{{#Wiki_filter:Complete NRC Active License Maintenance Log R-109      Page 1 of 53 JOB PERFORMANCE MEASURE TASK CONDITIONS:
{{#Wiki_filter:Complete NRC Active License Maintenance Log JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are an active licensed NSO for the past year.
: 1. You are an active licensed NSO for the past year.
: 2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014.
: 2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014.
: 3. All positions were appropriately logged in the SM log for during this time period.
: 3. All positions were appropriately logged in the SM log for during this time period.
INITIATING CUES:
INITIATING CUES:
: 1. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP
: 1. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP-AA-105-102.
-AA-105-102. 2. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.
: 2. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.
R-109                                    Page 1 of 53


Complete NRC Active License Maintenance Log R-109      Page 2 of 53 RO Work History:
Complete NRC Active License Maintenance Log RO Work History:
Hours   Day Date Shift Worked Job Position/Assignment Week 1 M 6/30/14 D 12 Unit 1 NSO T 7/1/14   D 12 Extra NSO in control room W 7/2/14 D 12 Unit 2 Admin NSO Th 7/3/14 D 12 Extra NSO in control room F 7/4/14 N/A   Day Off S 7/5/14 N/A   Day Off S 7/6/14 N/A   Day Off Week 2  M 7/7/14 D 12 Clearance Order Writer T 7/8/14 D 12 Clearance Order Writer W 7/9/14 D 12 Clearance Order Writer Th 7/10/14 D 12 Clearance Order Writer  F 7/11/14 N/A   Day Off  S 7/12/14 N/A   Day Off  S 7/13/14 N/A   Day Off Week 3  M 7/14/14   N/A   Day Off  T 7/1 5/14   N/A   Day Off  W 7/16/14   N/A   Day Off   Th 7/17/14   N/A   Day Off  F 7/18/14 D 12 Unit 1 Admin (relieved 2 hrs for NRC physical)
Hours Day Date           Shift Worked       Job Position/Assignment Week 1       M   6/30/14       D     12           Unit 1 NSO T   7/1/14         D     12           Extra NSO in control room W           7/2/14       D     12           Unit 2 Admin NSO Th         7/3/14       D     12           Extra NSO in control room F           7/4/14       N/A                 Day Off S           7/5/14       N/A                 Day Off S           7/6/14       N/A                 Day Off Week 2       M   7/7/14         D     12           Clearance Order Writer T   7/8/14         D     12           Clearance Order Writer W   7/9/14         D     12           Clearance Order Writer Th 7/10/14       D     12           Clearance Order Writer F   7/11/14       N/A               Day Off S   7/12/14       N/A               Day Off S   7/13/14       N/A               Day Off Week 3       M   7/14/14       N/A               Day Off T   7/15/14       N/A               Day Off W   7/16/14       N/A               Day Off Th 7/17/14       N/A               Day Off F   7/18/14       D     12           Unit 1 Admin (relieved 2 hrs for NRC physical)
S 7/19/14 D 12 Unit 1 NSO S 7/20/14 D 12 Unit 2 NSO Week 4  7/21/14   N/A   Day Off  T 7/22/14   N/A   Day Off  W 7/23/14   N/A   Day Off   Th  7/24/14   N/A   Day Off  F 7/25/14 N 12 Unit 2 Admin (relieved 2 hrs for PHC meeting)  S 7/26/14 N 12 Extra NSO in control room S 7/27/14 N 12 Unit 1 Admin NSO Week 5  M 7/28/14   N/A   Day Off  T 7/29/14 T 8 Requal Training W 7/30/14 T 8 Requal Training Th 7/31/14 T 8 Requal Training F 8/1/14 T 8 Requal Trainin g   S 8/2/14   N/A   Day Off  S 8/3/14   N/A   Day Off Weeks 6 and 7 8/4/14 thru 8/17/14   N/A   ON VACATION Complete NRC Active License Maintenance Log R-109     Page 3 of 53 RO Work History continued:
S   7/19/14       D     12           Unit 1 NSO S   7/20/14       D     12           Unit 2 NSO Week 4       M   7/21/14       N/A               Day Off T   7/22/14       N/A               Day Off W   7/23/14       N/A               Day Off Th  7/24/14       N/A               Day Off F   7/25/14       N     12           Unit 2 Admin (relieved 2 hrs for PHC meeting)
Hours  Day Date  Shift Worked Job Description Week 8  M 8/18/14    N/A  Day Off  T 8/19/14    N/A  Day Off  W 8/20/14    N/A  Day Off  Th 8/21/14    N/A  Day Off  F 8/22/14 D 12  Clearance Order Writer S 8/23/14 D 12  Unit 2 NSO S 8/24/14 D 12  Unit 2 Admin NSO Week 9  M  8/25/14    N/A  Day Off  T 8/26/14    N/A  Day Off  W 8/27/14    N/A  Day Off  Th  8/28/14    N/A  Day Off  F 8/29/14 N 12  Extra NSO in control room S 8/30/14 N 12  Unit 1 NSO S 8/31/14 N 12  Unit 2 NSO Week 10 M 9/1/14    N/A  Day Off  T 9/2/14  T 8  Requal Training W 9/3/14  T 8  Requal Training Th 9/4/14  T 8  Requal Training F 9/5/14  T 8  Requal Training S 9/6/14    N/A  Day Off  S 9/7/14    N/A  Day Off  Weeks 11 thru 13    9/8/14 thru 9/28/14      ON VACATION Week 14  M 9/29/14 N/A  Day Off  T 9/30/14    N/A  Day Off  W 10/1/14    N/A  Day Off  Th 10/2/14 N/A  Requal Training F 10/3/14 D 12  Unit 1 NSO S 10/4/14    D 12  Unit 1 Admin NSO S 10/5/14    D 12  Unit 2 NSO
S   7/26/14       N     12           Extra NSO in control room S   7/27/14       N     12           Unit 1 Admin NSO Week 5       M   7/28/14       N/A               Day Off T   7/29/14       T     8           Requal Training W   7/30/14       T     8           Requal Training Th 7/31/14       T     8           Requal Training F   8/1/14         T     8           Requal Training S   8/2/14         N/A               Day Off S   8/3/14         N/A               Day Off Weeks 6 and 7   8/4/14 thru 8/17/14       N/A                 ON VACATION R-109                                 Page 2 of 53


Complete NRC Active License Maintenance Log R-109      Page 4 of 53 TASK TITLE:
Complete NRC Active License Maintenance Log RO Work History continued:
Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2014 NRC Task No.: R-AM-075 K/A No.: 2.1.4 Objective No.:
Hours Day Date          Shift Worked      Job Description Week 8      M  8/18/14        N/A                Day Off T  8/19/14        N/A                Day Off W  8/20/14        N/A                Day Off Th  8/21/14        N/A                Day Off F  8/22/14        D    12          Clearance Order Writer S  8/23/14        D    12          Unit 2 NSO S  8/24/14        D    12          Unit 2 Admin NSO Week 9      M  8/25/14        N/A                Day Off T  8/26/14        N/A                Day Off W  8/27/14        N/A                Day Off Th 8/28/14        N/A               Day Off F  8/29/14        N    12          Extra NSO in control room S  8/30/14        N    12          Unit 1 NSO S  8/31/14        N    12          Unit 2 NSO Week 10      M  9/1/14        N/A               Day Off T  9/2/14        T    8            Requal Training W  9/3/14        T    8           Requal Training Th 9/4/14        T    8            Requal Training F  9/5/14        T    8            Requal Training S  9/6/14        N/A                Day Off S  9/7/14        N/A                Day Off Weeks 11 thru 13 9/8/14 thru 9/28/14              ON VACATION Week 14      M  9/29/14        N/A                Day Off T  9/30/14        N/A                Day Off W  10/1/14        N/A                Day Off Th 10/2/14        N/A                Requal Training F  10/3/14        D    12          Unit 1 NSO S  10/4/14        D    12          Unit 1 Admin NSO S  10/5/14        D    12          Unit 2 NSO R-109                                Page 3 of 53
4E.AM-75 K/A IMP: 3.3/3.8   EXAMINEE:  RO EVALUATOR:
DATE:
The Examinee:
PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
(*) 3, 4, 5, 6, 7, 8 APPROX COMPLETION TIME: 10 MINUTES


CRITICAL TIME:
Complete NRC Active License Maintenance Log TASK TITLE: Complete NRC Active License Maintenance Log JPM No.:      R-109                                                REV:          2014 NRC Task No.:      R-AM-075                                              K/A No.:      2.1.4 Objective No.: 4E.AM-75                                              K/A IMP:      3.3/3.8 EXAMINEE:                                                            RO EVALUATOR:                                                          DATE:
N/A EVALUATION METHOD:
The Examinee:          PASSED            this JPM.                  TIME STARTED:
LOCATION:   X PERFORM   X   IN PLANT       SIMULATE   X   SIMULATOR     X   CLASSROOM   GENERAL  
FAILED                                        TIME FINISHED:
JPM TIME:                  MINUTES CRITICAL ELEMENTS:            (*) 3, 4, 5, 6, 7, 8              APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                                   LOCATION:
X PERFORM                                             X IN PLANT SIMULATE                                           X SIMULATOR X CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
: 1.     OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE. rev. 11.
rev. 11. 2. 10CFR55.53(e) MATERIALS:
: 2.     10CFR55.53(e)
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
MATERIALS:
: 1.     OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
TASK STANDARDS:
TASK STANDARDS:
: 2. Determine shift activities that are credited toward active license maintenance.
: 2.     Determine shift activities that are credited toward active license maintenance.
: 3. Complete OP
: 3.     Complete OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log.
-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log. TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are an active licensed NSO for the past year.
: 1.     You are an active licensed NSO for the past year.
: 2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014. 3. All positions were appropriately logged in the SM log for during this time period.
: 2.     Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014.
: 3.     All positions were appropriately logged in the SM log for during this time period.
INITIATING CUES:
INITIATING CUES:
: 3. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP-AA-105-102. 4. Inform the Operations Support Manager when you have completed OP
: 3.     The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP-AA-105-102.
-AA-105-102, Attachment 1.
: 4.     Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.
R-109                                            Page 4 of 53
 
Complete NRC Active License Maintenance Log RECORD START TIME:
PERFORMANCE STEP                        STANDARD                  CIRCLE APPLICABLE
: 1. Refer to OP-AA-105-102, NRC      Refer to OP-AA-105-102:          SAT UNSAT    N/A ACTIVE LICENSE
* Determines Attachment 1        Comments:
MAINTENANCE.                        needs to be completed.
CUE: Provide examinee copy of OP-AA-105-102.
: 2. Complete upper section of
* From initiating cue, writes 3rd SAT UNSAT    N/A Attachment 1.                       quarter of 2014.                Comments:
* From initiating cue, writes examinee name and circles ACTIVE license status.
* Write employee number.
  *3. Complete date column of table
* Lists at least 5 dates of the  SAT UNSAT    N/A on Attachment 1.                    shifts listed below, from      Comments:
attached schedule, that count as credited days Note: Any date listed in June or    toward license maintenance.
October would  not be within the 3rd quarter of o RO (any 5 of 8) the year, thereby          o 7/2/14 D 12 2 incorrect.                  o 7/19/14 D 12 1 o 7/20/14 D 12 2 o 7/27/14 N 12 1 o 8/23/14 D 12 2 o 8/24/14 D 12 2 o 8/30/14 N 12 1 o 8/31/14 N 12 2
  *4. Complete shift column of table
* List the shift worked (N or D  SAT UNSAT    N/A on Attachment 1.                    as applicable)                  Comments:
  *5. Complete length column of
* List the shift length (12      SAT UNSAT    N/A table on Attachment 1.              hours)                          Comments:
  *6. Complete unit column of table
* List the applicable unit        SAT UNSAT    N/A on Attachment 1.                                                    Comments:
  *7. Complete position and SM log
* Circle the RO position          SAT UNSAT    N/A columns on Attachment 1.          o Circle Y on SM log.            Comments:
R-109                                  Page 5 of 53


Complete NRC Active License Maintenance Log R-109      Page 5 of 53 RECORD START TIME:
Complete NRC Active License Maintenance Log PERFORMANCE STEP                     STANDARD               CIRCLE APPLICABLE
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
   *8. Complete signature columns on
: 1. Refer to OP
* Sign under signature.      SAT UNSAT    N/A Attachment 1.                               .                 Comments:
-AA-105-102, NRC ACTIVE LICENSE MAINTENANCE.
: 9. Give completed Attachment 1 to                               SAT UNSAT     N/A evaluator.                                                    Comments:
CUE: Provide examinee copy of OP-AA-105-102. Refer to OP
CUE: THIS COMPLETES THIS JPM.
-AA-105-102:  Determines Attachment 1 needs to be completed. SAT    UNSAT      N/A Comments:   2. Complete upper section of Attachment 1.
From initiating cue, writes 3 rd quarter of 2014. From initiating cue, writes examinee name and circles ACTIVE license status.
Write employee number.
SAT    UNSAT      N
/A Comments: *3. Complete date column of table on Attachment 1.
Note: Any date listed in June or October would not be within the 3 rd quarter of the year, thereby incorrect.
Lists at least 5 dates of the shifts listed below, from attached schedule, that count as credited days toward license maintenance.
o RO (any 5 of 8) o 7/2/14    D  12  2 o 7/19/14  D  12  1 o 7/20/14  D  12  2 o 7/27/14  N  12  1 o 8/23/14  D  12  2 o 8/24/14  D  12  2 o 8/30/14  N  12  1 o 8/31/14  N  12  2 SAT    UNSAT N/A Comments: *4. Complete shift column of table on Attachment 1.
List the shift worked (N or D as applicable)
SAT    UNSAT     N/A Comments:  *5. Complete length column of table on Attachment 1.
List the shift length (12 hours) SAT     UNSAT     N
/A Comments:  *6. Complete unit column of table on  Attachment 1.
List the applicable unit SAT     UNSAT      N/A Comments:  *7. Complete position and SM log columns on Attachment 1.
Circle the RO position o Circle Y on SM log.
SAT    UNSAT      N/A Comments:
Complete NRC Active License Maintenance Log R-109      Page 6 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
*8. Complete signature columns on Attachment 1.
Sign under signature.
. SAT    UNSAT      N/A Comments:   9. Give completed Attachment 1 to evaluator.
SAT    UNSAT      N/A Comments:   CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Complete NRC Active License Maintenance Log R-109     Page 7 of 53 ATTACHMENT 1 Active License Tracking Log Page 1 o f 1  Employee Number: ____________
R-109                                 Page 6 of 53
SHIFT COVERAGE FOR THE ___3rd__(1 ST , 2 ND , 3 RD , 4 TH) CALENDAR QUARTER OF __2014__(YEAR)  ____Examinees Name____      ACTIVE / INACTIVE Name of License Holder License Status At Start (Print)        Quarter (circle one)  RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8
-hour or 8/12
-hour schedule, enter a "1" for the midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8
-hours in length are required per quarter. If working a straight 12
-hour schedule, enter a "N" for night shift or a "D" for dayshift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12
-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8
- and 12-hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
DATE SHIFT LENGTH UNIT POSITION (circle one)
SM log SIGNATURE  7/2/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/19/14 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 7/20/14  D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/27/14  N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/23/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/24/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/30/14 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/31/14 N 12 2 FHS SM US RO Logged Y/N Examinees Signature


At least 5 of the 8 rows above.
Complete NRC Active License Maintenance Log ATTACHMENT 1 Active License Tracking Log Page 1 of 1 Employee Number: ____________
SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2014__(YEAR)
____Examinees Name____                                                          ACTIVE / INACTIVE Name of License Holder                                                          License Status At Start (Print)                                                                Quarter (circle one)
RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a 1 for the midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a N for night shift or a D for dayshift (only enter shifts at least 12 hours in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
DATE      SHIFT    LENGTH      UNIT          POSITION              SM              SIGNATURE (circle one)          log Logged 7/2/14      D        12          2      FHS    SM    US    RO Y/N    Examinees Signature Logged 7/19/14 D            12          1      FHS    SM    US    RO Y/N    Examinees Signature Logged 7/20/14 D            12          2      FHS    SM    US    RO Y/N    Examinees Signature Logged 7/27/14 N            12          1      FHS    SM    US    RO Y/N    Examinees Signature Logged 8/23/14 D            12          2      FHS    SM    US    RO Y/N    Examinees Signature Logged 8/24/14 D            12          2      FHS    SM    US    RO Y/N    Examinees Signature Logged 8/30/14 N            12          1      FHS    SM    US    RO Y/N    Examinees Signature Logged 8/31/14 N            12          2      FHS    SM    US    RO Y/N    Examinees Signature At least 5 of the 8 rows above.
R-109                                                Page 7 of 53


Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-1 1 0    Page 8 of 53 TASK TITLE:
TASK TITLE:   Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
JPM No.:       R-110                                                   REV:           2014 NRC TPO No.:       4C.AP-04                                               K&A No.:       2.1.31 TASK No.:     R-AP-017, Perform Offsite AC power                     K&A IMP:       4.6 Availability Surveillance.
JPM No.: R-110 REV: 2014 NRC TPO No.: 4C.AP-04 K&A No.: 2.1.31 TASK No.: R-AP-017, Perform Offsite AC power K&A IMP: 4.6 Availability Surveillance.
EXAMINEE:                                                             RO EVALUATOR:                                                             DATE:
 
The Examinee:           PASSED             this JPM.                 TIME STARTED:
EXAMINEE:   RO EVALUATOR:
FAILED                                         TIME FINISHED:
DATE:   The Examinee:
JPM TIME:               MINUTES CRITICAL ELEMENTS:               (*) 4, 5, 7, 9                       APPROX COMPLETION TIME: 13 MINUTES CRITICAL TIME:                   45 Minutes EVALUATION METHOD:                                                     LOCATION:
PASSED           this JPM. TIME STARTED:
X PERFORM                                                 IN PLANT SIMULATE                                             X SIMULATOR GENERAL  
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 4, 5, 7, 9 APPROX COMPLETION TIME: 13 MINUTES CRITICAL TIME:
45 Minutes
 
EVALUATION METHOD:
LOCATION:   X   PERFORM       IN PLANT       SIMULATE   X   SIMULATOR GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOSR 3.8.1.1, Rev. 4, Unit One Offsite AC Power Availability Surveillance
: 1. 1BwOSR 3.8.1.1, Rev. 4, Unit One Offsite AC Power Availability Surveillance MATERIALS:
 
MATERIALS:
: 1. 1BwOSR 3.8.1.1 TASK STANDARDS:
: 1. 1BwOSR 3.8.1.1 TASK STANDARDS:
: 1. Partial completion of surveillance 1BwOSR 3.8.1.1.
: 1. Partial completion of surveillance 1BwOSR 3.8.1.1.
Line 130: Line 120:
: 1. The US has directed you to perform 1BwOSR 3.8.1.1, Unit One Offsite AC Power Availability Surveillance, subsection F.1.0 and notify the US when you have completed it.
: 1. The US has directed you to perform 1BwOSR 3.8.1.1, Unit One Offsite AC Power Availability Surveillance, subsection F.1.0 and notify the US when you have completed it.
: 2. This is a time critical JPM.
: 2. This is a time critical JPM.
R-110                                      Page 8 of 53


Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-1 1 0    Page 9 of 53 RECORD START TIME:
RECORD START TIME:
Note: Only provide cues that are not available in the simulator. Provide a copy of the surveillance.
Note: Only provide cues that are not available in the simulator. Provide a copy of the surveillance.
PERFORMANCE STEP STANDARD Circle applicable
PERFORMANCE STEP                               STANDARD                         Circle applicable
: 1. Record Initial Data.
: 1. Record Initial Data.                       On the Modes 1-4 Data Sheet,        SAT UNSAT          N/A RECORD:                              Comments:
CUE: All Prerequisites, Precautions, Limitations and Actions have been met. NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.
CUE:     All Prerequisites, Precautions, Limitations
Record critical time start time: __________
* Unit 1 Mode (1).
On the Modes 1
and Actions have been
-4 Data Sheet, RECORD:   Unit 1 Mode (1).
* Unit 2 Mode (1).
Unit 2 Mode (1).
met.
SAT     UNSAT     N/A Comments: 2. Check 345 KV Transmission Line Status.   
NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.
Record critical time start time:
__________
: 2. Check 345 KV Transmission Line            At 0PM03J, OBSERVE:                  SAT UNSAT          N/A Status.                                                                        Comments:
* AC amperes, MW and MVAR for all Lines.
On the Modes 1-4 Data Sheet, CIRCLE ENERGIZED for each:
* Line 0104.
CUE:     All 345 KV Transmission
* Line 2001.
Lines are energized.
* Line 2002.
* Line 0103.
* Line 2003.
* Line 2004.
: 3. Indicate all closed and open              Check status of all 345 KV Swyd      SAT UNSAT         N/A switchyard breakers.                      breakers.                            Comments:
On the Data Sheet Drawing of the 345 KV swyd, INDICATE:
CUE:    All Swyd breakers
* Closed breakers with X.
indicate closed.
o  Open breakers with O.
  *4. Trace paths for independent power          On the Data Sheet Drawing of the    SAT UNSAT          N/A sources to the Unit 1 and 2 SATs.         345 KV Swyd, TRACE:                  Comments:
CUE:      All 345 KV Transmission
* Single path along the dashed Lines are energized.                lines from any energized offsite power source to the Unit 1 SAT banks.
* Second path along the dashed lines from a second independent energized offsite power source to the Unit 2 SAT banks. (Cant retrace any portion of the first path).
o   Verify two independent paths exist from the offsite power sources through the swyd to the UNIT SAT Banks.
R-110                                    Page 9 of 53


CUE: All 345 KV Transmission Lines are energized.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
At 0PM03J, OBSERVE:  AC amperes, MW and MVAR for all Lines.
R-110                        Page 10 of 53


On the Modes 1
-4 Data Sheet, CIRCLE "ENERGIZED" for each:
Line 0104.
Line 2001.
Line 2002.
Line 0103.
Line 2003.
Line 2004.
SAT    UNSAT      N/A Comments: 3. Indicate all closed and open switchyard breakers.
CUE: All Swyd breakers indicate closed.
Check status of all 345 KV Swyd breakers.
On the Data Sheet Drawing of the 345 KV swyd, INDICATE:  Closed breakers with 'X'.
o Open breakers with 'O'.
SAT    UNSAT      N/A Comments: *4. Trace paths for independent power sources to the Unit 1 and 2 SATs.
CUE: All 345 KV Transmission Lines are energized.
On the Data Sheet Drawing of the 345 KV Swyd, TRACE:  Single path along the dashed lines from any energized offsite power source to the Unit 1 SAT banks.
Second path along the dashed lines from a second independent energized offsite power source to the Unit 2 SAT banks. (Can't retrace any portion of the first path). o Verify two independent paths exist from the offsite power sources through the swyd to the UNIT SAT Banks.
SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-1 1 0    Page 10 of 53 Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
PERFORMANCE STEP                             STANDARD                       Circle applicable
R-1 1 0    Page 11 of 53  PERFORMANCE STEP STANDARD Circle applicable
  *5. Verify Normal (Bus 4) and Alternate     At 0PM03J, on the Modes 1-4          SAT UNSAT      N/A (Bus 14) power are energized.           Data sheet, OBSERVE and              Comments:
*5. Verify Normal (Bus 4) and Alternate (Bus 14) power are energized.
RECORD STATUS:
CUE: Bus 4 alive light is lit.
CUE:     Bus 4 alive light is lit.
Bus 14 bus alive light is lit.
Bus 14 bus alive light is lit. o    Bus alive lights lit for buses 4 Bus voltage indicated on             and 14.
Bus voltage indicated on buses 4 and 14.
buses 4 and 14.
At 0PM03J, on the Modes 1
o   Bus Voltmeter indications for buses 4 and 14.
-4 Data sheet, OBSERVE and RECORD STATUS
o   Place Xs under ENERGIZED in step 1.7.
:  o Bus alive lights lit for buses 4 and 14. o Bus Voltmeter indications for buses 4 and 14.
* Place Xs under YES in steps 1.8 and 1.9.
o Place 'Xs' under  
: 6. Determine status of Normal and           At 0PM03J, 1PM01J and                SAT UNSAT      N/A Alternate Power SATs                     2PM01J, on the Modes 1-4 Data        Comments:
'ENERGIZED' in step 1.7.
Sheet, OBSERVE and RECORD STATUS:
Place 'Xs' under 'YES' in steps 1.8 and 1.9.
CUE:    All X and Y windings for
SAT    UNSAT      N/A Comments: 6. Determine status of Normal and Alternate Power SATs
* X or Y winding AC MW and both SATs at each unit are          AC amperes indications for energized                            each SAT at each unit.
* SAT MOD indications.
* Place X in ENERGIZED column.
R-110                                  Page 11 of 53


CUE: All X and Y windings for both SATs at each unit are energized  At 0PM03J, 1PM01J and 2PM01J, on the Modes 1
-4 Data Sheet, OBSERVE and RECORD STATUS:  X or Y winding AC MW and AC amperes indications for each SAT at each unit.
SAT MOD indications.
Place X in 'ENERGIZED' column. SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-1 1 0    Page 12 of 53 *7. Determine availability status of Normal and Alternate supply breakers to each Unit 1 4160V ESF bus:
  *7. Determine availability status of         On the Modes 1-4 Data Sheet,      SAT UNSAT N/A Normal and Alternate supply             OBSERVE and RECORD                Comments:
CUE: 1412 CLOSED 1414 NAT (normal after trip)
breakers to each Unit 1 4160V ESF       STATUS:
 
bus:
2414 NAT 2412 CLOSED
CUE:     1412 CLOSED
 
* ACB 1412 (X in Closed Box).
1422 CLOSED 1424 NAT (but no position indication)
* ACB 1414 (X in Avail Box).
US acknowledges and is unsure of why breaker 1424 has no indication.
* ACB 2414 (X in Avail Box).
If dispatched as EO to investigate 1424, report breaker is locally racked in and open, however the local position indicating lights are DARK. If asked as EO to check control power fuses, report that control power fuses are blown. If blown fuse reported to US, give cue, US directs you to complete surveillance. He will investigate the cause of blown fuses.
1414 NAT (normal after trip)
* ACB 2412 (X in Closed Box).
* ACB 1422 (X in Closed Box).
2414 NAT o    Notify US that breaker 1424 does not have position 2412 CLOSED                           indication lights.
o    May try changing position indication light bulb.
1422 CLOSED                     o    May request EO investigate breaker locally.
o    May ask EO to check control 1424 NAT (but no position             power fuse continuity.
indication)                     o    Report blown fuse indication to US US acknowledges and is
* ACB 1424 (X in Not Avail unsure of why breaker 1424           Box).
has no indication.
If dispatched as EO to investigate 1424, report
* ACB 2424 (X in Avail Box).
breaker is locally racked in
* ACB 2422 (X in Closed Box).
and open, however the local position indicating lights are DARK.
If asked as EO to check control power fuses, report that control power fuses are blown.
If blown fuse reported to US, give cue, US directs you to complete surveillance. He will investigate the cause of blown fuses.
If examinee indicates they would change the indicating light bulbs, cue that the bulbs have been changed and are still NOT lit.
If examinee indicates they would change the indicating light bulbs, cue that the bulbs have been changed and are still NOT lit.
2424 NAT 2422 CLOSED On the Modes 1
2424 NAT 2422 CLOSED R-110                                  Page 12 of 53
-4 Data Sheet, OBSERVE and RECORD STATUS:    ACB 1412 (X in Closed Box).
ACB 1414 (X in Avail Box).
ACB 2414 (X in Avail Box).
ACB 2412 (X in Closed Box).
ACB 1422 (X in Closed Box).
 
o Notify US that breaker 1424 does not have position indication lights.
o May try changing position indication light bulb.
o May request EO investigate breaker locally.
o May ask EO to check control power fuse continuity.
o Report blown fuse indication to US  ACB 1424 (X in Not Avail Box). 


ACB 2424 (X in Avail Box).
ACB 2422 (X in Closed Box).
SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-1 1 0    Page 13 of 53  PERFORMANCE STEP STANDARD Circle applicable
PERFORMANCE STEP                             STANDARD                     Circle applicable
: 8. Determine supply configuration to the 4160V ESF buses.
: 8. Determine supply configuration to the   On the Modes 1-4 Data Sheet,        SAT UNSAT      N/A 4160V ESF buses.                         OBSERVE and RECORD                  Comments:
CUE: All normal ESF bus feed breakers indicate closed, all crosstie breakers are available.
STATUS:
On the Modes 1
CUE:   All normal ESF bus feed breakers indicate
-4 Data Sheet, OBSERVE and RECORD STATUS:  ESF BUS 141 (X in FROM SAT 142-1 box). ESF Bus 142 (X in FROM SAT 142-2 box). ESF BUS 241 (X in FROM SAT 242-1 box). ESF BUS 242 (X in FROM SAT 242-2 box). SAT    UNSAT      N/A Comments: *9. Determine capabilities of Unit 1 and Unit 2 SATs to supply Unit 1 ESF buses.
* ESF BUS 141 (X in FROM closed, all crosstie        SAT 142-1 box).
breakers are
* ESF Bus 142 (X in FROM available.                  SAT 142-2 box).
* ESF BUS 241 (X in FROM SAT 242-1 box).
* ESF BUS 242 (X in FROM SAT 242-2 box).
  *9. Determine capabilities of Unit 1 and     After Reviewing the status of the  SAT UNSAT      N/A Unit 2 SATs to supply Unit 1 ESF         sources and configuration, on the  Comments:
buses.                                  Modes 1-4 Data sheet, RECORD STATUS:
* Unit 1 SAT capable of supplying bus 141 (X in YES box in step 1.13).
* Unit 2 SAT capable of supplying bus 141 (X in YES box in step 1.14).
* Unit 1 SAT capable of supplying bus 142 (X in YES box in step 1.15).
* Unit 2 SAT NOT capable of supplying bus 142 (X in NO box in step 1.16).
o    Step F.3.0.
Step F.3.0 will be completed by another NSO.
Step F.3.0 will be completed by another NSO.
After Reviewing the status of the sources and configuration, on the Modes 1-4 Data sheet, RECORD STATUS:  Unit 1 SAT capable of supplying bus 141 (X in 'YES' box in step 1.13).
*10. Notify US/SM of failure to meet
Unit 2 SAT capable of supplying bus 141 (X in 'YES box in step 1.14).
* NOTIFY US/SM of failure to    SAT UNSAT      N/A acceptance criteria.                           meet Acceptance Criteria /    Comments:
Unit 1 SAT capable of supplying bus 142 (X in 'YES' box in step 1.15).
need to initiate LCOAR CUE:   As SM/US,                     1BwOL 3.8.1, within 45 acknowledge failure.          minutes of time given in Task Conditions.
Unit 2 SAT NOT capable of supplying bus 142 (X in 'NO' box in step 1.16).
Record time that examinee reports failure to meet Acceptance Criteria /
o Step F.3.0.
need to initiate LCOAR 1BwOL 3.8.1: __________
SAT    UNSAT      N/A Comments: *10. Notify US/SM of failure to meet acceptance criteria.
CUE: As SM/US, acknowledge failure.
Record time that examinee reports failure to meet Acceptance Criteria / need to initiate LCOAR 1BwOL 3.8.1: __________
Critical time =
Critical time =
_________
_________ - ___________
- ___________
(end time)     (start time) 45 minutes.
(end time)       (start time) 45 minutes. NOTIFY US/SM of failure to meet Acceptance Criteria /
CUE: THIS COMPLETES THIS JPM.
need to initiate LCOAR 1BwOL 3.8.1, within 45 minutes of time given in Task Conditions.
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
R-110                                  Page 13 of 53


Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 14 of 53 JOB PERFORMANCE MEASURE TASK CONDITIONS:
JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are an extra operator on shift.
: 1.     You are an extra operator on shift.
: 2. Unit 2 is at 100% power.
: 2.     Unit 2 is at 100% power.
: 3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
: 3.     2CV03F, Unit 2 RC Filter, needs to be replaced.
: 4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV
: 4.     A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
INITIATING CUES:
INITIATING CUES:
: 1. Jim NSO asks you to be the second approval for the clearance order
: 1.     Jim NSO asks you to be the second approval for the clearance order.
. 2. Inform Jim when you have completed the peer check.
: 2.     Inform Jim when you have completed the peer check.
R-200                                    Page 14 of 53


Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 15 of 53 TASK TITLE:
TASK TITLE: Verify Worker Tagout Checklist.
Verify Worker Tagout Checklist.
JPM No.:       R-200                                             REV:           NRC 2014 Task No.:     4E.AM-06                                           K&A No.:       2.2.15 Objective No.: R-AM-010                                           K&A IMP:       3.9 EXAMINEE:                                                         RO EVALUATOR:                                                       DATE:
JPM No.: R-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Obje ctive No.: R-AM-010 K&A IMP: 3.9 EXAMINEE:   RO EVALUATOR:
The Examinee:         PASSED           this JPM.               TIME STARTED:
DATE:
FAILED                                     TIME FINISHED:
The Examinee:
JPM TIME:               MINUTES CRITICAL ELEMENTS:             (*) 4, 6                           APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                               LOCATION:
PASSED this JPM. TIME STARTED:
X PERFORM                                         X IN PLANT SIMULATE                                       X SIMULATOR X CLASSROOM GENERAL  
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 4, 6 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD:
LOCATION:   X PERFORM   X   IN PLANT       SIMULATE   X   SIMULATOR     X   CLASSROOM   GENERAL  


==REFERENCES:==
==REFERENCES:==
: 3. OP-AA-109-101, CLEARANCE AND TAGGING, REV 9. 4. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24
: 3.     OP-AA-109-101, CLEARANCE AND TAGGING, REV 9.
. 5. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 4.     BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24.
: 6. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22
: 5.     M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
. MATERIALS:
: 6.     BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22.
: 1. OP-AA-109-101, CLEARANCE AND TAGGING.
MATERIALS:
: 2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
: 1.     OP-AA-109-101, CLEARANCE AND TAGGING.
: 3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 2.     BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
: 4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.
: 3.     M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 4.     BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.
TASK STANDARDS:
TASK STANDARDS:
: 4. Verify isolation points correct for 2CV03F.
: 4.     Verify isolation points correct for 2CV03F.
: 5. Determine 2CV8422 position incorrect for 2CV03F.
: 5.     Determine 2CV8422 position incorrect for 2CV03F.
: 6. Determine the sequence of isolation points for 2CV03F is incorrect.
: 6.     Determine the sequence of isolation points for 2CV03F is incorrect.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are an extra operator on shift.
: 1.     You are an extra operator on shift.
: 2. Unit 2 is at 100% power.
: 2.     Unit 2 is at 100% power.
: 3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
: 3.     2CV03F, Unit 2 RC Filter, needs to be replaced.
: 4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV
: 4.     A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
INITIATING CUES:
INITIATING CUES:
: 1. Jim NSO asks you to be the second approval for clearance order
: 1.     Jim NSO asks you to be the second approval for clearance order.
. CUE: Hand examinee partially completed Worker Tagout.
CUE: Hand examinee partially completed Worker Tagout.
: 2. Inform Jim when you have completed the peer chec
: 2.     Inform Jim when you have completed the peer check.
: k.
R-200                                      Page 15 of 53
 
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200                            Page 16 of 53
 
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 16 of 53 Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
RECORD START TIME:
R-200 Page 17 of 53 RECORD START TIME:
PERFORMANCE STEP                     STANDARD               CIRCLE APPLICABLE
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
: 1. Refer to BwOP CV-10, CV           Refer to BwOP CV-10, step      SAT UNSAT        N/A FILTERS ISOLATION AND             F.3.                          Comments:
: 1. Refer to BwOP CV
RETURN TO SERVICE.
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
CUE: Provide examinee copy of BwOP CV-10.
CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV
: 2. Refer to Drawing:                Refer to M-138, sheet 5B.     SAT UNSAT       N/A
-10, step F.3. SAT     UNSAT     N/A Comments:  2. Refer to Drawing:
* M-138, sheet 5B, DIAGRAM                                       Comments:
M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M
OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.
-138, sheet 5B. Refer to M
: 3. Verify the clearance BOUNDARY     Determines clearance          SAT UNSAT        N/A for 2CV03F.                       boundary valves selected are  Comments:
-138, sheet 5B.
correct:
SAT    UNSAT      N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.
* 2CV129 C/S, Demin Hi Temp Divert Valve.
Determines clearance boundary valves selected ar e correct: 2CV129 C/S, Demin Hi Temp Divert Valve.
* 2CV8421, RC Filter Bypass Valve.
2CV8421, RC Filter Bypass Valve.
* 2CV8425, RC Filter Inlet Isol Valve.
2CV8425, RC Filter Inlet Isol Valve.
* 2CV8422, RC Filter Outlet Isol Valve.
2CV8422, RC Filter Outlet Isol Valve.
* 2CV8424, RC Filter Drain Valve.
2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments:
* 2CV8423, RC Filter Vent Valve.
R-200                              Page 17 of 53
 
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 18 of 53  EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4
EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4 & 6.
& 6. EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.
EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.
If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.
If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.
If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.
If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.
When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.
When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
PERFORMANCE STEP                       STANDARD                   CIRCLE APPLICABLE
*4. Determine the clearance SEQUENCE for the 2CV03F is incorrect.
  *4. Determine the clearance             Determines clearance            SAT UNSAT      N/A SEQUENCE for the 2CV03F is         sequence is incorrect:          Comments:
incorrect.                         1. 2CV129 C/S, Demin Hi Temp Divert Valve.
: 2. 2CV8421 RC Filter Bypass Valve.
CUE: Acknowledge as Unit Supervisor and inform      3. 2CV8422 RC Filter examinee the checklist            Outlet Isol Valve.
sequence will be            4. 2CV8425 RC Filter Inlet corrected.                        Isol Valve.
: 5. 2CV8424 RC Filter Drain CUE: Hand examinee corrected              Valve.
worker tagout in accordance with the        5. 2CV8423 RC Filter Vent evaluator note above.            Valve.
o    Notifies SM and NSOs of sequencing error.
: 5. Verify the tag type for 2CV03F. Verifies clearance tag type:    SAT UNSAT      N/A
* 2CV129 C/S, Demin Hi          Comments:
Temp Divert Valve - CI.
* 2CV8421 RC Filter Bypass Valve - RI.
* 2CV8425 RC Filter Inlet Isol Valve - RD.
* 2CV8422 RC Filter Outlet Isol Valve - RD.
* 2CV8424 RC Filter Drain Valve - RI.
* 2CV8423 RC Filter Vent Valve - RI.
R-200                                Page 18 of 53


CUE: Acknowledge as Unit Supervisor and inform examinee the checklist sequence will be corrected.
CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.
Determines clearance sequence is incorrect:
: 1. 2CV129 C/S, Demin Hi Temp Divert Valve.
: 2. 2CV8421 RC Filter Bypass Valve.
: 3. 2CV8422 RC Filter Outlet Isol Valve.
: 4. 2CV8425 RC Filter Inlet Isol Valve.
: 5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
SAT    UNSAT      N/A Comments: 5. Verify the tag type for 2CV 03F. Verifies clearance tag type:
2CV129 C/S, Demin Hi Temp Divert Valve
- CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve
- RD. 2CV8422 RC Filter Outlet Isol Valve
- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Ven t Valve - RI. SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 19 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
PERFORMANCE STEP                       STANDARD               CIRCLE APPLICABLE
*6. Determine the clearance POSITION for the 2CV03F is incorrect.
  *6. Determine the clearance           Determines clearance position  SAT UNSAT        N/A POSITION for the 2CV03F is       is incorrect:                  Comments:
incorrect.
* 2CV129 C/S, Demin Hi Temp Divert Valve - INFO.
* 2CV8421 RC Filter Bypass Valve - INFO.
* 2CV8425 RC Filter Inlet Isol Valve - CLOSED.
CUE: Acknowledge as Unit
* 2CV8422 RC Filter Outlet Supervisor and inform          Isol Valve - OPEN.
examinee the checklist
* 2CV8424 RC Filter Drain position will be                Valve - INFO.
corrected.
* 2CV8423 RC Filter Vent Valve - INFO.
CUE: Hand examinee corrected worker tagout in          o Notifies SM and NSOs of accordance with the            position error.
evaluator note on JPM page 4.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
COMMENTS:
R-200                              Page 19 of 53


CUE: Acknowledge as Unit Supervisor and inform examinee the checklist position will be corrected.
Perform Offsite Notification (NARS Form Transmittal) for General Emergency JOB PERFORMANCE MEASURE TASK TITLE: Perform Offsite Notification (NARS Form Transmittal) for General Emergency JPM No.:   R-403                                            REV:           NRC 2014 TPO No.:   4F.ZP-02                                         K&A No.:       2.4.43 TASK No.:   R-ZP-004                                         K&A IMP:       3.2/3.8 EXAMINEE:                                                     RO EVALUATOR:                                                   DATE:
CUE: Hand examinee corrected worker tagout in accordance with the evaluator note on JPM page 4. Determines clearance position is incorrect:
The Examinee:       PASSED           this JPM.               TIME STARTED:
2CV129 C/S, Demin Hi Temp Divert Valve
FAILED                                   TIME FINISHED:
- INFO. 2CV8421 RC Filter Bypass Valve - INFO. 2CV8425 RC Filter Inlet Isol Valve
JPM TIME:                 MINUTES CRITICAL ELEMENTS:         (*) 3, 4                         APPROX COMPLETION TIME:
- CLOSED. 2CV8422 RC Filter Outlet Isol Valve
10 MINUTES CRITICAL TIME:             13 minutes EVALUATION METHOD:                                           LOCATION:
- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.
X PERFORM                                           IN PLANT SIMULATE                                       _ SIMULATOR X CLASSROOM GENERAL  
SAT    UNSAT      N/A Comments:      CUE: THIS COMPLETES THIS JPM. RECORD STOP TIME: 
 
COMMENTS: 
 
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 20 of 53 JOB PERFORMANCE MEASURE TASK TITLE:
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency JPM No.: R-40 3 REV: NRC 201 4 TPO No.: 4F.ZP-02 K&A No.: 2.4.43 TASK No.: R-ZP-004 K&A IMP: 3.2/3.8   EXAMINEE:   RO EVALUATOR:
DATE:   The Examinee:
PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 3, 4 APPROX COMPLETION TIME:   10 MINUTES
 
CRITICAL TIME:
13 minutes
 
EVALUATION METHOD:
LOCATION:   X   PERFORM       IN PLANT       SIMULATE   _ SIMULATOR     X CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS, Rev. 13
: 1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS, Rev. 13.
. 2. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM, Rev. G.
: 2. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM, Rev. G.
MATERIALS:
MATERIALS:
: 1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
: 1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
Line 362: Line 369:
: 1. You are the Unit 2 Assist NSO.
: 1. You are the Unit 2 Assist NSO.
: 2. A reactor trip has occurred on Unit 1.
: 2. A reactor trip has occurred on Unit 1.
: 3. A General Emergency was declared two minutes ago, no previous EALs have been declared. 4. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
: 3. A General Emergency was declared two minutes ago, no previous EALs have been declared.
: 4. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
: 5. This is a Time Critical JPM.
: 5. This is a Time Critical JPM.
INITIATING CUES:
INITIATING CUES:
: 1. The Shift Manager directs you to transmit the NARS form per EP
: 1. The Shift Manager directs you to transmit the NARS form per EP-MW-114-100, MW Region Offsite Notifications.
-MW-114-100, MW Region Offsite Notifications. 2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
: 3. Inform the Shift Manager when the NARS form has been transmitted.
: 3. Inform the Shift Manager when the NARS form has been transmitted.
R-403                                      Page 20 of 53


Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 21 of 53 RECORD START TIME:
Perform Offsite Notification (NARS Form Transmittal) for General Emergency RECORD START TIME:
EVALUATOR NOTE: Provide examinee the completed NARS form and copy of EP
EVALUATOR NOTE: Provide examinee the completed NARS form and copy of EP-MW-114-100-F-01.
-MW-114-100-F-01. EVALUATOR NOTE: JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after initial roll call is complete on the back of the NARS form. PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
EVALUATOR NOTE: JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after initial roll call is complete on the back of the NARS form.
: 1. Refer to EP
PERFORMANCE STEP                             STANDARD                   CIRCLE APPLICABLE
-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
: 1. Refer to EP-MW-114-100, MW             Refer to EP-MW-114-100:             SAT UNSAT    N/A REGION OFFSITE
Refer to EP
* Determine step 4.2 needs         Comments:
-MW-114-100: Determine step 4.2 needs to be performed.
NOTIFICATIONS.                              to be performed.
SAT    UNSAT      N/A Comments: 2 Refer to EP
2 Refer to EP-MW-114-100-F-01,           Refer to EP-MW-114-100-F-           SAT UNSAT    N/A NUCLEAR ACCIDENT                      01:                                 Comments:
-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. Refer to EP
REPORTING SYSTEM (NARS)
-MW-114-100-F-01: Determine NARS Code 38 to be used to transmit NARS form.
* Determine NARS Code 38 FORM.                                      to be used to transmit NARS form.
SAT    UNSAT      N/A Comments:
R-403                                       Page 21 of 53
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403     Page 22 of 53 *3. Establish communications:
No te: After examinee dials Code 38 , provide the following cue:
CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.
NOTE:  If Examinee dials Code 20 (which is


wrong) use Code 20  
Perform Offsite Notification (NARS Form Transmittal) for General Emergency
  *3. Establish communications:            Establish communications as      SAT UNSAT      N/A follows:                        Comments:
Note: After examinee dials
* Pick up NARS phone.
Code 38, provide the
* DIAL code 38.
following cue:
* Read the following CUE: After a short pause, a              message:This is Exelon beep is heard, followed          Nuclear Braidwood Station by a seven more beeps,            Control Room. Please for a total of 8 beeps.          standby for a NARS NOTE: If Examinee dials                  message.
Code 20 (which is wrong) use Code 20         o Read the following cue. Otherwise use              message:This is the Code 38 Cue.                    Exelon Nuclear Braidwood Station Control room.
Note: After examinee reads                Please standby to receive messages, provide                a NARS message and the following cue:              respond as the roll is called.
CUE Code 38: IEMA online,
* TAKE Initial Roll Call Grundy Co. Sheriff online
* Mark Initial Boxes for Kankakee Co. Sheriff
* IEMA online                        *Grundy Co. Sheriff Will Co. Sheriff online
* Kankakee Co. Sheriff Illinois REAC online          *Will Co. Sheriff Grundy Co. EMA online
* Illinois REAC Kankakee Co. EOC
* Grundy Co. EMA online
                                                  *Kankakee Co. EOC Will Co. EOC online
* Will Co. EOC.
CUE Code 20: IEMA online, o Record time and date Illinois REAC online            initial roll call complete.
Note: Once stops after initial roll call is complete critical time STOPS:
EVALUATOR NOTE: Critical time TIME STOPS after initial roll call is complete on the back of the NARS form.
Determine critical time:
_________________________ - ________________________ = ________________________
(Initial roll call complete)              (JPM start time)                      < 13 minutes R-403                                        Page 22 of 53


cue. Otherwise use
Perform Offsite Notification (NARS Form Transmittal) for General Emergency PERFORMANCE STEP                        STANDARD              CIRCLE APPLICABLE
  *4. Verbally transmit the NARS        Verbally transmit the NARS    SAT UNSAT      N/A Form.                              Form:                        Comments:
* Utility Message No: 1_
* State Message No: N/A
* Status - [B] Drill/Exercise
* Station - [A] Braidwood
* Onsite Condition - [D]
General Emergency
* Accident Classified:
* Time: Two minutes ago.
* Date: Today.
* EAL # : MG1
* Accident Terminated Date and Time: N/A
* Release Status: [A] None
* Type of Release: [A] Not Applicable
* Wind Dir: 270
* Wind Speed:
o [A] is N/A
                                                * [B] 4.5 Miles/Hr
* Utility recommendation:
                                                * [D] 1, 3, 10
                                        * (Block 10) Additional Information:
None Verified With: U. Supervisor Approved By: S. Manager R-403                                  Page 23 of 53


Code 38 Cue.
Perform Offsite Notification (NARS Form Transmittal) for General Emergency PERFORMANCE STEP                         STANDARD                 CIRCLE APPLICABLE
Note: After examinee reads messages, provide
: 5. Complete the NARS form.             Fill in the following information SAT UNSAT     N/A on the NARS Form after            Comments:
 
transmitting info in blocks 1-10:
the following cue:
* Mark 11A, EXELON CUE:   IF examinee asks for a
CUE Code 38: IEMA online ,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online  Will Co. EOC online CUE Code 20: IEMA online,  Illinois REAC online Note: Once stops after initial roll call is complete critical time STOPS:
* Examinee Name phone number to use, provide: outside line is
Establish communications as follows:  Pick up NARS phone.
* Outside line number 815-458-7882.
DIAL code 38
* Current Time
. Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message." o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called."  TAKE Initial Roll Call Mark Initial Boxes for  IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC  Grundy Co. E MA  Kankakee Co. EOC Will Co. EOC.
* Current Date
o Record time and date initial roll call complete.
* Name of person from CUE: John Smith, IEMA.                  IEMA receiving message
SAT    UNSAT      N/A Comments: EVALUATOR NOTE:  Critical time TIME STOPS after initial roll call is complete on the back of the NARS form. Determine critical time:
* Organization (IEMA)
_________________________    -    ________________________    =    ________________________
* Current time
(Initial roll call complete)                    (JPM start time)                                       
* Todays date
< 13 minutes
: 6. Perform Final Roll Call             PERFORM Final Roll Call and      SAT UNSAT    N/A Note: As examinee performs         marks boxes for:                  Comments:
 
final roll call
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 23 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
* IEMA provide the following cues:
*4. Verbally transmit the NARS Form. Verbally transmit the NARS Form:  Utility Message No:
* Grundy Co. Sheriff CUE Code 38: IEMA online,
1_  State Message No: N/A  Status - [B] Drill/Exercise Station - [A] Braidwood Onsite Condition
* Kankakee Co. Sheriff Grundy Co. Sheriff
- [D] G eneral Emergency Accident Classified:
* Will Co. Sheriff online
Time: Two minutes ago.
* Illinois REAC Kankakee Co. Sheriff
Date: Today. EAL # : M G1  Accident Terminated Date and Time: N/A  Release Status: [A] None  Type of Release: [A] Not Applicable Wind Dir:
* Grundy Co. EMA, online
270  Wind Speed:
* Kankakee Co. EOC Will Co. Sheriff online
o [A] is N/A
* Will Co. EOC Illinois REAC online
[B] 4.5 Miles/Hr Utility recommendation
* Ask if there are any Grundy Co. EMA online             questions about the Kankakee Co. EOC                 information provided.
:  [D] 1, 3, 10 (Block 10) Additional Information:
online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.
None Verified With: U. Supervisor Approved By: S. Manager SAT    UNSAT      N/A Comments:
: 7. STATE NARS communication is       STATE NARS communication         SAT UNSAT     N/A complete.                          is complete.                    Comments:
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 24 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
CUE: THIS COMPLETES THIS JPM.
: 5. Complete the NARS form.
CUE: IF examinee asks for a phone number to use, provide: outside line is 815-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1
-10:  Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message Organization (IEMA)
Current time Today's date SAT    UNSAT      N/A Comments: 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:
CUE Code 38: IEMA online, Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.
PERFORM Final Roll Call and marks boxes for:
IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA,  Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.
SAT    UNSAT      N/A Comments: 7. STATE "NARS communication is complete."
STATE "NARS communication is complete."
SAT    UNSAT      N/A Comments:   CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Review Calorimetric Surveillance S-100 Page 25 of 53 TASK TITLE: Review Calorimetric Surveillance JPM No.:
R-403                                    Page 24 of 53
S-100   REV: NRC 2014 TPO No.: 4C.NI
 
-05   K&A No.: 2.1.7 TASK No.: NI
Review Calorimetric Surveillance TASK TITLE: Review Calorimetric Surveillance JPM No.: S-100                         REV: NRC 2014 TPO No.: 4C.NI-05                                                   K&A No.: 2.1.7 TASK No.: NI-004         Perform calorimetric calculation           K&A IMP: 4.7 ADMIN: CONDUCT OF OPS EXAMINEE:                                                           SRO EVALUATOR:                                                           DATE:
-004 Perform calorimetric calculation K&A IMP: 4.7 ADMIN: CONDUCT OF OPS EXAMINEE:     SRO EVALUATOR:
The Examinee:           PASSED         this JPM.                   TIME STARTED:
DATE:
FAILED                                     TIME FINISHED:
The Examinee:
CRITICAL ELEMENTS: (*) 2,3                                           JPM TIME:             MINUTES CRITICAL TIME: NA                                                   APPROX COMPLETION TIME: 10 MINUTES EVALUATION METHOD:                                                   LOCATION:
PASSED this JPM. TIME STARTED:
X PERFORM                                     IN PLANT SIMULATE                                 X SIMULATOR X CLASSROOM GENERAL  
FAILED TIME FINISHED:
CRITICAL ELEMENTS:
(*) 2,3 JPM TIME: MINUTE S CRITICAL TIME:
NA APPROX COMPLETION TIME
: 10 MINUTES EVALUATION METHOD:
LOCATION:     X PERFORM         IN PLANT         SIMULATE     X SIMULATOR       X CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOSR 3.3.1.2
: 1.     1BwOSR 3.3.1.2-1, Rev. 17, Unit 1 Power Range High Flux Setpoint Daily Channel Calibration (Computer Calorimetric).
-1, Rev. 17, Unit 1 Power Range High Flux Setpoint Daily Channel Calibration (Computer Calorimetric).
MATERIALS:
MATERIALS:
: 1. Copy of completed/ready for review 1BwOSR 3.3.1.2
: 1.     Copy of completed/ready for review 1BwOSR 3.3.1.2-1.
-1. TASK STANDARDS:
TASK STANDARDS:
: 1. Perform review of calorimetric data collected by NSO.
: 1.     Perform review of calorimetric data collected by NSO.
: 2. Determine calorimetric adjustment calculation incorrectly performed by NSO.
: 2.     Determine calorimetric adjustment calculation incorrectly performed by NSO.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1.     You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is at 100% power, all systems are normally aligned.
: 2.     Unit 1 is at 100% power, all systems are normally aligned.
INITIATING CUES:
INITIATING CUES:
: 1. The Unit NSO has performed the calorimetric surveillance and has asked you to review the proposed NI adjustments per 1BwOSR 0.1
: 1.     The Unit NSO has performed the calorimetric surveillance and has asked you to review the proposed NI adjustments per 1BwOSR 0.1-1,2,3.
-1,2,3. 2. Review the surveillance and if any changes are necessary, correct the surveillance
: 2.     Review the surveillance and if any changes are necessary, correct the surveillance.
. Note: Hand examinee completed calorimetric surveillance, with the Calorimetric printout provided.
Note: Hand examinee completed calorimetric surveillance, with the Calorimetric printout provided.
RECORD START TIME Note: This JPM is performed by having the examinee review the D
RECORD START TIME Note: This JPM is performed by having the examinee review the D-2 Data sheet from the surveillance. The first data sheet is complete through block 10 but has 3 mistakes in it (two of which propagate forward to blocks 9 and 10). The examinee must locate the mistakes to pass the JPM prior to signing block 11, Review Authorization, and ending the JPM.
-2 Data sheet from the surveillance. The first data sheet is complete through block 10 but has 3 mistakes in it (two of which propagate forward to blocks 9 and 10). The examinee must locate the mistakes to pass the JPM prior to signing block 11, Review Authorization, and ending the JPM.
Page 25 of 53 S-100


S-100 Page 26 of 53  PERFORMANCE STEP STANDARD Circle Applicable
PERFORMANCE STEP                             STANDARD             Circle Applicable
: 1. Refer to completed 1BwOSR 3.3.1.2-1. CUE: Ensure calorimetric surveillance is handed to examinee with the printout of th e calorimetric data.
: 1. Refer to completed 1BwOSR         Review the data sheet for      SAT UNSAT        N/A 3.3.1.2-1.                         completeness/errors for        Comments:
CUE: All Prerequisites were met. CUE: (if performed in classroom)
blocks 1 and 2:
CUE: Ensure calorimetric
* Date: Today surveillance is handed to examinee with the
* Time: 10 minutes ago printout of the
* Mwe Gross: Current calorimetric data.
* Control Bank Position CUE: All Prerequisites were
* NSOs Signature met.
CUE: (if performed in classroom)
CB-C at 226 steps, CB-D at 220 steps.
CB-C at 226 steps, CB-D at 220 steps.
Review the data sheet for completeness/errors for blocks 1 and 2:
*2. Review blocks 3, 5, 6 and 7.       Review blocks 3, 5, 6 and 7   SAT UNSAT        N/A for completeness and/or        Comments:
Date: Today Time: 10 minutes ago Mwe Gross: Current Control Bank Position NSO's Signature
Note: If asked, the plant         errors:
 
calorimetric printout from the computer show 99.51% (same as recorded in block 5).
SAT    UNSAT      N/A Comments: *2. Review blocks 3, 5, 6 and 7.
Note: Errors present:             o Initial NIS Drawer Front Panel Meter Power filled Block 6 second line (N-42) item       in.
 
should be positive 2.0             o Calculated Calorimetric Power from printout filled Block 6 fourth line (N-44) should     in.
Note: If asked, the plant calorimetric printout from the computer show 99.51% (same as recorded in block 5)
be negative 1.0                   o Calculated Power difference filled in.
.    
Block 7:                           o Block 12 checked (3 NO, 1 YES)
 
As a result of correcting the errors, NR-44 should now be
Note: Errors present:
* SRO makes the checked YES rather than NO.           following changes:
 
* Block 6 second line change to +2.0 (N-42)
Block 6 second line (N-42) item should be positive 2.0  
* Block 6 fourth line change to -1.0 (N-44)
 
* Block 7 check YES for NR-44 S-100                                       Page 26 of 53
Block 6 fourth line (N
-44) should be negative 1.0  
 
Block 7:
As a result of correcting the errors, NR
-44 should now be checked YES rather than NO.
Review blocks 3, 5, 6 and 7 for completeness and/or errors: 
 
o Initial NIS Drawer Front Panel Meter Power filled in. o Calculated Calorimetric Power from printout filled in. o Calculated Power difference filled in.
o Block 12 checked (3 NO, 1 YES)
SRO makes the following changes:
Block 6 second line change to +2.0 (N
-42)   Block 6 fourth line change to  
-1.0 (N-44)   Block 7 check "YES" for NR-44 SAT    UNSAT      N/A Comments:
S-100 Page 27 of 53 PERFORMANCE STEP STANDARD Circle Applicable
*3. Verify the power adjustment calculation for channel N
-44. Note:  If examinee discovers the mistakes, and wants the NSO to correct, cue the examinee to make the necessary correction on sheet D-2 himself and continue with the review. Note:  If examinee identifies early mistakes and stops, inform him to mark-up the needed changes, consider them incorporated and ask if the review is complete.
Note:  The examinee needs to verify the determination of the indicated power that N-42 and N-44 must be adjusted to.
Note:  If the examinee has NOT identified and corrected the incorrect adjustment determinations (N-44 and N-42) by the time the examinee signs Block 11, "Review Authorization", and ends the JPM then the JPM performance is UNSAT. IF ASKED (when examinee is making corrections):


Cue: N-44 reads 98.5%
PERFORMANCE STEP                            STANDARD            Circle Applicable
Cue:  N-42 still reads 101.5%
  *3. Verify the power adjustment      DETERMINE channel N-44         SAT UNSAT        N/A calculation for channel N-44. and N-42 require adjustment   Comments:
 
as follows:
DETERMINE channel N-44 and N-42 require adjustment as follows:
Note: If examinee discovers the  o Ensure the present mistakes, and wants the      percent power values are NSO to correct, cue the      filled in block 8.
 
examinee to make the necessary correction on  o VERIFY the corrected sheet D-2 himself and        calculated power continue with the            difference from block 6 in review.                      block 9.
o Ensure the present percent power values are filled in block 8.
Note: If examinee identifies      o VERIFY/SUBTRACT the early mistakes and          power difference from the stops, inform him to        present indicated power mark-up the needed          and the value as the changes, consider them      Power to adjust the NIS incorporated and ask if      channels to in block 10.
o VERIFY the corrected calculated power difference from block 6 in block 9. o VERIFY/SUBTRACT the power difference from the present indicated power and the value as the Power to adjust the NIS channels to in block 10.
the review is complete.
SRO Makes the following changes:   N-42: changes block 9 to + 2.0 and block 10 to 99.5. N-44: changes block 8 to 98.5, changes block 9 to -1.0 and changes block 10 to 99.5
Note: The examinee needs to      SRO Makes the following verify the determination changes:
. SAT    UNSAT      N/A Comments:
of the indicated power that N-42 and N-44 must
* N-42: changes block 9 be adjusted to.              to + 2.0 and block 10 to 99.5.
Note: If the examinee has NOT
* N-44: changes block 8 identified and corrected    to 98.5, changes block 9 the incorrect adjustment    to -1.0 and changes determinations (N-44        block 10 to 99.5.
and N-42) by the time the examinee signs Block 11, Review Authorization, and ends the JPM then the JPM performance is UNSAT.
IF ASKED (when examinee is making corrections):
Cue: N-44 reads 98.5%
Cue: N-42 still reads 101.5%
(CUE:) THIS COMPLETES THIS JPM.
(CUE:) THIS COMPLETES THIS JPM.
RECORD STOP TIME
RECORD STOP TIME           __________
__________
COMMENTS:
S-100                                      Page 27 of 53


COMMENTS: 
Perform Shutdown Margin Calculation TASK TITLE: Perform Shutdown Margin Calculation JPM No.:         S-112                                                       REV:           NRC 2014 Task No.:       S-AM-123                                                   K/A No.:       2.1.25 Objective No.: 7E.AM-123-A                                                   K/A IMP:       4.2 EXAMINEE:                                                                   SRO EVALUATOR:                                                                   DATE:
 
The Examinee:             PASSED             this JPM.                     TIME STARTED:
Perform Shutdown Margin Calculation S-112        Page 28 of 53 TASK TITLE:
FAILED                                             TIME FINISHED:
Perform Shutdown Margin Calculation JPM No.: S-112 REV: NRC 2014 Task No.: S-AM-123 K/A No.: 2.1.25 Objective No.: 7E.AM-123-A K/A IMP: 4.2 EXAMINEE:   S RO  EVALUATOR:
JPM TIME:                   MINUTES CRITICAL ELEMENTS:                 (*) 4, 6                               APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:                     45 minutes EVALUATION METHOD:                                                           LOCATION:
DATE:   The Examinee:
X PERFORM                                                   X IN PLANT SIMULATE                                                   SIMULATOR
PASSED this JPM. TIME STARTED:
_ CLASSROOM GENERAL  
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 4, 6 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:
45 minutes EVALUATION METHOD:
LOCATION:   X   PERFORM   X IN PLANT       SIMULATE       SIMULATOR     _ CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 1BwOSR 3.1.1.1
: 1. 1BwOSR 3.1.1.1-2, UNIT ONE SHUTDOWN MARGIN SURVEILLANCE DURING OPERATION, Rev. 3.
-2, UNIT ONE SHUTDOWN MARGIN SURVEILLANCE DURING OPERATION, Rev. 3
: 2. BwCB-1 (Various), Braidwood Curve Book, Unit 1.
. 2. BwCB-1 (Various), Braidwood Curve Book, Unit 1
: 3. 1BwOL 3.1.4, Rev. 5, LCOAR Rod Group Alignment Limits Tech Spec LCO 3.1.4.
. 3. 1BwOL 3.1.4, Rev. 5, LCOAR Rod Group Alignment Limits Tech Spec LCO 3.1.4.
MATERIALS:
MATERIALS:
: 1. Copy of 1BwOSR 3.1.1.1
: 1. Copy of 1BwOSR 3.1.1.1-2.
-2. 2. Copy of BwCB
: 2. Copy of BwCB-1.
-1. 3. Copy of Braidwood Technical Requirements Manual (TRM)
: 3. Copy of Braidwood Technical Requirements Manual (TRM).
. 4. Copy of Braidwood Tech Specs and Bases.
: 4. Copy of Braidwood Tech Specs and Bases.
TASK STANDARDS:
TASK STANDARDS:
: 1. Correctly determine total rod worth due to rods.
: 1. Correctly determine total rod worth due to rods.
: 2. Correctly determine actual reactivity available due to rods.
: 2. Correctly determine actual reactivity available due to rods.
: 3. Correctly determine current power defect.
: 3. Correctly determine current power defect.
: 4. Correctly determine shutdown margin is unacceptable for current plant conditions within 45 minutes. TASK CONDITIONS:
: 4. Correctly determine shutdown margin is unacceptable for current plant conditions within 45 minutes.
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is at full power (13,000 EFPH) with all control systems in automatic except rod control, which is in manual. Tave is 587 oF and Most Recent B10 Corrected RCS Boron sample is 300 ppm 1 hour ago. Control Bank 'D' is at 220 steps. All other rods are fully withdrawn.
: 2. Unit 1 is at full power (13,000 EFPH) with all control systems in automatic except rod control, which is in o
manual. Tave is 587 F and Most Recent B10 Corrected RCS Boron sample is 300 ppm 1 hour ago.
Control Bank D is at 220 steps. All other rods are fully withdrawn.
: 3. This is a time critical JPM.
: 3. This is a time critical JPM.
INITIATING CUES:
INITIATING CUES:
: 1. 15 minutes ago it was determined rod M
: 1. 15 minutes ago it was determined rod M-4 is inoperable and is immovable due to excessive friction. The QNE has been informed.
-4 is inoperable and is immovable due to excessive friction. The QNE has been informed.
: 2. The unit NSO has completed 1BwOSR 3.1.1.1-2, Unit One Shutdown Margin Surveillance During Operation, for your review.
: 2. The unit NSO has completed 1BwOSR 3.1.1.1
-2, Unit One Shutdown Margin Surveillance During Operation, for your review.
: 3. Review the surveillance and if any changes are necessary, correct the surveillance.
: 3. Review the surveillance and if any changes are necessary, correct the surveillance.
: 4. Verify appropriate required actions are completed.
: 4. Verify appropriate required actions are completed.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Perform Shutdown Margin Calculation S-112       Page 29 of 53 RECORD START TIME:
S-112                                                     Page 28 of 53
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE EVALUATOR NOTE: JPM will be performed in the classroom.
 
: 1. Refer to completed 1BwOSR 3.1.1.1-2: NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.
Perform Shutdown Margin Calculation RECORD START TIME:
PERFORMANCE STEP                         STANDARD               CIRCLE APPLICABLE EVALUATOR NOTE: JPM will be performed in the classroom.
: 1. Refer to completed 1BwOSR          Refer to 1BwOSR 3.1.1.1-2.      SAT UNSAT    N/A 3.1.1.1-2:                                                         Comments:
NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.
Record critical time start time:
Record critical time start time:
__________
__________
CUE:   Ensure shutdown margin surveillance is handed to examinee.
CUE: Ensure shutdown margin surveillance is handed to examinee.
CUE: All Prerequisites, Precautions, Limitations and Actions are met.
CUE: All Prerequisites, Precautions, Limitations and Actions are met.
Refer to 1BwOSR 3.1.1.1
: 2. Review Present Conditions: (step   Review the following from      SAT UNSAT    N/A F.1)                               initiating cue for completeness Comments:
-2. SAT    UNSAT      N/A Comments: 2. Review Present Conditions: (step F.1) Note:  NO errors present on step F.1. Review the following from initiating cue for completeness and/or errors
and/or errors:
: Date and Time: Current Date and 10 minutes ago Core Average Burnup: 13,000 EFPH Core Average Temperature:
Note: NO errors present on step
587 F Power Level:
* Date and Time: Current F.1.                            Date and 10 minutes ago
100% Present Boron Concentration:
* Core Average Burnup:
300 ppm SAT    UNSAT      N/A Comments:
13,000 EFPH
Perform Shutdown Margin Calculation S-112       Page 30 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
* Core Average Temperature: 587&deg;F
: 3. Review total worth due to rods (step F.2)
* Power Level: 100%
Note:  NO errors present on step F.2  NOTE: Examinee may refer to BwCB-1, Figure 2c for an expanded scale of Figure 2 control bank D rod worth. NOTE: Examinee must refer to correct figure and burn up range. BwCB-1 , Figures 2 & 2c are for Hot Full Power and Figures 2a and 2d are for Hot Zero Power. From initiating cue, Unit 1 is at 100% power
* Present Boron Concentration: 300 ppm S-112                                             Page 29 of 53
. Review total worth due to rods by performing the following:
o Review control bank position:  Bank D @ 220 steps (from initiating cue).
o Review control bank D inserted worth by performing the following:
o Refer to BwCB
-1 , Figure 2 for burn up range. o Record control bank D inserted worth:
1 5 pcm  10 pcm. o Review total available control bank worth by performing the following:
o Refer to BwCB
-1 , Table 4-1 for control bank worth for burn up.
o Determine control bank total worth:  3308.6 pcm. o Subtract control bank D


inserted worth from control bank total worth: 3308.6 pcm  
Perform Shutdown Margin Calculation PERFORMANCE STEP                        STANDARD                CIRCLE APPLICABLE
- 15 pcm ( 10 pcm) = 3293.6 pcm ( 10 pcm). o Review total worth due to rods by performing the following:
: 3. Review total worth due to rods      Review total worth due to rods SAT UNSAT      N/A (step F.2)                          by performing the following:    Comments:
o Refer to BwCB
o Review control bank Note: NO errors present on step          position: Bank D @ 220 F.2                              steps (from initiating cue).
-1 , Table 4-1 for shutdown bank worth for burn up range. o Determine shutdown bank total worth: 3648.2 pcm. o Review total rod worth by performing the following:
o Review control bank D inserted worth by NOTE: Examinee may refer to              performing the following:
o Add shutdown bank total worth to available control bank worth: 3648.2 pcm + 3293.6 pcm ( 10 pcm) = 6941.8 pcm ( 10 pcm) SAT    UNSAT      N/A Comments:
BwCB-1, Figure 2c for an expanded scale of Figure        o Refer to BwCB-1, 2 control bank D rod                Figure 2 for burn up worth.                              range.
Perform Shutdown Margin Calculation S-112       Page 31 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
NOTE: Examinee must refer to            o Record control bank D correct figure and burn              inserted worth: 15 pcm up range. BwCB-1,                    +/- 10 pcm.
*4. Review actual reactivity available due to rods (step F.3)
Figures 2 & 2c are for      o Review total available Hot Full Power and              control bank worth by Figures 2a and 2d are for        performing the following:
NOTE: Review value of highest stuck rod worth and determine that the highest stuck rod worth is incorrect (967.2 pcm) and that the correct value should be 1044.6 pcm. Note:  If examinee discovers the mistakes, and wants the NSO to correct, cue the examinee to make th e
Hot Zero Power. From            o Refer to BwCB-1, initiating cue, Unit 1 is at        Table 4-1 for control 100% power.                          bank worth for burn up.
necessary correction on surveillance sheet and continue with the review. Note:  If examinee identifies early mistakes and stops, inform them to mark-up the needed changes, consider them incorporated and ask if the review is complete.
o Determine control bank total worth: 3308.6 pcm.
NOTE: Review value of actual reactivity available due to rods and determine that the actual reactivity available due to rods is incorrect (3974.6 pcm) and that the value should be 3897.2 pcm.
o Subtract control bank D inserted worth from control bank total worth: 3308.6 pcm -
Review actual reactivity due to rods by performing the following:
15 pcm (+/- 10 pcm) =
o Review the number of immovable and/or untrippable control rods:
3293.6 pcm (+/- 10 pcm).
1 (from initiating cue) o Review highest stuck rod worth by performing the following:
o Review total worth due to rods by performing the following:
o Refer to BwC B-1 , Table 4-1 for highest stuck rod worth for burn
o Refer to BwCB-1, Table 4-1 for shutdown bank worth for burn up range.
o Determine shutdown bank total worth:
3648.2 pcm.
o Review total rod worth by performing the following:
o Add shutdown bank total worth to available control bank worth:
3648.2 pcm + 3293.6 pcm (+/- 10 pcm) =
6941.8 pcm (+/- 10 pcm)
S-112                                             Page 30 of 53


up. Determine and record highest stuck rod worth is incorrect at 967.2 and the correct value is: 1044.6 pcm
Perform Shutdown Margin Calculation PERFORMANCE STEP                            STANDARD                CIRCLE APPLICABLE
. o Review immovable /untrippable rod worth by performing the following:
  *4. Review actual reactivity            Review actual reactivity due to    SAT UNSAT    N/A available due to rods (step F.3)    rods by performing the            Comments:
o Multiply the number of immovable or untrippable control rods by 2000 pcm: 1 X 2000 pcm = 2000 pcm. o Review actual reactivity available due to rods by performing the following::
following:
Subtract immovable
o Review the number of immovable and/or untrippable control rods: 1 (from initiating cue) o Review highest stuck rod worth by performing the NOTE: Review value of highest            following:
/untrippable rod worth and highest stuck rod worth from total rod worth and determine
stuck rod worth and determine that the              o Refer to BwCB-1, highest stuck rod worth              Table 4-1 for highest is incorrect (967.2 pcm)              stuck rod worth for burn and that the correct                  up.
value should be 1044.6
* Determine and record pcm.                                  highest stuck rod worth is incorrect at 967.2 and the correct value is: 1044.6 pcm.
o Review immovable Note: If examinee discovers the          /untrippable rod worth by mistakes, and wants the        performing the following:
NSO to correct, cue the        o Multiply the number of examinee to make the                immovable or necessary correction on              untrippable control rods surveillance sheet and              by 2000 pcm: 1 X continue with the                    2000 pcm = 2000 pcm.
review.
o Review actual reactivity Note: If examinee identifies            available due to rods by early mistakes and              performing the following::
stops, inform them to mark-up the needed
* Subtract immovable changes, consider them              /untrippable rod worth incorporated and ask if              and highest stuck rod the review is complete.              worth from total rod worth and determine that 6941.8 pcm (+/- 10 NOTE: Review value of actual                  pcm) - 2000 pcm -
reactivity available due              967.2 pcm = 3974.6 to rods and determine                pcm (+/- 10 pcm) is that the actual reactivity            incorrect and it should available due to rods is              be: 6941.8 pcm (+/- 10 incorrect (3974.6 pcm)                pcm) - 2000 pcm -
and that the value                    1044.6 pcm = 3897.2 should be 3897.2 pcm.                pcm (+/- 10 pcm).
S-112                                              Page 31 of 53


that 6941.8 pcm ( 10 pcm) - 2000 pcm - 967.2 pcm = 3974.6 pcm ( 10 pcm) is incorrect and it should be:  6941.8 pcm ( 10 pcm) - 2000 pcm - 1044.6 pcm
Perform Shutdown Margin Calculation PERFORMANCE STEP                       STANDARD                 CIRCLE APPLICABLE
= 3897.2 pcm ( 10 pcm). SAT    UNSAT      N/A Comments:
: 5. Review current Power Defect (step Review the current power        SAT UNSAT    N/A F.4)                             defect for boron concentration  Comments:
Perform Shutdown Margin Calculation S-112        Page 32 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE 5. Review current Power Defect (step F.4) Note: NO errors present on step F.4    Review the current power defect for boron concentration and power level by performing the following:
Note: NO errors present on step   and power level by performing F.4                        the following:
Refer to BwCB
* Refer to BwCB-1, Figure 17A for power defect for burn up.
-1, Figure 17A for power defect for burn up. Review power defect:
* Review power defect:
2667 50 pcm. OR Refer to BwCB
2667 +/- 50 pcm.
-1, Table 2-1 for power defect for burn up range of 6466.8 EFPH.
OR
Review power defect:
* Refer to BwCB-1, Table 2-1 for power defect for burn up range of 6466.8 EFPH.
2667 pcm. SAT    UNSAT      N/A Comments:
* Review power defect:
Perform Shutdown Margin Calculation S-112       Page 33 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
2667 pcm.
*6. Review Shutdown Margin Verification (step F.5)
S-112                                         Page 32 of 53
NOTE: Review value of available shutdown margin and determine that it is incorrect (1307.6 pcm) and the correct value should be: (1230.2 pcm 60 pcm) NOTE: Review value of minimum required shutdown margin and determine tha t 1.0% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value should be: 1.3% k/k x 1000 pcm/% k/k = 1300 pcm. NOTE: 1230.2 pcm 60 pcm < 1300 pcm is correct. If examinee only catches the shutdown margin limit of 1000 pcm instead of 1300 pcm shutdow n margin will still be adequate   1307.6 pcm  
 
> 1300 pcm or if the examinee catches only the highest stuck rod worth shutdown margin will still be inadequate 1230.2 > 1000 pcm. NOTE: Critical Time ends when examinee completes surveillance or reports unacceptable shutdown margin. Record time that examinee reports unacceptable shutdown margin or completes surveillance: __________
Perform Shutdown Margin Calculation PERFORMANCE STEP                             STANDARD               CIRCLE APPLICABLE
  *6. Review Shutdown Margin                 VERIFY Shutdown Margin by      SAT UNSAT    N/A Verification (step F.5)                 performing the following:      Comments:
NOTE: Review value of available
* Review total corrected rod shutdown margin and                worth to power defect and determine that it is               determine that 3974.6 pcm incorrect (1307.6 pcm)             (+/- 10 pcm) + -2667 (+/- 50 and the correct value             pcm). = 1307.6 pcm (+/- 60 should be:                         pcm) is incorrect and it (1230.2 pcm +/- 60 pcm)             should be: 3897.2 pcm (+/-
10 pcm) + -2667 (+/- 50 pcm). = 1230.2 pcm (+/- 60 NOTE: Review value of                       pcm).
minimum required               o Refer to TRM for Unit 1 shutdown margin and               COLR.
determine that 1.0% k/k x 1000 pcm/% k/k =
* Review the Shutdown 1000 pcm is incorrect             Margin Limit for Modes 1 and the correct value             and 2 from the COLR and should be: 1.3% k/k x            determine that 1.0% k/k x 1000 pcm/% k/k = 1300             1000 pcm/% k/k = 1000 pcm.                              pcm is incorrect and the correct value is: 1.3%
k/k x 1000 pcm/% k/k =
NOTE: 1230.2 pcm +/- 60 pcm <                 1300 pcm.
1300 pcm is correct. If
* Determine the available examinee only catches             shutdown reactivity is less the shutdown margin limit         than the minimum required of 1000 pcm instead of           Shutdown Margin Limit:
1300 pcm shutdown                1230.2 pcm (+/- 60 pcm). <
margin will still be             1300 pcm adequate 1307.6 pcm >
1300 pcm or if the
* Determine shutdown examinee catches only             margin is unacceptable the highest stuck rod             within 45 minutes of JPM worth shutdown margin             start time.
will still be inadequate     o Determine 1BwOSR 1230.2 > 1000 pcm.               3.1.1.1-2 is complete.
NOTE: Critical Time ends when examinee completes surveillance or reports unacceptable shutdown margin.
Record time that examinee reports unacceptable shutdown margin or completes surveillance: __________
Critical time =
Critical time =
_________
_________ - ___________
- ___________
(end time)         (start time) 45 minutes.
(end time)       (start time) 45 minutes. CUE: As SM, acknowledge report of inadequate shutdown margin and/or completion of 1BwOSR 3.1.1.1-2 and asks what their recommended actions are
CUE:     As SM, acknowledge report of inadequate shutdown margin and/or completion of 1BwOSR 3.1.1.1-2 and asks what their recommended actions are.
. VERIFY Shutdown Margin by performing the following:
PERFORMANCE STEP                             STANDARD               CIRCLE APPLICABLE S-112                                                Page 33 of 53
Review total corrected rod worth to power defect and determine that 3974.6 pcm ( 10 pcm) + 
-2667 ( 50 pcm). = 1307.6 pcm ( 60 pcm) is incorrect and it should be:  3897.2 pcm ( 10 pcm) + 
-2667 ( 50 pcm). = 1230.2 pcm ( 60 pcm). o Refer to TRM for Unit 1 COLR. Review the Shutdown Margin Limit for Modes 1 and 2 from the COLR and determine that 1.0
% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value is
:  1.3% k/k x 1000 pcm/% k/k = 1300 pcm. Determine the available shutdown reactivity is less than the minimum required Shutdown Margin Limit:  1230.2 pcm ( 60 pcm). <
1300 pcm  Determine shutdown margin is unacceptable within 45 minutes of JPM start time
. o Determine 1BwOSR 3.1.1.1-2 is complete.
SAT    UNSAT      N/A Comments:  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE


Perform Shutdown Margin Calculation S-112        Page 34 of 53 *7. Review LCO 3.1.4 or 1BwOL 3.1.4. Note: Hand examinee copy of 1BwOL 3.1.4 if asked for.
Perform Shutdown Margin Calculation
Determine that boration is required to be initiated to restore SDM.
  *7. Review LCO 3.1.4 or 1BwOL
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM.
* Determine that boration    SAT UNSAT N/A 3.1.4.                             is required to be initiated Comments:
Note: Hand examinee copy of       to restore SDM.
1BwOL 3.1.4 if asked for.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Verify Worker Tagout Checklist. S-200 Page 35 of 53 TASK TITLE:
S-112                                        Page 34 of 53
Verify Worker Tagout Checklist. JPM No.: S-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.:
 
R-AM-010 K&A IMP: 4.3 EXAMINEE:   SRO   EVALUATOR:
Verify Worker Tagout Checklist.
DATE:
TASK TITLE: Verify Worker Tagout Checklist.
The Examinee:
JPM No.:       S-200                                             REV:           NRC 2014 Task No.:     4E.AM-06                                           K&A No.:       2.2.15 Objective No.: R-AM-010                                           K&A IMP:       4.3 EXAMINEE:                                                         SRO EVALUATOR:                                                       DATE:
PASSED this JPM. TIME STARTED:
The Examinee:         PASSED             this JPM.               TIME STARTED:
FAILED TIME FINISHED:
FAILED                                     TIME FINISHED:
JPM TIM E: MINUTES CRITICAL ELEMENTS:
JPM TIME:               MINUTES CRITICAL ELEMENTS:             (*) 4, 6, 7                       APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                               LOCATION:
(*) 4, 6 , 7 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:
X PERFORM                                         X IN PLANT SIMULATE                                       X SIMULATOR X CLASSROOM GENERAL  
N/A EVALUATION METHOD:
LOCATION:   X PERFORM   X   IN PLANT       SIMULATE   X   SIMULATOR     X   CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 7. OP-AA-109-101, CLEARANC E AND TAGGING, REV 9
: 7.     OP-AA-109-101, CLEARANCE AND TAGGING, REV 9.
. 8. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24
: 8.     BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24.
. 9. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 9.     M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 10. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22
: 10. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22.
. MATERIALS:
MATERIALS:
: 5. OP-AA-109-101, CLEARANCE AND TAGGING.
: 5.     OP-AA-109-101, CLEARANCE AND TAGGING.
: 6. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
: 6.     BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
: 7. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 7.     M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
: 8. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.
: 8.     BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.
TASK STANDARDS:
TASK STANDARDS:
: 7. Verify isolation points correct for 2CV03F.
: 7.     Verify isolation points correct for 2CV03F.
: 8. Determine 2CV8422 position incorrect for 2CV03F.
: 8.     Determine 2CV8422 position incorrect for 2CV03F.
: 9. Determine the sequence of isolation points for 2CV03F is incorrect.
: 9.     Determine the sequence of isolation points for 2CV03F is incorrect.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are an extra supervisor on shift. 2. Unit 2 is at 100% power.
: 1.     You are an extra supervisor on shift.
: 3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
: 2.     Unit 2 is at 100% power.
: 4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV
: 3.     2CV03F, Unit 2 RC Filter, needs to be replaced.
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
: 4.     A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.
INITIATING CUES:
INITIATING CUES:
: 1. Shift Manager asks you to authorize/verify the clearance order.
: 1. Shift Manager asks you to authorize/verify the clearance order.
CUE: Hand examinee partially completed Worker Tagout.
CUE: Hand examinee partially completed Worker Tagout.
: 2. Review the WTO and if any changes are necessary, correct them
: 2. Review the WTO and if any changes are necessary, correct them.
.
S-200                                        Page 35 of 53
Verify Worker Tagout Checklist. S-200 Page 36 of 53 Verify Worker Tagout Checklist. S-200 Page 37 of 53 RECORD START TIME:
 
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Verify Worker Tagout Checklist.
: 1. Refer to BwOP CV
S-200   Page 36 of 53
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
 
CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV
Verify Worker Tagout Checklist.
-10, step F.3. SAT    UNSAT      N/A Comments:  2. Refer to Drawing:
RECORD START TIME:
M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M
PERFORMANCE STEP                     STANDARD             CIRCLE APPLICABLE
-138, sheet 5B. Refer to M
: 1. Refer to BwOP CV-10, CV           Refer to BwOP CV-10, step    SAT UNSAT    N/A FILTERS ISOLATION AND             F.3.                        Comments:
-138, sheet 5B.
RETURN TO SERVICE.
SAT    UNSAT      N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.
CUE: Provide examinee copy of BwOP CV-10.
Determines clearance boundary valves selected are correct: 2CV129 C/S, Demin Hi Temp Divert Valve.
: 2. Refer to Drawing:                Refer to M-138, sheet 5B. SAT UNSAT     N/A
2CV8421, RC Filter Bypass Valve.
* M-138, sheet 5B, DIAGRAM                                     Comments:
2CV8425, RC Filter Inlet Isol Valve.
OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.
2CV8422, RC Filter Outlet Isol Valve.
: 3. Verify the clearance BOUNDARY     Determines clearance        SAT UNSAT    N/A for 2CV03F.                       boundary valves selected are Comments:
2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments:
correct:
Verify Worker Tagout Checklist. S-200 Page 38 of 53 EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4
* 2CV129 C/S, Demin Hi Temp Divert Valve.
& 6. EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.
* 2CV8421, RC Filter Bypass Valve.
* 2CV8425, RC Filter Inlet Isol Valve.
* 2CV8422, RC Filter Outlet Isol Valve.
* 2CV8424, RC Filter Drain Valve.
* 2CV8423, RC Filter Vent Valve.
S-200                               Page 37 of 53
 
Verify Worker Tagout Checklist.
EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4 & 6.
EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.
If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.
If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.
If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.
If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.
When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.
When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
PERFORMANCE STEP                         STANDARD                 CIRCLE APPLICABLE
*4. Determine the clearance SEQUENCE for the 2CV03F is incorrect.
  *4. Determine the clearance             Determines clearance            SAT UNSAT      N/A SEQUENCE for the 2CV03F is           sequence is incorrect:          Comments:
incorrect.                           1. 2CV129 C/S, Demin Hi Temp Divert Valve.
: 2. 2CV8421 RC Filter Bypass Valve.
CUE: Acknowledge as Unit Supervisor and inform        3. 2CV8422 RC Filter examinee the checklist            Outlet Isol Valve.
sequence will be            4. 2CV8425 RC Filter Inlet corrected.                        Isol Valve.
: 5. 2CV8424 RC Filter Drain CUE: Hand examinee corrected              Valve.
worker tagout in accordance with the          5. 2CV8423 RC Filter Vent evaluator note above.              Valve.
o    Notifies SM and NSOs of sequencing error.
: 5. Verify the tag type for 2CV03F.      Verifies clearance tag type:    SAT UNSAT      N/A
* 2CV129 C/S, Demin Hi          Comments:
Temp Divert Valve - CI.
* 2CV8421 RC Filter Bypass Valve - RI.
* 2CV8425 RC Filter Inlet Isol Valve - RD.
* 2CV8422 RC Filter Outlet Isol Valve - RD.
* 2CV8424 RC Filter Drain Valve - RI.
* 2CV8423 RC Filter Vent Valve - RI.
S-200                                  Page 38 of 53


CUE: Acknowledge as Unit Supervisor and inform examinee the checklist sequence will be corrected.
Verify Worker Tagout Checklist.
 
PERFORMANCE STEP                       STANDARD               CIRCLE APPLICABLE
CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.
  *6. Determine the clearance           Determines clearance position  SAT UNSAT    N/A POSITION for the 2CV03F is        is incorrect:                 Comments:
Determines clearance sequence is incorrect:
incorrect.
: 1. 2CV129 C/S, Demin Hi Temp Divert Valve. 2. 2CV8421 RC Filter Bypass Valve.
* 2CV129 C/S, Demin Hi Temp Divert Valve - INFO.
: 3. 2CV8422 RC Filter Outlet Isol Valve.
* 2CV8421 RC Filter Bypass Valve - INFO.
: 4. 2CV8425 RC Filter Inlet Isol Valve.
* 2CV8425 RC Filter Inlet Isol Valve - CLOSED.
: 5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
CUE: Acknowledge as Unit
SAT    UNSAT      N/A Comments: 5. Verify the tag type for 2CV03F.
* 2CV8422 RC Filter Outlet Supervisor and inform          Isol Valve - OPEN.
Verifies clearance tag type:
examinee the checklist
2CV129 C/S, Demin Hi Temp Divert Valve
* 2CV8424 RC Filter Drain position will be                Valve - INFO.
- CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve
corrected.
- RD. 2CV8422 RC Filter Outlet Isol Valve
* 2CV8423 RC Filter Vent Valve - INFO.
- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Vent Valve - RI. SAT    UNSAT      N/A Comments:
CUE: Hand examinee corrected worker tagout in          o   Notifies SM and NSOs of accordance with the            position error.
Verify Worker Tagout Checklist. S-200 Page 39 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
evaluator note above.
*6. Determine the clearance POSITION for the 2CV03F is incorrect.
   *7. Authorize the clearance order.
 
* Sign the WTO                 SAT UNSAT    N/A Authorization signature. Comments:
CUE: Acknowledge as Unit Supervisor and inform examinee the checklist position will be corrected.
CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.
Determines clearance position is incorrect:
2CV129 C/S, Demin Hi Temp Divert Valve  
- INFO. 2CV8421 RC Filter Bypass Valve - INFO. 2CV8425 RC Filter Inlet Isol Valve  
- CLOSED. 2CV8422 RC Filter Outlet Isol Valve  
- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.
SAT    UNSAT      N/A Comments:   *7. Authorize the clearance order.
Sign the WTO Authorization signature.
o Fill in the date and time.
o Fill in the date and time.
SAT    UNSAT      N/A Comments:      CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Verify Worker Tagout Checklist. S-200       Page 40 of 53 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:
S-200                               Page 39 of 53
Mode Dependent:
 
Condition Dependent:
Verify Worker Tagout Checklist.
Production Risk:
ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:             Mode Dependent:               Condition Dependent:
Environmental Risk:
Production Risk:             Environmental Risk:           Atmospheric Risk:           Reactivity Risk:
Atmospheric Risk:
WORKER TAGOUT# P14-005       JOB DESCRIPTION: CHANGE 2CV03F_________________
Reactivity Risk:
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE: Today ___________
WORKER TAGOUT
SECOND APPROVAL: __ Joe NSO      ___________________ DATE: Today ___________
# P14-005 JOB DESCRIPTION
WTO AUTHORIZATION: _             __________________ DATE/TIME __________________
: CHANGE 2CV03F_________________
SPECIAL INSTRUCTIONS:         YES:                 NO:      (IF YES SEE ATTACHMENT 14 PART 2)
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________
EQUIP. TAG/EQUIPMENT         SEQ   TAG     POSITION   HUNG     VERIF. SFTY. RTS     RTS       RTS VERIF.
DATE: Today ___________
NAME                                TYPE                BY        BY     VERIF. SEQ  POSITION      BY  BY 2CV129 C/S (DEMIN HI TEMP     1     CI       INFO                                 3     AS DIVERT VLV)                                                                            REQUIRED 2CV8421 RC FILTER BYPASS     2     RI       INFO                                 1     OPEN VLV 2CV8425 RC FILTER INLET       3     RD     CLOSED                               2   CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET     4     RD       OPEN                                 2   CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN       5     RI       INFO                                 2   CLOSED VLV 2CV8423 RC FILTER VENT       5     RI       INFO                                 2   CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________
SECOND APPROVAL:
__ Joe NSO      ___________________
DATE: Today ___________
WTO AUTHORIZATION: _                     __________________
DATE/TIME __________________
SPECIAL INSTRUCTIONS:
YES:         NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO   3 AS REQUIRED   2CV8421 RC FILTER BYPASS VLV 2 RI INFO   1 OPEN   2CV8425 RC FILTER INLET ISOL VLV  3 RD CLOSED    2 CLOSED   2CV8422 RC FILTER OUTLET ISOL VLV 4 RD OPEN     2 CLOSED   2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED   2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED WTO PLACED: ___________________
__________________________________________  DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTO FINAL CLEAR:
WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ___________________________ DATE/TIME: ___________________
WORK CREWMEMBER RELEASE: ___________________________
DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
S-200                                                Page 40 of 53


Verify Worker Tagout Checklist. S-200        Page 41 of 53  ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:
Verify Worker Tagout Checklist.
Mode Dependent:
ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:             Mode Dependent:               Condition Dependent:
Condition Dependent:
Production Risk:             Environmental Risk:           Atmospheric Risk:           Reactivity Risk:
Production Risk:
WORKER TAGOUT# P14-005       JOB DESCRIPTION: CHANGE 2CV03F_________________
Environmental Risk:
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE: Today ___________
Atmospheric Risk:
SECOND APPROVAL: __ Joe NSO      ___________________ DATE: Today ___________
Reactivity Risk:
WTO AUTHORIZATION: _             __________________ DATE/TIME __________________
WORKER TAGOUT
SPECIAL INSTRUCTIONS:         YES:                 NO:      (IF YES SEE ATTACHMENT 14 PART 2)
# P14-005 JOB DESCRIPTION
EQUIP. TAG/EQUIPMENT         SEQ   TAG     POSITION   HUNG     VERIF. SFTY. RTS     RTS       RTS VERIF.
: CHANGE 2CV03F_________________
NAME                                TYPE                BY        BY     VERIF. SEQ  POSITION      BY  BY 2CV129 C/S (DEMIN HI TEMP     1     CI       INFO                                 3     AS DIVERT VLV)                                                                            REQUIRED 2CV8421 RC FILTER BYPASS     2     RI       INFO                                 1     OPEN VLV 2CV8422 RC FILTER OUTLET     3     RD     CLOSED                               2   CLOSED ISOL VLV 2CV8425 RC FILTER INLET       4     RD     CLOSED                               2   CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN       5     RI       INFO                                 2   CLOSED VLV 2CV8423 RC FILTER VENT       5     RI       INFO                                 2   CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________
DATE: Today ___________
SECOND APPROVAL:
__ Joe NSO      ___________________
DATE: Today ___________
WTO AUTHORIZATION: _                     __________________
DATE/TIME __________________ SPECIAL INSTRUCTIONS:
YES:         NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO   3 AS REQUIRED   2CV8421 RC FILTER BYPASS VLV 2 RI INFO   1 OPEN   2CV8422 RC FILTER OUTLET ISOL VLV 3 RD CLOSED    2 CLOSED   2CV8425 RC FILTER INLET ISOL VLV  4 RD CLOSED    2 CLOSED   2CV8424 RC FILTER DRAIN V LV 5 RI INFO    2 CLOSED   2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED WTO PLACED: ___________________
__________________________________________  DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTO FINAL CLEAR:
WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ___________________________ DATE/TIME: ___________________
WORK CREWMEMBER RELEASE:
___________________________
DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
S-200                                                Page 41 of 53


Verify Worker Tagout Checklist. S-200        Page 42 of 53  ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:
Verify Worker Tagout Checklist.
Mode Dependent:
ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:             Mode Dependent:               Condition Dependent:
Condition Dependent:
Production Risk:             Environmental Risk:           Atmospheric Risk:           Reactivity Risk:
Production Risk:
WORKER TAGOUT# P14-005       JOB DESCRIPTION: CHANGE 2CV03F_________________
Environmental Risk:
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE: Today ___________
Atmospheric Risk:
SECOND APPROVAL: __ Joe NSO      ___________________ DATE: Today ___________
Reactivity Risk:
WTO AUTHORIZATION: _             __________________ DATE/TIME __________________
WORKER TAGOUT
SPECIAL INSTRUCTIONS:         YES:                 NO:      (IF YES SEE ATTACHMENT 14 PART 2)
# P14-005 JOB DESCRIPTION
EQUIP. TAG/EQUIPMENT         SEQ   TAG     POSITION   HUNG     VERIF. SFTY. RTS     RTS       RTS VERIF.
: CHANGE 2CV03F_________________
NAME                                TYPE                BY       BY    VERIF. SEQ  POSITION      BY  BY 2CV129 C/S (DEMIN HI TEMP     1     CI       INFO                                 3     AS DIVERT VLV)                                                                            REQUIRED 2CV8421 RC FILTER BYPASS     2     RI       INFO                                 1     OPEN VLV 2CV8425 RC FILTER INLET       3     RD     CLOSED                               2   CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET     4     RD     CLOSED                               2   CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN       5     RI       INFO                                 2   CLOSED VLV 2CV8423 RC FILTER VENT       5     RI       INFO                                 2   CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________
WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
DATE: Today ___________
WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ___________________________ DATE/TIME: ___________________
SECOND APPROVAL:
__ Joe NSO      ___________________
DATE: Today ___________
WTO AUTHORIZATION: _                     __________________
DATE/TIME __________________
SPECIAL INSTRUCTIONS:
YES:         NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO   3 AS REQUIRED   2CV8421 RC FILTER BYPASS VLV 2 RI INFO   1 OPEN   2CV8425 RC FILTER INLET ISOL VLV  3 RD CLOSED    2 CLOSED   2CV8422 RC FILTER OUTLET ISOL VLV 4 RD CLOSED    2 CLOSED   2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED   2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED     WTO PLACED: ___________________
__________________________________________  DATE/TIME: ___________________ WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTO FINAL CLEAR:
WORK CREWMEMBER RELEASE:
___________________________
DATE/TIME: ___________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)
S-200                                                Page 42 of 53


Review Containment Release for Approval S-300 Page 43 of 53  TASK TITLE: Review Containment Release for Approval
Review Containment Release for Approval TASK TITLE: Review Containment Release for Approval JPM No.: S-300                                                         REV: NRC 2014 TPO No.: 8C.HP-002                                                     K&A No.: 2.3.11 TASK No.: S-HP-002: Authorize Gaseous (Containment                     K&A IMP: 4.3 or Gas Decay Tank) Rad Waste Release EXAMINEE:                                                             RO      SRO    (circle one)
 
EVALUATOR:                                                             DATE:
JPM No.:
The Examinee:         PASSED             this JPM.                   TIME STARTED:
S-300   REV: NRC 2014 TPO No.: 8C.HP
FAILED                                         TIME FINISHED:
-002   K&A No.: 2.3.11 TASK No.: S
JPM TIME:                   MINUTES CRITICAL ELEMENTS:             (*) 3, 4, 6                             APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:                 N/A EVALUATION METHOD:                                                     LOCATION:
-HP-002: Authorize Gaseous (Containment K&A IMP: 4.3 or Gas Decay Tank) Rad Waste Release   EXAMINEE:   RO      SRO    (circle one)
X PERFORM                                               X IN PLANT SIMULATE                                             X SIMULATOR X CLASSROOM GENERAL  
 
EVALUATOR:
DATE:   The Examinee:
PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS:
(*) 3, 4, 6 APPROX COMPLETION TIME: 30 MINUTE S  CRITICAL TIME:
N/A EVALUATION METHOD:
LOCATION:   X   PERFORM   X   IN PLANT       SIMULATE   X   SIMULATOR     X   CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 11. 1BwOS RETS 2.2.B
: 11. 1BwOS RETS 2.2.B-1, Rev 2, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)
-1, Rev 2, Unit One Pre
-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE
-PR001A/B/C)
: 12. RP-BR-980, Rev 12, Containment Vent And Mini Purge Gaseous Effluents MATERIALS:
: 12. RP-BR-980, Rev 12, Containment Vent And Mini Purge Gaseous Effluents MATERIALS:
: 1. Copy of partially completed RP
: 1. Copy of partially completed RP-BR-980 TASK STANDARDS:
-BR-980 TASK STANDARDS:
: 1. Review RP-BR-980.
: 1. Review RP-BR-980. 2. Determine release cannot proceed due to error in RP
: 2. Determine release cannot proceed due to error in RP-BR-980.
-BR-980. TASK CONDITIONS: 1. You are the Unit 1 Unit Supervisor.
TASK CONDITIONS:
: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.
: 3. A Unit 1 Containment release package has been initiated to lower containment pressure.
: 3. A Unit 1 Containment release package has been initiated to lower containment pressure.
: 4. 1BwOS RETS 2.2.B-1 has been previously completed, reviewed and approved.
: 4. 1BwOS RETS 2.2.B-1 has been previously completed, reviewed and approved.
INITIATING CUES:
INITIATING CUES:
: 1. The U1 Assist NSO has completed Containment Release package G 001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
: 1. The U1 Assist NSO has completed Containment Release package G-14-001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
: 2. Inform the U1 Admin NSO when the release package review is complete.
: 2. Inform the U1 Admin NSO when the release package review is complete.
S-300                                              Page 43 of 53


Review Containment Release for Approval S-300 Page 44 of 53 RECORD START TIME:
Review Containment Release for Approval RECORD START TIME:
PERFORMANCE STEP STANDARD Circle Applicable
PERFORMANCE STEP                         STANDARD                   Circle Applicable
: 1. Refer to partially completed RP
: 1. Refer to partially completed RP-BR-980,
-BR-980, Section C Cue: (If asked) Gaseous Release in progress sign has been placed and the 0A VA exhaust fan is in operation.
* Reads Step D, determines    SAT UNSAT    N/A Section C                                   SRO approval required.      Comments:
Reads Step D, determines SRO approval required.
Cue:     (If asked) Gaseous Release in
Reviews entire document SAT    UNSAT      N/A Comments: 2. Review Section A   Reviews steps A.5.d Determines baseline values for ALERT and ALARM setpoints apply
* Reviews entire document progress sign has been placed and the 0A VA exhaust fan is in operation.
. SAT    UNSAT      N/
: 2. Review Section A
A Comments: *3. Determines HIGH Alarm Setpoint was incorrectly established Identifies that the value entered for the HIGH Alarm Setpoint is in error and should be 6.06E
* Reviews steps A.5.d       SAT UNSAT    N/A
-04Ci/cc. SAT    UNSAT      N/A Comments: *4. Determines ALERT Alarm Setpoint was incorrectly established Identifies that the value entered for the ALERT Alarm Setpoint is in error and should be 6.06E
* Determines baseline       Comments:
-05Ci/cc. SAT    UNSAT      N/A Comments: 5. Review Section C Cue:  Shift Manager acknowledges step A.5.d error failure.
values for ALERT and ALARM setpoints apply.
Identify from review that section C.1.c should have been N/A. SAT    UNSAT      N/A Comments: *6. Determines HIGH and ALERT Alarm Setpoint was incorrectly inputted Identify that the operator incorrectly inputted 7.23E-3Ci/cc into the High and Alert alarm setpoints instead of 7.23E-6Ci/cc in section C.1.c. Also determines that 7.23E
*3. Determines HIGH Alarm Setpoint was
-6Ci/cc is incorrect and the HIGH Alarm Setpoint is in error and should be 6.06E
* Identifies that the value   SAT UNSAT    N/A incorrectly established                    entered for the HIGH       Comments:
-04Ci/cc and ALERT Alarm Setpoint is in error and should be 6.06E
Alarm Setpoint is in error and should be 6.06E-04&#xb5;Ci/cc.
-05Ci/cc SAT    UNSAT      N/A Comments: *7. Refuse to approve release until HIGH Alarm and ALERT Alarm setpoints are correctly entered.
*4. Determines ALERT Alarm Setpoint
Determine release is unable to be performed (cannot be signed) until errors are resolved.
* Identifies that the value   SAT UNSAT    N/A was incorrectly established                entered for the ALERT       Comments:
SAT    UNSAT      N/A Comments:  CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:
Alarm Setpoint is in error and should be 6.06E-05 &#xb5;Ci/cc.
 
: 5. Review Section C
* Identify from review that SAT UNSAT    N/A section C.1.c should have Comments:
been N/A.
Cue: Shift Manager acknowledges step A.5.d error failure.
  *6. Determines HIGH and ALERT Alarm
* Identify that the operator SAT UNSAT    N/A Setpoint was incorrectly inputted           incorrectly inputted       Comments:
7.23E-3 &#xb5;Ci/cc into the High and Alert alarm setpoints instead of 7.23E-6 &#xb5;Ci/cc in section C.1.c. Also determines that 7.23E-6 &#xb5;Ci/cc is incorrect and the HIGH Alarm Setpoint is in error and should be 6.06E-04 &#xb5;Ci/cc and ALERT Alarm Setpoint is in error and should be 6.06E-05 &#xb5;Ci/cc
*7. Refuse to approve release until HIGH
* Determine release is      SAT UNSAT    N/A Alarm and ALERT Alarm setpoints are         unable to be performed     Comments:
correctly entered.                          (cannot be signed) until errors are resolved.
CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:
COMMENTS:
COMMENTS:
Perform Nuclear Accident Reporting System Notification S-41 3 Page 45 of 53 TASK TITLE:
S-300                                          Page 44 of 53
Perform Nuclear Accident Reporting System Notification JPM No.: S-413 REV: NRC 2014 TPO No.: 7.F.ZP-001 K&A No.: 2.4.40 TASK No.: S-ZP-001:  Complete the NARS Form K&A IMP: 4.5 EXAMINEE:  SRO  EVALUATOR:
DATE:  The Examinee:
PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:  MINUTES  CRITICAL ELEMENTS:
(*) 4, 13, 14 APPROX COMPLETION TIME:
13 MINUTES  CRITICAL TIME:
15 minutes


EVALUATION METHOD:
Perform Nuclear Accident Reporting System Notification TASK TITLE: Perform Nuclear Accident Reporting System Notification JPM No.:    S-413                                            REV:      NRC 2014 TPO No.:    7.F.ZP-001                                        K&A No.:      2.4.40 TASK No.:    S-ZP-001: Complete the NARS Form                  K&A IMP:      4.5 EXAMINEE:                                                      SRO EVALUATOR:                                                    DATE:
LOCATION:     X   PERFORM       IN PLANT       SIMULATE   X   SIMULATOR     X   CLASSROOM GENERAL  
The Examinee:      PASSED              this JPM.              TIME STARTED:
FAILED                                    TIME FINISHED:
JPM TIME:            MINUTES CRITICAL ELEMENTS:          (*) 4, 13, 14                    APPROX COMPLETION TIME:
13 MINUTES CRITICAL TIME:              15 minutes EVALUATION METHOD:                                             LOCATION:
X PERFORM                                           IN PLANT SIMULATE                                       X SIMULATOR X CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 13. EP-AA-112, Rev 16, ERO/ERF Activation and Operation
: 13. EP-AA-112, Rev 16, ERO/ERF Activation and Operation.
. 14. EP-MW-114-100, Rev 13, MW Region Offsite Notifications
: 14. EP-MW-114-100, Rev 13, MW Region Offsite Notifications.
. 15. EP-AA-111, Rev 18, Emergency Classification and Protective Action Recommendations
: 15. EP-AA-111, Rev 18, Emergency Classification and Protective Action Recommendations.
. 16. EP-MW-1 14-100-F-01, Rev G, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. 17. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
: 16. EP-MW-114-100-F-01, Rev G, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
 
: 17. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
MATERIALS:
MATERIALS:
: 2. EP-AA-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
: 2. EP-AA-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
: 3. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
: 3. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
: 4. EP-MW-114-100, Rev 13, MW Region Offsite Notifications.
: 4. EP-MW-114-100, Rev 13, MW Region Offsite Notifications.
TASK STANDARDS:
TASK STANDARDS:
: 10. Complete NARS form.
: 10. Complete NARS form.
: 11. Determine Protective Action Recommendations.
: 11. Determine Protective Action Recommendations.
: 12. Perform Notifications.
: 12. Perform Notifications.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are the Shift Emergency Director and the crew is performing 1BwFR
: 1. You are the Shift Emergency Director and the crew is performing 1BwFR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK.
-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK.
: 2. No release is occurring.
: 2. No release is occurring.
: 3. A general emergency has just been declared under MG2, due to the ATWS and Loss of Heat Sink.
: 3. A general emergency has just been declared under MG2, due to the ATWS and Loss of Heat Sink.
: 4. No hostile action in progress.
: 4. No hostile action in progress.
: 5. No impediments to evacuation.
: 5. No impediments to evacuation.
Page 45 of 53 S-413


Perform Nuclear Accident Reporting System Notification S-41 3 Page 46 of 53 6. This is a Time Critical JPM.
Perform Nuclear Accident Reporting System Notification
: 6. This is a Time Critical JPM.
INITIATING CUES:
INITIATING CUES:
The Emergency Plan requires that you COMPLETE AND TRANSMIT the initial NARS form. The Accident was just classified as a General Emergency, MG2, due to the ATWS and Loss of Heat Sink
The Emergency Plan requires that you COMPLETE AND TRANSMIT the initial NARS form. The Accident was just classified as a General Emergency, MG2, due to the ATWS and Loss of Heat Sink.
.
Page 46 of 53 S-413
Perform Nuclear Accident Reporting System Notification S-41 3 Page 47 of 53 RECORD START TIME
:  (Start time is after the student accepts and understands the task)
PERFORMANCE STEP STANDARD Circle applicable
: 1. Refer to NARS form
. CUE: Provide copy of NARS form to examinee (and


EP-MW-114-100 if a sked and EP-AA-111-F-02, Braidwood Plant Based PAR Flowchart if  
Perform Nuclear Accident Reporting System Notification RECORD START TIME:                                          (Start time is after the student accepts and understands the task)
PERFORMANCE STEP                STANDARD            Circle applicable
: 1. Refer to NARS form.        Refer to NARS form.      SAT UNSAT N/A CUE: Provide copy of                                Comments:
NARS form to examinee (and EP-MW-114-100 if asked and EP-AA-111-F-02, Braidwood Plant Based PAR Flowchart if asked)
: 2. Record Utility Message    Enters number 1.        SAT UNSAT Number.                                              N/A Comments:
: 3. Record State Message      Enters N/A.            SAT UNSAT Number.                                              N/A Comments:
  *4. Complete Sections 1-4. Completes sections 1-4    SAT UNSAT as follows:              N/A Comments:
o  Status - [1B]
Drill/Exercise o  Station- [2A]
Braidwood
* On-Site Condition -
[3D] General Emergency o  Accident Classified -
Time:
No later than Current Time Date: Todays Date
* EAL#: MG2 o  Accident Terminated -
Time and Date: N/A
: 5. Release Status.            [5A] None                SAT UNSAT Place X by occurring                              N/A Comments:
: 6. Type of Release.          [6A] Not Applicable      SAT UNSAT Place "X" by Gaseous                                N/A Comments:
: 7. Check Wind Direction and  Record actual data from  SAT UNSAT speed.                    PPDS:                    N/A Comments:
CUE: Wind direction is    o  Direction (~270 deg) 270 deg.
Wind speed is 10    o  Speed (mark units) mph    (~10 mph)
Page 47 of 53 S-413


asked)  Refer to NARS form
Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP                STANDARD            Circle applicable
. SAT     UNSAT     N/A Comments: 2. Record Utility Message Number. Enters number "1"
: 8. Recommended Actions        In block 9, Check box:    SAT UNSAT from EP-AA-111-F-02.                                  N/A o  [9D] Evacuate Illinois Comments:
. SAT     UNSAT     N/A Comments: 3. Record State Message Number. Enters "N/A". SAT     UNSAT      N/A Comments: *4. Complete Sections 1
Sub Areas 1,3,10
-4. Completes sections 1
: 9. Enter additional info. Record none in block 10  SAT UNSAT N/A Comments:
-4 as follows:
: 10. NARS form approved by
o Status - [1B] Drill/Exercise o Station- [2A] Braidwood  On-Site Condition
* Sign the Approved by SAT UNSAT Shift Emergency Director.     line                  N/A Comments:
- [3D] General Emergency o Accident Classified
CUE: No Verifier is available to second check the NARS form
-Time: No later than Current Time Date: Today's Date EAL#: MG2 o Accident Terminated
: 11. Refer to EP-MW-114-100,    Refer to EP-MW-114-100:   SAT UNSAT MW REGION OFFSITE
- Time and Date: N/A  SAT     UNSAT     N/A Comments: 5. Release Status
* Determine step 4.2      N/A NOTIFICATIONS.                needs to be            Comments:
. Place "X" by occurring
performed.
[5A] None SAT     UNSAT N/A Comments: 6. Type of Release
12 Refer to EP-MW-114-100-    Refer to EP-MW-114-100-    SAT UNSAT F-01, NUCLEAR              F-01:                      N/A ACCIDENT REPORTING
. Place "X" by Gaseous
* Determine NARS          Comments:
[6A] Not Applicable
SYSTEM (NARS) FORM.           Code 38 to be used to transmit NARS form.
Page 48 of 53 S-413


SAT     UNSAT N/A Comments: 7. Check Wind Direction and speed. CUE: Wind direction is 270 deg. Wind speed is 10 mph  Record actual data from PPDS:  o Direction (~270 deg) o Speed (mark units)
Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP                  STANDARD            Circle applicable
(~10 mph)  SAT    UNSAT      N/A Comments:
*13. Establish                Establish communications  SAT UNSAT communications:          as follows:                N/A
Perform Nuclear Accident Reporting System Notification S-41 3 Page 48 of 53  PERFORMANCE STEP STANDARD Circle applicable
* Pick up NARS phone.      Comments:
: 8. Recommended Actions from EP-AA-111-F-02. In block 9, Check box:
Note: After examinee
o [9D] Evacuate Illinois Sub Areas 1,3,10 SAT    UNSAT      N/A Comments: 9. Enter additional info
* DIAL code 38.
. Record "none" in block 10
dials Code 38, provide the
* Read the following following cue:        message:This is Exelon Nuclear CUE: After a short            Braidwood Station pause, a beep is       Control Room. Please heard, followed by    standby for a NARS a seven more          message.
beeps, for a total of 8 beeps.        o Read the following NOTE: If Examinee dials      message:This is the Code 20 (which is      Exelon Nuclear wrong) use Code        Braidwood Station 20 cue.                Control room. Please Otherwise use          standby to receive a Code 38 Cue.          NARS message and respond as the roll is Note: After examinee          called.
reads messages,
* TAKE Initial Roll Call provide the following cue:
* Mark Initial Boxes for CUE Code 38: IEMA
* IEMA online,
* Grundy Co. Sheriff Grundy Co.
* Kankakee Co. Sheriff Sheriff online
                                  *Will Co. Sheriff Kankakee Co.
Sheriff online
* Illinois REAC Will Co. Sheriff
* Grundy Co. EMA online              *Kankakee Co. EOC Illinois REAC
* Will Co. EOC.
online            o Record time and date Grundy Co. EMA        initial roll call online                complete.
Kankakee Co.
EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online Note: Once initial roll call is complete critical time STOPS:
Page 49 of 53 S-413


SAT    UNSAT N/A Comments:  10. NARS form approved by Shift Emergency Director
Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP               STANDARD             Circle applicable EVALUATOR NOTE: Critical time TIME STOPS when completes initial roll call of the NARS form.
. CUE: No Verifier is available to second check the NARS form  Sign the 'Approved by' line SAT    UNSAT N/A Comments: 1 1. Refer to EP
-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
Refer to EP
-MW-114-100:  Determine step 4.2 needs to be performed.
SAT    UNSAT      N/A Comments: 1 2 Refer to EP
-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
Refer to EP
-MW-114-100-F-01:  Determine NARS Code 38 to be used to transmit NARS form.
SAT    UNSAT N/A Comments:
Perform Nuclear Accident Reporting System Notification S-41 3 Page 49 of 53  PERFORMANCE STEP STANDARD Circle applicable
*1 3. Establish communications:
Note: After examinee dials Code 38, provide the following cue:
CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.
NOTE:  If Examinee dials Code 20 (which is wrong) use Code 20 cue.
Otherwise use Code 38 Cue.
Note: After examinee reads messages, provide the following cue:
CUE Code 38: IEMA online,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online  Will Co. EOC online CUE Code 20: IEMA online,  Illinois REAC online Note: Once initial roll call is complete critical time STOPS: Establish communications as follows:
Pick up NARS phone.
DIAL code 38.
Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message." o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called."  TAKE Initial Roll Cal l  Mark Initial Boxes for IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA Kankakee Co. EOC Will Co. EOC.
o Record time and date initial roll call complete. SAT    UNSAT      N/A Comments:
Perform Nuclear Accident Reporting System Notification S-41 3 Page 50 of 53  PERFORMANCE STEP STANDARD Circle applicable EVALUATOR NOTE: Critical time TIME STOPS when completes initial roll call of the NARS form.
Determine critical time:
Determine critical time:
_________________________   -   ________________________   =   ________________________
_________________________ - ________________________ =
(Initial roll call complete)                       (JPM start time)                                      
________________________
< 15 minutes
(Initial roll call complete)           (JPM start time)                       <
15 minutes Page 50 of 53 S-413
 
Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP              STANDARD                Circle applicable
*14. Verbally transmit the    Verbally transmit the        SAT UNSAT NARS Form.              NARS Form:                    N/A
* Utility Message No:        Comments:
1_
* State Message No:
N/A
* Status - [B]
Drill/Exerci se
* Station - [A]
Braidwood
* Onsite Condition - [D]
General Emergency
* Accident Classified:
* Time: When JPM started.
* Date: Today.
* EAL # : MG2
* Accident Terminated Date and Time: N/A
* Release Status: [A]
None
* Type of Release: [A]
Not Applicable
* Wind Dir: 270
* Wind Speed:
o [A] is N/A
                                      * [B] 10 Miles/Hr
* Utility recommendation:
                                      * [D] Evacuate Illinois Sub Areas 1,3,10
                              * (Block 10) Additional Information
: None Verified With: N/A Approved By: S. Manager Page 51 of 53 S-413


Perform Nuclear Accident Reporting System Notification S-41 3 Page 51 of 53  PERFORMANCE STEP STANDARD Circle applicable
Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP                   STANDARD           Circle applicable
*1 4. Verbally transmit the NARS Form.
: 15. Complete the NARS form. Fill in the following      SAT UNSAT information on the NARS   N/A Form after transmitting    Comments:
info in blocks 1-10:
* Mark 11A, EXELON CUE:  IF examinee asks
* Examinee Name for a phone number to use,
* Outside line number provide: outside
* Current Time line is 815-458-
* Current Date 7882.
* Name of person from IEMA receiving message CUE: John Smith, IEMA.
* Organization (IEMA)
* Current time
* Todays date
: 16. Perform Final Roll Call    PERFORM Final Roll Call    SAT UNSAT and marks boxes for:      N/A Note: As examinee
* IEMA                    Comments:
performs final roll
* Grundy Co. Sheriff call provide the following cues:
* Kankakee Co. Sheriff CUE Code 38: IEMA
* Will Co. Sheriff online,
* Illinois REAC Grundy Co.
* Grundy Co. EMA, Sheriff online
* Kankakee Co. EOC Kankakee Co.
Sheriff online
* Will Co. EOC Will Co. Sheriff
* Ask if there are any online                  questions about the information provided.
Illinois REAC online Grundy Co. EMA online Kankakee Co.
EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.
Page 52 of 53 S-413


Verbally transmit the NARS Form:
Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP             STANDARD             Circle applicable
Utility Message No:
: 17. STATE NARS              STATE NARS             SAT UNSAT communication is        communication is        N/A complete.               complete.               Comments:
1_  State Message No: N/A  Status - [B] Drill/Exerci se  Station - [A] Braidwood  Onsite Condition - [D] General Emergency Accident Classified:
CUE: THIS COMPLETES THIS JPM.
Time: When JPM started. Date: Today. EAL # : MG 2  Accident Terminated Date and Time: N/A  Release Status: [A] None  Type of Release: [A] Not Applicable Wind Dir:
RECORD STOP TIME:
270  Wind Speed:
COMMENTS:
o [A] is N/A
Page 53 of 53 S-413}}
[B] 10 Miles/Hr  Utility recommendation:
[D] Evacuate Illinois Sub Areas 1,3,10 (Block 10) Additional Information
: None Verified With: N/A Approved By: S. Manager SAT    UNSAT      N/A Comments:
Perform Nuclear Accident Reporting System Notification S-41 3 Page 52 of 53  PERFORMANCE STEP STANDARD Circle applicable 1 5. Complete the NARS form.
CUE: IF examinee asks for a phone number to use, provide: outside line is 815
-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1
-10:  Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message  Organization (IEMA)
Current time Today's date SAT     UNSAT N/A Comments: 1 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:
CUE Code 38: IEMA online,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online,  Illinois REAC online CUE: No questions.
PERFORM Final Roll Call and marks boxes for:
IEM A  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA,  Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.
SAT    UNSAT      N/A Comments:
Perform Nuclear Accident Reporting System Notification S-41 3 Page 53 of 53  PERFORMANCE STEP STANDARD Circle applicable 1 7. STATE "NARS communication is complete."  STATE "NARS communication is complete."
SAT    UNSAT      N/A Comments:     CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME
:
COMMENTS:}}

Revision as of 18:20, 31 October 2019

2014 Braidwood Station Initial License Examination Proposed Administrative JPMs
ML14365A133
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A989 List:
References
50-456/OL-14, 50-457/OL-14
Download: ML14365A133 (53)


Text

Complete NRC Active License Maintenance Log JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an active licensed NSO for the past year.
2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014.
3. All positions were appropriately logged in the SM log for during this time period.

INITIATING CUES:

1. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP-AA-105-102.
2. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.

R-109 Page 1 of 53

Complete NRC Active License Maintenance Log RO Work History:

Hours Day Date Shift Worked Job Position/Assignment Week 1 M 6/30/14 D 12 Unit 1 NSO T 7/1/14 D 12 Extra NSO in control room W 7/2/14 D 12 Unit 2 Admin NSO Th 7/3/14 D 12 Extra NSO in control room F 7/4/14 N/A Day Off S 7/5/14 N/A Day Off S 7/6/14 N/A Day Off Week 2 M 7/7/14 D 12 Clearance Order Writer T 7/8/14 D 12 Clearance Order Writer W 7/9/14 D 12 Clearance Order Writer Th 7/10/14 D 12 Clearance Order Writer F 7/11/14 N/A Day Off S 7/12/14 N/A Day Off S 7/13/14 N/A Day Off Week 3 M 7/14/14 N/A Day Off T 7/15/14 N/A Day Off W 7/16/14 N/A Day Off Th 7/17/14 N/A Day Off F 7/18/14 D 12 Unit 1 Admin (relieved 2 hrs for NRC physical)

S 7/19/14 D 12 Unit 1 NSO S 7/20/14 D 12 Unit 2 NSO Week 4 M 7/21/14 N/A Day Off T 7/22/14 N/A Day Off W 7/23/14 N/A Day Off Th 7/24/14 N/A Day Off F 7/25/14 N 12 Unit 2 Admin (relieved 2 hrs for PHC meeting)

S 7/26/14 N 12 Extra NSO in control room S 7/27/14 N 12 Unit 1 Admin NSO Week 5 M 7/28/14 N/A Day Off T 7/29/14 T 8 Requal Training W 7/30/14 T 8 Requal Training Th 7/31/14 T 8 Requal Training F 8/1/14 T 8 Requal Training S 8/2/14 N/A Day Off S 8/3/14 N/A Day Off Weeks 6 and 7 8/4/14 thru 8/17/14 N/A ON VACATION R-109 Page 2 of 53

Complete NRC Active License Maintenance Log RO Work History continued:

Hours Day Date Shift Worked Job Description Week 8 M 8/18/14 N/A Day Off T 8/19/14 N/A Day Off W 8/20/14 N/A Day Off Th 8/21/14 N/A Day Off F 8/22/14 D 12 Clearance Order Writer S 8/23/14 D 12 Unit 2 NSO S 8/24/14 D 12 Unit 2 Admin NSO Week 9 M 8/25/14 N/A Day Off T 8/26/14 N/A Day Off W 8/27/14 N/A Day Off Th 8/28/14 N/A Day Off F 8/29/14 N 12 Extra NSO in control room S 8/30/14 N 12 Unit 1 NSO S 8/31/14 N 12 Unit 2 NSO Week 10 M 9/1/14 N/A Day Off T 9/2/14 T 8 Requal Training W 9/3/14 T 8 Requal Training Th 9/4/14 T 8 Requal Training F 9/5/14 T 8 Requal Training S 9/6/14 N/A Day Off S 9/7/14 N/A Day Off Weeks 11 thru 13 9/8/14 thru 9/28/14 ON VACATION Week 14 M 9/29/14 N/A Day Off T 9/30/14 N/A Day Off W 10/1/14 N/A Day Off Th 10/2/14 N/A Requal Training F 10/3/14 D 12 Unit 1 NSO S 10/4/14 D 12 Unit 1 Admin NSO S 10/5/14 D 12 Unit 2 NSO R-109 Page 3 of 53

Complete NRC Active License Maintenance Log TASK TITLE: Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2014 NRC Task No.: R-AM-075 K/A No.: 2.1.4 Objective No.: 4E.AM-75 K/A IMP: 3.3/3.8 EXAMINEE: RO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4, 5, 6, 7, 8 APPROX COMPLETION TIME: 10 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE. rev. 11.
2. 10CFR55.53(e)

MATERIALS:

1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.

TASK STANDARDS:

2. Determine shift activities that are credited toward active license maintenance.
3. Complete OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log.

TASK CONDITIONS:

1. You are an active licensed NSO for the past year.
2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014.
3. All positions were appropriately logged in the SM log for during this time period.

INITIATING CUES:

3. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP-AA-105-102.
4. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.

R-109 Page 4 of 53

Complete NRC Active License Maintenance Log RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to OP-AA-105-102, NRC Refer to OP-AA-105-102: SAT UNSAT N/A ACTIVE LICENSE
  • Determines Attachment 1 Comments:

MAINTENANCE. needs to be completed.

CUE: Provide examinee copy of OP-AA-105-102.

2. Complete upper section of
  • From initiating cue, writes 3rd SAT UNSAT N/A Attachment 1. quarter of 2014. Comments:
  • From initiating cue, writes examinee name and circles ACTIVE license status.
  • Write employee number.
  • 3. Complete date column of table
  • Lists at least 5 dates of the SAT UNSAT N/A on Attachment 1. shifts listed below, from Comments:

attached schedule, that count as credited days Note: Any date listed in June or toward license maintenance.

October would not be within the 3rd quarter of o RO (any 5 of 8) the year, thereby o 7/2/14 D 12 2 incorrect. o 7/19/14 D 12 1 o 7/20/14 D 12 2 o 7/27/14 N 12 1 o 8/23/14 D 12 2 o 8/24/14 D 12 2 o 8/30/14 N 12 1 o 8/31/14 N 12 2

  • 4. Complete shift column of table
  • List the shift worked (N or D SAT UNSAT N/A on Attachment 1. as applicable) Comments:
  • 5. Complete length column of
  • List the shift length (12 SAT UNSAT N/A table on Attachment 1. hours) Comments:
  • 6. Complete unit column of table
  • List the applicable unit SAT UNSAT N/A on Attachment 1. Comments:
  • 7. Complete position and SM log
  • Circle the RO position SAT UNSAT N/A columns on Attachment 1. o Circle Y on SM log. Comments:

R-109 Page 5 of 53

Complete NRC Active License Maintenance Log PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 8. Complete signature columns on
  • Sign under signature. SAT UNSAT N/A Attachment 1. . Comments:
9. Give completed Attachment 1 to SAT UNSAT N/A evaluator. Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

R-109 Page 6 of 53

Complete NRC Active License Maintenance Log ATTACHMENT 1 Active License Tracking Log Page 1 of 1 Employee Number: ____________

SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2014__(YEAR)

____Examinees Name____ ACTIVE / INACTIVE Name of License Holder License Status At Start (Print) Quarter (circle one)

RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8-hour or 8/12-hour schedule, enter a 1 for the midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> length for which turnovers were conducted). Seven shifts at least 8-hours in length are required per quarter. If working a straight 12-hour schedule, enter a N for night shift or a D for dayshift (only enter shifts at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in length for which turnovers were conducted). Five 12-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8- and 12-hour shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG 1021, Revision 9)

DATE SHIFT LENGTH UNIT POSITION SM SIGNATURE (circle one) log Logged 7/2/14 D 12 2 FHS SM US RO Y/N Examinees Signature Logged 7/19/14 D 12 1 FHS SM US RO Y/N Examinees Signature Logged 7/20/14 D 12 2 FHS SM US RO Y/N Examinees Signature Logged 7/27/14 N 12 1 FHS SM US RO Y/N Examinees Signature Logged 8/23/14 D 12 2 FHS SM US RO Y/N Examinees Signature Logged 8/24/14 D 12 2 FHS SM US RO Y/N Examinees Signature Logged 8/30/14 N 12 1 FHS SM US RO Y/N Examinees Signature Logged 8/31/14 N 12 2 FHS SM US RO Y/N Examinees Signature At least 5 of the 8 rows above.

R-109 Page 7 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

TASK TITLE: Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

JPM No.: R-110 REV: 2014 NRC TPO No.: 4C.AP-04 K&A No.: 2.1.31 TASK No.: R-AP-017, Perform Offsite AC power K&A IMP: 4.6 Availability Surveillance.

EXAMINEE: RO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 5, 7, 9 APPROX COMPLETION TIME: 13 MINUTES CRITICAL TIME: 45 Minutes EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOSR 3.8.1.1, Rev. 4, Unit One Offsite AC Power Availability Surveillance MATERIALS:
1. 1BwOSR 3.8.1.1 TASK STANDARDS:
1. Partial completion of surveillance 1BwOSR 3.8.1.1.

TASK CONDITIONS:

1. You are an extra NSO.
2. The Unit is at power.
3. Unit 2 is at full power.
4. Unit 2 4KV ESF buses are being supplied from Unit 2 SATs.
5. All Unit 2 Switchyard and 4KV breakers are available.
6. 15 minutes ago the 1A D/G was declared inoperable.

INITIATING CUES:

1. The US has directed you to perform 1BwOSR 3.8.1.1, Unit One Offsite AC Power Availability Surveillance, subsection F.1.0 and notify the US when you have completed it.
2. This is a time critical JPM.

R-110 Page 8 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

RECORD START TIME:

Note: Only provide cues that are not available in the simulator. Provide a copy of the surveillance.

PERFORMANCE STEP STANDARD Circle applicable

1. Record Initial Data. On the Modes 1-4 Data Sheet, SAT UNSAT N/A RECORD: Comments:

CUE: All Prerequisites, Precautions, Limitations

  • Unit 1 Mode (1).

and Actions have been

  • Unit 2 Mode (1).

met.

NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.

Record critical time start time:

__________

2. Check 345 KV Transmission Line At 0PM03J, OBSERVE: SAT UNSAT N/A Status. Comments:

On the Modes 1-4 Data Sheet, CIRCLE ENERGIZED for each:

  • Line 0104.

CUE: All 345 KV Transmission

  • Line 2001.

Lines are energized.

  • Line 2002.
  • Line 0103.
  • Line 2003.
  • Line 2004.
3. Indicate all closed and open Check status of all 345 KV Swyd SAT UNSAT N/A switchyard breakers. breakers. Comments:

On the Data Sheet Drawing of the 345 KV swyd, INDICATE:

CUE: All Swyd breakers

  • Closed breakers with X.

indicate closed.

o Open breakers with O.

  • 4. Trace paths for independent power On the Data Sheet Drawing of the SAT UNSAT N/A sources to the Unit 1 and 2 SATs. 345 KV Swyd, TRACE: Comments:

CUE: All 345 KV Transmission

  • Single path along the dashed Lines are energized. lines from any energized offsite power source to the Unit 1 SAT banks.
  • Second path along the dashed lines from a second independent energized offsite power source to the Unit 2 SAT banks. (Cant retrace any portion of the first path).

o Verify two independent paths exist from the offsite power sources through the swyd to the UNIT SAT Banks.

R-110 Page 9 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-110 Page 10 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

PERFORMANCE STEP STANDARD Circle applicable

  • 5. Verify Normal (Bus 4) and Alternate At 0PM03J, on the Modes 1-4 SAT UNSAT N/A (Bus 14) power are energized. Data sheet, OBSERVE and Comments:

RECORD STATUS:

CUE: Bus 4 alive light is lit.

Bus 14 bus alive light is lit. o Bus alive lights lit for buses 4 Bus voltage indicated on and 14.

buses 4 and 14.

o Bus Voltmeter indications for buses 4 and 14.

o Place Xs under ENERGIZED in step 1.7.

  • Place Xs under YES in steps 1.8 and 1.9.
6. Determine status of Normal and At 0PM03J, 1PM01J and SAT UNSAT N/A Alternate Power SATs 2PM01J, on the Modes 1-4 Data Comments:

Sheet, OBSERVE and RECORD STATUS:

CUE: All X and Y windings for

  • X or Y winding AC MW and both SATs at each unit are AC amperes indications for energized each SAT at each unit.
  • Place X in ENERGIZED column.

R-110 Page 11 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

  • 7. Determine availability status of On the Modes 1-4 Data Sheet, SAT UNSAT N/A Normal and Alternate supply OBSERVE and RECORD Comments:

breakers to each Unit 1 4160V ESF STATUS:

bus:

CUE: 1412 CLOSED

  • ACB 1412 (X in Closed Box).
  • ACB 1414 (X in Avail Box).
  • ACB 2414 (X in Avail Box).

1414 NAT (normal after trip)

  • ACB 2412 (X in Closed Box).
  • ACB 1422 (X in Closed Box).

2414 NAT o Notify US that breaker 1424 does not have position 2412 CLOSED indication lights.

o May try changing position indication light bulb.

1422 CLOSED o May request EO investigate breaker locally.

o May ask EO to check control 1424 NAT (but no position power fuse continuity.

indication) o Report blown fuse indication to US US acknowledges and is

  • ACB 1424 (X in Not Avail unsure of why breaker 1424 Box).

has no indication.

If dispatched as EO to investigate 1424, report

  • ACB 2424 (X in Avail Box).

breaker is locally racked in

  • ACB 2422 (X in Closed Box).

and open, however the local position indicating lights are DARK.

If asked as EO to check control power fuses, report that control power fuses are blown.

If blown fuse reported to US, give cue, US directs you to complete surveillance. He will investigate the cause of blown fuses.

If examinee indicates they would change the indicating light bulbs, cue that the bulbs have been changed and are still NOT lit.

2424 NAT 2422 CLOSED R-110 Page 12 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

PERFORMANCE STEP STANDARD Circle applicable

8. Determine supply configuration to the On the Modes 1-4 Data Sheet, SAT UNSAT N/A 4160V ESF buses. OBSERVE and RECORD Comments:

STATUS:

CUE: All normal ESF bus feed breakers indicate

  • ESF BUS 141 (X in FROM closed, all crosstie SAT 142-1 box).

breakers are

  • ESF Bus 142 (X in FROM available. SAT 142-2 box).
  • ESF BUS 241 (X in FROM SAT 242-1 box).
  • ESF BUS 242 (X in FROM SAT 242-2 box).
  • 9. Determine capabilities of Unit 1 and After Reviewing the status of the SAT UNSAT N/A Unit 2 SATs to supply Unit 1 ESF sources and configuration, on the Comments:

buses. Modes 1-4 Data sheet, RECORD STATUS:

  • Unit 1 SAT capable of supplying bus 141 (X in YES box in step 1.13).
  • Unit 2 SAT capable of supplying bus 141 (X in YES box in step 1.14).
  • Unit 1 SAT capable of supplying bus 142 (X in YES box in step 1.15).
  • Unit 2 SAT NOT capable of supplying bus 142 (X in NO box in step 1.16).

o Step F.3.0.

Step F.3.0 will be completed by another NSO.

  • 10. Notify US/SM of failure to meet
  • NOTIFY US/SM of failure to SAT UNSAT N/A acceptance criteria. meet Acceptance Criteria / Comments:

need to initiate LCOAR CUE: As SM/US, 1BwOL 3.8.1, within 45 acknowledge failure. minutes of time given in Task Conditions.

Record time that examinee reports failure to meet Acceptance Criteria /

need to initiate LCOAR 1BwOL 3.8.1: __________

Critical time =

_________ - ___________

(end time) (start time) 45 minutes.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

R-110 Page 13 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra operator on shift.
2. Unit 2 is at 100% power.
3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Jim NSO asks you to be the second approval for the clearance order.
2. Inform Jim when you have completed the peer check.

R-200 Page 14 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

TASK TITLE: Verify Worker Tagout Checklist.

JPM No.: R-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.: R-AM-010 K&A IMP: 3.9 EXAMINEE: RO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 6 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

3. OP-AA-109-101, CLEARANCE AND TAGGING, REV 9.
4. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24.
5. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
6. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22.

MATERIALS:

1. OP-AA-109-101, CLEARANCE AND TAGGING.
2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.

TASK STANDARDS:

4. Verify isolation points correct for 2CV03F.
5. Determine 2CV8422 position incorrect for 2CV03F.
6. Determine the sequence of isolation points for 2CV03F is incorrect.

TASK CONDITIONS:

1. You are an extra operator on shift.
2. Unit 2 is at 100% power.
3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Jim NSO asks you to be the second approval for clearance order.

CUE: Hand examinee partially completed Worker Tagout.

2. Inform Jim when you have completed the peer check.

R-200 Page 15 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 16 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP CV-10, CV Refer to BwOP CV-10, step SAT UNSAT N/A FILTERS ISOLATION AND F.3. Comments:

RETURN TO SERVICE.

CUE: Provide examinee copy of BwOP CV-10.

2. Refer to Drawing: Refer to M-138, sheet 5B. SAT UNSAT N/A
  • M-138, sheet 5B, DIAGRAM Comments:

OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.

3. Verify the clearance BOUNDARY Determines clearance SAT UNSAT N/A for 2CV03F. boundary valves selected are Comments:

correct:

  • 2CV129 C/S, Demin Hi Temp Divert Valve.
  • 2CV8421, RC Filter Bypass Valve.
  • 2CV8425, RC Filter Inlet Isol Valve.
  • 2CV8422, RC Filter Outlet Isol Valve.
  • 2CV8424, RC Filter Drain Valve.
  • 2CV8423, RC Filter Vent Valve.

R-200 Page 17 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4 & 6.

EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.

If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.

If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.

When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Determine the clearance Determines clearance SAT UNSAT N/A SEQUENCE for the 2CV03F is sequence is incorrect: Comments:

incorrect. 1. 2CV129 C/S, Demin Hi Temp Divert Valve.

2. 2CV8421 RC Filter Bypass Valve.

CUE: Acknowledge as Unit Supervisor and inform 3. 2CV8422 RC Filter examinee the checklist Outlet Isol Valve.

sequence will be 4. 2CV8425 RC Filter Inlet corrected. Isol Valve.

5. 2CV8424 RC Filter Drain CUE: Hand examinee corrected Valve.

worker tagout in accordance with the 5. 2CV8423 RC Filter Vent evaluator note above. Valve.

o Notifies SM and NSOs of sequencing error.

5. Verify the tag type for 2CV03F. Verifies clearance tag type: SAT UNSAT N/A
  • 2CV129 C/S, Demin Hi Comments:

Temp Divert Valve - CI.

  • 2CV8421 RC Filter Bypass Valve - RI.
  • 2CV8425 RC Filter Inlet Isol Valve - RD.
  • 2CV8422 RC Filter Outlet Isol Valve - RD.
  • 2CV8424 RC Filter Drain Valve - RI.
  • 2CV8423 RC Filter Vent Valve - RI.

R-200 Page 18 of 53

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Determine the clearance Determines clearance position SAT UNSAT N/A POSITION for the 2CV03F is is incorrect: Comments:

incorrect.

  • 2CV129 C/S, Demin Hi Temp Divert Valve - INFO.
  • 2CV8421 RC Filter Bypass Valve - INFO.
  • 2CV8425 RC Filter Inlet Isol Valve - CLOSED.

CUE: Acknowledge as Unit

  • 2CV8422 RC Filter Outlet Supervisor and inform Isol Valve - OPEN.

examinee the checklist

  • 2CV8424 RC Filter Drain position will be Valve - INFO.

corrected.

  • 2CV8423 RC Filter Vent Valve - INFO.

CUE: Hand examinee corrected worker tagout in o Notifies SM and NSOs of accordance with the position error.

evaluator note on JPM page 4.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

R-200 Page 19 of 53

Perform Offsite Notification (NARS Form Transmittal) for General Emergency JOB PERFORMANCE MEASURE TASK TITLE: Perform Offsite Notification (NARS Form Transmittal) for General Emergency JPM No.: R-403 REV: NRC 2014 TPO No.: 4F.ZP-02 K&A No.: 2.4.43 TASK No.: R-ZP-004 K&A IMP: 3.2/3.8 EXAMINEE: RO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4 APPROX COMPLETION TIME:

10 MINUTES CRITICAL TIME: 13 minutes EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE _ SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS, Rev. 13.
2. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM, Rev. G.

MATERIALS:

1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
2. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.

TASK STANDARDS:

1. Determine correct NARS phone code.
2. Complete transmitting NARS block 10 within 13 minutes of the initiating cue.
3. Transmit NARS data to offsite agencies.

TASK CONDITIONS:

1. You are the Unit 2 Assist NSO.
2. A reactor trip has occurred on Unit 1.
3. A General Emergency was declared two minutes ago, no previous EALs have been declared.
4. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
5. This is a Time Critical JPM.

INITIATING CUES:

1. The Shift Manager directs you to transmit the NARS form per EP-MW-114-100, MW Region Offsite Notifications.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Shift Manager when the NARS form has been transmitted.

R-403 Page 20 of 53

Perform Offsite Notification (NARS Form Transmittal) for General Emergency RECORD START TIME:

EVALUATOR NOTE: Provide examinee the completed NARS form and copy of EP-MW-114-100-F-01.

EVALUATOR NOTE: JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after initial roll call is complete on the back of the NARS form.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to EP-MW-114-100, MW Refer to EP-MW-114-100: SAT UNSAT N/A REGION OFFSITE
  • Determine step 4.2 needs Comments:

NOTIFICATIONS. to be performed.

2 Refer to EP-MW-114-100-F-01, Refer to EP-MW-114-100-F- SAT UNSAT N/A NUCLEAR ACCIDENT 01: Comments:

REPORTING SYSTEM (NARS)

  • Determine NARS Code 38 FORM. to be used to transmit NARS form.

R-403 Page 21 of 53

Perform Offsite Notification (NARS Form Transmittal) for General Emergency

  • 3. Establish communications: Establish communications as SAT UNSAT N/A follows: Comments:

Note: After examinee dials

Code 38, provide the

  • DIAL code 38.

following cue:

  • Read the following CUE: After a short pause, a message:This is Exelon beep is heard, followed Nuclear Braidwood Station by a seven more beeps, Control Room. Please for a total of 8 beeps. standby for a NARS NOTE: If Examinee dials message.

Code 20 (which is wrong) use Code 20 o Read the following cue. Otherwise use message:This is the Code 38 Cue. Exelon Nuclear Braidwood Station Control room.

Note: After examinee reads Please standby to receive messages, provide a NARS message and the following cue: respond as the roll is called.

CUE Code 38: IEMA online,

  • TAKE Initial Roll Call Grundy Co. Sheriff online
  • Mark Initial Boxes for Kankakee Co. Sheriff
  • IEMA online *Grundy Co. Sheriff Will Co. Sheriff online
  • Kankakee Co. Sheriff Illinois REAC online *Will Co. Sheriff Grundy Co. EMA online
  • Grundy Co. EMA online
  • Kankakee Co. EOC Will Co. EOC online

CUE Code 20: IEMA online, o Record time and date Illinois REAC online initial roll call complete.

Note: Once stops after initial roll call is complete critical time STOPS:

EVALUATOR NOTE: Critical time TIME STOPS after initial roll call is complete on the back of the NARS form.

Determine critical time:

_________________________ - ________________________ = ________________________

(Initial roll call complete) (JPM start time) < 13 minutes R-403 Page 22 of 53

Perform Offsite Notification (NARS Form Transmittal) for General Emergency PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Verbally transmit the NARS Verbally transmit the NARS SAT UNSAT N/A Form. Form: Comments:
  • Utility Message No: 1_
  • State Message No: N/A
  • Status - [B] Drill/Exercise
  • Station - [A] Braidwood
  • Onsite Condition - [D]

General Emergency

  • Accident Classified:
  • Time: Two minutes ago.
  • Date: Today.
  • Accident Terminated Date and Time: N/A
  • Release Status: [A] None
  • Type of Release: [A] Not Applicable
  • Wind Dir: 270
  • Wind Speed:

o [A] is N/A

  • [B] 4.5 Miles/Hr
  • Utility recommendation:
  • [D] 1, 3, 10
  • (Block 10) Additional Information:

None Verified With: U. Supervisor Approved By: S. Manager R-403 Page 23 of 53

Perform Offsite Notification (NARS Form Transmittal) for General Emergency PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Complete the NARS form. Fill in the following information SAT UNSAT N/A on the NARS Form after Comments:

transmitting info in blocks 1-10:

  • Mark 11A, EXELON CUE: IF examinee asks for a
  • Examinee Name phone number to use, provide: outside line is
  • Outside line number 815-458-7882.
  • Current Time
  • Current Date
  • Name of person from CUE: John Smith, IEMA. IEMA receiving message
  • Current time
  • Todays date
6. Perform Final Roll Call PERFORM Final Roll Call and SAT UNSAT N/A Note: As examinee performs marks boxes for: Comments:

final roll call

  • IEMA provide the following cues:
  • Grundy Co. Sheriff CUE Code 38: IEMA online,
  • Kankakee Co. Sheriff Grundy Co. Sheriff
  • Will Co. Sheriff online
  • Grundy Co. EMA, online
  • Kankakee Co. EOC Will Co. Sheriff online
  • Ask if there are any Grundy Co. EMA online questions about the Kankakee Co. EOC information provided.

online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.

7. STATE NARS communication is STATE NARS communication SAT UNSAT N/A complete. is complete. Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

R-403 Page 24 of 53

Review Calorimetric Surveillance TASK TITLE: Review Calorimetric Surveillance JPM No.: S-100 REV: NRC 2014 TPO No.: 4C.NI-05 K&A No.: 2.1.7 TASK No.: NI-004 Perform calorimetric calculation K&A IMP: 4.7 ADMIN: CONDUCT OF OPS EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2,3 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 10 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. 1BwOSR 3.3.1.2-1, Rev. 17, Unit 1 Power Range High Flux Setpoint Daily Channel Calibration (Computer Calorimetric).

MATERIALS:

1. Copy of completed/ready for review 1BwOSR 3.3.1.2-1.

TASK STANDARDS:

1. Perform review of calorimetric data collected by NSO.
2. Determine calorimetric adjustment calculation incorrectly performed by NSO.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at 100% power, all systems are normally aligned.

INITIATING CUES:

1. The Unit NSO has performed the calorimetric surveillance and has asked you to review the proposed NI adjustments per 1BwOSR 0.1-1,2,3.
2. Review the surveillance and if any changes are necessary, correct the surveillance.

Note: Hand examinee completed calorimetric surveillance, with the Calorimetric printout provided.

RECORD START TIME Note: This JPM is performed by having the examinee review the D-2 Data sheet from the surveillance. The first data sheet is complete through block 10 but has 3 mistakes in it (two of which propagate forward to blocks 9 and 10). The examinee must locate the mistakes to pass the JPM prior to signing block 11, Review Authorization, and ending the JPM.

Page 25 of 53 S-100

PERFORMANCE STEP STANDARD Circle Applicable

1. Refer to completed 1BwOSR Review the data sheet for SAT UNSAT N/A 3.3.1.2-1. completeness/errors for Comments:

blocks 1 and 2:

CUE: Ensure calorimetric

  • Date: Today surveillance is handed to examinee with the
  • Time: 10 minutes ago printout of the
  • Mwe Gross: Current calorimetric data.
  • Control Bank Position CUE: All Prerequisites were
  • NSOs Signature met.

CUE: (if performed in classroom)

CB-C at 226 steps, CB-D at 220 steps.

  • 2. Review blocks 3, 5, 6 and 7. Review blocks 3, 5, 6 and 7 SAT UNSAT N/A for completeness and/or Comments:

Note: If asked, the plant errors:

calorimetric printout from the computer show 99.51% (same as recorded in block 5).

Note: Errors present: o Initial NIS Drawer Front Panel Meter Power filled Block 6 second line (N-42) item in.

should be positive 2.0 o Calculated Calorimetric Power from printout filled Block 6 fourth line (N-44) should in.

be negative 1.0 o Calculated Power difference filled in.

Block 7: o Block 12 checked (3 NO, 1 YES)

As a result of correcting the errors, NR-44 should now be

  • SRO makes the checked YES rather than NO. following changes:
  • Block 6 second line change to +2.0 (N-42)
  • Block 6 fourth line change to -1.0 (N-44)
  • Block 7 check YES for NR-44 S-100 Page 26 of 53

PERFORMANCE STEP STANDARD Circle Applicable

  • 3. Verify the power adjustment DETERMINE channel N-44 SAT UNSAT N/A calculation for channel N-44. and N-42 require adjustment Comments:

as follows:

Note: If examinee discovers the o Ensure the present mistakes, and wants the percent power values are NSO to correct, cue the filled in block 8.

examinee to make the necessary correction on o VERIFY the corrected sheet D-2 himself and calculated power continue with the difference from block 6 in review. block 9.

Note: If examinee identifies o VERIFY/SUBTRACT the early mistakes and power difference from the stops, inform him to present indicated power mark-up the needed and the value as the changes, consider them Power to adjust the NIS incorporated and ask if channels to in block 10.

the review is complete.

Note: The examinee needs to SRO Makes the following verify the determination changes:

of the indicated power that N-42 and N-44 must

  • N-42: changes block 9 be adjusted to. to + 2.0 and block 10 to 99.5.

Note: If the examinee has NOT

  • N-44: changes block 8 identified and corrected to 98.5, changes block 9 the incorrect adjustment to -1.0 and changes determinations (N-44 block 10 to 99.5.

and N-42) by the time the examinee signs Block 11, Review Authorization, and ends the JPM then the JPM performance is UNSAT.

IF ASKED (when examinee is making corrections):

Cue: N-44 reads 98.5%

Cue: N-42 still reads 101.5%

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME __________

COMMENTS:

S-100 Page 27 of 53

Perform Shutdown Margin Calculation TASK TITLE: Perform Shutdown Margin Calculation JPM No.: S-112 REV: NRC 2014 Task No.: S-AM-123 K/A No.: 2.1.25 Objective No.: 7E.AM-123-A K/A IMP: 4.2 EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 6 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME: 45 minutes EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE SIMULATOR

_ CLASSROOM GENERAL

REFERENCES:

1. 1BwOSR 3.1.1.1-2, UNIT ONE SHUTDOWN MARGIN SURVEILLANCE DURING OPERATION, Rev. 3.
2. BwCB-1 (Various), Braidwood Curve Book, Unit 1.
3. 1BwOL 3.1.4, Rev. 5, LCOAR Rod Group Alignment Limits Tech Spec LCO 3.1.4.

MATERIALS:

1. Copy of 1BwOSR 3.1.1.1-2.
2. Copy of BwCB-1.
3. Copy of Braidwood Technical Requirements Manual (TRM).
4. Copy of Braidwood Tech Specs and Bases.

TASK STANDARDS:

1. Correctly determine total rod worth due to rods.
2. Correctly determine actual reactivity available due to rods.
3. Correctly determine current power defect.
4. Correctly determine shutdown margin is unacceptable for current plant conditions within 45 minutes.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at full power (13,000 EFPH) with all control systems in automatic except rod control, which is in o

manual. Tave is 587 F and Most Recent B10 Corrected RCS Boron sample is 300 ppm 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago.

Control Bank D is at 220 steps. All other rods are fully withdrawn.

3. This is a time critical JPM.

INITIATING CUES:

1. 15 minutes ago it was determined rod M-4 is inoperable and is immovable due to excessive friction. The QNE has been informed.
2. The unit NSO has completed 1BwOSR 3.1.1.1-2, Unit One Shutdown Margin Surveillance During Operation, for your review.
3. Review the surveillance and if any changes are necessary, correct the surveillance.
4. Verify appropriate required actions are completed.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

S-112 Page 28 of 53

Perform Shutdown Margin Calculation RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE EVALUATOR NOTE: JPM will be performed in the classroom.

1. Refer to completed 1BwOSR Refer to 1BwOSR 3.1.1.1-2. SAT UNSAT N/A 3.1.1.1-2: Comments:

NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.

Record critical time start time:

__________

CUE: Ensure shutdown margin surveillance is handed to examinee.

CUE: All Prerequisites, Precautions, Limitations and Actions are met.

2. Review Present Conditions: (step Review the following from SAT UNSAT N/A F.1) initiating cue for completeness Comments:

and/or errors:

Note: NO errors present on step

  • Date and Time: Current F.1. Date and 10 minutes ago
  • Core Average Burnup:

13,000 EFPH

  • Core Average Temperature: 587°F
  • Power Level: 100%
  • Present Boron Concentration: 300 ppm S-112 Page 29 of 53

Perform Shutdown Margin Calculation PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

3. Review total worth due to rods Review total worth due to rods SAT UNSAT N/A (step F.2) by performing the following: Comments:

o Review control bank Note: NO errors present on step position: Bank D @ 220 F.2 steps (from initiating cue).

o Review control bank D inserted worth by NOTE: Examinee may refer to performing the following:

BwCB-1, Figure 2c for an expanded scale of Figure o Refer to BwCB-1, 2 control bank D rod Figure 2 for burn up worth. range.

NOTE: Examinee must refer to o Record control bank D correct figure and burn inserted worth: 15 pcm up range. BwCB-1, +/- 10 pcm.

Figures 2 & 2c are for o Review total available Hot Full Power and control bank worth by Figures 2a and 2d are for performing the following:

Hot Zero Power. From o Refer to BwCB-1, initiating cue, Unit 1 is at Table 4-1 for control 100% power. bank worth for burn up.

o Determine control bank total worth: 3308.6 pcm.

o Subtract control bank D inserted worth from control bank total worth: 3308.6 pcm -

15 pcm (+/- 10 pcm) =

3293.6 pcm (+/- 10 pcm).

o Review total worth due to rods by performing the following:

o Refer to BwCB-1, Table 4-1 for shutdown bank worth for burn up range.

o Determine shutdown bank total worth:

3648.2 pcm.

o Review total rod worth by performing the following:

o Add shutdown bank total worth to available control bank worth:

3648.2 pcm + 3293.6 pcm (+/- 10 pcm) =

6941.8 pcm (+/- 10 pcm)

S-112 Page 30 of 53

Perform Shutdown Margin Calculation PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Review actual reactivity Review actual reactivity due to SAT UNSAT N/A available due to rods (step F.3) rods by performing the Comments:

following:

o Review the number of immovable and/or untrippable control rods: 1 (from initiating cue) o Review highest stuck rod worth by performing the NOTE: Review value of highest following:

stuck rod worth and determine that the o Refer to BwCB-1, highest stuck rod worth Table 4-1 for highest is incorrect (967.2 pcm) stuck rod worth for burn and that the correct up.

value should be 1044.6

  • Determine and record pcm. highest stuck rod worth is incorrect at 967.2 and the correct value is: 1044.6 pcm.

o Review immovable Note: If examinee discovers the /untrippable rod worth by mistakes, and wants the performing the following:

NSO to correct, cue the o Multiply the number of examinee to make the immovable or necessary correction on untrippable control rods surveillance sheet and by 2000 pcm: 1 X continue with the 2000 pcm = 2000 pcm.

review.

o Review actual reactivity Note: If examinee identifies available due to rods by early mistakes and performing the following::

stops, inform them to mark-up the needed

  • Subtract immovable changes, consider them /untrippable rod worth incorporated and ask if and highest stuck rod the review is complete. worth from total rod worth and determine that 6941.8 pcm (+/- 10 NOTE: Review value of actual pcm) - 2000 pcm -

reactivity available due 967.2 pcm = 3974.6 to rods and determine pcm (+/- 10 pcm) is that the actual reactivity incorrect and it should available due to rods is be: 6941.8 pcm (+/- 10 incorrect (3974.6 pcm) pcm) - 2000 pcm -

and that the value 1044.6 pcm = 3897.2 should be 3897.2 pcm. pcm (+/- 10 pcm).

S-112 Page 31 of 53

Perform Shutdown Margin Calculation PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Review current Power Defect (step Review the current power SAT UNSAT N/A F.4) defect for boron concentration Comments:

Note: NO errors present on step and power level by performing F.4 the following:

  • Refer to BwCB-1, Figure 17A for power defect for burn up.
  • Review power defect:

2667 +/- 50 pcm.

OR

  • Refer to BwCB-1, Table 2-1 for power defect for burn up range of 6466.8 EFPH.
  • Review power defect:

2667 pcm.

S-112 Page 32 of 53

Perform Shutdown Margin Calculation PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

NOTE: Review value of available

  • Review total corrected rod shutdown margin and worth to power defect and determine that it is determine that 3974.6 pcm incorrect (1307.6 pcm) (+/- 10 pcm) + -2667 (+/- 50 and the correct value pcm). = 1307.6 pcm (+/- 60 should be: pcm) is incorrect and it (1230.2 pcm +/- 60 pcm) should be: 3897.2 pcm (+/-

10 pcm) + -2667 (+/- 50 pcm). = 1230.2 pcm (+/- 60 NOTE: Review value of pcm).

minimum required o Refer to TRM for Unit 1 shutdown margin and COLR.

determine that 1.0% k/k x 1000 pcm/% k/k =

  • Review the Shutdown 1000 pcm is incorrect Margin Limit for Modes 1 and the correct value and 2 from the COLR and should be: 1.3% k/k x determine that 1.0% k/k x 1000 pcm/% k/k = 1300 1000 pcm/% k/k = 1000 pcm. pcm is incorrect and the correct value is: 1.3%

k/k x 1000 pcm/% k/k =

NOTE: 1230.2 pcm +/- 60 pcm < 1300 pcm.

1300 pcm is correct. If

  • Determine the available examinee only catches shutdown reactivity is less the shutdown margin limit than the minimum required of 1000 pcm instead of Shutdown Margin Limit:

1300 pcm shutdown 1230.2 pcm (+/- 60 pcm). <

margin will still be 1300 pcm adequate 1307.6 pcm >

1300 pcm or if the

  • Determine shutdown examinee catches only margin is unacceptable the highest stuck rod within 45 minutes of JPM worth shutdown margin start time.

will still be inadequate o Determine 1BwOSR 1230.2 > 1000 pcm. 3.1.1.1-2 is complete.

NOTE: Critical Time ends when examinee completes surveillance or reports unacceptable shutdown margin.

Record time that examinee reports unacceptable shutdown margin or completes surveillance: __________

Critical time =

_________ - ___________

(end time) (start time) 45 minutes.

CUE: As SM, acknowledge report of inadequate shutdown margin and/or completion of 1BwOSR 3.1.1.1-2 and asks what their recommended actions are.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE S-112 Page 33 of 53

Perform Shutdown Margin Calculation

  • Determine that boration SAT UNSAT N/A 3.1.4. is required to be initiated Comments:

Note: Hand examinee copy of to restore SDM.

1BwOL 3.1.4 if asked for.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

S-112 Page 34 of 53

Verify Worker Tagout Checklist.

TASK TITLE: Verify Worker Tagout Checklist.

JPM No.: S-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.: R-AM-010 K&A IMP: 4.3 EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 6, 7 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

7. OP-AA-109-101, CLEARANCE AND TAGGING, REV 9.
8. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24.
9. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
10. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22.

MATERIALS:

5. OP-AA-109-101, CLEARANCE AND TAGGING.
6. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
7. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
8. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.

TASK STANDARDS:

7. Verify isolation points correct for 2CV03F.
8. Determine 2CV8422 position incorrect for 2CV03F.
9. Determine the sequence of isolation points for 2CV03F is incorrect.

TASK CONDITIONS:

1. You are an extra supervisor on shift.
2. Unit 2 is at 100% power.
3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Shift Manager asks you to authorize/verify the clearance order.

CUE: Hand examinee partially completed Worker Tagout.

2. Review the WTO and if any changes are necessary, correct them.

S-200 Page 35 of 53

Verify Worker Tagout Checklist.

S-200 Page 36 of 53

Verify Worker Tagout Checklist.

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP CV-10, CV Refer to BwOP CV-10, step SAT UNSAT N/A FILTERS ISOLATION AND F.3. Comments:

RETURN TO SERVICE.

CUE: Provide examinee copy of BwOP CV-10.

2. Refer to Drawing: Refer to M-138, sheet 5B. SAT UNSAT N/A
  • M-138, sheet 5B, DIAGRAM Comments:

OF CVCS AND BTRS CUE: Provide copy of M-138, sheet 5B.

3. Verify the clearance BOUNDARY Determines clearance SAT UNSAT N/A for 2CV03F. boundary valves selected are Comments:

correct:

  • 2CV129 C/S, Demin Hi Temp Divert Valve.
  • 2CV8421, RC Filter Bypass Valve.
  • 2CV8425, RC Filter Inlet Isol Valve.
  • 2CV8422, RC Filter Outlet Isol Valve.
  • 2CV8424, RC Filter Drain Valve.
  • 2CV8423, RC Filter Vent Valve.

S-200 Page 37 of 53

Verify Worker Tagout Checklist.

EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4 & 6.

EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.

If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.

If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.

When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Determine the clearance Determines clearance SAT UNSAT N/A SEQUENCE for the 2CV03F is sequence is incorrect: Comments:

incorrect. 1. 2CV129 C/S, Demin Hi Temp Divert Valve.

2. 2CV8421 RC Filter Bypass Valve.

CUE: Acknowledge as Unit Supervisor and inform 3. 2CV8422 RC Filter examinee the checklist Outlet Isol Valve.

sequence will be 4. 2CV8425 RC Filter Inlet corrected. Isol Valve.

5. 2CV8424 RC Filter Drain CUE: Hand examinee corrected Valve.

worker tagout in accordance with the 5. 2CV8423 RC Filter Vent evaluator note above. Valve.

o Notifies SM and NSOs of sequencing error.

5. Verify the tag type for 2CV03F. Verifies clearance tag type: SAT UNSAT N/A
  • 2CV129 C/S, Demin Hi Comments:

Temp Divert Valve - CI.

  • 2CV8421 RC Filter Bypass Valve - RI.
  • 2CV8425 RC Filter Inlet Isol Valve - RD.
  • 2CV8422 RC Filter Outlet Isol Valve - RD.
  • 2CV8424 RC Filter Drain Valve - RI.
  • 2CV8423 RC Filter Vent Valve - RI.

S-200 Page 38 of 53

Verify Worker Tagout Checklist.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Determine the clearance Determines clearance position SAT UNSAT N/A POSITION for the 2CV03F is is incorrect: Comments:

incorrect.

  • 2CV129 C/S, Demin Hi Temp Divert Valve - INFO.
  • 2CV8421 RC Filter Bypass Valve - INFO.
  • 2CV8425 RC Filter Inlet Isol Valve - CLOSED.

CUE: Acknowledge as Unit

  • 2CV8422 RC Filter Outlet Supervisor and inform Isol Valve - OPEN.

examinee the checklist

  • 2CV8424 RC Filter Drain position will be Valve - INFO.

corrected.

  • 2CV8423 RC Filter Vent Valve - INFO.

CUE: Hand examinee corrected worker tagout in o Notifies SM and NSOs of accordance with the position error.

evaluator note above.

  • 7. Authorize the clearance order.
  • Sign the WTO SAT UNSAT N/A Authorization signature. Comments:

o Fill in the date and time.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

S-200 Page 39 of 53

Verify Worker Tagout Checklist.

ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O: Mode Dependent: Condition Dependent:

Production Risk: Environmental Risk: Atmospheric Risk: Reactivity Risk:

WORKER TAGOUT# P14-005 JOB DESCRIPTION: CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE: Today ___________

SECOND APPROVAL: __ Joe NSO ___________________ DATE: Today ___________

WTO AUTHORIZATION: _ __________________ DATE/TIME __________________

SPECIAL INSTRUCTIONS: YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT SEQ TAG POSITION HUNG VERIF. SFTY. RTS RTS RTS VERIF.

NAME TYPE BY BY VERIF. SEQ POSITION BY BY 2CV129 C/S (DEMIN HI TEMP 1 CI INFO 3 AS DIVERT VLV) REQUIRED 2CV8421 RC FILTER BYPASS 2 RI INFO 1 OPEN VLV 2CV8425 RC FILTER INLET 3 RD CLOSED 2 CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET 4 RD OPEN 2 CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN 5 RI INFO 2 CLOSED VLV 2CV8423 RC FILTER VENT 5 RI INFO 2 CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________

WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ___________________________ DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

S-200 Page 40 of 53

Verify Worker Tagout Checklist.

ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O: Mode Dependent: Condition Dependent:

Production Risk: Environmental Risk: Atmospheric Risk: Reactivity Risk:

WORKER TAGOUT# P14-005 JOB DESCRIPTION: CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE: Today ___________

SECOND APPROVAL: __ Joe NSO ___________________ DATE: Today ___________

WTO AUTHORIZATION: _ __________________ DATE/TIME __________________

SPECIAL INSTRUCTIONS: YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT SEQ TAG POSITION HUNG VERIF. SFTY. RTS RTS RTS VERIF.

NAME TYPE BY BY VERIF. SEQ POSITION BY BY 2CV129 C/S (DEMIN HI TEMP 1 CI INFO 3 AS DIVERT VLV) REQUIRED 2CV8421 RC FILTER BYPASS 2 RI INFO 1 OPEN VLV 2CV8422 RC FILTER OUTLET 3 RD CLOSED 2 CLOSED ISOL VLV 2CV8425 RC FILTER INLET 4 RD CLOSED 2 CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN 5 RI INFO 2 CLOSED VLV 2CV8423 RC FILTER VENT 5 RI INFO 2 CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________

WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ___________________________ DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

S-200 Page 41 of 53

Verify Worker Tagout Checklist.

ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O: Mode Dependent: Condition Dependent:

Production Risk: Environmental Risk: Atmospheric Risk: Reactivity Risk:

WORKER TAGOUT# P14-005 JOB DESCRIPTION: CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________ DATE: Today ___________

SECOND APPROVAL: __ Joe NSO ___________________ DATE: Today ___________

WTO AUTHORIZATION: _ __________________ DATE/TIME __________________

SPECIAL INSTRUCTIONS: YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT SEQ TAG POSITION HUNG VERIF. SFTY. RTS RTS RTS VERIF.

NAME TYPE BY BY VERIF. SEQ POSITION BY BY 2CV129 C/S (DEMIN HI TEMP 1 CI INFO 3 AS DIVERT VLV) REQUIRED 2CV8421 RC FILTER BYPASS 2 RI INFO 1 OPEN VLV 2CV8425 RC FILTER INLET 3 RD CLOSED 2 CLOSED ISOL VLV 2CV8422 RC FILTER OUTLET 4 RD CLOSED 2 CLOSED ISOL VLV 2CV8424 RC FILTER DRAIN 5 RI INFO 2 CLOSED VLV 2CV8423 RC FILTER VENT 5 RI INFO 2 CLOSED VLV WTO PLACED: _____________________________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________

WTO FINAL CLEAR: WORK CREWMEMBER RELEASE: ___________________________ DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

S-200 Page 42 of 53

Review Containment Release for Approval TASK TITLE: Review Containment Release for Approval JPM No.: S-300 REV: NRC 2014 TPO No.: 8C.HP-002 K&A No.: 2.3.11 TASK No.: S-HP-002: Authorize Gaseous (Containment K&A IMP: 4.3 or Gas Decay Tank) Rad Waste Release EXAMINEE: RO SRO (circle one)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4, 6 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

11. 1BwOS RETS 2.2.B-1, Rev 2, Unit One Pre-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE-PR001A/B/C)
12. RP-BR-980, Rev 12, Containment Vent And Mini Purge Gaseous Effluents MATERIALS:
1. Copy of partially completed RP-BR-980 TASK STANDARDS:
1. Review RP-BR-980.
2. Determine release cannot proceed due to error in RP-BR-980.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at 100% power; all systems and controls are normally aligned.
3. A Unit 1 Containment release package has been initiated to lower containment pressure.
4. 1BwOS RETS 2.2.B-1 has been previously completed, reviewed and approved.

INITIATING CUES:

1. The U1 Assist NSO has completed Containment Release package G-14-001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
2. Inform the U1 Admin NSO when the release package review is complete.

S-300 Page 43 of 53

Review Containment Release for Approval RECORD START TIME:

PERFORMANCE STEP STANDARD Circle Applicable

1. Refer to partially completed RP-BR-980,
  • Reads Step D, determines SAT UNSAT N/A Section C SRO approval required. Comments:

Cue: (If asked) Gaseous Release in

  • Reviews entire document progress sign has been placed and the 0A VA exhaust fan is in operation.
2. Review Section A
  • Reviews steps A.5.d SAT UNSAT N/A
  • Determines baseline Comments:

values for ALERT and ALARM setpoints apply.

  • 3. Determines HIGH Alarm Setpoint was
  • Identifies that the value SAT UNSAT N/A incorrectly established entered for the HIGH Comments:

Alarm Setpoint is in error and should be 6.06E-04µCi/cc.

  • 4. Determines ALERT Alarm Setpoint
  • Identifies that the value SAT UNSAT N/A was incorrectly established entered for the ALERT Comments:

Alarm Setpoint is in error and should be 6.06E-05 µCi/cc.

5. Review Section C
  • Identify from review that SAT UNSAT N/A section C.1.c should have Comments:

been N/A.

Cue: Shift Manager acknowledges step A.5.d error failure.

  • 6. Determines HIGH and ALERT Alarm
  • Identify that the operator SAT UNSAT N/A Setpoint was incorrectly inputted incorrectly inputted Comments:

7.23E-3 µCi/cc into the High and Alert alarm setpoints instead of 7.23E-6 µCi/cc in section C.1.c. Also determines that 7.23E-6 µCi/cc is incorrect and the HIGH Alarm Setpoint is in error and should be 6.06E-04 µCi/cc and ALERT Alarm Setpoint is in error and should be 6.06E-05 µCi/cc

  • 7. Refuse to approve release until HIGH
  • Determine release is SAT UNSAT N/A Alarm and ALERT Alarm setpoints are unable to be performed Comments:

correctly entered. (cannot be signed) until errors are resolved.

CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:

COMMENTS:

S-300 Page 44 of 53

Perform Nuclear Accident Reporting System Notification TASK TITLE: Perform Nuclear Accident Reporting System Notification JPM No.: S-413 REV: NRC 2014 TPO No.: 7.F.ZP-001 K&A No.: 2.4.40 TASK No.: S-ZP-001: Complete the NARS Form K&A IMP: 4.5 EXAMINEE: SRO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 13, 14 APPROX COMPLETION TIME:

13 MINUTES CRITICAL TIME: 15 minutes EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

13. EP-AA-112, Rev 16, ERO/ERF Activation and Operation.
14. EP-MW-114-100, Rev 13, MW Region Offsite Notifications.
15. EP-AA-111, Rev 18, Emergency Classification and Protective Action Recommendations.
16. EP-MW-114-100-F-01, Rev G, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
17. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.

MATERIALS:

2. EP-AA-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
3. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
4. EP-MW-114-100, Rev 13, MW Region Offsite Notifications.

TASK STANDARDS:

10. Complete NARS form.
11. Determine Protective Action Recommendations.
12. Perform Notifications.

TASK CONDITIONS:

1. You are the Shift Emergency Director and the crew is performing 1BwFR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK.
2. No release is occurring.
3. A general emergency has just been declared under MG2, due to the ATWS and Loss of Heat Sink.
4. No hostile action in progress.
5. No impediments to evacuation.

Page 45 of 53 S-413

Perform Nuclear Accident Reporting System Notification

6. This is a Time Critical JPM.

INITIATING CUES:

The Emergency Plan requires that you COMPLETE AND TRANSMIT the initial NARS form. The Accident was just classified as a General Emergency, MG2, due to the ATWS and Loss of Heat Sink.

Page 46 of 53 S-413

Perform Nuclear Accident Reporting System Notification RECORD START TIME: (Start time is after the student accepts and understands the task)

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to NARS form. Refer to NARS form. SAT UNSAT N/A CUE: Provide copy of Comments:

NARS form to examinee (and EP-MW-114-100 if asked and EP-AA-111-F-02, Braidwood Plant Based PAR Flowchart if asked)

2. Record Utility Message Enters number 1. SAT UNSAT Number. N/A Comments:
3. Record State Message Enters N/A. SAT UNSAT Number. N/A Comments:
  • 4. Complete Sections 1-4. Completes sections 1-4 SAT UNSAT as follows: N/A Comments:

o Status - [1B]

Drill/Exercise o Station- [2A]

Braidwood

  • On-Site Condition -

[3D] General Emergency o Accident Classified -

Time:

No later than Current Time Date: Todays Date

  • EAL#: MG2 o Accident Terminated -

Time and Date: N/A

5. Release Status. [5A] None SAT UNSAT Place X by occurring N/A Comments:
6. Type of Release. [6A] Not Applicable SAT UNSAT Place "X" by Gaseous N/A Comments:
7. Check Wind Direction and Record actual data from SAT UNSAT speed. PPDS: N/A Comments:

CUE: Wind direction is o Direction (~270 deg) 270 deg.

Wind speed is 10 o Speed (mark units) mph (~10 mph)

Page 47 of 53 S-413

Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP STANDARD Circle applicable

8. Recommended Actions In block 9, Check box: SAT UNSAT from EP-AA-111-F-02. N/A o [9D] Evacuate Illinois Comments:

Sub Areas 1,3,10

9. Enter additional info. Record none in block 10 SAT UNSAT N/A Comments:
10. NARS form approved by
  • Sign the Approved by SAT UNSAT Shift Emergency Director. line N/A Comments:

CUE: No Verifier is available to second check the NARS form

11. Refer to EP-MW-114-100, Refer to EP-MW-114-100: SAT UNSAT MW REGION OFFSITE
  • Determine step 4.2 N/A NOTIFICATIONS. needs to be Comments:

performed.

12 Refer to EP-MW-114-100- Refer to EP-MW-114-100- SAT UNSAT F-01, NUCLEAR F-01: N/A ACCIDENT REPORTING

  • Determine NARS Comments:

SYSTEM (NARS) FORM. Code 38 to be used to transmit NARS form.

Page 48 of 53 S-413

Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP STANDARD Circle applicable

  • 13. Establish Establish communications SAT UNSAT communications: as follows: N/A
  • Pick up NARS phone. Comments:

Note: After examinee

  • DIAL code 38.

dials Code 38, provide the

  • Read the following following cue: message:This is Exelon Nuclear CUE: After a short Braidwood Station pause, a beep is Control Room. Please heard, followed by standby for a NARS a seven more message.

beeps, for a total of 8 beeps. o Read the following NOTE: If Examinee dials message:This is the Code 20 (which is Exelon Nuclear wrong) use Code Braidwood Station 20 cue. Control room. Please Otherwise use standby to receive a Code 38 Cue. NARS message and respond as the roll is Note: After examinee called.

reads messages,

  • TAKE Initial Roll Call provide the following cue:
  • Mark Initial Boxes for CUE Code 38: IEMA
  • Grundy Co. Sheriff Grundy Co.
  • Kankakee Co. Sheriff Sheriff online
  • Will Co. Sheriff Kankakee Co.

Sheriff online

online o Record time and date Grundy Co. EMA initial roll call online complete.

Kankakee Co.

EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online Note: Once initial roll call is complete critical time STOPS:

Page 49 of 53 S-413

Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP STANDARD Circle applicable EVALUATOR NOTE: Critical time TIME STOPS when completes initial roll call of the NARS form.

Determine critical time:

_________________________ - ________________________ =

________________________

(Initial roll call complete) (JPM start time) <

15 minutes Page 50 of 53 S-413

Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP STANDARD Circle applicable

  • 14. Verbally transmit the Verbally transmit the SAT UNSAT NARS Form. NARS Form: N/A
  • Utility Message No: Comments:

1_

  • State Message No:

N/A

  • Status - [B]

Drill/Exerci se

  • Station - [A]

Braidwood

  • Onsite Condition - [D]

General Emergency

  • Accident Classified:
  • Time: When JPM started.
  • Date: Today.
  • Accident Terminated Date and Time: N/A
  • Release Status: [A]

None

  • Type of Release: [A]

Not Applicable

  • Wind Dir: 270
  • Wind Speed:

o [A] is N/A

  • [B] 10 Miles/Hr
  • Utility recommendation:
  • (Block 10) Additional Information
None Verified With: N/A Approved By: S. Manager Page 51 of 53 S-413

Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP STANDARD Circle applicable

15. Complete the NARS form. Fill in the following SAT UNSAT information on the NARS N/A Form after transmitting Comments:

info in blocks 1-10:

  • Mark 11A, EXELON CUE: IF examinee asks
  • Examinee Name for a phone number to use,
  • Outside line number provide: outside
  • Current Time line is 815-458-
  • Current Date 7882.
  • Name of person from IEMA receiving message CUE: John Smith, IEMA.
  • Current time
  • Todays date
16. Perform Final Roll Call PERFORM Final Roll Call SAT UNSAT and marks boxes for: N/A Note: As examinee

performs final roll

  • Grundy Co. Sheriff call provide the following cues:
  • Kankakee Co. Sheriff CUE Code 38: IEMA
  • Will Co. Sheriff online,
  • Grundy Co. EMA, Sheriff online
  • Kankakee Co. EOC Kankakee Co.

Sheriff online

  • Will Co. EOC Will Co. Sheriff
  • Ask if there are any online questions about the information provided.

Illinois REAC online Grundy Co. EMA online Kankakee Co.

EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.

Page 52 of 53 S-413

Perform Nuclear Accident Reporting System Notification PERFORMANCE STEP STANDARD Circle applicable

17. STATE NARS STATE NARS SAT UNSAT communication is communication is N/A complete. complete. Comments:

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

Page 53 of 53 S-413