ML15092A754: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                NUCLEAR REGULATORY COMMISSION
  April 2, 2015  
                                              REGION II
Mr. David A. Heacock President and Chief Nuclear Officer  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Virginia Electric and Power Company  
                                    ATLANTA, GEORGIA 30303-1257
Dominion Nuclear  
                                          April 2, 2015
Innsbrook Technical Center  
Mr. David A. Heacock
5000 Dominion Boulevard  
President and Chief Nuclear Officer
Glen Allen, VA 23060-6711  
Virginia Electric and Power Company
Dominion Nuclear
SUBJECT:   SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR  
Innsbrook Technical Center
INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)  
5000 Dominion Boulevard
Dear Mr. Heacock:  
Glen Allen, VA 23060-6711
SUBJECT:       SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor,  
                INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)
Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Surry Power Station. The operating test is scheduled to be administered during the weeks of September 21 and September 28, 2015. The written examination is scheduled to be administered the week of October 5, 2015. The on-site  
Dear Mr. Heacock:
preparatory week is scheduled for the week of August 24, 2015.  
In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor,
Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the
administration of licensing examinations at Surry Power Station. The operating test is
scheduled to be administered during the weeks of September 21 and September 28, 2015. The
written examination is scheduled to be administered the week of October 5, 2015. The on-site
preparatory week is scheduled for the week of August 24, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline and reference material by June 23, 2015. Ms. Toth provided the written examination
outline to your staff in October 2014. The operating test, written examination, and the
supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23,
2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


D. Heacock                                    2
As agreed during the telephone conversation, your staff will prepare both the operating test and  
In order to conduct the requested written examinations and operating tests, it will be necessary
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
for your staff to provide adequate space and accommodations in accordance with ES-402, and
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and reference material by June 23, 2015.  Ms. Toth provided the written examination
to make the simulation facility available on the dates noted above. In accordance with ES-302,
outline to your staff in October 2014. The operating test, written examination, and the
your staff should retain the original simulator performance data (e.g., system pressures,
supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23,
temperatures, and levels) generated during the dynamic operating tests until the examination
2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
results are final.
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.  
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-
0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before
the first examination date. If the applications are not received at least 30 days before the
examination date, a postponement may be necessary. Signed applications certifying that all
training has been completed should be submitted at least 14 days before the first examination
date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 2500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC
Website at http://www.nrc.gov/reading-rm.adams.html .


D. Heacock                                    3
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and
your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Ms. Toth at (404) 997-4520,
(Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
                                                Sincerely,
                                                /RA: Gerald J. McCoy/
                                                Eugene F. Guthrie, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket Nos.: 50-280, 50-281
License Nos.: DPR-32, DPR-37
cc: Distribution via Listserv


 
D. Heacock 2
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.


   
  _ML15092A754___________________       SUNSI REVIEW COMPLETE  FORM 665 ATTACHED
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
OFFICE             RII:DRS       RII:DRS
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
SIGNATURE         AXT6           GJM1 FOR
operator and senior reactor operator license applications (Office of Management and Budget
NAME               JATOTH         EFGUTHRIE
(OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all
DATE                   4/2/2015       4/2/2015     4/ /2015       4/ /2015       4/ /2015
training has been completed should be submitted at least 14 days before the first examination
E-MAIL COPY?         YES     NO   YES     NO   YES   NO     YES   NO     YES   NO   YES   NO     YES   NO
 
       
date.
Letter to David A. Heacock from Eugene F. Guthrie dated April 2, 2015.
This letter contains information collections that are subject to the
SUBJECT:       SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
Paperwork Reduction Act of
              INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016.  The public reporting burden for this collection of information is estimated to average 2500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC
Website at http://www.nrc.gov/reading-rm.adams.html .   
D. Heacock 3
Thank you for your cooperation in this matter.  Mr. Philpot has been advised of the policies and guidelines referenced in this letter.  If y
ou have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov
), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov
).  Sincerely,  /RA: Gerald J. McCoy/
Eugene F. Guthrie, Chief        Operations Branch 2
       Division of Reactor Safety
 
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
 
cc: Distribution via Listserv
 
_ML15092A754___________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS     SIGNATURE AXT6 GJM1 FOR     NAME JATOTH EFGUTHRIE     DATE 4/2/2015 4/2/2015 4/   /2015 4/   /2015 4/   /2015   E-MAIL COPY?    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO    
  Letter to David A. Heacock from Eugene F. Guthrie dated April 2, 2015.
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR  
INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)  
Distribution:
Distribution:
RIDSNRRDIRS  
RIDSNRRDIRS
 
PUBLIC
PUBLIC  
RidsNrrPMSurry Resource
RidsNrrPMSurry Resource
}}
}}

Latest revision as of 14:27, 31 October 2019

Notification of Licensed Operator Initial Examination (05000280/2015301 and 05000281/2015301)
ML15092A754
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/02/2015
From: Eugene Guthrie
Division of Reactor Safety II
To: Heacock D
Dominion Nuclear, Virginia Electric & Power Co (VEPCO)
References
50-280/15-301, 50-281/15-301
Download: ML15092A754 (5)


See also: IR 05000280/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 2, 2015

Mr. David A. Heacock

President and Chief Nuclear Officer

Virginia Electric and Power Company

Dominion Nuclear

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)

Dear Mr. Heacock:

In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor,

Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the

administration of licensing examinations at Surry Power Station. The operating test is

scheduled to be administered during the weeks of September 21 and September 28, 2015. The

written examination is scheduled to be administered the week of October 5, 2015. The on-site

preparatory week is scheduled for the week of August 24, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline and reference material by June 23, 2015. Ms. Toth provided the written examination

outline to your staff in October 2014. The operating test, written examination, and the

supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23,

2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline, examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

D. Heacock 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-

0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before

the first examination date. If the applications are not received at least 30 days before the

examination date, a postponement may be necessary. Signed applications certifying that all

training has been completed should be submitted at least 14 days before the first examination

date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 2500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC

Website at http://www.nrc.gov/reading-rm.adams.html .

D. Heacock 3

Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Ms. Toth at (404) 997-4520,

(Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA: Gerald J. McCoy/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

cc: Distribution via Listserv

_ML15092A754___________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE AXT6 GJM1 FOR

NAME JATOTH EFGUTHRIE

DATE 4/2/2015 4/2/2015 4/ /2015 4/ /2015 4/ /2015

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to David A. Heacock from Eugene F. Guthrie dated April 2, 2015.

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMSurry Resource