ML17221A376: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/04/1987
| issue date = 09/04/1987
| title = Application for Amend to License NPF-16,revising Tech Spec Surveillance Requirement 4.4.5.2 Re Steam Generator Tube Sample Selection & Insp by Adding New Section to Exclude Tubing in Batwing Area from Sample Selection.Fee Paid
| title = Application for Amend to License NPF-16,revising Tech Spec Surveillance Requirement 4.4.5.2 Re Steam Generator Tube Sample Selection & Insp by Adding New Section to Exclude Tubing in Batwing Area from Sample Selection.Fee Paid
| author name = WOODY C O
| author name = Woody C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 8
| page count = 8
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:UORYINFORNATIONDISTUTSYSTEN(RIDS)p.eCACCESSIONNBR:8709100217DOC.DATE:87/09/04NOTARIZED:NO!FACIL':50-389St.LuciePlantiUnit2iFloridaPower~uLightCo.AUTH.NANE*UTHORAFFILIATIONWOODYiC.O.FloridaPower5LightCo.RECIP.MANERECIPIENTAFFlLIATIONDocumentControlBranch(DocumentControlDesk)
{{#Wiki_filter:U  ORY INFORNATION  DIST    UT      SYSTEN (RIDS)
: p. eC ACCESSION NBR:       8709100217      DOC. DATE: 87/09/04    NOTARIZED: NO         DOCKET 4
! FACIL': 50-389 St.     Lucie Planti Unit 2i Florida Power      ~u Light  Co. 05000389 AUTH. NANE             *UTHOR  AFFILIATION WOODYi C. O.           Florida  Power 5 Light Co.
RECIP. MANE            RECIPIENT AFFlLIATION Document Control Branch    (Document    Control Desk)


==SUBJECT:==
==SUBJECT:==
*pplicationforamendtoLicenseNPF-ihrevisingTechSpecSurveillanceRequirement4.4.5.2reSteamGeneratorTubeSampleSelection5Inspbgaddingnewsectionexcludingtubesinbatwingareaofsteamgenerator.Feepaid.DISTRIBUTIONCODE:AOOIDCOPIESRECEIVED:LTRiENCL+SIZE:TITLE:ORSubmittal:GeneralDistributionDOCKET405000389NOTES:REClPIENTIDCODE/NANEPD2-2LATOURIQNYiECOPIESLTTRENCL0RECIPIENTIDCODE/MANEPD2-2PDCOPIESLTTRENCL55INTERNAL:ARM/DAF/LFNBNRR/DEBT/CEBNRR/DEST/RSBILRBREQFILE0110111111NRR/DEST/ADSNRR/DEST/NTBNRR/DOE*/TSBOQC/HDS2RES/DE/EIB11111110EXTERNAL:EQSQBRUSKEi8NRCPDR1111LPDRNSIC111>i<0~ggo'LTOTALNUNBEROFCOPIESREQUIRED:LTTR21ENCL18 E\~
      *pplication for    amend  to License NPF-ih revising Tech Spec Surveillance Requirement 4. 4. 5. 2 re Steam Generator Tube Sample Selection 5 Insp bg adding new section excluding tubes in batwing area of steam generator. Fee paid.
9~O.BOX14000,JUNOBEACH,FL33408.0420+Uliy>re+~SEPTEMBER04~987L-87-369U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555Gentlemen:Re:St.'LucieUnit2DocketNo.50-389ProposedLicenseAmendmentSteamGeneratorTubeSamleSelectionandlnsectionlnaccordancewithIOCFR50.90,FloridaPower&LightCompany(FPL)submitsherewitharequesttoamendFacilityOperatingLicenseNPF-I6.TheproposedamendmentrevisestheTechnicalSpecificationSurveillanceRequirement4.4.5.2,SteamGeneratorTubeSamleSelectionandlnsectionbyaddinganewsectionwhichexcludestubesinthe"batwing"areaofthesteamgeneratorfromthesampleselection.Tubesinthe"batwing"area,ifl00/oinspected,wouldnotbeincludedinthedeterminationoftheCategoryofInspectionResults.Thisproposedamendmentwillresultinamorerepresentativedeterminationofthestatusoftubesinallotherareasofthesteamgeneratorwhileadditionallyrecognizingtheneedfor100%surveillanceoftubesinthe"batwing."AmarkedupcopyoftheaffectedTechnicalSpecificationpageisincludedasAttachmentI.ASafetyEvaluation,insupportoftheproposedamendmentisincludedasAttachment2.A"DeterminationofNoSignificantHazardsConsideration"isprovidedasAttachment3.TheproposedamendmenthasbeenreviewedbytheSt.LucieFacilityReviewGroupandtheFloridaPower&LightCompanyNuclearReviewBoard.Inaccordancewith10CFR50.9l(b)(l),acopyoftheproposedamendmentisbeingforwardedtothestatedesigneefortheStateofFlorida.870910Oc~0500038900217-870904pgRADO,.p>R''PEJW3/008/Igol3$0g4anFPLGroupcompany
DISTRIBUTION CODE: AOOID TITLE:   OR COPIES RECEIVED: LTR Submittal: General Distribution i ENCL  +   SIZE:
~~4III04SNl1!E t'~g4U.S.NuclearRegulatoryCommissionL-87-369PagetwoInaccordancewithIOCFRl70.2I,FPLCheckNo.5408isattachedasremittanceforthelicenseamendmentapplicationfee.Pleasecontactusifyouhaveanyquestionsaboutthissubmittal.VerytrulC.O.WoodyGroupVicePresidentNuclearEnergyCOW/EJW/gpAttachments(5)cc:Dr.J.NelsonGrace,RegionalAdministrator,USNRC,RegionIISeniorResidentInspector,USNRC,St.LuciePlantMr.LyleJerrett,FloridaDept.ofHealthandRehabilitativeServicesEJW3/008/2  
NOTES:
~0~4gt~UAI1 STATEOFFLORIDA))ss.COUNTYOFPALhhBEACH)E.A.Adomatbeingfirstdulysworn,deposesandsays:ThatheisanExecutiveVicePresidentofFloridaPower&LightCompany,theLicenseeherein;Thathehasexecutedtheforegoingdocument;thatthestatementsmadeinthisdocumentaretrueandcorrecttothebestofhisknowledge,information,andbelief,andthatheisauthorizedtoexecutethedocumentonbehalfofsaidLicensee.E.A.AdomatSubscribedandsworntobeforemethis4th.,dayofSetembeT,1987.r~...>/~g~'qn,'(,'NOTAR~PUBLIC,inandfortheCounty'>,ofPalmBeach,StateofFloridaROTARYPUBLICSTATEOFFLORIOAKYCOKNISSIONEXP.JAN.5,1989MyCommissionexpires:  
REC lP IENT        COPIES          REC IP IENT          COPIES ID CODE/NANE        LTTR ENCL      ID CODE/MANE        LTTR ENCL PD2-2 LA                      0    PD2-2 PD                  5    5 TOURIQNYi E INTERNAL: ARM/DAF/LFNB                  1    0    NRR/DEST/ADS              1    1 NRR/DEBT/CEB            1    1    NRR/DEST/NTB              1    1 NRR/DEST/RSB            1          NRR/DOE*/TSB              1    1 ILRB        1    1    OQC/HDS2                  1    0 REQ FILE        01      1          RES/DE/EIB EXTERNAL: EQSQ BRUSKEi 8                1    1    LPDR                      1 NRC PDR                  1    1    NSIC                      1    1
~~  
                                > i<0
}}
                                ~ ggo'L TOTAL NUNBER OF COPIES REQUIRED: LTTR            21  ENCL    18
 
E\ ~
9~                                                   O. BOX 14000, JUNO BEACH, FL 33408.0420
                                                                                                          +Uliy
                                                                                                          >re+~
SEPTEMBER  0 4 ~987 L-87-369 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: St.'Lucie Unit 2 Docket No. 50-389 Proposed License Amendment Steam Generator Tube Sam le Selection and lns ection ln accordance with IO CFR 50.90, Florida Power & Light Company (FPL) submits herewith a request to amend Facility Operating License NPF-I6.
The  proposed    amendment revises the Technical Specification Surveillance Requirement 4.4.5.2, Steam Generator Tube Sam le Selection and lns ection by adding a new section which excludes tubes in the "batwing" area of the steam generator from the sample selection.             Tubes in the "batwing" area, if l00/o inspected, would not be      included    in  the  determination of the Category of Inspection Results. This proposed  amendment      will result in a more representative determination of    the status  of  tubes    in  all other  areas of the steam generator while  additionally  recognizing  the  need    for  100%   surveillance of tubes in the "batwing."
A marked up copy of the affected Technical Specification page is included as Attachment I. A Safety Evaluation, in support of the proposed amendment is included as Attachment 2.           A "Determination of No Significant Hazards Consideration" is provided as Attachment 3.
The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board.
In accordance with 10 CFR 50.9l(b)(l), a copy of the proposed amendment is being forwarded to the state designee for the State of Florida.
go l 3        $0 87091000217-    870904                                              g4 Oc~
ADO,     05000389 pgR
''P              .
p>R E JW3/008/ I                                                                          an FPL Group company
 
~~
4 I
II 0
4 S
N l
1!
E
 
4 t'~
g U. S. Nuclear Regulatory Commission L-87-369 Page two In accordance  with  IO CFR l70.2I, FPL Check No. 5408 is attached as remittance for the license amendment application fee.
Please contact us  if you have any questions about this submittal.
Very trul C. O. Woody Group Vice President Nuclear Energy COW/E JW/gp Attachments (5) cc: Dr. J. Nelson Grace, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Mr. Lyle Jerrett, Florida Dept. of Health and Rehabilitative Services E J W3/008/2
 
    ~0         ~ 4 g
t A
~ U I
1
 
STATE OF FLORIDA              )
                                            )   ss.
COUNTY OF PALhh BEACH          )
E. A. Adomat    being first duly sworn, deposes and says:
That he is    an Executive Vice President            of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
E. A. Adomat Subscribed and sworn to before me this 4th.,day of  Se tembeT,           19  87 .
r~   ...     >/~g
~
  'qn,
        '(,
            'NOTAR~ PUBLIC, in and for the County
        '>, of Palm Beach, State of Florida ROTARY PUBLIC STATE OF FLORIOA KY COKNISSION EXP. JAN. 5,1989 My Commission expires:
 
~ ~}}

Latest revision as of 08:57, 10 November 2019

Application for Amend to License NPF-16,revising Tech Spec Surveillance Requirement 4.4.5.2 Re Steam Generator Tube Sample Selection & Insp by Adding New Section to Exclude Tubing in Batwing Area from Sample Selection.Fee Paid
ML17221A376
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/04/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17221A377 List:
References
L-87-369, NUDOCS 8709100217
Download: ML17221A376 (8)


Text

U ORY INFORNATION DIST UT SYSTEN (RIDS)

p. eC ACCESSION NBR: 8709100217 DOC. DATE: 87/09/04 NOTARIZED: NO DOCKET 4

! FACIL': 50-389 St. Lucie Planti Unit 2i Florida Power ~u Light Co. 05000389 AUTH. NANE *UTHOR AFFILIATION WOODYi C. O. Florida Power 5 Light Co.

RECIP. MANE RECIPIENT AFFlLIATION Document Control Branch (Document Control Desk)

SUBJECT:

  • pplication for amend to License NPF-ih revising Tech Spec Surveillance Requirement 4. 4. 5. 2 re Steam Generator Tube Sample Selection 5 Insp bg adding new section excluding tubes in batwing area of steam generator. Fee paid.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED: LTR Submittal: General Distribution i ENCL + SIZE:

NOTES:

REC lP IENT COPIES REC IP IENT COPIES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PD2-2 LA 0 PD2-2 PD 5 5 TOURIQNYi E INTERNAL: ARM/DAF/LFNB 1 0 NRR/DEST/ADS 1 1 NRR/DEBT/CEB 1 1 NRR/DEST/NTB 1 1 NRR/DEST/RSB 1 NRR/DOE*/TSB 1 1 ILRB 1 1 OQC/HDS2 1 0 REQ FILE 01 1 RES/DE/EIB EXTERNAL: EQSQ BRUSKEi 8 1 1 LPDR 1 NRC PDR 1 1 NSIC 1 1

> i<0

~ ggo'L TOTAL NUNBER OF COPIES REQUIRED: LTTR 21 ENCL 18

E\ ~

9~ O. BOX 14000, JUNO BEACH, FL 33408.0420

+Uliy

>re+~

SEPTEMBER 0 4 ~987 L-87-369 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St.'Lucie Unit 2 Docket No. 50-389 Proposed License Amendment Steam Generator Tube Sam le Selection and lns ection ln accordance with IO CFR 50.90, Florida Power & Light Company (FPL) submits herewith a request to amend Facility Operating License NPF-I6.

The proposed amendment revises the Technical Specification Surveillance Requirement 4.4.5.2, Steam Generator Tube Sam le Selection and lns ection by adding a new section which excludes tubes in the "batwing" area of the steam generator from the sample selection. Tubes in the "batwing" area, if l00/o inspected, would not be included in the determination of the Category of Inspection Results. This proposed amendment will result in a more representative determination of the status of tubes in all other areas of the steam generator while additionally recognizing the need for 100% surveillance of tubes in the "batwing."

A marked up copy of the affected Technical Specification page is included as Attachment I. A Safety Evaluation, in support of the proposed amendment is included as Attachment 2. A "Determination of No Significant Hazards Consideration" is provided as Attachment 3.

The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board.

In accordance with 10 CFR 50.9l(b)(l), a copy of the proposed amendment is being forwarded to the state designee for the State of Florida.

go l 3 $0 87091000217- 870904 g4 Oc~

ADO, 05000389 pgR

P .

p>R E JW3/008/ I an FPL Group company

~~

4 I

II 0

4 S

N l

1!

E

4 t'~

g U. S. Nuclear Regulatory Commission L-87-369 Page two In accordance with IO CFR l70.2I, FPL Check No. 5408 is attached as remittance for the license amendment application fee.

Please contact us if you have any questions about this submittal.

Very trul C. O. Woody Group Vice President Nuclear Energy COW/E JW/gp Attachments (5) cc: Dr. J. Nelson Grace, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Mr. Lyle Jerrett, Florida Dept. of Health and Rehabilitative Services E J W3/008/2

~0 ~ 4 g

t A

~ U I

1

STATE OF FLORIDA )

) ss.

COUNTY OF PALhh BEACH )

E. A. Adomat being first duly sworn, deposes and says:

That he is an Executive Vice President of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

E. A. Adomat Subscribed and sworn to before me this 4th.,day of Se tembeT, 19 87 .

r~ ... >/~g

~

'qn,

'(,

'NOTAR~ PUBLIC, in and for the County

'>, of Palm Beach, State of Florida ROTARY PUBLIC STATE OF FLORIOA KY COKNISSION EXP. JAN. 5,1989 My Commission expires:

~ ~