{{#Wiki_filter:April 16, 2013 | {{#Wiki_filter:UNITE D S TATE S | ||
NUC LEAR RE GULATOR Y C OMMI S SI ON | |||
Randall K. Edington, Executive | R E G IO N I V | ||
Vice President, Nuclear/CNO | 1600 EAST LAMAR BLVD | ||
AR L I NGTON , TEXAS 7 601 1- 4511 | |||
April 16, 2013 | |||
Randall K. Edington, Executive | |||
Vice President, Nuclear/CNO | |||
Arizona Public Service Company | |||
P.O. Box 52034, Mail Stop 7602 | |||
Phoenix, AZ 85072-2034 | |||
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF TI-186 | |||
INSPECTION (NRC INSPECTION REPORT 05000528, 529, 530/2013406) AND | |||
REQUEST FOR INFORMATION | |||
Dear Mr. Edington: | |||
From May 21 to May 23, 2013, inspectors from the Nuclear Regulatory Commissions (NRC) | |||
Region IV office will be onsite to perform the Temporary Instruction (TI)-186, Inspection of | |||
Procedures and Processes for Responding to Potential Aircraft Threats. In order to minimize | |||
the impact to your onsite resources and to ensure a productive inspection, we have enclosed a | |||
request for documents needed for this inspection. It is important that all of these documents are | |||
up to date and complete in order to minimize the number of additional documents requested | |||
during the preparation and/or the onsite portions of the inspection. Also, in order to | |||
demonstrate compliance with TI-186, we ask that you have the necessary staff members | |||
available to the inspection team to assist in any plant walk-throughs, interviews, and/or | |||
simulator demonstrations. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing | |||
organization. If there are any questions about this inspection or the material requested, please | |||
contact the lead inspector Sean Hedger at (817) 200-1556 (Sean.Hedger@nrc.gov) or Gabriel | |||
Apger (Gabriel.Apger@nrc.gov). | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
R. Edington -2- | |||
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRCs document | |||
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-528, 50-529, 50-530 | |||
License: NPF-41, NPF-51, NPF-74 | |||
Enclosure: | |||
Inservice Inspection Document Request | |||
cc: Electronic Distribution for Palo Verde Nuclear Generating Station | |||
ML13107A190 | |||
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SDH | |||
Publicly Available Non-Sensitive | |||
Category A. Non-publicly Available Sensitive | |||
KEYWORD: SUNSI Review Complete | |||
OE:OB C:OB | |||
SHedger VGaddy | |||
/RA/ /RA/ | |||
4/16/2013 4/16/2013 | |||
TI-186 INSPECTION DOCUMENT REQUEST | |||
From: Sean Hedger | |||
Operations Engineer, NRC RIV | |||
817-200-1556 | |||
To: Dan Hautala | |||
Regulatory Affairs, Palo Verde Nuclear Generating Station | |||
623-393-5868 | |||
Subj: Information Request to Support May 21-23, 2013, TI-186 Inspection, Inspection of | |||
Procedures and Processes for Responding to Potential Aircraft Threats. | |||
A. The following information is requested in order to support inspection preparation | |||
activities. Requested materials should be sent either electronically or hardcopy in | |||
order to arrive at the Region IV office no later than May 10, 2013. | |||
* Electronically: Via email, CD, or IMS Certrec | |||
and/or | |||
* Hardcopy to: US Nuclear Regulatory Commission, Region IV | |||
1600 E. Lamar Blvd | |||
Arlington, TX 76011 | |||
ATTN: Sean Hedger | |||
Document Request: | |||
* Procedure(s) that describe actions taken to address potential aircraft threat | |||
notifications onsite. This may include procedures that operations, security, | |||
emergency preparedness, and health physics staff use. | |||
* Plant specific analyses prepared to support the designed actions you have taken to | |||
address this issue in your procedures. Such analyses were described for support of | |||
site actions in the topical Regulatory Guide 1.214 (dated January 2009). | |||
* Training materials used to train the various affected groups when contacted with a | |||
potential aircraft threat (licensed operators, operators in training for a license, non- | |||
licensed operators, security, EP, HP, fire brigade, and other support staff, as | |||
examples). | |||
* If the site has conducted exercises or drills to evaluate the ability of staff to | |||
implement these procedures in the past, provide any documentation summarizing | |||
the results of these events. If any condition reports came out of the exercises/drills, | |||
provide those as well. | |||
-1- Enclosure | |||
From: Sean Hedger | |||
Operations Engineer, NRC RIV | |||
817-200-1556 | |||
623-393-5868 | |||
Subj: Information Request to Support May 21-23, 2013, TI-186 Inspection, | |||
A. The following information is requested in order to support inspection preparation activities. | |||
order to arrive at the Region IV office no later than May 10, 2013. | |||
and/or | |||
* Plant specific analyses prepared to support the designed actions you have taken to address this issue in your procedures. | |||
* Training materials used to train the various affected groups when contacted with a potential aircraft threat (licensed operators, operators in training for a license, non-licensed operators, security, EP, HP, fire brigade, and other support staff, as | |||
examples). | |||
* If the site has conducted exercises or drills to evaluate the ability of staff to implement these procedures in the past, provide any documentation summarizing the results of these events. | |||
}} | }} |
Latest revision as of 19:34, 4 November 2019
ML13107A190 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 04/16/2013 |
From: | Vincent Gaddy Operations Branch IV |
To: | Edington R Arizona Public Service Co |
References | |
Download: ML13107A190 (4) | |
See also: IR 05000528/2013406
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
April 16, 2013
Randall K. Edington, Executive
Vice President, Nuclear/CNO
Arizona Public Service Company
P.O. Box 52034, Mail Stop 7602
Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF TI-186
INSPECTION (NRC INSPECTION REPORT 05000528, 529, 530/2013406) AND
REQUEST FOR INFORMATION
Dear Mr. Edington:
From May 21 to May 23, 2013, inspectors from the Nuclear Regulatory Commissions (NRC)
Region IV office will be onsite to perform the Temporary Instruction (TI)-186, Inspection of
Procedures and Processes for Responding to Potential Aircraft Threats. In order to minimize
the impact to your onsite resources and to ensure a productive inspection, we have enclosed a
request for documents needed for this inspection. It is important that all of these documents are
up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection. Also, in order to
demonstrate compliance with TI-186, we ask that you have the necessary staff members
available to the inspection team to assist in any plant walk-throughs, interviews, and/or
simulator demonstrations.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector Sean Hedger at (817) 200-1556 (Sean.Hedger@nrc.gov) or Gabriel
Apger (Gabriel.Apger@nrc.gov).
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
R. Edington -2-
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-528, 50-529, 50-530
License: NPF-41, NPF-51, NPF-74
Enclosure:
Inservice Inspection Document Request
cc: Electronic Distribution for Palo Verde Nuclear Generating Station
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SDH
Publicly Available Non-Sensitive
Category A. Non-publicly Available Sensitive
KEYWORD: SUNSI Review Complete
OE:OB C:OB
SHedger VGaddy
/RA/ /RA/
4/16/2013 4/16/2013
TI-186 INSPECTION DOCUMENT REQUEST
From: Sean Hedger
Operations Engineer, NRC RIV
817-200-1556
To: Dan Hautala
Regulatory Affairs, Palo Verde Nuclear Generating Station
623-393-5868
Subj: Information Request to Support May 21-23, 2013, TI-186 Inspection, Inspection of
Procedures and Processes for Responding to Potential Aircraft Threats.
A. The following information is requested in order to support inspection preparation
activities. Requested materials should be sent either electronically or hardcopy in
order to arrive at the Region IV office no later than May 10, 2013.
- Electronically: Via email, CD, or IMS Certrec
and/or
- Hardcopy to: US Nuclear Regulatory Commission, Region IV
1600 E. Lamar Blvd
Arlington, TX 76011
ATTN: Sean Hedger
Document Request:
- Procedure(s) that describe actions taken to address potential aircraft threat
notifications onsite. This may include procedures that operations, security,
emergency preparedness, and health physics staff use.
- Plant specific analyses prepared to support the designed actions you have taken to
address this issue in your procedures. Such analyses were described for support of
site actions in the topical Regulatory Guide 1.214 (dated January 2009).
- Training materials used to train the various affected groups when contacted with a
potential aircraft threat (licensed operators, operators in training for a license, non-
licensed operators, security, EP, HP, fire brigade, and other support staff, as
examples).
- If the site has conducted exercises or drills to evaluate the ability of staff to
implement these procedures in the past, provide any documentation summarizing
the results of these events. If any condition reports came out of the exercises/drills,
provide those as well.
-1- Enclosure