Line 3: Line 3:
| issue date = 05/18/2012
| issue date = 05/18/2012
| title = Draft Request for Additional Information, License Amendment Request to Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6)
| title = Draft Request for Additional Information, License Amendment Request to Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6)
| author name = Wilkins L E
| author name = Wilkins L
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Hansher B R
| addressee name = Hansher B
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:REQUEST FOR ADDITIONAL INFORMATION FORT CALHOUN STATION, UNIT NO. 1 LICENSE AMENDMENT REQUEST (LAR) 11-03 "INCORPORATE NEW RADIAL PEAKING FACTOR DEFINITION AND CLARIFY LIMITING CONDITIONS FOR OPERATION (LCO) 2.10.2(6)"
{{#Wiki_filter:REQUEST FOR ADDITIONAL INFORMATION FORT CALHOUN STATION, UNIT NO. 1 LICENSE AMENDMENT REQUEST (LAR) 11-03 INCORPORATE NEW RADIAL PEAKING FACTOR DEFINITION AND CLARIFY LIMITING CONDITIONS FOR OPERATION (LCO) 2.10.2(6)
(TAC NO. ME7796)
(TAC NO. ME7796)
By letter dated December 23, 2011 (ADAMS Accession No. ML120030225), Omaha Public Power District submitted Fort Calhoun Station, Unit No. 1, License Amendment Request 11-03, "Incorporate New Radial Peaking Factor Definition and Clarify Limiting Conditions for Operation (LCO) 2.10.2(6).OPPD has proposed revisions to remove requirements for, and references to, the unrodded radial peaking factor in the Ft. Calhoun Unit 1 Technical Specifications (TSs). This parameter has not been used since OPPD converted to Siemens Power Corporation (now AREVA NP) analysis methods in April 2001. OPPD is also proposing to make editorial changes to clarify LCO 2.10.2(6) regarding the shutdown control element assembly insertion limit during power operations.  
By letter dated December 23, 2011 (ADAMS Accession No. ML120030225), Omaha Public Power District submitted Fort Calhoun Station, Unit No. 1, License Amendment Request 11-03, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Conditions for Operation (LCO) 2.10.2(6). OPPD has proposed revisions to remove requirements for, and references to, the unrodded radial peaking factor in the Ft. Calhoun Unit 1 Technical Specifications (TSs).
 
This parameter has not been used since OPPD converted to Siemens Power Corporation (now AREVA NP) analysis methods in April 2001. OPPD is also proposing to make editorial changes to clarify LCO 2.10.2(6) regarding the shutdown control element assembly insertion limit during power operations.
The NRC staff has determined that the information specified below is needed for the staff to complete its evaluation.
The NRC staff has determined that the information specified below is needed for the staff to complete its evaluation.
Please provide copies of Condition Reports (CR) 2010-2429 and CR 2011-6946, as well as any associated information or documentation related to the specified CRs. This information should allow the staff to fully understand the rationale for the proposed TS revisions.}}
Please provide copies of Condition Reports (CR) 2010-2429 and CR 2011-6946, as well as any associated information or documentation related to the specified CRs. This information should allow the staff to fully understand the rationale for the proposed TS revisions.}}

Latest revision as of 03:22, 12 November 2019

Draft Request for Additional Information, License Amendment Request to Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6)
ML121390487
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/18/2012
From: Lynnea Wilkins
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
Wilkins, L E, NRR/DORL/LPL4, 415-1377
Shared Package
ML121390480 List:
References
TAC ME7796
Download: ML121390487 (1)


Text

REQUEST FOR ADDITIONAL INFORMATION FORT CALHOUN STATION, UNIT NO. 1 LICENSE AMENDMENT REQUEST (LAR) 11-03 INCORPORATE NEW RADIAL PEAKING FACTOR DEFINITION AND CLARIFY LIMITING CONDITIONS FOR OPERATION (LCO) 2.10.2(6)

(TAC NO. ME7796)

By letter dated December 23, 2011 (ADAMS Accession No. ML120030225), Omaha Public Power District submitted Fort Calhoun Station, Unit No. 1, License Amendment Request 11-03, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Conditions for Operation (LCO) 2.10.2(6). OPPD has proposed revisions to remove requirements for, and references to, the unrodded radial peaking factor in the Ft. Calhoun Unit 1 Technical Specifications (TSs).

This parameter has not been used since OPPD converted to Siemens Power Corporation (now AREVA NP) analysis methods in April 2001. OPPD is also proposing to make editorial changes to clarify LCO 2.10.2(6) regarding the shutdown control element assembly insertion limit during power operations.

The NRC staff has determined that the information specified below is needed for the staff to complete its evaluation.

Please provide copies of Condition Reports (CR) 2010-2429 and CR 2011-6946, as well as any associated information or documentation related to the specified CRs. This information should allow the staff to fully understand the rationale for the proposed TS revisions.