|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML113260423 | | | number = ML113260423 |
| | issue date = 12/13/2011 | | | issue date = 12/13/2011 |
| | title = Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request (TAC No. ME7244) | | | title = Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request |
| | author name = Wilkins L E | | | author name = Wilkins L |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = Bannister D J | | | addressee name = Bannister D |
| | addressee affiliation = Omaha Public Power District | | | addressee affiliation = Omaha Public Power District |
| | docket = 05000285 | | | docket = 05000285 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 December 13, 2011 Mr. David J. Bannister Vice President and CNO Omaha Public Power District Fort Calhoun Station 444 South 16th St. Mall Omaha, NE 68102-2247 FORT CALHOUN STATION, UNIT NO.1 -NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 LICENSE AMENDMENT APPLICATION ONLINE REFERENCE PORTAL (TAC NO. ME7244) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 December 13, 2011 Mr. David J. Bannister Vice President and CNO Omaha Public Power District Fort Calhoun Station 444 South 16th St. Mall Omaha, NE 68102-2247 |
| | |
| | ==SUBJECT:== |
| | FORT CALHOUN STATION, UNIT NO.1 - NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 LICENSE AMENDMENT APPLICATION ONLINE REFERENCE PORTAL (TAC NO. ME7244) |
|
| |
|
| ==Dear Mr. Bannister:== | | ==Dear Mr. Bannister:== |
|
| |
|
| By letter dated September 28, 2011, Omaha Public Power District (OPPD) submitted a license amendment application to adopt National Fire Protection Association Standard NFPA 805 for Fort Calhoun Station, Unit 1. To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, OPPD and the NRC staff discussed the use of an online reference portal that would allow the NRC staff and its contractors limited read-only access to the basis documents and other reference materials cited in the applications. | | By letter dated September 28, 2011, Omaha Public Power District (OPPD) submitted a license amendment application to adopt National Fire Protection Association Standard NFPA 805 for Fort Calhoun Station, Unit 1. |
| The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents supports the application. | | To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, OPPD and the NRC staff discussed the use of an online reference portal that would allow the NRC staff and its contractors limited read-only access to the basis documents and other reference materials cited in the applications. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents supports the application. Documents identified as necessary for analysis of the application and regulatory decision making will be identified by the NRC staff. The NRC will request OPPD to submit those documents to the NRC Document Control Desk. Use of the online reference portal is acceptable as long as the following conditions are met: |
| Documents identified as necessary for analysis of the application and regulatory decision making will be identified by the NRC staff. The NRC will request OPPD to submit those documents to the NRC Document Control Desk. Use of the online reference portal is acceptable as long as the following conditions are met: The online reference portal will be password-protected and passwords will be assigned to NRC staff directly involved in the review on a need-to-know basis; The online reference portal will be sufficiently secure to prevent NRC staff from printing, saving, or downloading any documents; and Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user. The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that OPPD agrees to the terms and conditions set forth in this letter. | | * The online reference portal will be password-protected and passwords will be assigned to NRC staff directly involved in the review on a need-to-know basis; |
| D. Bannister Should you have any questions, please contact Mr. Harry Barrett, Senior Fire Protection Engineer, at 301-415-1402, or via e-mail at Harold.Barrett@nrc.gov.
| | * The online reference portal will be sufficiently secure to prevent NRC staff from printing, saving, or downloading any documents; and |
| Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 cc: Distribution via Listserv D. Bannister -2 Should you have any questions, please contact Mr. Harry Barrett, Senior Fire Protection Engineer, at 301-415-1402, or via e-mail at Harold.Barrett@nrc.gov.
| | * Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user. |
| Sincerely, /RAJ Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 cc: Distribution via Listserv DISTRIBUTION:
| | The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that OPPD agrees to the terms and conditions set forth in this letter. |
| PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDraAfpb Resource RidsNrrPMFortCalhoun Resource RidsNrrLAJBurkhardt Resource RidsOgcRp Resource RidsRgn4MailCenter Resource HBarrett, NRRIDRAJAFPB PLain, NRRIDRAJAFPB NRRIDRAJAFPB ADAMS Accession No. M L 113260423 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRAlAFPB/BC NRR/LPL4/BC NRR/LPL4/PM NAME LWilkins JBurkhardt AKlein MMarkley LWilkins DATE 11/28/11 11/28/11 11/30/11 12/12/11 12/13/11 OFFICIAL RECORD COPY Page 3 of 3}}
| | |
| | D. Bannister -2 Should you have any questions, please contact Mr. Harry Barrett, Senior Fire Protection Engineer, at 301-415-1402, or via e-mail at Harold.Barrett@nrc.gov. |
| | Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 cc: Distribution via Listserv |
| | |
| | M L 113260423 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRAlAFPB/BC NRR/LPL4/BC NRR/LPL4/PM NAME LWilkins JBurkhardt AKlein MMarkley LWilkins DATE 11/28/11 11/28/11 11/30/11 12/12/11 12/13/11}} |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition, LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition, LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition, LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition, ML11276A118, ML113260423, ML13256A110, ML14163A002, ML16103A348
|
MONTHYEARML11276A1182011-09-28028 September 2011 Fort Calhoun Station - License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Other ML1132604232011-12-13013 December 2011 Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request Project stage: Other ML1135403342011-12-19019 December 2011 Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement LIC-11-0136, Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition)2011-12-22022 December 2011 Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition) Project stage: Supplement ML1136300832011-12-29029 December 2011 Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants, Project stage: Acceptance Review LIC-12-0033, Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station2012-03-20020 March 2012 Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station Project stage: Request ML1210205742012-04-11011 April 2012 Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210205612012-04-11011 April 2012 Draft Request for Additional Information Email, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition). Project stage: Draft RAI ML1210400482012-04-26026 April 2012 Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-12-0083, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition2012-07-24024 July 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Response to RAI LIC-12-0120, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-08-24024 August 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI LIC-12-0135, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-09-27027 September 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI ML13016A4322013-01-16016 January 2013 E-mail, Request for Additional Information, Round 2, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13053A2262013-02-22022 February 2013 Email, Second Round Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. Project stage: Draft RAI LIC-13-0033, Omaha Public Power District'S, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-04-23023 April 2013 Omaha Public Power District'S, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request W3F1-2013-0022, Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052013-05-16016 May 2013 Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Request LIC-13-0060, Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-05-21021 May 2013 Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request ML13178A0352013-06-27027 June 2013 Email Request for Additional Information Round 3 (Afpb), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition). Project stage: RAI LIC-13-0096, Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 8052013-07-29029 July 2013 Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: Request ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13256A1102013-09-12012 September 2013 Safe Shutdown Analysis (SSA) RAI Response - NFPA-805 Transition (ME7244) Project stage: Other ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition2013-10-11011 October 2013 Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition Project stage: Other LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition2013-11-0404 November 2013 Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition Project stage: Other LIC-13-0167, Safe Shutdown Analysis (SSA) RAI 17.02 Response - NFPA-805 Transition (ME7244)2013-11-11011 November 2013 Safe Shutdown Analysis (SSA) RAI 17.02 Response - NFPA-805 Transition (ME7244) Project stage: Request LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition2013-12-18018 December 2013 Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition Project stage: Other LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition2014-01-24024 January 2014 Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition Project stage: Other ML14036A0682014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 12/9/11 Affidavit Executed by C. M. Molnar, Westinghouse, LTR-RAM-II-10-046, Revision 1, Dated 4/22/2011 Project stage: Withholding Request Acceptance ML14036A0832014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 3/14/12 Affidavit Executed by J. A. Gresham, Westinghouse, Re.: Compact Containing Fire Dynamic Simulator Input Project stage: Withholding Request Acceptance ML14051A3972014-02-20020 February 2014 NFPA 805 IE PRA F&O Tables Project stage: Request ML14051A3882014-02-20020 February 2014 NFPA 805 Fpra F&O Tables Project stage: Request ML14070A5912014-02-28028 February 2014 Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition Project stage: Supplement ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14115A2982014-04-10010 April 2014 Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance -Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement LIC-14-0042, Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2014-04-10010 April 2014 Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14122A2452014-05-22022 May 2014 Request for Withholding Information from Public Disclosure, 3/26/13 Affidavit Executed by C. M. Molnar, Westinghouse, Re.: LTR-RAM-II-10-046, Rev. 3 Project stage: Withholding Request Acceptance LIC-14-0075, Request Clarifications to Draft National Fire Protection Association (NFPA) 805 Safety Evaluation Report2014-06-11011 June 2014 Request Clarifications to Draft National Fire Protection Association (NFPA) 805 Safety Evaluation Report Project stage: Request ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Approval ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Other ML16103A3482016-04-0404 April 2016 Ft. Calhoun, Unit 1 - License Amendment Request (LAR) 16-01; Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 Project stage: Other LIC-16-0099, License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program2016-11-18018 November 2016 License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program Project stage: Request 2013-04-23
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22159A2152022-06-28028 June 2022 Letter Forwarding FRN on Public Meeting and Request for Comment on License Termination Plan LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 December 13, 2011 Mr. David J. Bannister Vice President and CNO Omaha Public Power District Fort Calhoun Station 444 South 16th St. Mall Omaha, NE 68102-2247
SUBJECT:
FORT CALHOUN STATION, UNIT NO.1 - NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 LICENSE AMENDMENT APPLICATION ONLINE REFERENCE PORTAL (TAC NO. ME7244)
Dear Mr. Bannister:
By letter dated September 28, 2011, Omaha Public Power District (OPPD) submitted a license amendment application to adopt National Fire Protection Association Standard NFPA 805 for Fort Calhoun Station, Unit 1.
To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, OPPD and the NRC staff discussed the use of an online reference portal that would allow the NRC staff and its contractors limited read-only access to the basis documents and other reference materials cited in the applications. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents supports the application. Documents identified as necessary for analysis of the application and regulatory decision making will be identified by the NRC staff. The NRC will request OPPD to submit those documents to the NRC Document Control Desk. Use of the online reference portal is acceptable as long as the following conditions are met:
- The online reference portal will be password-protected and passwords will be assigned to NRC staff directly involved in the review on a need-to-know basis;
- The online reference portal will be sufficiently secure to prevent NRC staff from printing, saving, or downloading any documents; and
- Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user.
The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please provide written confirmation that OPPD agrees to the terms and conditions set forth in this letter.
D. Bannister -2 Should you have any questions, please contact Mr. Harry Barrett, Senior Fire Protection Engineer, at 301-415-1402, or via e-mail at Harold.Barrett@nrc.gov.
Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 cc: Distribution via Listserv
M L 113260423 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRAlAFPB/BC NRR/LPL4/BC NRR/LPL4/PM NAME LWilkins JBurkhardt AKlein MMarkley LWilkins DATE 11/28/11 11/28/11 11/30/11 12/12/11 12/13/11