ML14055A325: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14055A325
| number = ML14055A325
| issue date = 02/24/2014
| issue date = 02/24/2014
| title = Palo Verde Nuclear Generating Station - Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (Inspection Report 05000528, 529, 530/2014003) and Request for Information
| title = Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (Inspection Report 05000528, 529, 530/2014003) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Edlington R K
| addressee name = Edlington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Lantz R E
| contact person = Lantz R
| document report number = IR-14-003
| document report number = IR-14-003
| document type = Letter
| document type = Letter
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511
                            NUCLEAR REGULATORY COMMISSION
   
                                                REGION IV
          February 24, 2014  
                                            1600 E. LAMAR BLVD.
                                        ARLINGTON, TX 76011-4511
                                          February 24, 2014
Randall K. Edington, Executive  Vice President, Nuclear/CNO  
Randall K. Edington, Executive
Arizona Public Service Company  
   Vice President, Nuclear/CNO
P.O. Box 52034, MS 7602  
Arizona Public Service Company
Phoenix, AZ 85072-2034  
P.O. Box 52034, MS 7602
Phoenix, AZ 85072-2034
SUBJECT:        PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF
                EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS, AND
                PERMANENT PLANT MODIFICATIONS INSPECTION (INSPECTION
                REPORT 05000528, 529, 530/2014003) AND REQUEST FOR INFORMATION
Dear Mr. Edington:
From June 16-27, 2014, reactor inspectors from NRCs Region IV office will perform the
baseline inspection of changes, tests, experiments, and permanent plant modifications at the
Palo Verde Nuclear Generating Station, using NRC Inspection Procedure 71111.17,
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be David Heckman of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at
Wayne.Sifre@nrc.gov.


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS, AND
R. Edington                                      -2-
PERMANENT PLANT MODIFICATIONS INSPECTION (INSPECTION 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
REPORT 05000528, 529, 530/2014003) AND REQUEST FOR INFORMATION
enclosure will be available electronically for public inspection in the NRC Public Document
Dear Mr. Edington:
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
From June 16-27, 2014, reactor inspectors from NRC's Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at the Palo Verde Nuclear Generating Station, using NRC Inspection Procedure 71111.17,  
rm/adams.html (the Public Electronic Reading Room).
"Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications." 
                                              Sincerely,
Experience has shown that this
                                              /RA/
inspection is resource intens
                                              Thomas R. Farnholtz, Chief
ive both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a
                                              Engineering Branch 1
productive inspection, we have enclosed a request for documents needed for this inspection. 
                                              Division of Reactor Safety
Upon review of these documents, the inspectors will select additional documentation for review upon arrival.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the
Dockets: 50-528; 50-529; 50-530
onsite portions of the inspection.
Licenses: NPF-41; NPF-51; NPF-74
Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
          Request for Information
cc: Electronic Distribution for Palo Verde Nuclear Generating Station


   
R. Edington                  -3-
We have discussed the schedule for these inspection activities with your staff and understand
ML14055A325
that our regulatory contact for this inspection will be David Heckman of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at
                    Non-Sensitive      Publicly Available  TRF
    SUNSI Review
                    Sensitive          Non-Publicly Available
  SRI:EB1        C:EB1
WSifre          TFarnholtz
/RA/            /RA/
  02/20/2014      02/24/2014
                  OFFICIAL RECORD COPY


Wayne.Sifre@nrc.gov. 
    Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
R. Edington - 2 -
                                Inspection Request for Information
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Inspection Report:               05000528, 529, 530/2014003
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
Inspection Dates:               June 16-27, 2014
Sincerely,
Inspection Procedure:           IP 71111.17, Evaluation of Changes, Tests, or Experiments and
                                Permanent Plant Modifications
      /RA/
Lead Inspector:                 Wayne Sifre, Senior Reactor Inspector
Thomas R. Farnholtz, Chief
Engineering Branch 1
 
Division of Reactor Safety
  Dockets:  50-528; 50-529; 50-530
Licenses:  NPF-41; NPF-51; NPF-74
 
Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
Request for Information
cc:  Electronic Distribution for Palo Verde Nuclear Generating Station
 
 
R. Edington - 3 -
 
 
 
 
ML14055A325  SUNSI Review  Non-Sensitive
Sensitive  Publicly Available      TRF
Non-Publicly Available SRI:EB1 C:EB1  WSifre TFarnholtz  /RA/ /RA/  02/20/2014 02/24/2014 
OFFICIAL RECORD COPY
 
  - 1 - Enclosure
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications  
Inspection Request for Information  
Inspection Report:   05000528, 529, 530/2014003  
 
Inspection Dates: June 16-27, 2014  
 
Inspection Procedure: IP 71111.17, "Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications"
Lead Inspector: Wayne Sifre, Senior Reactor Inspector
 
Information Requested for the In-Office Preparation Week
Information Requested for the In-Office Preparation Week
  The following information should be sent to the Region IV office in hard copy or electronic  
The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Wayne Sifre, by June 2, 2014, to facilitate the  
format (Certrec IMS preferred), to the attention of Wayne Sifre, by June 2, 2014, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the  
selection of specific items that will be reviewed during the onsite inspection week. The
specific items requested be available and ready for review on the first day of inspection. Also,  
inspectors will select specific items from the information requested below and then request from
we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically, if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.  
your staff additional documents needed during the onsite inspection weeks. We ask that the
 
specific items requested be available and ready for review on the first day of inspection. Also,
1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since February 11, 2011, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
we request that you categorize the documents in your response with the numbered list below.
Please provide requested documentation electronically, if possible. If requested documents are
2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment since February 11, 2011. Note: Description of  
large and only hard copy formats are available, please inform the inspector(s), and provide
evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
subject documentation during the first day of the onsite inspection. If you have any questions
3. Palo Verde procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  
regarding this information request, please call the lead inspector as soon as possible.
 
    1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since
        February 11, 2011, which did not result in an evaluation. Note: Description of
4. A list with descriptions of all Corrective Action documents related to 10 CFR 50.59 activities, including screenings and evaluations from February 11, 2011, to the present.  
        screenings should be brief, but of sufficient detail so that inspectors can determine the
5. A list, with descriptions of all permanent plant modifications since February 11, 2011. Include sufficient detail to enable the inspector to determine the significance of each  
        significance of the issue.
modification. For this inspection, permanent plant modifications include permanent plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.  
    2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result
6. Palo Verde procedure for implementing and controlling permanent plant modifications.  
        in an application for license amendment since February 11, 2011. Note: Description of
 
        evaluations should be brief, but of sufficient detail so that inspectors can determine the
- 2 -  7. A list, with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since February 11, 2011.  Include
        significance of the issue.
sufficient detail to enable the inspector to determine the significance of each modification.
    3. Palo Verde procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.
    4. A list with descriptions of all Corrective Action documents related to 10 CFR 50.59
9. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.
        activities, including screenings and evaluations from February 11, 2011, to the present.
    5. A list, with descriptions of all permanent plant modifications since February 11, 2011.
        Include sufficient detail to enable the inspector to determine the significance of each
        modification. For this inspection, permanent plant modifications include permanent plant
Inspector Contact Information:
        changes, design changes, setpoint changes, procedure changes, equivalency
Wayne Sifre  Gwynne Skaggs-Ryan  Nnaerika Okonkwo
        evaluations, suitability analyses, calculations, and commercial grade dedications.
Senior Reactor Inspector Reactor Inspector  Reactor Inspector
    6. Palo Verde procedure for implementing and controlling permanent plant modifications.
817-200-1193  817-200-1563    817-200-1114
                                                  -1-                                     Enclosure
Wayne.Sifre@nrc.gov  Gwynne.SkaggsRyann@nrc.gov Nnaerika.Okonkwo@nrc.gov
 
Mailing Address:


    7. A list, with descriptions of all Corrective Action documents related to your permanent
U.S. NRC, Region IV  
        plant modification program and its implementation since February 11, 2011. Include
Attn: Wayne Sifre 1600 East Lamar Blvd. Arlington, TX 76011-4125
        sufficient detail to enable the inspector to determine the significance of each
        modification.
    8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including
        qualification dates.
    9. A listing of personnel qualified to review and approve 50.59 screenings and/or
        evaluations, including qualification dates.
Inspector Contact Information:
Wayne Sifre                    Gwynne Skaggs-Ryan                    Nnaerika Okonkwo
Senior Reactor Inspector        Reactor Inspector                    Reactor Inspector
817-200-1193                    817-200-1563                          817-200-1114
Wayne.Sifre@nrc.gov            Gwynne.SkaggsRyann@nrc.gov            Nnaerika.Okonkwo@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Wayne Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4125
                                                  -2-
}}
}}

Latest revision as of 08:57, 4 November 2019

Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (Inspection Report 05000528, 529, 530/2014003) and Request for Information
ML14055A325
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/24/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Edlington R
Arizona Public Service Co
Lantz R
References
IR-14-003
Download: ML14055A325 (5)


See also: IR 05000528/2014003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

February 24, 2014

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Arizona Public Service Company

P.O. Box 52034, MS 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS, AND

PERMANENT PLANT MODIFICATIONS INSPECTION (INSPECTION

REPORT 05000528, 529, 530/2014003) AND REQUEST FOR INFORMATION

Dear Mr. Edington:

From June 16-27, 2014, reactor inspectors from NRCs Region IV office will perform the

baseline inspection of changes, tests, experiments, and permanent plant modifications at the

Palo Verde Nuclear Generating Station, using NRC Inspection Procedure 71111.17,

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be David Heckman of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at

Wayne.Sifre@nrc.gov.

R. Edington -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-528; 50-529; 50-530

Licenses: NPF-41; NPF-51; NPF-74

Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

Request for Information

cc: Electronic Distribution for Palo Verde Nuclear Generating Station

R. Edington -3-

ML14055A325

Non-Sensitive Publicly Available TRF

SUNSI Review

Sensitive Non-Publicly Available

SRI:EB1 C:EB1

WSifre TFarnholtz

/RA/ /RA/

02/20/2014 02/24/2014

OFFICIAL RECORD COPY

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

Inspection Request for Information

Inspection Report: 05000528, 529, 530/2014003

Inspection Dates: June 16-27, 2014

Inspection Procedure: IP 71111.17, Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Lead Inspector: Wayne Sifre, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec IMS preferred), to the attention of Wayne Sifre, by June 2, 2014, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically, if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since

February 11, 2011, which did not result in an evaluation. Note: Description of

screenings should be brief, but of sufficient detail so that inspectors can determine the

significance of the issue.

2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result

in an application for license amendment since February 11, 2011. Note: Description of

evaluations should be brief, but of sufficient detail so that inspectors can determine the

significance of the issue.

3. Palo Verde procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

4. A list with descriptions of all Corrective Action documents related to 10 CFR 50.59

activities, including screenings and evaluations from February 11, 2011, to the present.

5. A list, with descriptions of all permanent plant modifications since February 11, 2011.

Include sufficient detail to enable the inspector to determine the significance of each

modification. For this inspection, permanent plant modifications include permanent plant

changes, design changes, setpoint changes, procedure changes, equivalency

evaluations, suitability analyses, calculations, and commercial grade dedications.

6. Palo Verde procedure for implementing and controlling permanent plant modifications.

-1- Enclosure

7. A list, with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since February 11, 2011. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including

qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

Wayne Sifre Gwynne Skaggs-Ryan Nnaerika Okonkwo

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1193 817-200-1563 817-200-1114

Wayne.Sifre@nrc.gov Gwynne.SkaggsRyann@nrc.gov Nnaerika.Okonkwo@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4125

-2-