| number = ML15037A085
| number = ML15037A085
| issue date = 01/29/2015
| issue date = 01/29/2015
| title = Palo Verde, Units 1, 2 and 3 - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees
| title = Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:The content of Enclosure 2 is PROPRIETARY and should be withheld From Public Disclosure pursuant to 10 CFR 2.390 10 CFR 50.90 Palo Verde Nuclear Generating Station 5801 S. Wintersburg Road Tonopah, AZ 85354 102-06998-TNW/CJS January 29, 2015 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Response to Regulatory Issue Summary (RIS) 2014-13, PlannedLicensing Action Submittals for all Power Reactor Licensees
==Dear Sirs:==
Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for all Power Reactor Licensees, dated December 17, 2014, requested licensees to provide information regarding the licensing actions that are planned to be submitted to the NRC staff for review over the next 3 calendar years and power uprate applications planned over the next 5 years.
The requested information is strictly voluntary. The NRC staff plans to use the information in allocating its resources for licensing reviews.
Arizona Public Service Company (APS) supports the objective of the RIS in promoting early communication with the NRC staff regarding planned licensing activities. Enclosure 1 of this letter is a listing of planned licensing actions over the next 3 years for the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 and Enclosure 2 of this letter is the Annual Power Uprate Survey for PVNGS Units 1, 2 and 3.
APS requests that the contents of Enclosure 2 be withheld from public disclosure, pursuant to 10 CFR 2.390. The NRC has waived the affidavit requirements on its own initiative, since the response to the survey contains business-sensitive information, the disclosure of which is likely to cause competitive harm and should, therefore, be classified as proprietary information.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Diablo Canyon -Palo  Verde - Wolf Creek
102-06998-TNW/CJS ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for all Power Reactor Licensees Page 2 The enclosures reflect the current target dates for the APS submittals. These target dates are subject to change. Also, operational considerations may result in the addition of licensing actions that are not currently itemized in the enclosures.
As requested in RIS 2014-13, a copy of this letter and enclosures is being provided to Tracy Orf, Division of Operating Reactor Licensing, Technical Assistant.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.
Sincerely, G"'A%                  0J/
Thomas N. Weber Nuclear Regulatory Affairs Department Leader TNW/CJS/hsc  - Listing of Planned Licensing Actions for PVNGS Units 1, 2 and 3  - Annual Power Uprate Survey for PVNGS Units 1, 2 and 3 cc:
M. L. Dapas          NRC Region IV Regional Administrator B. K. Singal        NRC NRR Project Manager for PVNGS M. M. Watford        NRC NRR Project Manager C. A. Peabody        NRC Senior Resident Inspector for PVNGS T. Orf              NRC Technical Assistant, Division of Operating Reactor Licensing
Enclosure 1 Listing of Planned Licensing Actions for PVNGS Units 1, 2 and 3
Enclosure 1 Listing of Planned Licensing Actions for PVNGS Units 1, 2 and 3 LICENSING  LICENSING      LICENSING ACTION              PROJECTED        OUTAGE        COMMENTS (AS ACTION      ACTION          DESCRIPTION            SUBMITTAL DATE        RELATED?            NEEDED)
NUMBER                                                                    IS SO, DATE NEEDED 1    Revise Quality Adopts Regulatory Guide      February 27, 2015        No        10 CFR 50.54(a) NRC Assurance      1.28 / ASME NQA-1                                                Approval Program Document 2    License        Revises TSs per approved      February 27, 2015        No        TSTF-439 is a Amendment to  TS Task Force (TSTF)                                            prerequisite for the Eliminate      Traveler 439, Eliminate                                          planned submittal to Second        Second Completion Times                                          adopt risk-informed Completion    Limiting Time From                                              completions times Times from    Discovery of Failure to                                          per TSTF-505, Technical      Meet an LCO                                                      Provide Risk-Specifications                                                                  Informed Extended (TSs)                                                                          Completion Times -
RITSTF Initiative 4b 3    License        Revises TSs to adopt            June 30, 2015        No Amendment to  TSTF-505, Provide Risk-Adopt Risk-    Informed Extended Informed TS    Completion Times -
Completion    RITSTF Initiative 4b Times 4    License        Revises EALs to adopt NEI      Second Quarter        No        License Amendment Amendment to  99-01, Revision 6,                  2015                        Required by 10 CFR Update        Development of                                                  50.54(q)(4)
Emergency      Emergency Action Levels Action Level  for Non-Passive Reactors (EAL) Scheme 1
Enclosure 2 Annual Power Uprate Survey for PVNGS Units 1, 2 and 3 LICENSING  LICENSING        LICENSING ACTION            PROJECTED        OUTAGE        COMMENTS (AS ACTION        ACTION            DESCRIPTION          SUBMITTAL DATE      RELATED?            NEEDED)
NUMBER                                                                  IS SO, DATE NEEDED 5    License          Revises SFP Criticality    Third Quarter 2015      No      Resolves non-Amendment to    TSs, incorporating new                                      conservative TS and Revise Spent    analysis and SFP design                                      addresses next Fuel Pool (SFP)  characteristics                                              generation fuel as Criticality TSs                                                              part of the new analysis 6    License          Implements a design        December 18, 2015        No      Commitment related Amendment to    change to shorten                                            to DVRs in APS letter Revise Degraded  degraded voltage relay                                      number 102-06948, Voltage Relay    (DVR) time delay when an                                    dated September 26, (DVR) Time      accident signal is present                                  2014 Delay            (TS Surveillance Requirement 3.3.7.3) 7    License          Implements next              March 30, 2016        Yes    Schedule still under Amendment and    generation fuel design                        September 30, review Exemption        which requires Exemption                            2017 Request for Next to 10 CFR 50, Appendix K Generation Fuel 8    License          Implements notes in TS        March 30, 2016        No      Commitment from Amendment to    for as-found and as-left                                    prior power uprate, Adopt            set-points per TSTF-493,                                    described in APS Recommended      Clarify Application of                                      letter number 102-Notes for TS    Setpoint Methodology for                                    06982, dated Setpoints        Limiting Safety System                                      December 30, 2014 Settings 2
Enclosure 2 Annual Power Uprate Survey for PVNGS Units 1, 2 and 3 LICENSING  LICENSING        LICENSING ACTION            PROJECTED        OUTAGE        COMMENTS (AS ACTION      ACTION            DESCRIPTION        SUBMITTAL DATE      RELATED?            NEEDED)
NUMBER                                                                IS SO, DATE NEEDED 9    License          Adopt TSTF-523, Generic      June 30, 2016        No      Generic Letter 2008-Amendment to    Letter 2008-01, Managing                                  01 commitment, Implement        Gas Accumulation                                          described in APS Surveillance                                                                letter number 102-Requirements to                                                            06982, dated Monitor Gas                                                                December 30, 2014 Accumulation 10  License          Revises TS 5.5.16 to        March 31, 2017        Yes Amendment to    adopt ILRT (Type A Test)                    March 3, 2023 Make            15 year interval Containment      permanently Integrated Leak Rate Test (ILRT)
Interval every 15 Years 3}}

Latest revision as of 17:03, 31 October 2019

Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees
ML15037A085
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/29/2015
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, NRC/NMSS/SFST
Shared Package
ML15037A106 List:
References
102-06998-TNW/CJS
Download: ML15037A085 (6)


Text

The content of Enclosure 2 is PROPRIETARY and should be withheld From Public Disclosure pursuant to 10 CFR 2.390 10 CFR 50.90 Palo Verde Nuclear Generating Station 5801 S. Wintersburg Road Tonopah, AZ 85354 102-06998-TNW/CJS January 29, 2015 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Response to Regulatory Issue Summary (RIS) 2014-13, PlannedLicensing Action Submittals for all Power Reactor Licensees

Dear Sirs:

Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for all Power Reactor Licensees, dated December 17, 2014, requested licensees to provide information regarding the licensing actions that are planned to be submitted to the NRC staff for review over the next 3 calendar years and power uprate applications planned over the next 5 years.

The requested information is strictly voluntary. The NRC staff plans to use the information in allocating its resources for licensing reviews.

Arizona Public Service Company (APS) supports the objective of the RIS in promoting early communication with the NRC staff regarding planned licensing activities. Enclosure 1 of this letter is a listing of planned licensing actions over the next 3 years for the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 and Enclosure 2 of this letter is the Annual Power Uprate Survey for PVNGS Units 1, 2 and 3.

APS requests that the contents of Enclosure 2 be withheld from public disclosure, pursuant to 10 CFR 2.390. The NRC has waived the affidavit requirements on its own initiative, since the response to the survey contains business-sensitive information, the disclosure of which is likely to cause competitive harm and should, therefore, be classified as proprietary information.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Diablo Canyon -Palo Verde - Wolf Creek

102-06998-TNW/CJS ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for all Power Reactor Licensees Page 2 The enclosures reflect the current target dates for the APS submittals. These target dates are subject to change. Also, operational considerations may result in the addition of licensing actions that are not currently itemized in the enclosures.

As requested in RIS 2014-13, a copy of this letter and enclosures is being provided to Tracy Orf, Division of Operating Reactor Licensing, Technical Assistant.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.

Sincerely, G"'A% 0J/

Thomas N. Weber Nuclear Regulatory Affairs Department Leader TNW/CJS/hsc - Listing of Planned Licensing Actions for PVNGS Units 1, 2 and 3 - Annual Power Uprate Survey for PVNGS Units 1, 2 and 3 cc:

M. L. Dapas NRC Region IV Regional Administrator B. K. Singal NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS T. Orf NRC Technical Assistant, Division of Operating Reactor Licensing

Enclosure 1 Listing of Planned Licensing Actions for PVNGS Units 1, 2 and 3

Enclosure 1 Listing of Planned Licensing Actions for PVNGS Units 1, 2 and 3 LICENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (AS ACTION ACTION DESCRIPTION SUBMITTAL DATE RELATED? NEEDED)

NUMBER IS SO, DATE NEEDED 1 Revise Quality Adopts Regulatory Guide February 27, 2015 No 10 CFR 50.54(a) NRC Assurance 1.28 / ASME NQA-1 Approval Program Document 2 License Revises TSs per approved February 27, 2015 No TSTF-439 is a Amendment to TS Task Force (TSTF) prerequisite for the Eliminate Traveler 439, Eliminate planned submittal to Second Second Completion Times adopt risk-informed Completion Limiting Time From completions times Times from Discovery of Failure to per TSTF-505, Technical Meet an LCO Provide Risk-Specifications Informed Extended (TSs) Completion Times -

RITSTF Initiative 4b 3 License Revises TSs to adopt June 30, 2015 No Amendment to TSTF-505, Provide Risk-Adopt Risk- Informed Extended Informed TS Completion Times -

Completion RITSTF Initiative 4b Times 4 License Revises EALs to adopt NEI Second Quarter No License Amendment Amendment to 99-01, Revision 6, 2015 Required by 10 CFR Update Development of 50.54(q)(4)

Emergency Emergency Action Levels Action Level for Non-Passive Reactors (EAL) Scheme 1

Enclosure 2 Annual Power Uprate Survey for PVNGS Units 1, 2 and 3 LICENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (AS ACTION ACTION DESCRIPTION SUBMITTAL DATE RELATED? NEEDED)

NUMBER IS SO, DATE NEEDED 5 License Revises SFP Criticality Third Quarter 2015 No Resolves non-Amendment to TSs, incorporating new conservative TS and Revise Spent analysis and SFP design addresses next Fuel Pool (SFP) characteristics generation fuel as Criticality TSs part of the new analysis 6 License Implements a design December 18, 2015 No Commitment related Amendment to change to shorten to DVRs in APS letter Revise Degraded degraded voltage relay number 102-06948, Voltage Relay (DVR) time delay when an dated September 26, (DVR) Time accident signal is present 2014 Delay (TS Surveillance Requirement 3.3.7.3) 7 License Implements next March 30, 2016 Yes Schedule still under Amendment and generation fuel design September 30, review Exemption which requires Exemption 2017 Request for Next to 10 CFR 50, Appendix K Generation Fuel 8 License Implements notes in TS March 30, 2016 No Commitment from Amendment to for as-found and as-left prior power uprate, Adopt set-points per TSTF-493, described in APS Recommended Clarify Application of letter number 102-Notes for TS Setpoint Methodology for 06982, dated Setpoints Limiting Safety System December 30, 2014 Settings 2

Enclosure 2 Annual Power Uprate Survey for PVNGS Units 1, 2 and 3 LICENSING LICENSING LICENSING ACTION PROJECTED OUTAGE COMMENTS (AS ACTION ACTION DESCRIPTION SUBMITTAL DATE RELATED? NEEDED)

NUMBER IS SO, DATE NEEDED 9 License Adopt TSTF-523, Generic June 30, 2016 No Generic Letter 2008-Amendment to Letter 2008-01, Managing 01 commitment, Implement Gas Accumulation described in APS Surveillance letter number 102-Requirements to 06982, dated Monitor Gas December 30, 2014 Accumulation 10 License Revises TS 5.5.16 to March 31, 2017 Yes Amendment to adopt ILRT (Type A Test) March 3, 2023 Make 15 year interval Containment permanently Integrated Leak Rate Test (ILRT)

Interval every 15 Years 3