ML17262A831: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 2
| page count = 2
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Po"hester Gas and.Electric Corporation (R.E.Ginna Nuclear Power Plant))))Docket No.50-244))APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S.Nuclear Regulatory Commission (the"Commission"), Rochester Gas and Electric Corporation
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                 )
("RG&E"), holder of Facility Operating License No.DPR-18, hereby requests that the Technical Specifications set forth in Appendix A to that license be amended..This request for change in Technical Specifications is submitted to redefine the snubber visual inspection schedule pursuant to guidance contained in Generic Letter 90-09,"Alternative Requirements For Snubber Visual Inspection Intervals and Corrective Actions" dated December 11, 1990.Further, an updated bases section was included to address the provisions of Generic Letter 90-09.Consistent with the guidance of Generic Letter 91-04,"Changes in Technical Specification Surveillance Intervals To Accommodate a 24-Month Fuel Cycle" dated April 2, 1991 an evaluation of the proposed change was performed.
                                                )
The evaluation confirmed that historical maintenance and surveillance data does not invalid'ate an extension to the existing inspection interval.The proposed Technical Specification change is set forth in Attachment A to this Application.
Po "hester Gas and. Electric Corporation       )    Docket No. 50-244 (R.E. Ginna Nuclear Power Plant)                 )
A safety evaluation is set forth in Attachment B.This evaluation also demonstrates that the proposed change does not involve a significant change in the types or a 9205060108 920423 PDR ADOCK 05000244 P PDR significant increase, in the amounts of effluent or any change in the authorized, power level of the facility.As demonstrated in Attachment B, the proposed change does not involve a significant hazards consideration.
                                                )
WHEREFORE, Applicant respectfully requests that Appendix A to Facility Operating License No.DPR-18 be amended in the form attached hereto as Attachment A.Rochester Gas and Electric Corporation Robert C.Mecr dy Vice President, Ginna Nuclear Production Subscribed and sworn to before me on this gf day of MARIE C.VILLENEUVE Notary Public, State of Nev(Yorit Monroe County Commission Expires Octobet;31', 19+~}}
APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S. Nuclear Regulatory Commission (the "Commission" ), Rochester Gas and Electric Corporation ("RG&E"), holder of Facility Operating License No. DPR-18, hereby requests     that the Technical Specifications set forth in Appendix A to that license be amended.. This request for change in Technical Specifications is submitted to redefine the snubber visual inspection schedule pursuant to guidance contained in Generic Letter 90-09, "Alternative Requirements For Snubber Visual Inspection Intervals and Corrective Actions" dated December 11, 1990. Further, an updated bases section was included to address the provisions of Generic Letter 90-09. Consistent with the guidance of Generic Letter 91-04, "Changes in Technical Specification Surveillance Intervals To Accommodate a 24-Month Fuel Cycle" dated April 2, 1991 an evaluation of the proposed change was performed. The evaluation confirmed that historical maintenance and surveillance data does not invalid'ate an extension to the existing inspection interval.
The proposed Technical Specification change is set forth in Attachment A to this Application. A safety evaluation is set forth in Attachment B. This evaluation also demonstrates that the proposed change does not involve a significant change in the types or a 9205060108 920423 PDR   ADOCK 05000244 P               PDR
 
significant increase, in the amounts of effluent or any change in the authorized, power level of the facility.                         As demonstrated   in Attachment B, the proposed change does not involve a significant hazards consideration.
WHEREFORE,           Applicant respectfully requests that Appendix         A to Facility Operating License                   No. DPR-18 be amended   in the   form attached hereto as Attachment A.
Rochester Gas and Electric Corporation Robert C. Mecr dy Vice President, Ginna Nuclear Production Subscribed and sworn to before                 me on this   gf       day of MARIE C. VILLENEUVE Notary Public, State of Nev( Yorit Monroe County Commission Expires Octobet; 31', 19 +~}}

Latest revision as of 08:13, 10 November 2019

Application for Amend to License DPR-18,changing TSs to Redefine Snubber Visual Insp Schedule,Per Generic Ltr 90-09 Guidance
ML17262A831
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/23/1992
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17262A830 List:
References
GL-90-09, GL-90-9, NUDOCS 9205060108
Download: ML17262A831 (2)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Po "hester Gas and. Electric Corporation ) Docket No. 50-244 (R.E. Ginna Nuclear Power Plant) )

)

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S. Nuclear Regulatory Commission (the "Commission" ), Rochester Gas and Electric Corporation ("RG&E"), holder of Facility Operating License No. DPR-18, hereby requests that the Technical Specifications set forth in Appendix A to that license be amended.. This request for change in Technical Specifications is submitted to redefine the snubber visual inspection schedule pursuant to guidance contained in Generic Letter 90-09, "Alternative Requirements For Snubber Visual Inspection Intervals and Corrective Actions" dated December 11, 1990. Further, an updated bases section was included to address the provisions of Generic Letter 90-09. Consistent with the guidance of Generic Letter 91-04, "Changes in Technical Specification Surveillance Intervals To Accommodate a 24-Month Fuel Cycle" dated April 2, 1991 an evaluation of the proposed change was performed. The evaluation confirmed that historical maintenance and surveillance data does not invalid'ate an extension to the existing inspection interval.

The proposed Technical Specification change is set forth in Attachment A to this Application. A safety evaluation is set forth in Attachment B. This evaluation also demonstrates that the proposed change does not involve a significant change in the types or a 9205060108 920423 PDR ADOCK 05000244 P PDR

significant increase, in the amounts of effluent or any change in the authorized, power level of the facility. As demonstrated in Attachment B, the proposed change does not involve a significant hazards consideration.

WHEREFORE, Applicant respectfully requests that Appendix A to Facility Operating License No. DPR-18 be amended in the form attached hereto as Attachment A.

Rochester Gas and Electric Corporation Robert C. Mecr dy Vice President, Ginna Nuclear Production Subscribed and sworn to before me on this gf day of MARIE C. VILLENEUVE Notary Public, State of Nev( Yorit Monroe County Commission Expires Octobet; 31', 19 +~