ML17328A946: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONST+.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET 05000315 05000316  
{{#Wiki_filter:ACCELERATED                                       DEMONST+.TION SYSTEM DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9103010095              DOC.DATE:  91/02/25    NOTARIZED: NO                    DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1 Indiana                            & 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                            & 05000316 AUTH. NAME            AUTHOR AFFILIATION ALEXICH,M.P.          Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME            RECIPIENT AFFILIATION MURLEY,T.E.              Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Application for amends to Licenses DPR-58&DPR-74,modifying Tech Spec 4.0.3 requirements delayed to permit completion of missed surveillance allowable outage time limits of action.D1STRIBUTION CODE AOOID COPIES RECEIVED LTR I ENCL l SIZE'ITLE:
Application for amends to Licenses DPR-58 & DPR-74,modifying NOTES:
OR Submittal:
OR missed surveillance allowable outage time limits of action.
General Distribution NOTES: ACCESSION NBR:9103010095 DOC.DATE: 91/02/25 NOTARIZED:
D1STRIBUTION CODE       AOOID     COPIES RECEIVED LTR Submittal: General Distribution I ENCL   l Tech Spec 4.0.3 requirements delayed to permit completion of SIZE'ITLE:
NO FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1Indiana&50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana&AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P.
RECIPIENT                COPIES            RECIPIENT                    COPIES ID  CODE/NAME             LTTR ENCL      ID CODE/NAME       LTTR ENCL PD3-1 LA                     1    1      PD3-1 PD                        1    1 COLBURN,T.                   2    2 INTERNAL: NRR/DET/ECMB 9H               1    1      NRR/DET/ESGB                    1    1 NRR/DOEA/OTSB11               1    1      NRR/DST      8E2                1    1 NRR/DST/SELB 8D               1    1      NRR/DST/SICB 7E                  1     1 NRR/DST/SRXB 8E              1    1    NUDOCS-ABSTRACT                   1    1 OC LFMB                      1    0      OGC/HDS2                         1    0
Indiana Michigan Power Co.(formerly Indiana&Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
              ~GE            01        1    1    RES/DSIR/EIB                     1     1 EXTERNAL:    C PDR                      1     1     NSIC                            1     1 NOTE TO ALL "RIDS" RECIPIENTS:
Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.
PLEASE HELP US TO REDUCE WASTE! CO~ACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIFfS FOR DOCUMENTS YOU DON'T NEED!
INTERNAL: NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC LFMB~GE 01 EXTERNAL: C PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
TOTAL NUMBER OF COPIES REQUIRED: LTTR               18   ENCL   16
PLEASE HELP US TO REDUCE WASTE!CO~ACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LIFfS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 16 Indiana Michigan Power Company P.O.Box 16631 Columbus, OH 43216 AEP:NRC:1036C Donald C.Cook Nuclear Plant Units 1 and 2 License Nos.DPR-58 and DPR-74 Docket Nos.50-315 and 50-316 MODIFICATION OF TECHNICAL SPECIFICATION 4.0.3 REQUIREMENTS REGARDING MISSED SURVEILLANCES U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Attn: T.E.Murley February 25, 1991


==Dear Dr.Murley:==
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:1036C Donald C. Cook Nuclear Plant Units          1 and 2 License Nos. DPR-58 and DPR-74 Docket Nos. 50-315 and 50-316 MODIFICATION OF TECHNICAL SPECIFICATION          4.0.3 REQUIREMENTS REGARDING MISSED SURVEILLANCES U.S. Nuclear Regulatory Commission Document      Control Desk Washington, D.C.        20555 Attn:      T. E. Murley February 25, 1991
This letter and its attachments constitute an application for amendment to the Technical Specifications (T/Ss)for the Donald C.Cook Nuclear Plant Units 1 and 2~Specifically, we aze proposing to modify T/S 4.0.3 such that the action requirements of the T/Ss may be delayed foz up to 24 hours to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24 hours.This modification is consistent with an NRC position provided in Generic Letter 87-09.We believe the proposed change will not result in (1)a significant change in the types of effluents or a significant increase in the amounts of any effluent that may be released offsite, or (2)a significant increase in individual or cumulative occupational radiation exposure.The reason for the change and our 10 CFR 50.92 significant hazards analysis are found in Attachment l.Attachment 2 contains the proposed revised T/Ss pages.The proposed change has been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.
 
In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr.J.R.Padgett of the Michigan Public Service Commission and the Michigan Department of Public Health.t;9103010095 9i0225 PDR ADOCK 050003i'b;P'DR ooi Dr.T.E.Murley-2-AEP:NRC:1036C This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
==Dear Dr. Murley:==
Sincerely, M..Alexich Vice President ldp Attachments cc: D.H.Williams, Jr.A.A.Blind-Bridgman J.R.Padgett G.Charnoff A.B.Davis-Region III NRC Resident Inspector-Bridgman NFEM.Section Chief}}
 
This     letter and   its attachments constitute an application for amendment to the Technical Specifications (T/Ss) for the Donald C.
Cook Nuclear Plant Units 1 and 2       ~   Specifically, we aze proposing to modify T/S 4.0.3 such that the action requirements of the T/Ss may be delayed foz up to 24 hours to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24 hours. This modification is consistent with an NRC position provided in Generic Letter 87-09.
We   believe the proposed change will not result in (1) a significant change     in the types of effluents or a significant increase in the amounts       of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.
The reason       for the change and our 10   CFR 50.92 significant hazards analysis are found in Attachment         l. Attachment 2 contains the proposed revised T/Ss pages.
The proposed change has been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.
In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr. J. R. Padgett of the Michigan Public Service Commission and the Michigan Department of Public Health.
t
  ;9103010095 9i0225                                                                 ooi PDR
  ;P              'DR ADOCK 050003i'b
 
Dr. T. E. Murley                               AEP:NRC:1036C This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M.   . Alexich Vice President ldp Attachments cc:   D. H. Williams, Jr.
A. A. Blind - Bridgman J. R. Padgett G. Charnoff A. B. Davis - Region   III NRC Resident Inspector - Bridgman NFEM .Section Chief}}

Latest revision as of 04:01, 10 November 2019

Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Spec 4.0.3 Requirements Delayed to Permit Completion of Missed Surveillance Allowable Outage Time Limits of Action
ML17328A946
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/25/1991
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17328A947 List:
References
AEP:NRC:1036C, GL-87-09, GL-87-9, NUDOCS 9103010095
Download: ML17328A946 (3)


Text

ACCELERATED DEMONST+.TION SYSTEM DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103010095 DOC.DATE: 91/02/25 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1 Indiana & 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana & 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. Document Control Branch (Document Control Desk)

SUBJECT:

Application for amends to Licenses DPR-58 & DPR-74,modifying NOTES:

OR missed surveillance allowable outage time limits of action.

D1STRIBUTION CODE AOOID COPIES RECEIVED LTR Submittal: General Distribution I ENCL l Tech Spec 4.0.3 requirements delayed to permit completion of SIZE'ITLE:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1 COLBURN,T. 2 2 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DET/ESGB 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC LFMB 1 0 OGC/HDS2 1 0

~GE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: C PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CO~ACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIFfS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 16

Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:1036C Donald C. Cook Nuclear Plant Units 1 and 2 License Nos. DPR-58 and DPR-74 Docket Nos. 50-315 and 50-316 MODIFICATION OF TECHNICAL SPECIFICATION 4.0.3 REQUIREMENTS REGARDING MISSED SURVEILLANCES U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Attn: T. E. Murley February 25, 1991

Dear Dr. Murley:

This letter and its attachments constitute an application for amendment to the Technical Specifications (T/Ss) for the Donald C.

Cook Nuclear Plant Units 1 and 2 ~ Specifically, we aze proposing to modify T/S 4.0.3 such that the action requirements of the T/Ss may be delayed foz up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This modification is consistent with an NRC position provided in Generic Letter 87-09.

We believe the proposed change will not result in (1) a significant change in the types of effluents or a significant increase in the amounts of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.

The reason for the change and our 10 CFR 50.92 significant hazards analysis are found in Attachment l. Attachment 2 contains the proposed revised T/Ss pages.

The proposed change has been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.

In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr. J. R. Padgett of the Michigan Public Service Commission and the Michigan Department of Public Health.

t

9103010095 9i0225 ooi PDR
P 'DR ADOCK 050003i'b

Dr. T. E. Murley AEP:NRC:1036C This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, M. . Alexich Vice President ldp Attachments cc: D. H. Williams, Jr.

A. A. Blind - Bridgman J. R. Padgett G. Charnoff A. B. Davis - Region III NRC Resident Inspector - Bridgman NFEM .Section Chief