| {{#Wiki_filter:Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: AN1 First Exam Date: | | {{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: AN1 First Exam Date: August 26, 2011 Written Exam Outline (Sent June 9, 2011) |
| August 26, 2011 Written Exam Outline (Sent June 9, 2011 | | Comment Resolution On the ES-401-4 (RO Exam), the Discussed, no issue needing a corrective second item (062 AA1.05) says that action document. |
| ) Comment Resolution 1 On the ES-401-4 (RO Exam), the second item (062 AA1.05) says that there isn't any procedural guidance on how to address CCW system (ICW at ANO U1) effects/perturbations as a result of loss of Nuclear Service Water. Is there a corrective action document to track resolving this issue?
| | there isnt any procedural guidance on how to address CCW system (ICW at 1 |
| Discussed, no issue needing a corrective action document.
| | ANO U1) effects/perturbations as a result of loss of Nuclear Service Water. |
| 2 In the SRO outline, there were two items where the K/A topic described didn't match the K/A number provided. The K/A number should be the one randomly selected in the outline building process, and the description should match it.
| | Is there a corrective action document to track resolving this issue? |
| - Tier 2, Group 1: 007 Pressurizer Relief/Quench Tank, says K/A is A2.01, but one described is A2.02 - Tier 2, Group 2: 045 Main Turbine Generator, says K/A is A2.07, but one described is A2.17 Copy submitted with draft exam corrected these issues.
| | In the SRO outline, there were two items Copy submitted with draft exam corrected where the K/A topic described didnt these issues. |
| Administrative JPM Outline (Sent June 9, 2011 | | match the K/A number provided. The K/A number should be the one randomly selected in the outline building process, and the description should match it. |
| ) Comment Resolution 1 On the ES-301-1, the descriptions need to provide information that describing the JPM. The K/A is re
| | - Tier 2, Group 1: 007 Pressurizer 2 |
| -written, but no description to correlate to the K/A statement is provided. | | Relief/Quench Tank, says K/A is A2.01, but one described is A2.02 |
| The 2010 exam outlines provide an example. | | - Tier 2, Group 2: 045 Main Turbine Generator, says K/A is A2.07, but one described is A2.17 Administrative JPM Outline (Sent June 9, 2011) |
| The licensee expanded the text to provide a description of the JPMs in the ES
| | Comment Resolution On the ES-301-1, the descriptions need The licensee expanded the text to provide a to provide information that describing the description of the JPMs in the ES-301-1 JPM. The K/A is re-written, but no forms. |
| -301-1 forms. Control Room / In
| | 1 description to correlate to the K/A statement is provided. The 2010 exam outlines provide an example. |
| -Plant System JPM Outline (Sent June 9, 2011 | | Control Room / In-Plant System JPM Outline (Sent June 9, 2011) |
| ) Comment Resolution 1 (Editorial) For Simulator JPM a, fill in the Importance Rating for SROs.
| | Comment Resolution (Editorial) For Simulator JPM a, fill in the Resolved based on revisions made during 1 |
| Resolved based on revisions made during exam development process. | | Importance Rating for SROs. exam development process. |
| 2 On the ES-301-2, it says that there are 2 Resolved based on revisions made during Attachment 6 OBDI 202 - IOLE Process Emergency or Abnormal In | | 2 On the ES-301-2, it says that there are 2 Resolved based on revisions made during OBDI 202 - IOLE Process |
| -Plant JPMs. JPM i is the "E" classified one to meet this. JPM d would not meet this. | | |
| exam development proce ss. Simulator Scenario Outline Comments (Sent June 9, 2011
| | Emergency or Abnormal In-Plant JPMs. exam development process. |
| ) Comment Resolution 1 2 3 4 5}}
| | JPM i is the E classified one to meet this. JPM d would not meet this. |
| | Simulator Scenario Outline Comments (Sent June 9, 2011) |
| | Comment Resolution 1 |
| | 2 3 |
| | 4 5 OBDI 202 - IOLE Process}} |
|
---|
Category:License-Operator
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines 2024-09-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23114A1542023-03-23023 March 2023 03 Public Forms ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22147A1882022-04-13013 April 2022 04 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms 0CAN051701, Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-05-0303 May 2017 Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. 2024-09-09
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: AN1 First Exam Date: August 26, 2011 Written Exam Outline (Sent June 9, 2011)
Comment Resolution On the ES-401-4 (RO Exam), the Discussed, no issue needing a corrective second item (062 AA1.05) says that action document.
there isnt any procedural guidance on how to address CCW system (ICW at 1
ANO U1) effects/perturbations as a result of loss of Nuclear Service Water.
Is there a corrective action document to track resolving this issue?
In the SRO outline, there were two items Copy submitted with draft exam corrected where the K/A topic described didnt these issues.
match the K/A number provided. The K/A number should be the one randomly selected in the outline building process, and the description should match it.
- Tier 2, Group 1: 007 Pressurizer 2
Relief/Quench Tank, says K/A is A2.01, but one described is A2.02
- Tier 2, Group 2: 045 Main Turbine Generator, says K/A is A2.07, but one described is A2.17 Administrative JPM Outline (Sent June 9, 2011)
Comment Resolution On the ES-301-1, the descriptions need The licensee expanded the text to provide a to provide information that describing the description of the JPMs in the ES-301-1 JPM. The K/A is re-written, but no forms.
1 description to correlate to the K/A statement is provided. The 2010 exam outlines provide an example.
Control Room / In-Plant System JPM Outline (Sent June 9, 2011)
Comment Resolution (Editorial) For Simulator JPM a, fill in the Resolved based on revisions made during 1
Importance Rating for SROs. exam development process.
2 On the ES-301-2, it says that there are 2 Resolved based on revisions made during OBDI 202 - IOLE Process
Emergency or Abnormal In-Plant JPMs. exam development process.
JPM i is the E classified one to meet this. JPM d would not meet this.
Simulator Scenario Outline Comments (Sent June 9, 2011)
Comment Resolution 1
2 3
4 5 OBDI 202 - IOLE Process