ML13107A190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13107A190
| number = ML13107A190
| issue date = 04/16/2013
| issue date = 04/16/2013
| title = Palo Verde Nuclear Generating Station - Notification Of Ti-186 Inspection (NRC Inspection Report 05000528-13-406, 05000529-13-406, 05000530-13-406) And Request For Information
| title = Notification of Ti-186 Inspection (NRC Inspection Report 05000528-13-406, 05000529-13-406, 05000530-13-406) and Request for Information
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000528/2013406]]
See also: [[see also::IR 05000528/2013406]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITE D S TATE S
[[Issue date::April 16, 2013]]
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                    R E G IO N I V
                                              1600 EAST LAMAR BLVD
                                        AR L I NGTON , TEXAS 7 601 1- 4511
                                                April 16, 2013
Randall K. Edington, Executive
  Vice President, Nuclear/CNO
Arizona Public Service Company
P.O. Box 52034, Mail Stop 7602
Phoenix, AZ 85072-2034
SUBJECT:       PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF TI-186
                INSPECTION (NRC INSPECTION REPORT 05000528, 529, 530/2013406) AND
                REQUEST FOR INFORMATION
Dear Mr. Edington:
From May 21 to May 23, 2013, inspectors from the Nuclear Regulatory Commissions (NRC)
Region IV office will be onsite to perform the Temporary Instruction (TI)-186, Inspection of
Procedures and Processes for Responding to Potential Aircraft Threats. In order to minimize
the impact to your onsite resources and to ensure a productive inspection, we have enclosed a
request for documents needed for this inspection. It is important that all of these documents are
up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection. Also, in order to
demonstrate compliance with TI-186, we ask that you have the necessary staff members
available to the inspection team to assist in any plant walk-throughs, interviews, and/or
simulator demonstrations.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector Sean Hedger at (817) 200-1556 (Sean.Hedger@nrc.gov) or Gabriel
Apger (Gabriel.Apger@nrc.gov).
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.


Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034
R. Edington                                 -2-
 
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF TI-186 INSPECTION (NRC INSPECTION REPORT 05000528, 529, 530/2013406) AND REQUEST FOR INFORMATION
enclosure will be available electronically for public inspection in the NRC Public Document
 
Room or from the Publicly Available Records (PARS) component of NRCs document
==Dear Mr. Edington:==
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
From May 21 to May 23, 2013, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will be onsite to perform the Temporary Instruction (TI)-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Also, in order to demonstrate compliance with TI-186, we ask that you have the necessary staff members available to the inspection team to assist in any plant walk-throughs, interviews, and/or simulator demonstrations.
rm/adams.html (the Public Electronic Reading Room).
                                                        Sincerely,
                                                        /RA/
                                                        Vincent G. Gaddy, Chief
                                                        Operations Branch
                                                        Division of Reactor Safety
Docket: 50-528, 50-529, 50-530
License: NPF-41, NPF-51, NPF-74
Enclosure:
Inservice Inspection Document Request
cc: Electronic Distribution for Palo Verde Nuclear Generating Station


We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Sean Hedger at (817) 200-1556 (Sean.Hedger@nrc.gov) or Gabriel Apger (Gabriel.Apger@nrc.gov).


This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ML13107A190
ADAMS:  No    Yes      SUNSI Review Complete    Reviewer Initials: SDH
                        Publicly Available        Non-Sensitive
Category A.             Non-publicly Available   Sensitive
KEYWORD: SUNSI Review Complete
OE:OB        C:OB
SHedger      VGaddy
/RA/         /RA/
4/16/2013    4/16/2013


Sincerely,/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
                          TI-186 INSPECTION DOCUMENT REQUEST
 
From: Sean Hedger
Docket: 50-528, 50-529, 50-530 License: NPF-41, NPF-51, NPF-74
        Operations Engineer, NRC RIV
 
        817-200-1556
===Enclosure:===
To:    Dan Hautala
Inservice Inspection Document Request  
        Regulatory Affairs, Palo Verde Nuclear Generating Station
 
        623-393-5868
cc: Electronic Distribution for Palo Verde Nuclear Generating Station
Subj: Information Request to Support May 21-23, 2013, TI-186 Inspection, Inspection of
        Procedures and Processes for Responding to Potential Aircraft Threats.
A. The following information is requested in order to support inspection preparation
    activities. Requested materials should be sent either electronically or hardcopy in
    order to arrive at the Region IV office no later than May 10, 2013.
    *  Electronically: Via email, CD, or IMS Certrec
                        and/or
    *  Hardcopy to: US Nuclear Regulatory Commission, Region IV
                        1600 E. Lamar Blvd
                        Arlington, TX 76011
                        ATTN: Sean Hedger
    Document Request:
        * Procedure(s) that describe actions taken to address potential aircraft threat
            notifications onsite. This may include procedures that operations, security,
            emergency preparedness, and health physics staff use.
        * Plant specific analyses prepared to support the designed actions you have taken to
            address this issue in your procedures. Such analyses were described for support of
            site actions in the topical Regulatory Guide 1.214 (dated January 2009).
        * Training materials used to train the various affected groups when contacted with a
            potential aircraft threat (licensed operators, operators in training for a license, non-
            licensed operators, security, EP, HP, fire brigade, and other support staff, as
            examples).
        * If the site has conducted exercises or drills to evaluate the ability of staff to
            implement these procedures in the past, provide any documentation summarizing
            the results of these events. If any condition reports came out of the exercises/drills,
            provide those as well.
                                              -1-                                          Enclosure
}}
}}

Latest revision as of 19:34, 4 November 2019

Notification of Ti-186 Inspection (NRC Inspection Report 05000528-13-406, 05000529-13-406, 05000530-13-406) and Request for Information
ML13107A190
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/16/2013
From: Vincent Gaddy
Operations Branch IV
To: Edington R
Arizona Public Service Co
References
Download: ML13107A190 (4)


See also: IR 05000528/2013406

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

April 16, 2013

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Arizona Public Service Company

P.O. Box 52034, Mail Stop 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF TI-186

INSPECTION (NRC INSPECTION REPORT 05000528, 529, 530/2013406) AND

REQUEST FOR INFORMATION

Dear Mr. Edington:

From May 21 to May 23, 2013, inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will be onsite to perform the Temporary Instruction (TI)-186, Inspection of

Procedures and Processes for Responding to Potential Aircraft Threats. In order to minimize

the impact to your onsite resources and to ensure a productive inspection, we have enclosed a

request for documents needed for this inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection. Also, in order to

demonstrate compliance with TI-186, we ask that you have the necessary staff members

available to the inspection team to assist in any plant walk-throughs, interviews, and/or

simulator demonstrations.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector Sean Hedger at (817) 200-1556 (Sean.Hedger@nrc.gov) or Gabriel

Apger (Gabriel.Apger@nrc.gov).

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

R. Edington -2-

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-528, 50-529, 50-530

License: NPF-41, NPF-51, NPF-74

Enclosure:

Inservice Inspection Document Request

cc: Electronic Distribution for Palo Verde Nuclear Generating Station

ML13107A190

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SDH

Publicly Available Non-Sensitive

Category A. Non-publicly Available Sensitive

KEYWORD: SUNSI Review Complete

OE:OB C:OB

SHedger VGaddy

/RA/ /RA/

4/16/2013 4/16/2013

TI-186 INSPECTION DOCUMENT REQUEST

From: Sean Hedger

Operations Engineer, NRC RIV

817-200-1556

To: Dan Hautala

Regulatory Affairs, Palo Verde Nuclear Generating Station

623-393-5868

Subj: Information Request to Support May 21-23, 2013, TI-186 Inspection, Inspection of

Procedures and Processes for Responding to Potential Aircraft Threats.

A. The following information is requested in order to support inspection preparation

activities. Requested materials should be sent either electronically or hardcopy in

order to arrive at the Region IV office no later than May 10, 2013.

  • Electronically: Via email, CD, or IMS Certrec

and/or

  • Hardcopy to: US Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Sean Hedger

Document Request:

  • Procedure(s) that describe actions taken to address potential aircraft threat

notifications onsite. This may include procedures that operations, security,

emergency preparedness, and health physics staff use.

  • Plant specific analyses prepared to support the designed actions you have taken to

address this issue in your procedures. Such analyses were described for support of

site actions in the topical Regulatory Guide 1.214 (dated January 2009).

  • Training materials used to train the various affected groups when contacted with a

potential aircraft threat (licensed operators, operators in training for a license, non-

licensed operators, security, EP, HP, fire brigade, and other support staff, as

examples).

  • If the site has conducted exercises or drills to evaluate the ability of staff to

implement these procedures in the past, provide any documentation summarizing

the results of these events. If any condition reports came out of the exercises/drills,

provide those as well.

-1- Enclosure