{{#Wiki_filter:8:00 AM Daily Reactor Oversight Coordination Meeting- August 16, 2012 Date Added Lead Branch Plant/Issue/Status 8/13/12 PB1 CC- U1 Tech Spec required shutdown due to CEA #9 dropped MS- U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp Events, Significant 8limit of 75 degrees, Mode 5 Cold Shutdown Safety Issues, and 8/13/12 PB6 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational Challenges 8/13/12 PB4 SUS- Dry fuel storage transfer trailer detected with removable contamination Fi 8/13/12 PB6 1 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews _6/21/12 PB1 NMP -U1 AL3 UIL 0.35 gpm 7/09/12 PB6 TMI -AL3 UIL 0.16 gpm; downpower 8/22 Plant Status Items PlaIntetsIte 8/07/12 PB4 S -U2 UIL 0.35 gpm (first 90 days)8/13/12 PB4 LM- U1 LP Turbine Blade Inspection 8/23 HC- CDBI 7/30, 8/13, 8/27 Salem/HC -95002 8/27 Team Inspections OC -PI&R 8/13 & 8/27 MS- 95001 9/10 1/03/12 *EB1/PB3 SB -ASR resolution:
{{#Wiki_filter:8:00 AM Daily Reactor Oversight Coordination Meeting- August 16, 2012 Date Added Lead Branch Plant/Issue/Status 8/13/12       PB1       CC- U1 Tech Spec required shutdown due to CEA #9 dropped MS- U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp Events, Significant   8limit                         of 75 degrees, Mode 5 Cold Shutdown Safety Issues, and   8/13/12       PB6       TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational Challenges           8/13/12       PB4       SUS- Dry fuel storage transfer trailer detected with removable contamination Fi 8/13/12       PB6     1TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews   _
: 1) CAL Follow-up INSP in progress;  
6/21/12       PB1       NMP - U1 AL3 UIL 0.35 gpm Plant Status Items  7/09/12       PB6       TMI - AL3 UIL 0.16 gpm; downpower 8/22 PlaIntetsIte         8/07/12       PB4       S   - U2 UIL 0.35 gpm (first 90 days) 8/13/12       PB4       LM- U1 LP Turbine Blade Inspection 8/23 HC- CDBI 7/30, 8/13, 8/27 Salem/HC - 95002 8/27 Team Inspections   OC - PI&R 8/13 & 8/27 MS- 95001 9/10 1/03/12 *EB1/PB3         SB - ASR resolution: 1) CAL Follow-up INSP in progress; 2) Working group priority 1/03/12 Profe           Issues: TIA, deviation memo, technical issues position papers High Profile     7/02/12 ORA/DRP         Meeting w/ NJ OC Oversight Panel 8/23 Actrivities   7/12/12       PB1       CC - Magwood visit to site 8/23 7/31/12       PB2       IP- Magwood visit 9/13 GAMDP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx
: 2) Working group priority 1/03/12 Profe Issues: TIA, deviation memo, technical issues position papers High Profile 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Actrivities 7/12/12 PB1 CC -Magwood visit to site 8/23 7/31/12 PB2 IP -Magwood visit 9/13 GAMDP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx 8/02/12 DRM 1 Region -Chairman visit 9/13 8/16/12 PB1 CC -GAO visit to site 9/25 8/16/12 PB4 jPB --Apostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests 2515/177 ECCS Gas Accumulation  
 
-96% complete, pending at BV Due 12/31/12 2515/185 Follow-up on Industry's Groundwater Protection Initiative Due 12/31/12 TI Status 2516/001 Review of License Renewal Activities (1P2) Due 12/31/13 (1 st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns 12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns Due 12/31/13 Review of the Implementation of the Industry Initiative to Control Degradation of Due 2515/182 0/01 Underground Piping and Tanks -50% 06/30/14 General Announcements and Other Items of Interest G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx Weeend CoverageI (Thursdays)
8/02/12   DRM   1Region - Chairman visit 9/13 8/16/12   PB1       CC - GAO visit to site 9/25 8/16/12   PB4     jPB -- Apostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests ECCS Gas Accumulation - 96% complete, pending at BV                               Due 2515/177 12/31/12 Due 2515/185 Follow-up on Industry's Groundwater Protection Initiative 12/31/12 Review of License Renewal Activities (1P2)                                       Due TI Status            2516/001                                                                                  12/31/13 (1 st Tuesday of the                                                                                           Due Month)               2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns         12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns           Due 12/31/13 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Due 0/01 Underground Piping and Tanks -50%                                                 06/30/14 General Announcements and Other Items of Interest G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx
DRP: Clifford DRS: Wilson 51: RDO: Powell PAO: Sheehan 10/2011 11PB6 TM__I -Flood evaluation review (PI&R sample)Long-Term Items of 5/29/12 PB4 LM & 5O -Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP -ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussed if there 7/31/12 ,3PB2 FP -Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP -U1 Tritium leak, no identified source" NRR/OpE" Off-line security issues Following the meeting please select file and send email to Georqe.Wilson(M.nrc.lov G:\DRP\MorninR Meeting Files\New Format 2012\June 2012\06-14-2012.docx}}
 
Weeend CoverageI (Thursdays)       DRP: Clifford           DRS: Wilson               51:                       RDO: Powell   PAO: Sheehan 10/2011         11PB6     TM__I - Flood evaluation review (PI&R sample)
Long-Term Items of 5/29/12         PB4       LM & 5O - Siemens Turbine Blade Cracking Interest           7/30/12         PB2       IP - ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussedif there 7/31/12     ,3PB2         FP - Increasing tritium in RB perimeter sump; TI inspection in August are updates)       8/16/12         PSB2       NMP - U1 Tritium leak, no identified source
  "   NRR/OpE
    " Off-line security issues Following the meeting please select file and send email to Georqe.Wilson(M.nrc.lov G:\DRP\MorninR Meeting Files\New Format 2012\June 2012\06-14-2012.docx}}

Latest revision as of 22:52, 4 November 2019

8:30 Am Daily Reactor Oversight Coordination Meeting
ML13032A129
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/16/2012
From:
Division Reactor Projects I
To:
References
FOIA/PA-2013-0045
Download: ML13032A129 (3)


Text

8:00 AM Daily Reactor Oversight Coordination Meeting- August 16, 2012 Date Added Lead Branch Plant/Issue/Status 8/13/12 PB1 CC- U1 Tech Spec required shutdown due to CEA #9 dropped MS- U2 Tech Spec required shutdown due to ultimate heat sink exceeding temp Events, Significant 8limit of 75 degrees, Mode 5 Cold Shutdown Safety Issues, and 8/13/12 PB6 TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel Operational Challenges 8/13/12 PB4 SUS- Dry fuel storage transfer trailer detected with removable contamination Fi 8/13/12 PB6 1TMI- Flood Barrier Seals could not be verified installed in the Air Intake Tunnel IMC 0309 Reviews _

6/21/12 PB1 NMP - U1 AL3 UIL 0.35 gpm Plant Status Items 7/09/12 PB6 TMI - AL3 UIL 0.16 gpm; downpower 8/22 PlaIntetsIte 8/07/12 PB4 S - U2 UIL 0.35 gpm (first 90 days) 8/13/12 PB4 LM- U1 LP Turbine Blade Inspection 8/23 HC- CDBI 7/30, 8/13, 8/27 Salem/HC - 95002 8/27 Team Inspections OC - PI&R 8/13 & 8/27 MS- 95001 9/10 1/03/12 *EB1/PB3 SB - ASR resolution: 1) CAL Follow-up INSP in progress; 2) Working group priority 1/03/12 Profe Issues: TIA, deviation memo, technical issues position papers High Profile 7/02/12 ORA/DRP Meeting w/ NJ OC Oversight Panel 8/23 Actrivities 7/12/12 PB1 CC - Magwood visit to site 8/23 7/31/12 PB2 IP- Magwood visit 9/13 GAMDP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx

8/02/12 DRM 1Region - Chairman visit 9/13 8/16/12 PB1 CC - GAO visit to site 9/25 8/16/12 PB4 jPB -- Apostolakis visit 10/3 Daily Notes & One-Week Look Aheads FOIA Requests ECCS Gas Accumulation - 96% complete, pending at BV Due 2515/177 12/31/12 Due 2515/185 Follow-up on Industry's Groundwater Protection Initiative 12/31/12 Review of License Renewal Activities (1P2) Due TI Status 2516/001 12/31/13 (1 st Tuesday of the Due Month) 2515/187 Inspection of Near-Term Task Force Recommendations 2.3 Flooding Walkdowns 12/31/13 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns Due 12/31/13 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Due 0/01 Underground Piping and Tanks -50% 06/30/14 General Announcements and Other Items of Interest G:\DRP\Morning Meeting Files\New Format 2012\June 2012\06-14-2012.docx

Weeend CoverageI (Thursdays) DRP: Clifford DRS: Wilson 51: RDO: Powell PAO: Sheehan 10/2011 11PB6 TM__I - Flood evaluation review (PI&R sample)

Long-Term Items of 5/29/12 PB4 LM & 5O - Siemens Turbine Blade Cracking Interest 7/30/12 PB2 IP - ASLB license renewal oral testimony 10/15-18; 10/22-24; 12/10-14 (discussedif there 7/31/12 ,3PB2 FP - Increasing tritium in RB perimeter sump; TI inspection in August are updates) 8/16/12 PSB2 NMP - U1 Tritium leak, no identified source

" NRR/OpE

" Off-line security issues Following the meeting please select file and send email to Georqe.Wilson(M.nrc.lov G:\DRP\MorninR Meeting Files\New Format 2012\June 2012\06-14-2012.docx