SVPLTR 11-0035, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ExelknExelon Generation Company, LLC www.exeloncorp.com Dresden Nuclear Power Station Nuclear 65oo North Dresden Road Morris, IL 60450-9765 10 CFR 72.44(d)(3)
{{#Wiki_filter:Exelon Generation Company, LLC     www.exeloncorp.com Exelkn Dresden Nuclear Power Station                                                             Nuclear 65oo North Dresden Road Morris, IL60450-9765                                                           10 CFR 72.44(d)(3)
September 9, 2011 SVPLTR #11-0035 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-10, 50-237, 50-249, and 72-37  
September 9, 2011 SVPLTR #11-0035 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-10, 50-237, 50-249, and 72-37


==Subject:==
==Subject:==
Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report.In accordance with 10 CFR 72.44, "License conditions," paragraph (d)(3); Certificate of Compliance No. 1008, Appendix A, section 3.4, "Radioactive Effluent Control Program," paragraph c; and Certificate of Compliance No. 1014 (Amendment 2), Appendix A, section 5.4, "Radioactive Effluent Control Program," paragraph c; this letter provides the annual radioactive effluent release report for the Dresden Nuclear Power Station (DNPS) Independent Spent Fuel Storage Installation (ISFSI). The 12-month monitoring period ended on July 23, 2011. Submittal of this report is required within 60 days of the end date of the monitoring period, i.e., by September 21, 2011.During the 12-month period ended July 23, 2011, there were no radioactive effluents released from the DNPS ISFSI.Should you have any questions concerning this letter, please contact Mr. Dennis Leggett, Regulatory Assurance Manager, at (815) 416-2800.Respectfully, David Czufi Site Vice Pres F en Dresden Nuclear Power Station cc: Regional Administrator  
Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report.
-NRC Region III Senior NRC Resident Inspector  
In accordance with 10 CFR 72.44, "License conditions," paragraph (d)(3); Certificate of Compliance No. 1008, Appendix A, section 3.4, "Radioactive Effluent Control Program," paragraph c; and Certificate of Compliance No. 1014 (Amendment 2), Appendix A, section 5.4, "Radioactive Effluent Control Program," paragraph c; this letter provides the annual radioactive effluent release report for the Dresden Nuclear Power Station (DNPS) Independent Spent Fuel Storage Installation (ISFSI). The 12-month monitoring period ended on July 23, 2011. Submittal of this report is required within 60 days of the end date of the monitoring period, i.e., by September 21, 2011.
-Dresden Nuclear Power Station}}
During the 12-month period ended July 23, 2011, there were no radioactive effluents released from the DNPS ISFSI.
Should you have any questions concerning this letter, please contact Mr. Dennis Leggett, Regulatory Assurance Manager, at (815) 416-2800.
Respectfully, David Czufi Site Vice Pres F     en Dresden Nuclear Power Station cc:         Regional Administrator - NRC Region III Senior NRC Resident Inspector - Dresden Nuclear Power Station}}

Latest revision as of 15:21, 12 November 2019

Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report
ML11263A144
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/09/2011
From: Czufin D
Exelon Corp, Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, NRC/NMSS/SFPO
References
SVPLTR #11-0035
Download: ML11263A144 (1)


Text

Exelon Generation Company, LLC www.exeloncorp.com Exelkn Dresden Nuclear Power Station Nuclear 65oo North Dresden Road Morris, IL60450-9765 10 CFR 72.44(d)(3)

September 9, 2011 SVPLTR #11-0035 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-10, 50-237, 50-249, and 72-37

Subject:

Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report.

In accordance with 10 CFR 72.44, "License conditions," paragraph (d)(3); Certificate of Compliance No. 1008, Appendix A, section 3.4, "Radioactive Effluent Control Program," paragraph c; and Certificate of Compliance No. 1014 (Amendment 2), Appendix A, section 5.4, "Radioactive Effluent Control Program," paragraph c; this letter provides the annual radioactive effluent release report for the Dresden Nuclear Power Station (DNPS) Independent Spent Fuel Storage Installation (ISFSI). The 12-month monitoring period ended on July 23, 2011. Submittal of this report is required within 60 days of the end date of the monitoring period, i.e., by September 21, 2011.

During the 12-month period ended July 23, 2011, there were no radioactive effluents released from the DNPS ISFSI.

Should you have any questions concerning this letter, please contact Mr. Dennis Leggett, Regulatory Assurance Manager, at (815) 416-2800.

Respectfully, David Czufi Site Vice Pres F en Dresden Nuclear Power Station cc: Regional Administrator - NRC Region III Senior NRC Resident Inspector - Dresden Nuclear Power Station