2005-26
RY 2005-26
                                                                                    Page 2 of 5
CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUA
Since the events of September 11, 2001, NRC has issued advisories and taken specific actions
RDS INFORMATION RELATED TO NU
regarding the security of its licensed facilities. NRC has also assessed and revised its policies
CLEAR POWER REA
and practices for control of information so that information that could reasonably be expected to
CTORS ADDRESSEES
be useful to terrorists in planning or executing an attack against nuclear power plants or other
All hold ers of operating li
NRC-licensed facilities will be withheld from public disclosure. The most recent and detailed
censes for nucle
guidance on the control of information related to operating nuclear power plants is provided in
ar power re
the Commission paper SECY-04-0191, Withholding Sensitive Unclassified Information
actors and hol
Concerning Nuclear Power Reactors From Public Disclosure, dated October 19, 2004, and the
ders of and appl
associated staff requirements memorandum dated November 9, 2004. Also see
icants for
SECY-05-0091, Task Force Report on Public Disclosure of Security-Related Information,
certificates for reactor d
dated May 18, 2005, and the associated staff requirements memorandum dated June 30, 2005.
esigns.INTENT The U.S. Nuclear Regulator
The NRC staff is preparing similar guidance for materials licensees and expects to make it
y Commission (NRC) is issuing this regulatory issue summ
available to the public in early 2006.
ary (RIS)to inform the addres
SUMMARY OF ISSUE
sees of the appropriate hand
Considering the various reviews, legislation, and other changes since September 11, 2001, the
ling of inform
NRC staff believes that clarifying NRCs current procedures and policies regarding the control
ation that warrants controls
of information will be beneficial to stakeholders. NRC will continue to make available to the
because of conti
public most of the information that the agency receives from or sends to its licensees. In
nuing concerns
addition, the public will have access to a large amount of information included in various reports
about terrorist a
produced by the NRC staff. Much of NRCs information also will be readily available to the
ttacks against the cri
public via the NRC Web site (www.nrc.gov) and the NRCs electronic document management
tical infrastructu
system (ADAMS) (www.nrc.gov/reading-rm/adams.html). In addition, other information may be
re of the Unite d State s. The N RC in tends to bal ance i ts resp onsib ilit y to p reserv e publ ic acc ess to informat ion a nd sup port me aningful parti cipat ion i n NRC's regu latory proce sses a gainst its responsibil
released to the public in response to formal or informal requests. The exceptions for certain
ity to w ithhold i nformation that might unn
information to be withheld from public disclosure for reasons other than security (e.g., privacy,
ecessarily
proprietary, and pre-decisional information) have not changed as a result of recent events. The
compromise the  
appropriate handling of Safeguards Information (SGI) is discussed in RIS-2003-08, Protection
security of
of Safeguards Information From Unauthorized Disclosure, dated April 30, 2003, and more
nucle ar facil ities.  Lic ensee s for ope rating nucle ar pow er pla nts an d reac tor faci lity desi gners may need t
specific SGI designation guidance documents.
o assess their doc
NRC withheld from public disclosure some information related to protecting operating nuclear
ument contro l procedu res to en sure th ey protec t sensit ive information.  Al
power plants although it does not meet the existing criteria for designation as SGI. This type of
though no speci
information was recognized before September 11, 2001, and, when submitted to NRC by a
fic action or w
licensee, was withheld from public disclosure according to the provisions of 10 CFR
ritten response
2.390(d)(1). This regulation states:
is required, th
        (d) The following information is considered commercial or financial information within the
e NRC enco
        meaning of §9.17(a)(4) of this chapter and is subject to disclosure only in accordance
urages the addr essees f or this RI
        with the provisions of §9.19 of this chapter.
S, vendor s and cont
        (1) Correspondence and reports to or from the NRC which contain information or
ractor s, and ot hers who ma
        records concerning a licensees or applicants physical protection, classified matter
y possess sensitive
        protection, or material control and accounting program for special nuclear material not
information to dest
        otherwise designated as Safeguards Information or classified as National Security
roy, mark, or other
        Information or Restricted Data.
wise control the information to avoid inadvertently
                                                                                          Enclosure 2
providin g assistance to
 
those who
                                                                                        RIS 2005-26
might use the in
                                                                                        Page 3 of 5
formation for malevol
NRC expects that licensees will continue to request NRC withhold some information citing
ent acts.BA CKGROU ND INF ORMA TION NRC traditi
10 CFR 2.390(d)(1) and that the volume of material requested to be withheld from public
onally has given th
disclosure under this provision will increase as the NRC staff and licensees implement the
e public access to a si
guidance in this RIS. NRC changed its procedures shortly after September 11, 2001, to
gnificant amount of in
withhold from public disclosure various categories of documents likely to include individual
formation about the
records that warrant withholding under 10 CFR 2.390. The NRC staff will assess the need to
facilities a
withhold such document categories if licensees routinely identify specific documents containing
nd materials
sensitive information. The NRC staff will interact with licensees on a case-by-case basis
the agency regul
regarding the use of the provisions of 10 CFR 2.390(d)(1) to assure that information is properly
ates.  Openness
controlled, under either Section 2.390(d)(1) or one of the other Freedom of Information Act
has been and
(FOIA) exemptions that might be applicable. Licensees that identify information to be withheld
remains a co
from public disclosure in accordance with 10 CFR 2.390(d)(1) or other provision in the
rnerstone of NRC's regula
regulation should use the same general practices as used for proprietary commercial or
tory phil osophy. The
financial information. As shown on the attached diagram, the cover letter should clearly state
Atomic Energy
that the document includes sensitive information and the affected pages should include the
Act, subsequent l
marking Security-Related Information Withhold Under 10 CFR 2.390. Unlike the
egislation, a
requirements for withholding proprietary information, licensees are not required to provide an
nd variou s NRC regulatio
affidavit for sensitive information withheld under 10 CFR 2.390(d) and related to (1) physical
ns have giv
protection or (2) material control and accounting.
en the publ
Most information received and generated by NRC deals with design, operations, or other
ic the right to  
matters not directly related to the physical security of nuclear facilities or radioactive materials.
participate i
This information, if not protected as proprietary or under another exception, is generally made
n the lice
available to the public. After September 11, 2001, NRC and other Government agencies
nsing and ov
responded to concerns that some information easily available on public Web sites or by other
ersight process for nucle
means might be useful to terrorists. SECY-04-0191 provides the primary NRC guidance on
ar power re
whether information related to operating nuclear power plants should be withheld from public
actors and othe
disclosure in light of the post-September 11 concerns. The NRC staff has posted the guidance
r NRC lic ensees. To parti
and related material within the public reading room (http://www.nrc.gov/reading-rm.html) on the
cipate in
NRC Web site, and stakeholders can ask questions or make suggestions about the guidance
a meaningful
and the examples.
way, the public mus
As discussed in SECY-04-0191, other Government agencies have issued regulations or
t have acce
guidance for protecting information that could be reasonably expected to be useful to terrorists
ss to information  
in planning or executing an attack on critical infrastructure.
about the desi
*      Protected critical infrastructure information (PCII) is information related to the security of
gn and operatio
        critical infrastructure that is voluntarily provided to the Department of Homeland Security
n of regulated
        (DHS).
facilit ies and use
*      Critical energy infrastructure information (CEII) is defined in Federal Energy Regulatory
of nucle ar mat erials. However, NRC an
        Commission (FERC) regulations as information related to energy-related infrastructure
d other G overnme nt agen cies have alway s withhel d some information  
        (e.g., hydroelectric dams and electric transmission systems).
from public dis
*      Sensitive security information (SSI) is defined in Transportation Safety Administration
closure for reason
        (TSA) and Department of Transportation (DOT) regulations as information about the
s of security, p
        security of transportation assets, including pipelines.
ersonal priv acy, or comme rcial or trad e secre t prote ction. In l ight of i ncreas ed terr orist activ ity worldw ide, NRC re
                                                                                            Enclosure 2
examined i
 
ts document dis
                                                                                      RIS 2005-26
closure pol
                                                                                      Page 4 of 5
icies.  
Licensees may need to assess and revise their procedures for handling sensitive unclassified
RIS 2005-26 
nonsafeguards information in their normal activities and interactions with parties other than
Pag e 2 of 5 Since the e
NRC. During discussions of existing practices with various licensees, the NRC staff discovered
vents of Septembe
that licensees vary in how they treat and protect information that was previously unprotected but
r 11, 2001, NR
now is considered sensitive. Some licensees have instituted more restrictive controls. Some
C has issue
have determined that their routine business practices provide an appropriate level of protection
d adviso ries and taken s
for the sensitive information.
pecific action
As described in 10 CFR 2.390, information deemed sensitive because it relates to physical
s regarding the securi
protection or material control and accounting is protected in much the same way as commercial
ty of its li
or financial information. As with proprietary information, licensees are expected to have
censed facili
sufficient internal controls to keep the information confidential. Possible methods to prevent the
ties. NRC
inadvertent release of sensitive unclassified nonsafeguards information include marking
has also as
documents as described in 10 CFR 2.390, restricting access to electronic recordkeeping
sessed and re
systems, and controlling the reproduction, distribution, and destruction of potentially sensitive
vised i ts policie
records. NRC uses the marking Security-Related Information  Withhold Under
s and pr actice s for con trol o f informat
10 CFR 2.390 and encourages the use of this marking by licensees and others possessing
ion s o that informat ion th at cou ld rea sonab ly b e exp ected to be useful to terrori
information deemed sensitive using the guidance in SECY-04-0191. Licensees should ensure
sts in plan
that similar controls are in place when sensitive information is provided to outside parties such
ning or exec
as contractors or other Government agencies. The NRC staff posted information on NRCs
uting an attack again
Web site (http://www.nrc.gov/reading-rm.html) and included a feedback form for questions or
st nuclear po
suggestions on how to effectively control sensitive information.
wer plan ts or other
BACKFIT DISCUSSION
NRC-licen sed faciliti
This RIS requires no action or written response. Any action on the part of addressees to
es wil l be wi thheld from publi
assess and revise their document control procedures in accordance with the guidance
c disclosu
contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109.
re.  The most recent
Consequently, the NRC staff did not perform a backfit analysis.
and detail
FEDERAL REGISTER NOTIFICATION
ed guidance on the control of inf
A notice of opportunity for public comment on this RIS was not published in the Federal
ormation related to operat
Register because it is informational and pertains to a staff position that does not represent a
ing nuclear power plants is provided in
departure from current regulatory requirements and practice. NRC intends to work with the
the Commission
Nuclear Energy Institute, industry representatives, members of the public, and other
paper SECY
stakeholders in modifying related guidance documents.
-04-0191, "Withholding Sensi
SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT OF 1996
tive Uncl assified Information
The NRC has determined that this action is not a rule and thus is not subject to the Small
Concerning Nu
Business Regulatory Enforcement Fairness Act of 1996.
clear Pow er Reactors From
                                                                                          Enclosure 2
Public Di sclosure," dated
October 19, 2004 , and the associated sta
ff requirements memorandum dated
November 9, 2004. Also
see SECY-05-009 1, "Task F
orce R eport o n Publ ic Di sclos ure of S ecuri ty-Re lated Informati
on,"dated May 18, 20 05, an d the a ssoci ated s taff requir
ements memoran dum dat ed Jun e 30, 2 005. The NRC staff
is preparing similar guidance f
or materials licensees and expects to mak
e it availab le to the pu
blic in early 200 6.SUMMARY OF ISSUE
Considerin
g the various
review s, legislati
on, and other c
hanges since S
eptember 11, 200
1, the NRC staff believ
es that clari
fying NRC's
current procedures
and poli cies regarding the
control of information wi
ll be ben eficial to stakeho
lders.  NRC
will continue to
make availab
le to the publi c most o f the in formatio n that the age ncy r eceiv es from o r send s to i ts li censee s.  In addit ion, t he pub lic w ill have acces s to a large a mount o f informat
ion i nclud ed in vari ous re ports produced by
  the NRC sta
ff.  Much of NRC's
information als
o will be readil
y avai lable to th
e public v ia the NRC
Web site (www.n
rc.gov) and the
NRC's el ectronic docume
nt management
system (ADAM
S) (www.nrc.gov/reading-rm/adams.html
). In additi
on, other informatio
n may be released to the public in response to form
al or informal request
s. The exceptions for cert
ain infor mation to be withhe
ld from public disc
losure f or reas ons othe r than se curity (e.g., privacy, proprietary, a
nd pre-decisi
onal information) have not
changed as a res
ult of recent ev
ents. The
appropriate ha
ndling of Safeguards Informatio
n (SGI) is dis
cussed in R
IS-2003-08, "Prote
ction of Safegua
rds Infor mation From U nautho rize d Dis closu re," da ted Ap ril 3 0, 200 3, and more speci fic SGI d esigna tion gu idanc e docu ments.  NRC wi thheld from publi
c disclosu
re some information  
related to prote
cting operating nu
clear power pl ants although i
t does not meet th
e existi ng criteria for desi
gnation as SGI.  Thi
s type of infor mation was recog
nized bef ore Sept ember 11, 2001, and, when su
bmitt ed to NRC by a
licensee, w
as withhe ld from public  
disclosure
according to the
provisio ns of 10 CFR
2.390(d)(1). This re
gulation states: (d) The follow
ing information i
s considered
commercial or  
financial i
nformation with
in the meaning of §9.17(a)(4) o
f this chapter and
is subject to
disclosure
only in accordance
with the pr ovis ions of §9.19 of this chapt er.(1) Corresponden
ce and reports
to or from the NRC
which co ntain information
or records concerni
ng a license
e's or appl
icant's phy
sical protec
tion, classi
fied matter
protection, or mate
rial control
and accounti
ng program for special
nuclear materia
l not otherw ise d esigna ted as Safegua rds Infor mation or cl assifi ed as Natio nal S ecuri ty Information or Restri
cted Data.
RIS 2005-26 
Pag e 3 of 5 NRC expe cts that lice
nsees wi ll contin ue to request NRC
withhol d some information  
citing 10 CFR 2.390(d)(1) and that the volume of
material requested to be withheld fr
om public disclosure
under this pro
vision will increase as
the NRC staff and l
icensees i
mplement the
guidan ce in this RIS. N RC ch anged i ts proc edures shortl y after Septe mber 11 , 2001 , to withhol d from public di
sclosure v
arious categorie
s of documents li
kely to inc
lude indi vidual record s that warra nt wi thhol ding u nder 1 0 CFR 2.390.  The N RC sta ff will asses s the n eed to withhol d such documen
t categories if li
censees routin
ely ide ntify specific
documents contai
ning sensitive information.  The NRC staf
f will interact with licensees on a case-by-case basis
regarding the use of
the provisions of 10 CFR 2.390(d)(1) to assu
re that informat
ion is properly
controlled, u
nder either S
ection 2.390(d
)(1) or one of the o
ther Freedom of Information
Act (FOIA) exemptions that m
ight be applicable. Licensees that identify inf
ormation to be withheld
from public dis
closure in  
accordance w
ith 10 CFR
2.390(d)(1) or oth
er provisi
on in the regulation sho
uld use the  
same general prac
tices as used
for proprietary
commercial or
financi al in formatio n. As show n on th e attac hed di agram, th e cov er let ter sho uld c learl y sta te that the document
includes s
ensitive information and
the affected pages shoul
d include the marking "Security-R
elated Information
- Withhold Under 10 CFR
2.390."  Unl
ike the requirements for wi
thholding prop
rietary in
formation, license
es are not requi
red to provi
de an affidavit for sensiti
ve information
withhel d under 10 C
FR 2.390(d) an
d related to
(1) physica
l prot ecti on o r (2) mate rial con trol and acc ount ing.Most informatio
n receive d and generated
by NRC deals w ith design, op
erations, or oth
er matters not di rectly relat ed to t he phy sical securi ty of n uclea r facil ities or rad ioact ive materi als. This information, i
f not protected as p
roprietary o
r under another
exception, is generally
made availab le to the pu
blic.  After Sep
tember 11, 2001, NRC and oth
er Government agenc
ies responded to c
oncerns that some
information easi
ly ava ilable o n public Web sites or by other
means might be use
ful to terrorists.  S
ECY-04-0191
provides the primary N
RC guidance
on whether information relate
d to operating nuclear power plants should be withheld from
public disclosure
in light of the
post-September 11
concerns.  The N
RC staff has posted th
e guidance
and related
material w
ithin the p
ublic readi
ng room (http://ww
w.nrc.gov/readi
ng-rm.html) on the
NRC Web site, and stakehol
ders can ask questi
ons or make suggestions
about the guida
nce and th e exa mples.  As discussed
in SECY-04-0191, other Gov
ernment agencies
have issu ed regulations
or guidan ce for pr otecti ng inform ation that c ould be rea sonab ly e xpec ted to be use ful to t errori sts in planni ng or executi
ng an attack on criti
cal infrastructure.
*Protected criti
cal infrastructure
information (PCII) i
s information rel
ated to the sec
urity of criti cal i nfrastru cture t hat is vol untari ly p rovi ded to the De partmen t of Home land Securi ty (DHS). *Criti cal e nergy infrastr ucture informa tion (CEII) i s defin ed in Feder al En ergy R egulat ory Commission (FE
RC) regulation
s as information
related to ene
rgy-related in
frastructure (e.g., hy droel ectric dams a nd el ectric transmi ssion syste ms).*Sensitiv e security
information (SSI) i
s defined in
Transportation Sa
fety Administrati
on (TSA) and Departmen
t of Transportation (DOT) regul
ations as i
nformation about the
security of trans
portation asse
ts, includi
ng pipeline
s.
RIS 2005-26 
Pag e 4 of 5 Licensees may
need to asse
ss and revi
se their proce
dures for handli
ng sensitiv
e unclassi
fied nonsafeguards information
in their n
ormal activ
ities and
interactions
with parti
es other than
NRC.  Duri
ng discussion
s of existin
g practices w
ith vario us license
es, the NRC
staff discovered
that license
es vary in how they treat and
protect information
that was pre
viously unprotected bu
t now is con sider ed sen sitiv e.  Som e lic ensee s hav e ins titute d more restri ctiv e cont rols.  Some have determi
ned that their
routine busi
ness practices
provide an appropria
te level of protection
for the s ensit ive informat ion.  As described
in 10 CF R 2.390, informatio
n deemed sensi
tive beca use it relate
s to physi
cal protection or mate
rial control
and accounti
ng is protected i
n much the same
way as commercial
or fina ncial inf ormat ion.  As with pr
oprieta ry infor mation , license es are expe
cted to have sufficient internal
controls to keep
the information c
onfidential. 
Possible methods to prev
ent the inadverten
t release of sens
itive un classified no
nsafeguards information i
nclude marking
documents as de
scribed in
10 CFR 2.39
0, restricting acce
ss to electroni
c recordkeeping
system s, and co ntrollin g the re produc tion, dis tribut ion, and de
struc tion of potent ially sensit
ive records.  NRC
uses the marking "Sec
urity-Rela
ted Information - Withhold Unde
r 10 CFR 2.39
0" and encoura
ges the use of this
marking by lic
ensees and o
thers possessi
ng informat ion d eemed s ensit ive using t he gui dance in SE CY-04-0191.  Lice nsees shoul d ensu re that similar
controls are i
n place w hen sensiti
ve information
is provi ded to outsid
e parties suc
h as contractors or other
Government agencies.  T
he NRC staff posted inf
ormation on NRC's
Web site (http://www.n
rc.gov/reading-rm.html) an
d include d a feedback form for questions o
r suggesti ons on how to effecti
vely contro l sen sitiv e infor mation.  BA CKFIT DISCU SSION This R IS requi res no actio n or w ritten respo nse.  A ny ac tion o n the p art of ad dresse es to assess and rev
ise their do
cument control p
rocedures in
accordance w
ith the guidan
ce contai ned i n this RIS i s stric tly v olunt ary a nd, the refore, i s not a backfit under 10 CFR 50.10 9. Consequently , the NRC sta
ff did not perform a backfit anal
ysis.FEDERAL REGISTER
NOTIF ICA TION A notice of opp
ortunity for pub
lic comment on
this RIS w
as not publi
shed in the
Federal Register becau se it is in formatio nal a nd per tains to a s taff posi tion t hat do es not repres ent a departure from current regul
atory requirements
and practice.  NRC inte
nds to work w
ith the Nuclear Ene
rgy Institute, in
dustry represe
ntatives, membe
rs of the publi
c, and other
stakeholders in
modifying rela
ted guidance d
ocuments.SMAL L BUSINESS
REGULA TORY ENFOR
CEMENT FA IRNESS A CT OF 1996
The NRC has determined that this act
ion is not a rule and thus is not subject to the Small
Busin ess Re gulato ry En forcemen t Fair ness A ct of 199 6. 
RIS 2005-26 
Pag e 5 of 5 PAPERWORK REDUCTION A
CT STA TEMENT This RIS does
not contain i
nformation colle
ctions and, th
erefore, is not sub
ject to the
require ments o f the Pa perw ork Red uctio n Act o f 1995 (44 U.S.C. 350 1 et se q.).CONTACT Please di rect any questi
ons about thi
s matter to the tech
nical conta
cts listed b
elow or to the approp riate Office of N
uclea r Reac tor Regu latio n (NRR) proje ct mana ger./RA/ By Patrick
L. Hiland For
/Michael J. Case, Di
rector Divi sion of Inspe ction and R egiona l Sup port Office of Nuclear Reacto
r Regulation
Technical Co
ntacts: W illiam Reckley, NRR
Margie Kotzalas, NRR
301-415-1323
301-415-2737
E-mail: wdr@nrc.gov
E-mail: mxk5@nrc.gov
Attachment:  M
arking diagram for documents
withhel d under 10 C
FR 2.390 Note:  NRC
generic communica
tions may b
e found on the N
RC publi c Web site, http://www.nrc.gov, under E
lectronic Re
ading Room/Docu
ment Collecti
ons.  
Security-Re
lated Information
Withhold Under 10 CFR
2.390 Subject XXXXXXXXXX
XXXXXXXXXX
XXXXXXXXXX


XXXXXXXXXX
                                                                                    RIS 2005-26
Attachment
                                                                                    Page 5 of 5
PAPERWORK REDUCTION ACT STATEMENT
This RIS does not contain information collections and, therefore, is not subject to the
requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
CONTACT
Please direct any questions about this matter to the technical contacts listed below or to the
appropriate Office of Nuclear Reactor Regulation (NRR) project manager.
                                            /RA/ By Patrick L. Hiland For/
                                            Michael J. Case, Director
                                            Division of Inspection and Regional Support
                                            Office of Nuclear Reactor Regulation
Technical Contacts: William Reckley, NRR            Margie Kotzalas, NRR
                      301-415-1323                301-415-2737
                      E-mail: wdr@nrc.gov          E-mail: mxk5@nrc.gov
Attachment: Marking diagram for documents withheld under 10 CFR 2.390
Note: NRC generic communications may be found on the NRC public Web site,
http://www.nrc.gov, under Electronic Reading Room/Document Collections.
                                                                                          Enclosure 2


RIS-2005-26
                                                                                      Attachment
                                                                                      RIS-2005-26
                                                                                      Page 1 of 1
                              SUGGESTED MARKINGS
            Withhold From Public Disclosure In Accordance With 10 CFR 2.390
                                                            Overall page marking on the top of all pages
            Security-Related Information
          Withhold Under 10 CFR 2.390
                                                              Ensure Subject Line is non-sensitive
          Subject
                  XXXXXXXXXX
                  XXXXXXXXXX
                  XXXXXXXXXX
                  XXXXXXXXXX
                                    Appropriate Controls
Access:                      Need-to-know in order to perform official licensee functions.
Storage:                    Openly within licensee facilities with electronic or other access
                            controls, for example, key cards, guards, alarms.
Mail:                        U.S. Postal Service first class mail, single opaque envelope with
                            no markings to indicate 10 CFR 2.390 contents.
Electronic Transmission:            Over encrypted phone, facsimile, computer, if available;
                                    otherwise over non-encrypted circuits where recipient will
                                    be present to receive the transmission.
                                                                                              Enclosure 2


Pag e 1 of 1 SUGGESTED MA
                                                                                      RIS 2003-08
RKINGS Withhold From Pub
                                                                                      Page 1 of 4
lic Disclosure In
                SUMMARY OF SAFEGUARDS INFORMATION REQUIREMENTS
Ac cordance With 1
                                          I. AUTHORITY
0 CFR 2.390
The Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2011 et seq. (Act), grants the
           
Nuclear Regulatory Commission broad and unique authority to prohibit the unauthorized
           
disclosure of Safeguards Information upon a determination that the unauthorized disclosure of
           
           
           
           
           
           
           
      Over
all page marking on
the top of all pa
ges Ensure Subjec t Line is non-se nsitive Appropriate Controls
Access: Need-to-know i
n order to perform official
licensee
functions.
Storage: Openly w ithin li censee facili
ties wi th electronic
or other acces
s controls, for exa
mple, key cards , guards, alarms.
Mail: U.S. P ostal Serv ice fir st cla ss mai l, si ngle o paque e nvel ope w ith no markings to indi
cate 10 CFR
2.390 contents.
Electronic Tran
smission: Over encryp
ted phone, facsimi
le, computer, if av
ailable;otherwise over non-encrypted circuits where recipient will
be present to re
ceive the transmission.
RIS 2003-08
Page 1 of 4SUMMARY OF SAFEGUARDS INFORMATION REQUIREMENTSI. AUTHORITYThe Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2011  
et seq. (Act), grants theNuclear Regulatory Commission broad and unique authority to prohibit the unauthorizeddisclosure of Safeguards Information upon a determination that the unauthorized disclosure of
such information could reasonably be expected to have a significant adverse effect on the
such information could reasonably be expected to have a significant adverse effect on the
health and safety of the public or the common defense and security by significantly increasing
health and safety of the public or the common defense and security by significantly increasing
the likelihood of theft, diversion, or sabotage of materials or facilities subject to NRC jurisdiction.
the likelihood of theft, diversion, or sabotage of materials or facilities subject to NRC jurisdiction.
Section 147 of the Act, 42 U.S.C. § 2167. For licensees and any other person, whether or not a licensee (primarily 10 C.F.R. Part 50reactor licensees, 10 C.F.R. Part 70 licensees for special nuclear material, and their employeesand contractors) subject to the requirements in 10 C.F.R. Part 73, Safeguards Information is
Section 147 of the Act, 42 U.S.C. § 2167.
defined by NRC regulation as follows:Safeguards Information means information not otherwise classified as NationalSecurity Information or Restricted Data which specifically identifies a licensee's
For licensees and any other person, whether or not a licensee (primarily 10 C.F.R. Part 50
or applicant's detailed, (1) security measures for the physical protection of
reactor licensees, 10 C.F.R. Part 70 licensees for special nuclear material, and their employees
special nuclear material, or (2) security measures for the physical protection and
and contractors) subject to the requirements in 10 C.F.R. Part 73, Safeguards Information is
location of certain plant equipment vital to the safety of production or utilization
defined by NRC regulation as follows:
facilities. 10 C.F.R. § 73.2.Specific requirements for the protection of Safeguards Information are contained in10 C.F.R. § 73.21. Access to Safeguards Information is limited as follows: (c) Access to Safeguards Information. (1) Except as the Commission mayotherwise authorize, no person may have access to Safeguards Information
        Safeguards Information means information not otherwise classified as National
unless the person has an established "need to know" for the information and is: (i) An employee, agent, or contractor of an applicant, a licensee, theCommission, or the United States Government. However, an individual to be
        Security Information or Restricted Data which specifically identifies a licensee's
authorized access to Safeguards Information by a nuclear power reactor
        or applicant's detailed, (1) security measures for the physical protection of
applicant or licensee must undergo a Federal Bureau of Investigation criminal
        special nuclear material, or (2) security measures for the physical protection and
history check to the extent required by 10 CFR 73.57; (ii) A member of a duly authorized committee of the Congress; (iii) The Governor of a State or designated representatives;
        location of certain plant equipment vital to the safety of production or utilization
(iv) A representative of the International Atomic Energy Agency (IAEA) engagedin activities associated with the U.S./IAEA Safeguards Agreement who has beencertified by the NRC;  
        facilities.
RIS 2003-08
10 C.F.R. § 73.2.
Page 2 of 4 (v) A member of a state or local law enforcement authority that is responsible forresponding to requests for assistance during safeguards emergencies; or(vi) An individual to whom disclosure is ordered pursuant to § 2.744(e) of thischapter [10 CFR 2.744(e)]. (2) Except as the Commission may otherwise authorize, no person may discloseSafeguards Information to any other person except as set forth in paragraph
Specific requirements for the protection of Safeguards Information are contained in
(c)(1) of this section. 10 C.F.R. § 73.21(c).The "need to know" requirement is specified by NRC regulation as follows:Need to know means a determination by a person having responsibility forprotecting Safeguards Information that a proposed recipient's access toSafeguards Information is necessary in the performance of official, contractual,
10 C.F.R. § 73.21. Access to Safeguards Information is limited as follows:
or licensee duties of employment.10 C.F.R. § 73.2.Thus, unless otherwise authorized by the Commission, NRC regulations limit access toSafeguards Information to certain specified individuals who have been determined to have a
        (c) Access to Safeguards Information. (1) Except as the Commission may
"need to know," i.e., specified individuals whose access has been determined to be necessary
        otherwise authorize, no person may have access to Safeguards Information
in the performance of official, contractual or licensee duties of employment. Furthermore, except as otherwise authorized by the Commission, no person may discloseSafeguards Information to any other person unless that other person is one of the specified
        unless the person has an established "need to know" for the information and is:
persons listed in 10 C.F.R. § 73.21(c)(1) and that person also has a "need to know."
        (i) An employee, agent, or contractor of an applicant, a licensee, the
10 C.F.R. § 73.21(c)(2). These regulations and prohibitions on unauthorized disclosure of
        Commission, or the United States Government. However, an individual to be
Safeguards Information are applicable to all licensees and all individuals:This part [10 C.F.R. Part 73] prescribes requirements for the protection of
        authorized access to Safeguards Information by a nuclear power reactor
Safeguards Information in the hands of any person, whether or not a licensee of
        applicant or licensee must undergo a Federal Bureau of Investigation criminal
the Commission, who produces, receives, or acquires Safeguards Information.10 C.F.R. § 73.1(b)(7).The Commission's statutory authority to protect and prohibit the unauthorized disclosure ofSafeguards Information is even broader than is reflected in these regulations. Section 147 of
        history check to the extent required by 10 CFR 73.57;
the Act grants the Commission explicit authority to "issue such orders, as necessary to prohibit
        (ii) A member of a duly authorized committee of the Congress;
the unauthorized disclosure of safeguards information . . . .This authority extends to
        (iii) The Governor of a State or designated representatives;
        (iv) A representative of the International Atomic Energy Agency (IAEA) engaged
        in activities associated with the U.S./IAEA Safeguards Agreement who has been
        certified by the NRC;
                                                                                            Enclosure 3
 
                                                                                    RIS 2003-08
                                                                                    Page 2 of 4
        (v) A member of a state or local law enforcement authority that is responsible for
        responding to requests for assistance during safeguards emergencies; or
        (vi) An individual to whom disclosure is ordered pursuant to § 2.744(e) of this
        chapter [10 CFR 2.744(e)].
        (2) Except as the Commission may otherwise authorize, no person may disclose
        Safeguards Information to any other person except as set forth in paragraph
        (c)(1) of this section.
10 C.F.R. § 73.21(c).
The need to know requirement is specified by NRC regulation as follows:
        Need to know means a determination by a person having responsibility for
        protecting Safeguards Information that a proposed recipient's access to
        Safeguards Information is necessary in the performance of official, contractual,
        or licensee duties of employment.
10 C.F.R. § 73.2.
Thus, unless otherwise authorized by the Commission, NRC regulations limit access to
Safeguards Information to certain specified individuals who have been determined to have a
need to know, i.e., specified individuals whose access has been determined to be necessary
in the performance of official, contractual or licensee duties of employment.
Furthermore, except as otherwise authorized by the Commission, no person may disclose
Safeguards Information to any other person unless that other person is one of the specified
persons listed in 10 C.F.R. § 73.21(c)(1) and that person also has a need to know.
10 C.F.R. § 73.21(c)(2). These regulations and prohibitions on unauthorized disclosure of
Safeguards Information are applicable to all licensees and all individuals:
        This part [10 C.F.R. Part 73] prescribes requirements for the protection of
        Safeguards Information in the hands of any person, whether or not a licensee of
        the Commission, who produces, receives, or acquires Safeguards Information.
10 C.F.R. § 73.1(b)(7).
The Commissions statutory authority to protect and prohibit the unauthorized disclosure of
Safeguards Information is even broader than is reflected in these regulations. Section 147 of
the Act grants the Commission explicit authority to issue such orders, as necessary to prohibit
the unauthorized disclosure of safeguards information . . . . This authority extends to
information concerning special nuclear material, source material, and byproduct material, as
information concerning special nuclear material, source material, and byproduct material, as
well as production and utilization facilities.  
well as production and utilization facilities.
RIS 2003-08
                                                                                        Enclosure 3
Page 3 of 4The Act explicitly provides: "Any person, whether or not a licensee of the Commission, who
 
                                                                                    RIS 2003-08
                                                                                    Page 3 of 4
The Act explicitly provides: Any person, whether or not a licensee of the Commission, who
violates any regulations adopted under this section shall be subject to the civil monetary
violates any regulations adopted under this section shall be subject to the civil monetary
penalties of Section 234 of this Act.Section 147a of the Act. Section 234a of the Actprovides for a civil monetary penalty not to exceed $120,000 for each violation. S
penalties of Section 234 of this Act. Section 147a of the Act. Section 234a of the Act
ee10 C.F.R. § 2.205(j) (2003). Furthermore, a willful violation of any regulation or order governingSafeguards Information is a felony subject to criminal penalties in the form of fines or
provides for a civil monetary penalty not to exceed $120,000 for each violation. See
imprisonment, or both.  
10 C.F.R. § 2.205(j) (2003). Furthermore, a willful violation of any regulation or order governing
See Sections 147b and 223a of the Act. The NRC Enforcement Policy outlines potential NRC actions against both licensees andindividuals for violations of the regulations and Orders using criteria that evaluate both the
Safeguards Information is a felony subject to criminal penalties in the form of fines or
details and severity of the violation. II. DISCUSSIONAll licensees and all other persons who now have, or in the future may have, access to
imprisonment, or both. See Sections 147b and 223a of the Act.
The NRC Enforcement Policy outlines potential NRC actions against both licensees and
individuals for violations of the regulations and Orders using criteria that evaluate both the
details and severity of the violation.
                                          II. DISCUSSION
All licensees and all other persons who now have, or in the future may have, access to
Safeguards Information must comply with all applicable requirements delineated in regulations
Safeguards Information must comply with all applicable requirements delineated in regulations
and Orders governing the handling and unauthorized disclosure of Safeguards Information. As
and Orders governing the handling and unauthorized disclosure of Safeguards Information. As
stipulated in 10 C.F.R. § 73.21(a), licensees and persons who produce, receive or acquire
stipulated in 10 C.F.R. § 73.21(a), licensees and persons who produce, receive or acquire
Safeguards Information are required to ensure that Safeguards Information is protected against
Safeguards Information are required to ensure that Safeguards Information is protected against
unauthorized disclosure. To meet this requirement, licensees and persons subject to
unauthorized disclosure. To meet this requirement, licensees and persons subject to
10 C.F.R. § 73.21(a) shall establish and maintain an information protection system governing
10 C.F.R. § 73.21(a) shall establish and maintain an information protection system governing
the proper handling and unauthorized disclosure of Safeguards Information. All licensees
the proper handling and unauthorized disclosure of Safeguards Information. All licensees
should be aware that since the requirements of 10 C.F.R. § 73.21(a) apply to all persons who
should be aware that since the requirements of 10 C.F.R. § 73.21(a) apply to all persons who
receive Safeguards Information, they apply to all contractors whose employees may haveaccess to Safeguards Information and they must either adhere to the licensee's policies andprocedures on Safeguards Information or develop, maintain and implement their own
receive Safeguards Information, they apply to all contractors whose employees may have
access to Safeguards Information and they must either adhere to the licensees policies and
procedures on Safeguards Information or develop, maintain and implement their own
information protection system, but the licensees remain responsible for the conduct of their
information protection system, but the licensees remain responsible for the conduct of their
contractors. The elements of the required information protection system are specified in
contractors. The elements of the required information protection system are specified in
10 C.F.R. § 73.21(b) through (i). The information protection system must address, at a
10 C.F.R. § 73.21(b) through (i). The information protection system must address, at a
minimum, the following: the general performance requirement that each person who produces,
minimum, the following: the general performance requirement that each person who produces,
receives, or acquires Safeguards Information shall ensure that Safeguards Information is
receives, or acquires Safeguards Information shall ensure that Safeguards Information is
Line 976: Line 597:
containing Safeguards Information; access to Safeguards Information; preparation, marking,
containing Safeguards Information; access to Safeguards Information; preparation, marking,
reproduction and destruction of documents; external transmission of documents; use of
reproduction and destruction of documents; external transmission of documents; use of
automatic data processing systems; and removal of the Safeguards Information category.As noted above, in addition to the responsibility of each licensee to ensure that all of itsemployees, contractors and subcontractors, and their employees comply with applicable
automatic data processing systems; and removal of the Safeguards Information category.
As noted above, in addition to the responsibility of each licensee to ensure that all of its
employees, contractors and subcontractors, and their employees comply with applicable
requirements, all contractors, subcontractors, and individual employees also are individually
requirements, all contractors, subcontractors, and individual employees also are individually
responsible for complying with applicable requirements and all are subject to civil and criminal
responsible for complying with applicable requirements and all are subject to civil and criminal
sanctions for failures to comply. The NRC considers that violations of the requirements
sanctions for failures to comply. The NRC considers that violations of the requirements
applicable to the handling of Safeguards Information are a serious breach of adequate
applicable to the handling of Safeguards Information are a serious breach of adequate
protection of the public health and safety and the common defense and security of the United
protection of the public health and safety and the common defense and security of the United
States.  
States.
RIS 2003-08
                                                                                            Enclosure 3
Page 4 of 4As a result, the staff intends to use the NRC Enforcement Policy, including the discretion to
 
                                                                                      RIS 2003-08
                                                                                      Page 4 of 4
As a result, the staff intends to use the NRC Enforcement Policy, including the discretion to
increase penalties for violations, to determine appropriate sanctions against licensees and
increase penalties for violations, to determine appropriate sanctions against licensees and
individuals who violate these requirements. In addition, the Commission may use its discretion,based on the severity of the violation, to further increase the penalty for any violation up to thestatutory maximum. Willful violations of these requirements will also be referred to the
individuals who violate these requirements. In addition, the Commission may use its discretion,
based on the severity of the violation, to further increase the penalty for any violation up to the
statutory maximum. Willful violations of these requirements will also be referred to the
Department of Justice for a determination of whether criminal penalties will be pursued.
Department of Justice for a determination of whether criminal penalties will be pursued.
                                                                                            Enclosure 3
}}
}}

Latest revision as of 18:05, 12 November 2019

Update of NRC Distribution List for Documents Containing Safeguards (Sgi), Official Use Only (Ouo), and Routine Information - Edwin I. Hatch Nuclear Plant
ML11206B151
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/20/2011
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Madison D
Southern Nuclear Operating Co
References
RIS-03-008, RIS-05-026
Download: ML11206B151 (18)


See also: RIS 2003-08

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

July 20, 2011

Mr. Dennis R. Madison

Vice President

Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

SUBJECT: UPDATE OF NUCLEAR REGULATORY COMMISSION (NRC) DISTRIBUTION

LIST FOR DOCUMENTS CONTAINING SAFEGUARDS (SGI), OFFICIAL USE

ONLY (OUO), AND ROUTINE INFORMATION - (EDWIN I. HATCH NUCLEAR

PLANT)

Dear Mr. Madison:

I am writing to request current information on those individuals authorized to receive documents

containing Safeguards (SGI), Official Use Only (OUO), and Routine information on issues

relating to your facility. Safeguards information is a special category of sensitive unclassified

information authorized by Section 147 of the Atomic Energy Act of 1954, as amended (the Act),

to be protected. While SGI is considered sensitive unclassified information, it is handled and

protected more like classified confidential information than like other sensitive unclassified

information (e.g., privacy and proprietary information).

Access to SGI is controlled by a valid need-to-know basis. It is the responsibility of the NRC to

maintain the integrity of SGI distribution, therefore we are currently in the process of verifying

the identity, and contact information of individuals designated to receive documents with SGI,

OUO, and Routine information for your facility.

You are requested to provide an updated distribution list of those persons who should receive

documents containing SGI, OUO, and Routine information within 20 days of the date of this

letter to: ATTN: Document Control Desk, Washington, D.C. 20555-0001; with a copy to the

Regional Administrator Region II, so that we can verify and/or update our distribution

information.

Please ensure that each list clearly specifies the individuals who are authorized to receive

matter specific correspondence. To facilitate this request, I have enclosed a copy of the NRCs

official distribution list on file, which has been organized by category. Additionally, you will find

NRC Regulatory Issue Summary 2005-26 defining control of sensitive unclassified non-

safeguards information related to nuclear power reactors, and NRC Regulatory Issue Summary 2003-08, Summary of Safeguards Information Requirements.

SNC 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://ww.nrc.gov/reading-

rm/adams.html (the Public Electronic Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Michael E. Ernstes, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No.: 50-321, 50-366

License No.: DPR-57, NPF-5

Enclosures:

1. Current Official Distribution List

2. NRC Regulatory Issue Summary 2005-26

3. NRC Regulatory Issue Summary 2003-08

_________________________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED

OFFICE RII:DRS RII: DRS RII: DRP

SIGNATURE RA RA RA

NAME J. CALLOWAY M. ERNSTES S.SHAEFFER

DATE 07/15/2011 07/20/2011 07/18/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL DISTRIBUTION LIST

HATCH NUCLEAR STATION

ROUTINE DISTRIBUTION:

cc w/encl: J. L. Pemberton

B. D. McKinney, Jr. SVP & General Counsel-Ops & SNC

Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Steven B. Tipps

Jeffrey T. Gasser Hatch Principal Engineer - Licensing

Chief Nuclear Officer Edwin I. Hatch Nuclear Plant

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Mr. Ken Rosanski

M. J. Ajluni Resident Manager

Nuclear Licensing Director Edwin I. Hatch Nuclear Plant

Southern Nuclear Operating Company, Inc. Oglethorpe Power Corporation

Electronic Mail Distribution Electronic Mail Distribution

T. D. Honeycutt Chris Clark

Regulatory Response Supervisor Commissioner

Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

L. Mike Stinson Lee Foley

Vice President Manager of Contracts Generation

Joseph M. Farley Nuclear Plant Oglethorpe Power Corporation

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Senior Resident Inspector

L. P. Hill U.S. Nuclear Regulatory Commission

Licensing Supervisor Edwin I. Hatch Nuclear Plant

Southern Nuclear Operating Company, Inc. U.S. NRC

Electronic Mail Distribution 11030 Hatch Parkway N

Baxley, GA 30334

Paula Marino

Vice President Arthur H. Domby, Esq.

Engineering Troutman Sanders

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

James C. Hardeman

R. E. Varnadore Environmental Radiation Program Manager

Site Support Manager Environmental Protection Division

Edwin I. Hatch Nuclear Plant Georgia Department of Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

R. L. Gladney Ted V. Jackson

Licensing Engineer Emergency Response and Radiation

Southern Nuclear Operating Company, Inc. Program Manager

Electronic Mail Distribution Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

Enclosure 1

OFFICIAL DISTRIBUTION LIST

HATCH NUCLEAR STATION

ROUTINE DISTRIBUTION:

cc w/encl: (Continued)

F. Allen Barnes

Director

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

Cynthia A. Sanders

Radioactive Materials Program Manager

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

James A. Sommerville

Program Coordination Branch Chief

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

L. L. Crumpton

Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Mr. Steven M. Jackson

Senior Engineer - Power Supply

Municipal Electric Authority of Georgia

Electronic Mail Distribution

Mr. Reece McAlister

Executive Secretary

Georgia Public Service Commission

Electronic Mail Distribution

Chairman

Appling County Commissioners

County Courthouse

69 Tippins Street, Suite 201

Baxley, GA 31513

Amy Whaley

Engineer

Nuclear Generation Development and

Construction

Electronic Mail Distribution

Enclosure 1

OFFICIAL DISTRIBUTION LIST

HATCH NUCLEAR STATION

OFFICIAL USE ONLY (OUO) DISTRIBUTION

cc w/encl

Jeffrey T. Gasser

Chief Nuclear Officer

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

W. L. Bargeron

Plant General Manager

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

Keith Wooten

Project Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

David Burford

Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

Enclosure 1

OFFICIAL DISTRIBUTION LIST

HATCH NUCLEAR STATION

SAFEGUARDS (SGI) DISTRIBUTION:

cc w/encl

L. Mike Stinson David Burford

Vice President Manager

Joseph M. Farley Nuclear Plant Nuclear Fleet Security

Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Farley Nuclear Plant 40 Iverness Center Parkway

P.O. Drawer 470 Birmingham, AL 35242

BIN B500

Ashford, AL 36312 Lee Foley

Manager of Contracts Generation

J. L. Pemberton Oglethorpe Power Corporation

SVP & General Counsel-Ops & SNC 2100 East Exchange Place

Southern Nuclear Operating Company, Inc. P.O. Box 1349

40 Inverness Center Parkway Tucker, GA 30085-1349

BIN B022

Birmingham, AL 35242 F. Allen Barnes

Director

Chairman Environmental Protection Division

Appling County Commissioners Georgia Department of Natural Resources

County Courthouse 2 Martin Luther King Jr. Drive.

69 Tippins Street, Suite 201 Suite 1152 East Floyd Tower

Baxley, GA 31513 Atlanta, GA 30334-9000

cc w/Inspection Summary: Cynthia A. Sanders

Jeffrey T. Gasser Radioactive Materials Program Manager

Chief Nuclear Officer Environmental Protection Division

Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources

40 Iverness Center Parkway 4220 International Parkway

Birmingham, AL 35242 Suite 100

Atlanta, GA 30354-3906

Keith Wooten

Project Manager Mr. Ken Rosanski

Nuclear Fleet Security Resident Manager

Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant

40 Iverness Center Parkway Oglethorpe Power Corporation

Birmingham, AL 35242 11028 Hatch Parkway North

Baxley, GA 31513

Paula Marino

Vice President Senior Engineer

Engineering Power Supply

Southern Nuclear Operating Company, Inc. Municipal Electric Authority of Georgia

P.O. Box 1295 1470 Riveredge Parkway NW

Birmingham, AL 35201-1295 Atlanta, GA 30328-4684

Arthur H. Domby, Esq. Reece McAlister

Troutman Sanders Executive Secretary

Nations Bank Plaza Public Service Commission

600 Peachtree Street, NE, Suite 5200 244 Washington Street, SW

Atlanta, GA 30308-2216 Atlanta, GA 30334

Enclosure 1

OFFICIAL DISTRIBUTION LIST

HATCH NUCLEAR STATION

SAFEGUARDS (SGI) DISTRIBUTION:

cc w/encl - Continued

W. L. Bargeron

Plant General Manager

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

Jonathan M. Merritt

Site Security Manager

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

Enclosure 1

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001

November 7, 2005

NRC REGULATORY ISSUE SUMMARY 2005-26

CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUARDS

INFORMATION RELATED TO NUCLEAR POWER REACTORS

ADDRESSEES

All holders of operating licenses for nuclear power reactors and holders of and applicants for

certificates for reactor designs.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to inform the addressees of the appropriate handling of information that warrants controls

because of continuing concerns about terrorist attacks against the critical infrastructure of the

United States. The NRC intends to balance its responsibility to preserve public access to

information and support meaningful participation in NRCs regulatory processes against its

responsibility to withhold information that might unnecessarily compromise the security of

nuclear facilities. Licensees for operating nuclear power plants and reactor facility designers

may need to assess their document control procedures to ensure they protect sensitive

information. Although no specific action or written response is required, the NRC encourages

the addressees for this RIS, vendors and contractors, and others who may possess sensitive

information to destroy, mark, or otherwise control the information to avoid inadvertently

providing assistance to those who might use the information for malevolent acts.

BACKGROUND INFORMATION

NRC traditionally has given the public access to a significant amount of information about the

facilities and materials the agency regulates. Openness has been and remains a cornerstone

of NRCs regulatory philosophy. The Atomic Energy Act, subsequent legislation, and various

NRC regulations have given the public the right to participate in the licensing and oversight

process for nuclear power reactors and other NRC licensees. To participate in a meaningful

way, the public must have access to information about the design and operation of regulated

facilities and use of nuclear materials. However, NRC and other Government agencies have

always withheld some information from public disclosure for reasons of security, personal

privacy, or commercial or trade secret protection. In light of increased terrorist activity

worldwide, NRC reexamined its document disclosure policies.

ML051430228

Enclosure 2

RIS 2005-26

Page 2 of 5

Since the events of September 11, 2001, NRC has issued advisories and taken specific actions

regarding the security of its licensed facilities. NRC has also assessed and revised its policies

and practices for control of information so that information that could reasonably be expected to

be useful to terrorists in planning or executing an attack against nuclear power plants or other

NRC-licensed facilities will be withheld from public disclosure. The most recent and detailed

guidance on the control of information related to operating nuclear power plants is provided in

the Commission paper SECY-04-0191, Withholding Sensitive Unclassified Information

Concerning Nuclear Power Reactors From Public Disclosure, dated October 19, 2004, and the

associated staff requirements memorandum dated November 9, 2004. Also see

SECY-05-0091, Task Force Report on Public Disclosure of Security-Related Information,

dated May 18, 2005, and the associated staff requirements memorandum dated June 30, 2005.

The NRC staff is preparing similar guidance for materials licensees and expects to make it

available to the public in early 2006.

SUMMARY OF ISSUE

Considering the various reviews, legislation, and other changes since September 11, 2001, the

NRC staff believes that clarifying NRCs current procedures and policies regarding the control

of information will be beneficial to stakeholders. NRC will continue to make available to the

public most of the information that the agency receives from or sends to its licensees. In

addition, the public will have access to a large amount of information included in various reports

produced by the NRC staff. Much of NRCs information also will be readily available to the

public via the NRC Web site (www.nrc.gov) and the NRCs electronic document management

system (ADAMS) (www.nrc.gov/reading-rm/adams.html). In addition, other information may be

released to the public in response to formal or informal requests. The exceptions for certain

information to be withheld from public disclosure for reasons other than security (e.g., privacy,

proprietary, and pre-decisional information) have not changed as a result of recent events. The

appropriate handling of Safeguards Information (SGI) is discussed in RIS-2003-08, Protection

of Safeguards Information From Unauthorized Disclosure, dated April 30, 2003, and more

specific SGI designation guidance documents.

NRC withheld from public disclosure some information related to protecting operating nuclear

power plants although it does not meet the existing criteria for designation as SGI. This type of

information was recognized before September 11, 2001, and, when submitted to NRC by a

licensee, was withheld from public disclosure according to the provisions of 10 CFR 2.390(d)(1). This regulation states:

(d) The following information is considered commercial or financial information within the

meaning of §9.17(a)(4) of this chapter and is subject to disclosure only in accordance

with the provisions of §9.19 of this chapter.

(1) Correspondence and reports to or from the NRC which contain information or

records concerning a licensees or applicants physical protection, classified matter

protection, or material control and accounting program for special nuclear material not

otherwise designated as Safeguards Information or classified as National Security

Information or Restricted Data.

Enclosure 2

RIS 2005-26

Page 3 of 5

NRC expects that licensees will continue to request NRC withhold some information citing

10 CFR 2.390(d)(1) and that the volume of material requested to be withheld from public

disclosure under this provision will increase as the NRC staff and licensees implement the

guidance in this RIS. NRC changed its procedures shortly after September 11, 2001, to

withhold from public disclosure various categories of documents likely to include individual

records that warrant withholding under 10 CFR 2.390. The NRC staff will assess the need to

withhold such document categories if licensees routinely identify specific documents containing

sensitive information. The NRC staff will interact with licensees on a case-by-case basis

regarding the use of the provisions of 10 CFR 2.390(d)(1) to assure that information is properly

controlled, under either Section 2.390(d)(1) or one of the other Freedom of Information Act

(FOIA) exemptions that might be applicable. Licensees that identify information to be withheld

from public disclosure in accordance with 10 CFR 2.390(d)(1) or other provision in the

regulation should use the same general practices as used for proprietary commercial or

financial information. As shown on the attached diagram, the cover letter should clearly state

that the document includes sensitive information and the affected pages should include the

marking Security-Related Information Withhold Under 10 CFR 2.390. Unlike the

requirements for withholding proprietary information, licensees are not required to provide an

affidavit for sensitive information withheld under 10 CFR 2.390(d) and related to (1) physical

protection or (2) material control and accounting.

Most information received and generated by NRC deals with design, operations, or other

matters not directly related to the physical security of nuclear facilities or radioactive materials.

This information, if not protected as proprietary or under another exception, is generally made

available to the public. After September 11, 2001, NRC and other Government agencies

responded to concerns that some information easily available on public Web sites or by other

means might be useful to terrorists. SECY-04-0191 provides the primary NRC guidance on

whether information related to operating nuclear power plants should be withheld from public

disclosure in light of the post-September 11 concerns. The NRC staff has posted the guidance

and related material within the public reading room (http://www.nrc.gov/reading-rm.html) on the

NRC Web site, and stakeholders can ask questions or make suggestions about the guidance

and the examples.

As discussed in SECY-04-0191, other Government agencies have issued regulations or

guidance for protecting information that could be reasonably expected to be useful to terrorists

in planning or executing an attack on critical infrastructure.

  • Protected critical infrastructure information (PCII) is information related to the security of

critical infrastructure that is voluntarily provided to the Department of Homeland Security

(DHS).

  • Critical energy infrastructure information (CEII) is defined in Federal Energy Regulatory

Commission (FERC) regulations as information related to energy-related infrastructure

(e.g., hydroelectric dams and electric transmission systems).

  • Sensitive security information (SSI) is defined in Transportation Safety Administration

(TSA) and Department of Transportation (DOT) regulations as information about the

security of transportation assets, including pipelines.

Enclosure 2

RIS 2005-26

Page 4 of 5

Licensees may need to assess and revise their procedures for handling sensitive unclassified

nonsafeguards information in their normal activities and interactions with parties other than

NRC. During discussions of existing practices with various licensees, the NRC staff discovered

that licensees vary in how they treat and protect information that was previously unprotected but

now is considered sensitive. Some licensees have instituted more restrictive controls. Some

have determined that their routine business practices provide an appropriate level of protection

for the sensitive information.

As described in 10 CFR 2.390, information deemed sensitive because it relates to physical

protection or material control and accounting is protected in much the same way as commercial

or financial information. As with proprietary information, licensees are expected to have

sufficient internal controls to keep the information confidential. Possible methods to prevent the

inadvertent release of sensitive unclassified nonsafeguards information include marking

documents as described in 10 CFR 2.390, restricting access to electronic recordkeeping

systems, and controlling the reproduction, distribution, and destruction of potentially sensitive

records. NRC uses the marking Security-Related Information Withhold Under

10 CFR 2.390 and encourages the use of this marking by licensees and others possessing

information deemed sensitive using the guidance in SECY-04-0191. Licensees should ensure

that similar controls are in place when sensitive information is provided to outside parties such

as contractors or other Government agencies. The NRC staff posted information on NRCs

Web site (http://www.nrc.gov/reading-rm.html) and included a feedback form for questions or

suggestions on how to effectively control sensitive information.

BACKFIT DISCUSSION

This RIS requires no action or written response. Any action on the part of addressees to

assess and revise their document control procedures in accordance with the guidance

contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109.

Consequently, the NRC staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal

Register because it is informational and pertains to a staff position that does not represent a

departure from current regulatory requirements and practice. NRC intends to work with the

Nuclear Energy Institute, industry representatives, members of the public, and other

stakeholders in modifying related guidance documents.

SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT OF 1996

The NRC has determined that this action is not a rule and thus is not subject to the Small

Business Regulatory Enforcement Fairness Act of 1996.

Enclosure 2

RIS 2005-26

Page 5 of 5

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain information collections and, therefore, is not subject to the

requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

CONTACT

Please direct any questions about this matter to the technical contacts listed below or to the

appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

/RA/ By Patrick L. Hiland For/

Michael J. Case, Director

Division of Inspection and Regional Support

Office of Nuclear Reactor Regulation

Technical Contacts: William Reckley, NRR Margie Kotzalas, NRR

301-415-1323 301-415-2737

E-mail: wdr@nrc.gov E-mail: mxk5@nrc.gov

Attachment: Marking diagram for documents withheld under 10 CFR 2.390

Note: NRC generic communications may be found on the NRC public Web site,

http://www.nrc.gov, under Electronic Reading Room/Document Collections.

Enclosure 2

Attachment

RIS-2005-26

Page 1 of 1

SUGGESTED MARKINGS

Withhold From Public Disclosure In Accordance With 10 CFR 2.390

Overall page marking on the top of all pages

Security-Related Information

Withhold Under 10 CFR 2.390

Ensure Subject Line is non-sensitive

Subject

XXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

Appropriate Controls

Access: Need-to-know in order to perform official licensee functions.

Storage: Openly within licensee facilities with electronic or other access

controls, for example, key cards, guards, alarms.

Mail: U.S. Postal Service first class mail, single opaque envelope with

no markings to indicate 10 CFR 2.390 contents.

Electronic Transmission: Over encrypted phone, facsimile, computer, if available;

otherwise over non-encrypted circuits where recipient will

be present to receive the transmission.

Enclosure 2

RIS 2003-08

Page 1 of 4

SUMMARY OF SAFEGUARDS INFORMATION REQUIREMENTS

I. AUTHORITY

The Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2011 et seq. (Act), grants the

Nuclear Regulatory Commission broad and unique authority to prohibit the unauthorized

disclosure of Safeguards Information upon a determination that the unauthorized disclosure of

such information could reasonably be expected to have a significant adverse effect on the

health and safety of the public or the common defense and security by significantly increasing

the likelihood of theft, diversion, or sabotage of materials or facilities subject to NRC jurisdiction.

Section 147 of the Act, 42 U.S.C. § 2167.

For licensees and any other person, whether or not a licensee (primarily 10 C.F.R. Part 50

reactor licensees, 10 C.F.R. Part 70 licensees for special nuclear material, and their employees

and contractors) subject to the requirements in 10 C.F.R. Part 73, Safeguards Information is

defined by NRC regulation as follows:

Safeguards Information means information not otherwise classified as National

Security Information or Restricted Data which specifically identifies a licensee's

or applicant's detailed, (1) security measures for the physical protection of

special nuclear material, or (2) security measures for the physical protection and

location of certain plant equipment vital to the safety of production or utilization

facilities.

10 C.F.R. § 73.2.

Specific requirements for the protection of Safeguards Information are contained in

10 C.F.R. § 73.21. Access to Safeguards Information is limited as follows:

(c) Access to Safeguards Information. (1) Except as the Commission may

otherwise authorize, no person may have access to Safeguards Information

unless the person has an established "need to know" for the information and is:

(i) An employee, agent, or contractor of an applicant, a licensee, the

Commission, or the United States Government. However, an individual to be

authorized access to Safeguards Information by a nuclear power reactor

applicant or licensee must undergo a Federal Bureau of Investigation criminal

history check to the extent required by 10 CFR 73.57;

(ii) A member of a duly authorized committee of the Congress;

(iii) The Governor of a State or designated representatives;

(iv) A representative of the International Atomic Energy Agency (IAEA) engaged

in activities associated with the U.S./IAEA Safeguards Agreement who has been

certified by the NRC;

Enclosure 3

RIS 2003-08

Page 2 of 4

(v) A member of a state or local law enforcement authority that is responsible for

responding to requests for assistance during safeguards emergencies; or

(vi) An individual to whom disclosure is ordered pursuant to § 2.744(e) of this

chapter [10 CFR 2.744(e)].

(2) Except as the Commission may otherwise authorize, no person may disclose

Safeguards Information to any other person except as set forth in paragraph

(c)(1) of this section.

10 C.F.R. § 73.21(c).

The need to know requirement is specified by NRC regulation as follows:

Need to know means a determination by a person having responsibility for

protecting Safeguards Information that a proposed recipient's access to

Safeguards Information is necessary in the performance of official, contractual,

or licensee duties of employment.

10 C.F.R. § 73.2.

Thus, unless otherwise authorized by the Commission, NRC regulations limit access to

Safeguards Information to certain specified individuals who have been determined to have a

need to know, i.e., specified individuals whose access has been determined to be necessary

in the performance of official, contractual or licensee duties of employment.

Furthermore, except as otherwise authorized by the Commission, no person may disclose

Safeguards Information to any other person unless that other person is one of the specified

persons listed in 10 C.F.R. § 73.21(c)(1) and that person also has a need to know.

10 C.F.R. § 73.21(c)(2). These regulations and prohibitions on unauthorized disclosure of

Safeguards Information are applicable to all licensees and all individuals:

This part [10 C.F.R. Part 73] prescribes requirements for the protection of

Safeguards Information in the hands of any person, whether or not a licensee of

the Commission, who produces, receives, or acquires Safeguards Information.

10 C.F.R. § 73.1(b)(7).

The Commissions statutory authority to protect and prohibit the unauthorized disclosure of

Safeguards Information is even broader than is reflected in these regulations. Section 147 of

the Act grants the Commission explicit authority to issue such orders, as necessary to prohibit

the unauthorized disclosure of safeguards information . . . . This authority extends to

information concerning special nuclear material, source material, and byproduct material, as

well as production and utilization facilities.

Enclosure 3

RIS 2003-08

Page 3 of 4

The Act explicitly provides: Any person, whether or not a licensee of the Commission, who

violates any regulations adopted under this section shall be subject to the civil monetary

penalties of Section 234 of this Act. Section 147a of the Act. Section 234a of the Act

provides for a civil monetary penalty not to exceed $120,000 for each violation. See

10 C.F.R. § 2.205(j) (2003). Furthermore, a willful violation of any regulation or order governing

Safeguards Information is a felony subject to criminal penalties in the form of fines or

imprisonment, or both. See Sections 147b and 223a of the Act.

The NRC Enforcement Policy outlines potential NRC actions against both licensees and

individuals for violations of the regulations and Orders using criteria that evaluate both the

details and severity of the violation.

II. DISCUSSION

All licensees and all other persons who now have, or in the future may have, access to

Safeguards Information must comply with all applicable requirements delineated in regulations

and Orders governing the handling and unauthorized disclosure of Safeguards Information. As

stipulated in 10 C.F.R. § 73.21(a), licensees and persons who produce, receive or acquire

Safeguards Information are required to ensure that Safeguards Information is protected against

unauthorized disclosure. To meet this requirement, licensees and persons subject to

10 C.F.R. § 73.21(a) shall establish and maintain an information protection system governing

the proper handling and unauthorized disclosure of Safeguards Information. All licensees

should be aware that since the requirements of 10 C.F.R. § 73.21(a) apply to all persons who

receive Safeguards Information, they apply to all contractors whose employees may have

access to Safeguards Information and they must either adhere to the licensees policies and

procedures on Safeguards Information or develop, maintain and implement their own

information protection system, but the licensees remain responsible for the conduct of their

contractors. The elements of the required information protection system are specified in

10 C.F.R. § 73.21(b) through (i). The information protection system must address, at a

minimum, the following: the general performance requirement that each person who produces,

receives, or acquires Safeguards Information shall ensure that Safeguards Information is

protected against unauthorized disclosure; protection of Safeguards Information at fixed sites,

in use and in storage, and while in transit; inspections, audits and evaluations; correspondence

containing Safeguards Information; access to Safeguards Information; preparation, marking,

reproduction and destruction of documents; external transmission of documents; use of

automatic data processing systems; and removal of the Safeguards Information category.

As noted above, in addition to the responsibility of each licensee to ensure that all of its

employees, contractors and subcontractors, and their employees comply with applicable

requirements, all contractors, subcontractors, and individual employees also are individually

responsible for complying with applicable requirements and all are subject to civil and criminal

sanctions for failures to comply. The NRC considers that violations of the requirements

applicable to the handling of Safeguards Information are a serious breach of adequate

protection of the public health and safety and the common defense and security of the United

States.

Enclosure 3

RIS 2003-08

Page 4 of 4

As a result, the staff intends to use the NRC Enforcement Policy, including the discretion to

increase penalties for violations, to determine appropriate sanctions against licensees and

individuals who violate these requirements. In addition, the Commission may use its discretion,

based on the severity of the violation, to further increase the penalty for any violation up to the

statutory maximum. Willful violations of these requirements will also be referred to the

Department of Justice for a determination of whether criminal penalties will be pursued.

Enclosure 3