ML17328A946: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =
| stage = Request
}}
}}



Latest revision as of 03:01, 10 November 2019

Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Spec 4.0.3 Requirements Delayed to Permit Completion of Missed Surveillance Allowable Outage Time Limits of Action
ML17328A946
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/25/1991
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17328A947 List:
References
AEP:NRC:1036C, GL-87-09, GL-87-9, NUDOCS 9103010095
Download: ML17328A946 (3)


Text

ACCELERATED DEMONST+.TION SYSTEM DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103010095 DOC.DATE: 91/02/25 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1 Indiana & 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana & 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. Document Control Branch (Document Control Desk)

SUBJECT:

Application for amends to Licenses DPR-58 & DPR-74,modifying NOTES:

OR missed surveillance allowable outage time limits of action.

D1STRIBUTION CODE AOOID COPIES RECEIVED LTR Submittal: General Distribution I ENCL l Tech Spec 4.0.3 requirements delayed to permit completion of SIZE'ITLE:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1 COLBURN,T. 2 2 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DET/ESGB 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC LFMB 1 0 OGC/HDS2 1 0

~GE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: C PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CO~ACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIFfS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 16

Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:1036C Donald C. Cook Nuclear Plant Units 1 and 2 License Nos. DPR-58 and DPR-74 Docket Nos. 50-315 and 50-316 MODIFICATION OF TECHNICAL SPECIFICATION 4.0.3 REQUIREMENTS REGARDING MISSED SURVEILLANCES U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Attn: T. E. Murley February 25, 1991

Dear Dr. Murley:

This letter and its attachments constitute an application for amendment to the Technical Specifications (T/Ss) for the Donald C.

Cook Nuclear Plant Units 1 and 2 ~ Specifically, we aze proposing to modify T/S 4.0.3 such that the action requirements of the T/Ss may be delayed foz up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This modification is consistent with an NRC position provided in Generic Letter 87-09.

We believe the proposed change will not result in (1) a significant change in the types of effluents or a significant increase in the amounts of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.

The reason for the change and our 10 CFR 50.92 significant hazards analysis are found in Attachment l. Attachment 2 contains the proposed revised T/Ss pages.

The proposed change has been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.

In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr. J. R. Padgett of the Michigan Public Service Commission and the Michigan Department of Public Health.

t

9103010095 9i0225 ooi PDR
P 'DR ADOCK 050003i'b

Dr. T. E. Murley AEP:NRC:1036C This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, M. . Alexich Vice President ldp Attachments cc: D. H. Williams, Jr.

A. A. Blind - Bridgman J. R. Padgett G. Charnoff A. B. Davis - Region III NRC Resident Inspector - Bridgman NFEM .Section Chief