ML12017A098: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 01/17/2012 | | issue date = 01/17/2012 | ||
| title = Annual Letter - Generic Fundamentals Examination (GFE) Section | | title = Annual Letter - Generic Fundamentals Examination (GFE) Section | ||
| author name = Caballero B | | author name = Caballero B | ||
| author affiliation = NRC/RGN-II/DRS/OLB | | author affiliation = NRC/RGN-II/DRS/OLB | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 13, 2012 THIS LETTER DISTRIBUTED TO THE FOLLOWING DOCKET NUMBERS: | ||
Browns Ferry Nuclear Plant, Docket Nos. 50-259, 50-260, and 50-296 Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324 Catawba Nuclear Station, Docket Nos. 50-413 and 50-414 Crystal River Nuclear Plant, Docket No. 50-302 Joseph M. Farley Nuclear Plant, Docket Nos. 50-348 and 50-364 Shearon Harris Nuclear Power Plant, Docket No. 50-400 E. I. Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 McGuire Nuclear Station, Docket Nos. 50-369 and 50-370 North Anna Power Station, Docket Nos. 50-338 and 50-339 Oconee Nuclear Station, Docket Nos. 50-269, 50-270, and 50-287 H. B. Robinson Steam Electric Plant, Docket No. 50-261 St. Lucie Nuclear Plant, Docket Nos. 50-335 and 50-389 Sequoyah Nuclear Plant, Docket Nos. 50-327 and 50-328 Virgil C. Summer Nuclear Station, Docket No. 50-395 Surry Power Station, Docket Nos. 50-280 and 50-281 Turkey Point Nuclear Plant, Docket Nos. 50-250 and 50-251 Vogtle Electric Generating Plant, Docket Nos. 50-424 and 50-425 Watts Bar Nuclear Plant, Docket Nos. 50-390 and 50-391 | |||
Browns Ferry Nuclear Plant, Docket Nos. 50-259, 50-260, and 50-296 | |||
==SUBJECT:== | ==SUBJECT:== | ||
ANNUAL LETTER - GENERIC FUNDAMENTALS EXAMINATION (GFE) SECTION | ANNUAL LETTER - GENERIC FUNDAMENTALS EXAMINATION (GFE) SECTION The U. S. Nuclear Regulatory Commission (NRC) plans to administer the generic fundamentals examination (GFE) section of the written operator licensing examination on the following dates for the 2011 calendar year: | ||
Date of GFE exams for 2012 Date registration letters from facilities due to NRC March 7, 2012 February 7, 2012 June 6, 2012 May 7, 2012 September 5, 2012 August 6, 2012 December 5, 2012 November 5, 2012 | |||
Region II Part 50 Dockets 2 To register personnel to take the GFE, an authorized representative of your facility must submit a letter to Mr. Victor M. McCree, Regional Administrator, Region II, with a copy addressed as follows: | |||
John McHale, Chief, Operator Licensing and Human Performance Branch (IOLB) | |||
Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS) | |||
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Your letter should identify the individuals who will take the examination, and it should certify that they are enrolled in a facility licensee-sponsored program leading to NRC operator or senior operator licensing and that they will have completed their fundamentals training by the date of the examination. The letter should also identify the personnel who will have access to the examinations before they are administered (e.g., proctors) and the address to which the examinations are to be sent. To allow the NRC to assign docket numbers, your letter should be received by both the NRC Regional Administrator and the Chief, Operator Licensing and Human Performance Branch, 30 days before each desired examination date shown above. A sample registration letter is enclosed. | |||
Copies of the administered GFEs and their answer keys will be available for review in the NRCs Public Document Room approximately 45 days following each examination. The NRCs GFE Web page (which is available at http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html) will be updated semi-annually, approximately 60 days following the June and December examinations. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Bruno L. Caballero, Acting Chief Operations Branch 1 Division of Reactor Safety | |||
==Enclosure:== | |||
As Stated cc w/encl: (See Page 3) | |||
Region II Part 50 Dockets 3 cc w/encl: | |||
K. Polson, Site Vice President J. A. Franke, Vice President Browns Ferry Nuclear Plant Crystal River Nuclear Plant (NA1B) | |||
P. O. Box 2000 15760 West Power Line Street Decatur, AL 35602-2000 Crystal River, FL 34428-6708 M. Wilson, Training Manager P. Dixon, Training Manager Browns Ferry Nuclear Plant Crystal River Nuclear Plant P. O. Box 2000 8200 West Venable Street Decatur, AL 35609-2000 Crystal River, FL 34429 D. T. Langley, Manager J. L. Pemberton, Site Vice President Licensing & Industry Affairs Joseph M. Farley Nuclear Plant Browns Ferry Nuclear Plant P. O. Box 470 P. O. Box 2000 Ashford, AL 36312 Decatur, AL 35609 D. Christiansen, Plant Training & | |||
M. Annacone, Vice President Emergency Preparedness Manager Brunswick Steam Electric Plant Joseph M. Farley Nuclear Plant P. O. Box 10429 P. O. Box 470 Southport, NC 24861-0429 Ashford, AL 36312 P. Dubrouillet, Training Manager C. L. Burton, Vice President Brunswick Steam Electric Plant Shearon Harris Nuclear Power Plant P. O. Box 10429 P. O. Box 165, Mail Code: Zone 1 Southport, NC 28461-0429 New Hill, NC 27562-0165 J. R. Morris, Site Vice President D. Griffith, Training Manager Catawba Nuclear Station Harris Energy & Environmental Center 4800 Concord Road P. O. Box 327, State Road 1127 York, SC 29745-9635 New Hill, NC 27562-0165 K. Phillips, Training Manager D. R. Madison, Site Vice President Catawba Nuclear Station Hatch Nuclear Plant 4800 Concord Road 11028 Hatch Parkway North York, SC 29745-9635 Baxley, GA 31513 R. D. Hart, Manager, Regulatory S. Grantham, Training Manager Compliance, Catawba Nuclear Station Hatch Nuclear Plant 4800 Concord Road (CN01RC) 11028 Hatch Parkway North York, SC 29745-9635 Baxley, GA 31513 R. L. Gill, Jr., Manager R. Repko, Vice President Regulatory Issues & Industry Affairs McGuire Nuclear Station 526 South Church Street 12700 Hagers Ferry Road Charlotte, NC 28201-1006 Huntersville, NC 28078-8985 | |||
Region II Part 50 Dockets | Region II Part 50 Dockets 4 cc w/encl: (Continued) B. Duncan, Vice President P. Schuerger, Training Manager Robinson Steam Electric Plant McGuire Nuclear Station 3581 West Entrance Road Maintenance Training Center Hartsville, SC 29550 Courier Mail Code MG03MT 12700 Hagers Ferry Road H. Curry, Training Manager Huntersville, NC 28078 Robinson Steam Electric Plant 3581 West Entrance Road K. Ashe, Licensing Manager Hartsville, SC 29550 Regulatory Compliance McGuire Nuclear Station *(MN01RC) J. A. Stall, Senior Vice President and 12700 Hagers Ferry Road Chief Nuclear Officer Huntersville, NC 28078-8985 P. O. Box 14000 Juno Beach, FL 33408-0420 D. A. Heacock, President and Chief Nuclear Officer R. Anderson, Site Vice President Virginia Electric and Power Company St. Lucie Nuclear Plant Innsbrook Technical Center 6351 South Ocean Drive 5000 Dominion Boulevard Jensen Beach, FL 34957 Glen Allen, VA 23060 S. Duston Training Manager L. Lane, Site Vice President St. Lucie Nuclear Plant North Anna Power Station 6351 South Ocean Drive P. O. Box 402 Jensen Beach, FL 34957 Mineral, VA 23117 J. T. Carlin, Site Vice President R. W. Wesley, Nuclear Training Sequoyah Nuclear Plant North Anna Power Station P. O. Box 2000 1022 Haley Drive Soddy-Daisy, TN 37384-2000 Mineral, VA 23117 C. Ware, Training Manager T. Preston Gillespie, Jr., Vice President Sequoyah Nuclear Plant Oconee Nuclear Station P. O. Box 2000 7800 Rochester Highway Soddy-Daisy, TN 37384-2000 Seneca, SC 29672-0752 J. B. Archie, Senior Vice President P. Stovall, Training Manager Nuclear Operations Oconee Nuclear Station Virgil C. Summer Nuclear Station 7800 Rochester Highway P. O. Box 88 Seneca, SC 29672-0752 Jenkinsville, SC 29065 K. Alter, Regulatory Compliance M. W. Mosley, Training Manager Oconee Nuclear Station (ON03RC) Virgil C. Summer Nuclear Station 7800 Rochester Highway P. O. Box 88 Seneca, SC 29672-0752 Jenkinsville, SC 29065 | ||
Region II Part 50 Dockets 5 cc w/encl: (Continued) | |||
G. T. Bischof, Site Vice President Surry Power Station 5570 Hog Island Road Surry, VA 23883 T. Steed, Training Manager Surry Power Station 5570 Hog Island Road Surry, VA 23883 M. Kiley, Vice President Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 N. Constance, Training Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 T. Tynan, Vice President Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830-2965 R. Brigdon, Plant Training & Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road - Bin 63030 Waynesboro, GA 30830-2965 D. Grissette, Site Vice President Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381 M. J. Lorek, Plant Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381 W. Thompson, Training Manager Watts Bar Nuclear Plant Watts Bar Training Center 1260 Nuclear Plant Road Spring City, TN 37381 | |||
In accordance with 10 CFR 2.390 of the | Region II Part 50 Dockets 6 To register personnel to take the GFE, an authorized representative of your facility must submit a letter to Mr. Victor M. McCree, Regional Administrator, Region II, with a copy addressed as follows: | ||
Sincerely, | John McHale, Chief, Operator Licensing and Human Performance Branch (IOLB) | ||
Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS) | |||
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Your letter should identify the individuals who will take the examination, and it should certify that they are enrolled in a facility licensee-sponsored program leading to NRC operator or senior operator licensing and that they will have completed their fundamentals training by the date of the examination. The letter should also identify the personnel who will have access to the examinations before they are administered (e.g., proctors) and the address to which the examinations are to be sent. To allow the NRC to assign docket numbers, your letter should be received by both the NRC Regional Administrator and the Chief, Operator Licensing and Human Performance Branch, 30 days before each desired examination date shown above. A sample registration letter is enclosed. | |||
Bruno L. Caballero, Acting Chief | Copies of the administered GFEs and their answer keys will be available for review in the NRCs Public Document Room approximately 45 days following each examination. The NRCs GFE Web page (which is available at http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html) will be updated semi-annually, approximately 60 days following the June and December examinations. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Bruno L. Caballero, Acting Chief Operations Branch 1 Division of Reactor Safety | |||
==Enclosure:== | ==Enclosure:== | ||
As Stated | As Stated cc w/encl: (See Page 3) | ||
Distribution: | |||
cc w/encl: | J. McHale, IOLB, NRR J. Vincent, DRS X PUBLICLY AVAILABLE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML12017A098 X SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE BLC NAME BCABALLERO DATE 1/13 /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FFICIAL RECORD COPY DOCUMENT NAME: O:\#GFE EXAMS\2010 GFE EXAMS\#1 GFE ANNUAL LETTER FOR FY 2011.DOCX | ||
J. | |||
SAMPLE REGISTRATION LETTER Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Region II, Suite 1200 245 Peachtree Center Ave., NE Atlanta, Georgia 30303-1257 | |||
==Dear Mr. McCree:== | ==Dear Mr. McCree:== | ||
(Facility name) requests approval from the U.S. Nuclear Regulatory Commission (NRC) to have the following (number) individuals take the (specify BWR or PWR) generic fundamentals examination (GFE) section of the written operator licensing examination to be administered on (date): | (Facility name) requests approval from the U.S. Nuclear Regulatory Commission (NRC) to have the following (number) individuals take the (specify BWR or PWR) generic fundamentals examination (GFE) section of the written operator licensing examination to be administered on (date): | ||
Name Date of Birth Previous Docket No. | |||
(Insert the name, date of birth, and previous 10 CFR Part 55 Docket Number (if applicable) for each person.) | |||
All of the listed personnel are enrolled in the (facility name) operator licensing training program and will have completed the generic fundamentals portion of the program by the examination date. The following personnel will have access to the examinations before they are administered. | All of the listed personnel are enrolled in the (facility name) operator licensing training program and will have completed the generic fundamentals portion of the program by the examination date. | ||
The following personnel will have access to the examinations before they are administered. | |||
Name | Name Title (Insert the name and title of each person who will have access to the examinations before they are administered (e.g., proctors). | ||
Please address the examinations to the overnight mail address, as follows (note that home addresses are not acceptable): | Please address the examinations to the overnight mail address, as follows (note that home addresses are not acceptable): | ||
Name | Name Street Address City, State, Zip Code If you have any questions, please contact (facility contact name) at (telephone number). | ||
Sincerely, (Name, Title) cc: J. McHale, IOLB, NRR M. Widmann, DRS, RII M. Franke, DRS, RII Enclosure}} | |||
Latest revision as of 10:41, 12 November 2019
ML12017A098 | |
Person / Time | |
---|---|
Site: | Hatch, Browns Ferry, Oconee, Mcguire, Catawba, Harris, Saint Lucie, Watts Bar, Sequoyah, Summer, Brunswick, Surry, North Anna, Turkey Point, Crystal River, Vogtle, Farley, Robinson, McGuire ![]() |
Issue date: | 01/17/2012 |
From: | Bruno Caballero NRC/RGN-II/DRS/OLB |
To: | |
References | |
Download: ML12017A098 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 13, 2012 THIS LETTER DISTRIBUTED TO THE FOLLOWING DOCKET NUMBERS:
Browns Ferry Nuclear Plant, Docket Nos. 50-259, 50-260, and 50-296 Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324 Catawba Nuclear Station, Docket Nos. 50-413 and 50-414 Crystal River Nuclear Plant, Docket No. 50-302 Joseph M. Farley Nuclear Plant, Docket Nos. 50-348 and 50-364 Shearon Harris Nuclear Power Plant, Docket No. 50-400 E. I. Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 McGuire Nuclear Station, Docket Nos. 50-369 and 50-370 North Anna Power Station, Docket Nos. 50-338 and 50-339 Oconee Nuclear Station, Docket Nos. 50-269, 50-270, and 50-287 H. B. Robinson Steam Electric Plant, Docket No. 50-261 St. Lucie Nuclear Plant, Docket Nos. 50-335 and 50-389 Sequoyah Nuclear Plant, Docket Nos. 50-327 and 50-328 Virgil C. Summer Nuclear Station, Docket No. 50-395 Surry Power Station, Docket Nos. 50-280 and 50-281 Turkey Point Nuclear Plant, Docket Nos. 50-250 and 50-251 Vogtle Electric Generating Plant, Docket Nos. 50-424 and 50-425 Watts Bar Nuclear Plant, Docket Nos. 50-390 and 50-391
SUBJECT:
ANNUAL LETTER - GENERIC FUNDAMENTALS EXAMINATION (GFE) SECTION The U. S. Nuclear Regulatory Commission (NRC) plans to administer the generic fundamentals examination (GFE) section of the written operator licensing examination on the following dates for the 2011 calendar year:
Date of GFE exams for 2012 Date registration letters from facilities due to NRC March 7, 2012 February 7, 2012 June 6, 2012 May 7, 2012 September 5, 2012 August 6, 2012 December 5, 2012 November 5, 2012
Region II Part 50 Dockets 2 To register personnel to take the GFE, an authorized representative of your facility must submit a letter to Mr. Victor M. McCree, Regional Administrator, Region II, with a copy addressed as follows:
John McHale, Chief, Operator Licensing and Human Performance Branch (IOLB)
Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Your letter should identify the individuals who will take the examination, and it should certify that they are enrolled in a facility licensee-sponsored program leading to NRC operator or senior operator licensing and that they will have completed their fundamentals training by the date of the examination. The letter should also identify the personnel who will have access to the examinations before they are administered (e.g., proctors) and the address to which the examinations are to be sent. To allow the NRC to assign docket numbers, your letter should be received by both the NRC Regional Administrator and the Chief, Operator Licensing and Human Performance Branch, 30 days before each desired examination date shown above. A sample registration letter is enclosed.
Copies of the administered GFEs and their answer keys will be available for review in the NRCs Public Document Room approximately 45 days following each examination. The NRCs GFE Web page (which is available at http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html) will be updated semi-annually, approximately 60 days following the June and December examinations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Bruno L. Caballero, Acting Chief Operations Branch 1 Division of Reactor Safety
Enclosure:
As Stated cc w/encl: (See Page 3)
Region II Part 50 Dockets 3 cc w/encl:
K. Polson, Site Vice President J. A. Franke, Vice President Browns Ferry Nuclear Plant Crystal River Nuclear Plant (NA1B)
P. O. Box 2000 15760 West Power Line Street Decatur, AL 35602-2000 Crystal River, FL 34428-6708 M. Wilson, Training Manager P. Dixon, Training Manager Browns Ferry Nuclear Plant Crystal River Nuclear Plant P. O. Box 2000 8200 West Venable Street Decatur, AL 35609-2000 Crystal River, FL 34429 D. T. Langley, Manager J. L. Pemberton, Site Vice President Licensing & Industry Affairs Joseph M. Farley Nuclear Plant Browns Ferry Nuclear Plant P. O. Box 470 P. O. Box 2000 Ashford, AL 36312 Decatur, AL 35609 D. Christiansen, Plant Training &
M. Annacone, Vice President Emergency Preparedness Manager Brunswick Steam Electric Plant Joseph M. Farley Nuclear Plant P. O. Box 10429 P. O. Box 470 Southport, NC 24861-0429 Ashford, AL 36312 P. Dubrouillet, Training Manager C. L. Burton, Vice President Brunswick Steam Electric Plant Shearon Harris Nuclear Power Plant P. O. Box 10429 P. O. Box 165, Mail Code: Zone 1 Southport, NC 28461-0429 New Hill, NC 27562-0165 J. R. Morris, Site Vice President D. Griffith, Training Manager Catawba Nuclear Station Harris Energy & Environmental Center 4800 Concord Road P. O. Box 327, State Road 1127 York, SC 29745-9635 New Hill, NC 27562-0165 K. Phillips, Training Manager D. R. Madison, Site Vice President Catawba Nuclear Station Hatch Nuclear Plant 4800 Concord Road 11028 Hatch Parkway North York, SC 29745-9635 Baxley, GA 31513 R. D. Hart, Manager, Regulatory S. Grantham, Training Manager Compliance, Catawba Nuclear Station Hatch Nuclear Plant 4800 Concord Road (CN01RC) 11028 Hatch Parkway North York, SC 29745-9635 Baxley, GA 31513 R. L. Gill, Jr., Manager R. Repko, Vice President Regulatory Issues & Industry Affairs McGuire Nuclear Station 526 South Church Street 12700 Hagers Ferry Road Charlotte, NC 28201-1006 Huntersville, NC 28078-8985
Region II Part 50 Dockets 4 cc w/encl: (Continued) B. Duncan, Vice President P. Schuerger, Training Manager Robinson Steam Electric Plant McGuire Nuclear Station 3581 West Entrance Road Maintenance Training Center Hartsville, SC 29550 Courier Mail Code MG03MT 12700 Hagers Ferry Road H. Curry, Training Manager Huntersville, NC 28078 Robinson Steam Electric Plant 3581 West Entrance Road K. Ashe, Licensing Manager Hartsville, SC 29550 Regulatory Compliance McGuire Nuclear Station *(MN01RC) J. A. Stall, Senior Vice President and 12700 Hagers Ferry Road Chief Nuclear Officer Huntersville, NC 28078-8985 P. O. Box 14000 Juno Beach, FL 33408-0420 D. A. Heacock, President and Chief Nuclear Officer R. Anderson, Site Vice President Virginia Electric and Power Company St. Lucie Nuclear Plant Innsbrook Technical Center 6351 South Ocean Drive 5000 Dominion Boulevard Jensen Beach, FL 34957 Glen Allen, VA 23060 S. Duston Training Manager L. Lane, Site Vice President St. Lucie Nuclear Plant North Anna Power Station 6351 South Ocean Drive P. O. Box 402 Jensen Beach, FL 34957 Mineral, VA 23117 J. T. Carlin, Site Vice President R. W. Wesley, Nuclear Training Sequoyah Nuclear Plant North Anna Power Station P. O. Box 2000 1022 Haley Drive Soddy-Daisy, TN 37384-2000 Mineral, VA 23117 C. Ware, Training Manager T. Preston Gillespie, Jr., Vice President Sequoyah Nuclear Plant Oconee Nuclear Station P. O. Box 2000 7800 Rochester Highway Soddy-Daisy, TN 37384-2000 Seneca, SC 29672-0752 J. B. Archie, Senior Vice President P. Stovall, Training Manager Nuclear Operations Oconee Nuclear Station Virgil C. Summer Nuclear Station 7800 Rochester Highway P. O. Box 88 Seneca, SC 29672-0752 Jenkinsville, SC 29065 K. Alter, Regulatory Compliance M. W. Mosley, Training Manager Oconee Nuclear Station (ON03RC) Virgil C. Summer Nuclear Station 7800 Rochester Highway P. O. Box 88 Seneca, SC 29672-0752 Jenkinsville, SC 29065
Region II Part 50 Dockets 5 cc w/encl: (Continued)
G. T. Bischof, Site Vice President Surry Power Station 5570 Hog Island Road Surry, VA 23883 T. Steed, Training Manager Surry Power Station 5570 Hog Island Road Surry, VA 23883 M. Kiley, Vice President Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 N. Constance, Training Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 T. Tynan, Vice President Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830-2965 R. Brigdon, Plant Training & Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road - Bin 63030 Waynesboro, GA 30830-2965 D. Grissette, Site Vice President Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381 M. J. Lorek, Plant Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381 W. Thompson, Training Manager Watts Bar Nuclear Plant Watts Bar Training Center 1260 Nuclear Plant Road Spring City, TN 37381
Region II Part 50 Dockets 6 To register personnel to take the GFE, an authorized representative of your facility must submit a letter to Mr. Victor M. McCree, Regional Administrator, Region II, with a copy addressed as follows:
John McHale, Chief, Operator Licensing and Human Performance Branch (IOLB)
Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 Your letter should identify the individuals who will take the examination, and it should certify that they are enrolled in a facility licensee-sponsored program leading to NRC operator or senior operator licensing and that they will have completed their fundamentals training by the date of the examination. The letter should also identify the personnel who will have access to the examinations before they are administered (e.g., proctors) and the address to which the examinations are to be sent. To allow the NRC to assign docket numbers, your letter should be received by both the NRC Regional Administrator and the Chief, Operator Licensing and Human Performance Branch, 30 days before each desired examination date shown above. A sample registration letter is enclosed.
Copies of the administered GFEs and their answer keys will be available for review in the NRCs Public Document Room approximately 45 days following each examination. The NRCs GFE Web page (which is available at http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html) will be updated semi-annually, approximately 60 days following the June and December examinations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Bruno L. Caballero, Acting Chief Operations Branch 1 Division of Reactor Safety
Enclosure:
As Stated cc w/encl: (See Page 3)
Distribution:
J. McHale, IOLB, NRR J. Vincent, DRS X PUBLICLY AVAILABLE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML12017A098 X SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE BLC NAME BCABALLERO DATE 1/13 /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 1/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FFICIAL RECORD COPY DOCUMENT NAME: O:\#GFE EXAMS\2010 GFE EXAMS\#1 GFE ANNUAL LETTER FOR FY 2011.DOCX
SAMPLE REGISTRATION LETTER Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Region II, Suite 1200 245 Peachtree Center Ave., NE Atlanta, Georgia 30303-1257
Dear Mr. McCree:
(Facility name) requests approval from the U.S. Nuclear Regulatory Commission (NRC) to have the following (number) individuals take the (specify BWR or PWR) generic fundamentals examination (GFE) section of the written operator licensing examination to be administered on (date):
Name Date of Birth Previous Docket No.
(Insert the name, date of birth, and previous 10 CFR Part 55 Docket Number (if applicable) for each person.)
All of the listed personnel are enrolled in the (facility name) operator licensing training program and will have completed the generic fundamentals portion of the program by the examination date.
The following personnel will have access to the examinations before they are administered.
Name Title (Insert the name and title of each person who will have access to the examinations before they are administered (e.g., proctors).
Please address the examinations to the overnight mail address, as follows (note that home addresses are not acceptable):
Name Street Address City, State, Zip Code If you have any questions, please contact (facility contact name) at (telephone number).
Sincerely, (Name, Title) cc: J. McHale, IOLB, NRR M. Widmann, DRS, RII M. Franke, DRS, RII Enclosure