{{#Wiki_filter:2012 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION OUTLINE SUBMITTAL INDIANA. MICHIGAN Indiana Michigan Power One Cook Place flOWER" Bridgman, MI 49106 A unit of American Electric Power IndianaMichiganPoweLcom April 23, 2012 U. S. Nuclear Regulatory Attn: Mr. Carl J. Region III 2443 Warrenville Road, Suite Lisle, Illinois Donald C. Cook Nuclear Plant Units 1 and 2012 NRC EXAMINATION OUTLINE Enclosed you will find a copy of the Initial License Examination Outline for the planned July/August 2012 Examination at Donald C. Cook Nuclear Plant (CNP). Also enclosed is the proposed examination schedule, based on 3 Senior Reactor Operator (SRO) (I), 3 SRO (U), and 8 Reactor Operator (RO) candidates.
{{#Wiki_filter:2012 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION OUTLINE SUBMITTAL
The examination is being prepared in accordance with NUREG 1021, Revision 9, Supplement  
 
: 1. The following items are enclosed in the sealed envelope:  
m INDIANA.
: 1) ES-201-2 Examination Outline Quality Checklist Form 2) ES-201-3 Examination Security Agreement Form 3) ES-301-1 Administrative Topics (JPM) Outline Form (SRO) 4) ES-301-1 Administrative Topics (JPM) Outline Form (RO) 5) ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-I) 6} ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-U) 7) ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (RO)  
MICHIGAN                                                                               Indiana Michigan Power flOWER"                                                                                One Cook Place Bridgman, MI 49106 Aunit ofAmerican Electric Power                                                       IndianaMichiganPoweLcom April 23, 2012 U. S. Nuclear Regulatory Commission Attn: Mr. Carl J. Moore Region III Examiner 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2012 NRC EXAMINATION OUTLINE SUBMITTAL Enclosed you will find a copy of the Initial License Examination Outline for the planned July/August 2012 Examination at Donald C. Cook Nuclear Plant (CNP). Also enclosed is the proposed examination schedule, based on 3 Senior Reactor Operator (SRO) (I), 3 SRO (U), and 8 Reactor Operator (RO) candidates. The examination is being prepared in accordance with NUREG 1021, Revision 9, Supplement 1.
: 8) ES-D-1 NRC2012-01 Scenario Outline Form 9) ES-D-1 NRC2012-02 Scenario Outline Form 10) ES-D-1 NRC2012-03 Scenario Outline Form 11) ES-D-1 NRC2012-04 Scenario Outline Form 12) ES-301-4 Simulator Scenario Quality Checklist Form 13) ES-301-5 Transient and Event Checklist Form -Crew 1 14) ES-301-5 Transient and Event Checklist Form -Crew 2 15) ES-301-5 Transient and Event Checklist Form -Crew 3 16) ES-301-5 Transient and Event Checklist Form -Crew 4 17) ES-301-5 Transient and Event Checklist Form -Crew 5 18) ES-301-6 Competencies Checklist Form -Crew 1 19) ES-301-6 Competencies Checklist Form -Crew 2 20) ES-301-6 Competencies Checklist Form -Crew 3 21) ES-301-6 Competencies Checklist Form -Crew 4 22) ES-301-6 Competencies Checklist Form -Crew 5 23) ES-401-2 PWR Examination (Written)
The following items are enclosed in the sealed envelope:
Outline Form (SRO) 24) ES-401-3 Generic Knowledge and Abilities (Written)
: 1)       ES-201-2 Examination Outline Quality Checklist Form
Outline Form (SRO)
: 2)       ES-201-3 Examination Security Agreement Form
APR 2 4 U. S. Nuclear Regulatory April 23, Page 25) ES-401-2 PWR Examination (Written)
: 3)       ES-301-1 Administrative Topics (JPM) Outline Form (SRO)
Outline Form 26} ES-401-3 Generic Knowledge and Abilities (Written)
: 4)       ES-301-1 Administrative Topics (JPM) Outline Form (RO)
Outline Form 27) ES-401-4 Record of Rejected KlAs Form  
: 5)     ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-I) 6}     ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-U)
: 28) Written Exam Sample  
: 7)       ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (RO)
: 29) Probabilistic Risk Assessment 30) Draft CNP 20121LT Exam A hard copy of all the examination materials is provided for your review. An electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided.
: 8)     ES-D-1 NRC2012-01 Scenario Outline Form
: 9)     ES-D-1 NRC2012-02 Scenario Outline Form
: 10)     ES-D-1 NRC2012-03 Scenario Outline Form
: 11)     ES-D-1 NRC2012-04 Scenario Outline Form
: 12)     ES-301-4 Simulator Scenario Quality Checklist Form
: 13)     ES-301-5 Transient and Event Checklist Form - Crew 1
: 14)     ES-301-5 Transient and Event Checklist Form - Crew 2
: 15)     ES-301-5 Transient and Event Checklist Form - Crew 3
: 16)     ES-301-5 Transient and Event Checklist Form - Crew 4
: 17)     ES-301-5 Transient and Event Checklist Form - Crew 5
: 18)     ES-301-6 Competencies Checklist Form - Crew 1
: 19)     ES-301-6 Competencies Checklist Form - Crew 2
: 20)     ES-301-6 Competencies Checklist Form - Crew 3
: 21)     ES-301-6 Competencies Checklist Form - Crew 4
: 22)     ES-301-6 Competencies Checklist Form - Crew 5
: 23)     ES-401-2 PWR Examination (Written) Outline Form (SRO)
: 24)     ES-401-3 Generic Knowledge and Abilities (Written) Outline Form (SRO)
 
APR 2 4 2012 U. S. Nuclear Regulatory Commission April 23, 2012 Page 2
: 25)   ES-401-2 PWR Examination (Written) Outline Form (RO) 26}   ES-401-3 Generic Knowledge and Abilities (Written) Outline Form (RO)
: 27)   ES-401-4 Record of Rejected KlAs Form (RO/SRO)
: 28)   Written Exam Sample Methodology
: 29)   Probabilistic Risk Assessment Input
: 30)   Draft CNP 20121LT Exam Schedule A hard copy of all the examination materials is provided for your review. An electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided.
None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.
None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.
If you have any questions, please contact Ted Werk or Steve Pettinger at (269) 465-5901, extension 3738, or myself at (269) 466-3407.
If you have any questions, please contact Ted Werk or Steve Pettinger at (269) 465-5901, extension 3738, or myself at (269) 466-3407.
Brian E. Evans Operations Training Manager TCW/jen/kmh Enclosures ES*201 Examination Outline Quality Checklist Form ES*201*2 Facility:
Z:c~d Brian E. Evans Operations Training Manager TCW/jen/kmh Enclosures
Pi C, ObbK Date of Examination:
 
* Initials Item Task Description b" C#a 1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with E5-401. ..j.;J K3, w R b. Assess whether the outline was systematically and randomly prepared in accordance with tt-f!> I Section D.1 of ES-401 and whether a/l KIA categories are appropriately_sampled.
ES*201                                     Examination Outline Quality Checklist                                     Form ES*201*2 Facility:
T T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. Jw t..3 WA E d. Assess whether the justifications for deselected or rejected KIA statements are appropriate. N 1lr3 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, oJ:) K5 'tIw-S and major transients.
Pi C, ObbK                                                                         Date of Examination:
I M b. Assess whether there are enough scenario sets (and spares) to test the projected number U and mix of applicants in accordance with the expected crew composition and rotation schedule ql.c L without compromising exam integrity, and ensure that each applicant can be tested using J::> K!3 A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants' audit test(s)J and that scenarios will not be on subsequent days. 0 c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D. Jw /(.3 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
7-J'l-~ iJ
1'(1 ) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I task repetition from the last two NRC examinations is within the limits specified on the form t!JN..T 3) no tasks are duplicated from the applicants' audit testes) ..{4) the number of new or modified tasks meets or exceeds the minimums specified on the form ...-(5) the number of altemate path, low-power, emergency, and RCA tasks meet the criteria J::> KO on the form. b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
* Initials Item                                                     Task Description a    b"     C#
1(1) the tasks are distributed among the topics as specified on the form "(2) at least one task is new or significantly modified WJ "13 tI..-<3t no more than one task is from the last two NRC licensing examinations  
: 1.     a. Verify that the outline(s) fit(s) the appropriate model, in accordance with E5-401.                     ..j.;J K3, ~
: c. Determine if there are enough different outlines to test the projected number and mix .Jw /(J3 of applicants and ensure that no items are duplicated on subsequent days. 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered .p "'6 in the appropriate exam sections.
w
G b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. E N c. Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5. J.., 1\13 E d. Check for duplication and overlap among exam sections.
                                                                                                                      ~ tt-f!>      ~
Jw R A e. Check the entire exam for balance of coverage.  
R       b. Assess whether the outline was systematically and randomly prepared in accordance with I           Section D.1 of ES-401 and whether a/l KIA categories are appropriately_sampled.
.;w q..L f. Assess whether the exam fits the appropriate job level (RO or SRO). .Jw i'ep f
T T
Dale a. Author 3-3C)-{2.. b. Facility Reviewer (*)  
: c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
&#xa5;IJ$c. NRC Chief Examiner (#) Z t. d. NRC Supervisor Note: # Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.  
Jw t..3       WA E
.Not applicable for NRC-prepared examination outlines ES-201, Page 26 of}}
N
: d. Assess whether the justifications for deselected or rejected KIA statements are appropriate.
                                                                                                                      ~ 1lr3         ~
: 2.     a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S            and major transients.                                                                                oJ:)   K5 'tIw-I M     b. Assess whether there are enough scenario sets (and spares) to test the projected number U           and mix of applicants in accordance with the expected crew composition and rotation schedule L           without compromising exam integrity, and ensure that each applicant can be tested using                             ql.c A           at least one new or significantly modified scenario, that no scenarios are duplicated                 J::> K!3 T           from the applicants' audit test(s)J and that scenarios will not be re~eated on subsequent days.
0     c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R           and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
Jw       /(.3 ~
: 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
1'(1 ) the outline(s) contain(s) the required number of control room and in-plant tasks W                   distributed among the safety functions as specified on the form I
T
              ~)      task repetition from the last two NRC examinations is within the limits specified on the form
: 3) no tasks are duplicated from the applicants' audit testes)                                                       t!JN..
              ..{4) the number of new or modified tasks meets or exceeds the minimums specified on the form
              ...-(5) the number of altemate path, low-power, emergency, and RCA tasks meet the criteria on the form.                                                                                    J::> KO
: b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
1(1) the tasks are distributed among the topics as specified on the form
              "(2) at least one task is new or significantly modified
              -<3t no more than one task is re~eated from the last two NRC licensing examinations                     WJ "13          tI..
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.                             .Jw    /(J3 ~
: 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered                   .p in the appropriate exam sections.                                                                             "'6 ~
G E
: b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.                                   ~        ".~  ~
N     c. Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5.             J..,     1\13 ~
E R
: d. Check for duplication and overlap among exam sections.                                                   Jw      N~    ~
A     e. Check the entire exam for balance of coverage.                                                           .;w   i~    q..
L
: f. Assess whether the exam fits the appropriate job level (RO or SRO).                                   .Jw     ~      ~
: a. Author i'ep ~(9;i'l1<:. f .J:f~me/Signature                                                    Dale 3- 3C)- {2..
                                      ~~~~                                                                                    &#xa5;IJ$
: b. Facility Reviewer (*)
: c. NRC Chief Examiner (#)                                                                                                         Z t.
: d. NRC Supervisor                                                                                                             ~l/.lZ Note:
                        .# Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.
Not applicable for NRC-prepared examination outlines ES-201, Page 26 of 28}}

Latest revision as of 23:58, 11 November 2019

2012 Donald C. Cook Nuclear Power Plant Initial License Examination Outline Submittal
ML12250A009
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/23/2012
From:
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML11354A199 List:
References
Download: ML12250A009 (4)


Text

2012 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION OUTLINE SUBMITTAL

m INDIANA.

MICHIGAN Indiana Michigan Power flOWER" One Cook Place Bridgman, MI 49106 Aunit ofAmerican Electric Power IndianaMichiganPoweLcom April 23, 2012 U. S. Nuclear Regulatory Commission Attn: Mr. Carl J. Moore Region III Examiner 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2012 NRC EXAMINATION OUTLINE SUBMITTAL Enclosed you will find a copy of the Initial License Examination Outline for the planned July/August 2012 Examination at Donald C. Cook Nuclear Plant (CNP). Also enclosed is the proposed examination schedule, based on 3 Senior Reactor Operator (SRO) (I), 3 SRO (U), and 8 Reactor Operator (RO) candidates. The examination is being prepared in accordance with NUREG 1021, Revision 9, Supplement 1.

The following items are enclosed in the sealed envelope:

1) ES-201-2 Examination Outline Quality Checklist Form
2) ES-201-3 Examination Security Agreement Form
3) ES-301-1 Administrative Topics (JPM) Outline Form (SRO)
4) ES-301-1 Administrative Topics (JPM) Outline Form (RO)
5) ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-I) 6} ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-U)
7) ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (RO)
8) ES-D-1 NRC2012-01 Scenario Outline Form
9) ES-D-1 NRC2012-02 Scenario Outline Form
10) ES-D-1 NRC2012-03 Scenario Outline Form
11) ES-D-1 NRC2012-04 Scenario Outline Form
12) ES-301-4 Simulator Scenario Quality Checklist Form
13) ES-301-5 Transient and Event Checklist Form - Crew 1
14) ES-301-5 Transient and Event Checklist Form - Crew 2
15) ES-301-5 Transient and Event Checklist Form - Crew 3
16) ES-301-5 Transient and Event Checklist Form - Crew 4
17) ES-301-5 Transient and Event Checklist Form - Crew 5
18) ES-301-6 Competencies Checklist Form - Crew 1
19) ES-301-6 Competencies Checklist Form - Crew 2
20) ES-301-6 Competencies Checklist Form - Crew 3
21) ES-301-6 Competencies Checklist Form - Crew 4
22) ES-301-6 Competencies Checklist Form - Crew 5
23) ES-401-2 PWR Examination (Written) Outline Form (SRO)
24) ES-401-3 Generic Knowledge and Abilities (Written) Outline Form (SRO)

APR 2 4 2012 U. S. Nuclear Regulatory Commission April 23, 2012 Page 2

25) ES-401-2 PWR Examination (Written) Outline Form (RO) 26} ES-401-3 Generic Knowledge and Abilities (Written) Outline Form (RO)
27) ES-401-4 Record of Rejected KlAs Form (RO/SRO)
28) Written Exam Sample Methodology
29) Probabilistic Risk Assessment Input
30) Draft CNP 20121LT Exam Schedule A hard copy of all the examination materials is provided for your review. An electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided.

None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.

If you have any questions, please contact Ted Werk or Steve Pettinger at (269) 465-5901, extension 3738, or myself at (269) 466-3407.

Z:c~d Brian E. Evans Operations Training Manager TCW/jen/kmh Enclosures

ES*201 Examination Outline Quality Checklist Form ES*201*2 Facility:

Pi C, ObbK Date of Examination:

7-J'l-~ iJ

  • Initials Item Task Description a b" C#
1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with E5-401. ..j.;J K3, ~

w

~ tt-f!> ~

R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D.1 of ES-401 and whether a/l KIA categories are appropriately_sampled.

T T

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

Jw t..3 WA E

N

d. Assess whether the justifications for deselected or rejected KIA statements are appropriate.

~ 1lr3 ~

2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients. oJ:) K5 'tIw-I M b. Assess whether there are enough scenario sets (and spares) to test the projected number U and mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using ql.c A at least one new or significantly modified scenario, that no scenarios are duplicated J::> K!3 T from the applicants' audit test(s)J and that scenarios will not be re~eated on subsequent days.

0 c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

Jw /(.3 ~

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

1'(1 ) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I

T

~) task repetition from the last two NRC examinations is within the limits specified on the form

3) no tasks are duplicated from the applicants' audit testes) t!JN..

..{4) the number of new or modified tasks meets or exceeds the minimums specified on the form

...-(5) the number of altemate path, low-power, emergency, and RCA tasks meet the criteria on the form. J::> KO

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

1(1) the tasks are distributed among the topics as specified on the form

"(2) at least one task is new or significantly modified

-<3t no more than one task is re~eated from the last two NRC licensing examinations WJ "13 tI..

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. .Jw /(J3 ~
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered .p in the appropriate exam sections. "'6 ~

G E

b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. ~ ".~ ~

N c. Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5. J.., 1\13 ~

E R

d. Check for duplication and overlap among exam sections. Jw N~ ~

A e. Check the entire exam for balance of coverage. .;w i~ q..

L

f. Assess whether the exam fits the appropriate job level (RO or SRO). .Jw ~ ~
a. Author i'ep ~(9;i'l1<:. f .J:f~me/Signature Dale 3- 3C)- {2..

~~~~ ¥IJ$

b. Facility Reviewer (*)
c. NRC Chief Examiner (#) Z t.
d. NRC Supervisor ~l/.lZ Note:

.# Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.