ML15258A389: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/27/2015
| issue date = 08/27/2015
| title = Shine Medical Technologies V. 0 - PSAR Master Table of Contents
| title = Shine Medical Technologies V. 0 - PSAR Master Table of Contents
| author name = Bynum R V
| author name = Bynum R
| author affiliation = Shine Medical Technologies, Inc
| author affiliation = Shine Medical Technologies, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiRev. 0Master Table of Contents CHAPTER 1THE FACILITY
{{#Wiki_filter:Preliminary Safety Analysis Report                                                                       Master Table of Contents Master Table of Contents Section                                                          Title                                                              Page CHAPTER 1 THE FACILITY


==1.1INTRODUCTION==
==1.1          INTRODUCTION==
.....................................................................................................1-11.2
..................................................................................................... 1-1 1.2        


==SUMMARY==
==SUMMARY==
AND CONCLUSIONS ON PRINCIPAL SAFETYCONSIDERATIONS.................................................................................................1-21.3GENERAL DESCRIPTION OF THE FACILITY.......................................................1-81.4SHARED FACILITIES AND EQUIPMENT...............................................................1-131.5COMPARISON WITH SIMILAR FACILITIES...........................................................1-141.6
AND CONCLUSIONS ON PRINCIPAL SAFETY CONSIDERATIONS................................................................................................. 1-2 1.3          GENERAL DESCRIPTION OF THE FACILITY ....................................................... 1-8 1.4          SHARED FACILITIES AND EQUIPMENT............................................................... 1-13 1.5          COMPARISON WITH SIMILAR FACILITIES........................................................... 1-14 1.6        


==SUMMARY==
==SUMMARY==
OF OPERATIONS................................................................................1-18 1.7COMPLIANCE WITH THE NUCLEAR WASTE POLICY ACT OF 1982.................1-191.8FACILITY MODIFICATIONS AND HISTORY..........................................................1-2
OF OPERATIONS ................................................................................ 1-18 1.7          COMPLIANCE WITH THE NUCLEAR WASTE POLICY ACT OF 1982 ................. 1-19 1.8          FACILITY MODIFICATIONS AND HISTORY.......................................................... 1-20


==01.9REFERENCES==
==1.9          REFERENCES==
........................................................................................................1-21 CHAPTER 2 SITE CHARACTERISTICS2.1GEOGRAPHY AND DEMOGRAPHY......................................................................2.1-12.2NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES..............................................................................................................2.2-12.3METEOROLOGY.....................................................................................................2.3-1 2.4HYDROLOGY..........................................................................................................2.4-12.5GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING....................2.5-
........................................................................................................ 1-21 CHAPTER 2 SITE CHARACTERISTICS 2.1          GEOGRAPHY AND DEMOGRAPHY ...................................................................... 2.1-1 2.2          NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES.............................................................................................................. 2.2-1 2.3          METEOROLOGY..................................................................................................... 2.3-1 2.4          HYDROLOGY.......................................................................................................... 2.4-1 2.5          GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING.................... 2.5-1


==12.6REFERENCES==
==2.6          REFERENCES==
........................................................................................................2.6-1 CHAPTER 3DESIGN OF STRUCTURES, SYSTEMS, AND COMPONENTS3.1DESIGN CRITERIA.................................................................................................3-13.2METEOROLOGICAL DAMAGE..............................................................................3-193.3WATER DAMAGE...................................................................................................3-223.4SEISMIC DAMAGE.................................................................................................3-25 3.5SYSTEMS AND COMPONMENTS.........................................................................3-453.5aIRRADIATION FACILITY.........................................................................................3-573.5bRADIOISOTPE PRODUCTION FACILITY..............................................................3-9
........................................................................................................ 2.6-1 CHAPTER 3 DESIGN OF STRUCTURES, SYSTEMS, AND COMPONENTS 3.1          DESIGN CRITERIA ................................................................................................. 3-1 3.2          METEOROLOGICAL DAMAGE .............................................................................. 3-19 3.3          WATER DAMAGE ................................................................................................... 3-22 3.4          SEISMIC DAMAGE ................................................................................................. 3-25 3.5          SYSTEMS AND COMPONMENTS ......................................................................... 3-45 3.5a        IRRADIATION FACILITY......................................................................................... 3-57 3.5b        RADIOISOTPE PRODUCTION FACILITY .............................................................. 3-94


==43.6REFERENCES==
==3.6          REFERENCES==
........................................................................................................3-107 CHAPTER 4IRRADIATION UNIT AND RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION4a1HETEROGENEOUS REACTOR DESCRIPTION..............................................4a1-14a2IRRADIATION FACILITY DESCRIPTION.........................................................4a2-14a2.1
........................................................................................................ 3-107 CHAPTER 4 IRRADIATION UNIT AND RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION 4a1          HETEROGENEOUS REACTOR DESCRIPTION .............................................. 4a1-1 4a2          IRRADIATION FACILITY DESCRIPTION ......................................................... 4a2-1 4a2.1      


==SUMMARY==
==SUMMARY==
DESCRIPTION............................................................................4a2-24a2.2SUBCRITICAL ASSEMBLY..........................................................................4a2-6 SectionTitle Page Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiRev. 14a2.3NEUTRON DRIVER.....................................................................................4a2-204a2.4TARGET SOLUTION VESSEL AND LIGHT WATER POOL...............................
DESCRIPTION ............................................................................ 4a2-2 4a2.2        SUBCRITICAL ASSEMBLY .......................................................................... 4a2-6 SHINE Medical Technologies                                      i                                                                      Rev. 0
4a2-264a2.5IRRADIATION FACILITY BIOLOGICAL SHIELD....................................................4a2-324a2.6NUCLEAR DESIGN.................................................................................................4a2-374a2.7THERMAL HYDRAULIC DESIGN...........................................................................4a2-514a2.8GAS MANAGEMENT SYSTEM...............................................................................4a2-564a


==2.9REFERENCES==
Preliminary Safety Analysis Report                                                                    Master Table of Contents 4a2.3        NEUTRON DRIVER ..................................................................................... 4a2-20 4a2.4        TARGET SOLUTION VESSEL AND LIGHT WATER POOL ............................... 4a2-26 4a2.5        IRRADIATION FACILITY BIOLOGICAL SHIELD .................................................... 4a2-32 4a2.6        NUCLEAR DESIGN................................................................................................. 4a2-37 4a2.7        THERMAL HYDRAULIC DESIGN ........................................................................... 4a2-51 4a2.8        GAS MANAGEMENT SYSTEM............................................................................... 4a2-56 4a
........................................................................................................4a2-62 4bRADIOISOTOPE PRODUCTION FACILITY DESCRIPTION..................................4b-14b.1FACILITY AND PROCESS DESCRIPTION............................................................4b-24b.2RADIOISOTOPE PRODUCTION FACILITY BIOLOGICAL SHIELD.......................4b-134b.3RADIOISOTOPE EXTRACTION SYSTEM.............................................................4b-184b.4SPECIAL NUCLEAR MATERIAL PROCESSING AND STORAGE........................4b-27 4b.5REFERENCES........................................................................................................4b-56 CHAPTER 5 COOLING SYSTEMS5a1HETEROGENEOUS REACTOR COOLING SYSTEMS..........................................5a1-15a2IRRADIATION UNIT COOLING SYSTEMS.............................................................5a2-15a2.1
 
==2.9        REFERENCES==
........................................................................................................ 4a2-62 4b          RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION.................................. 4b-1 4b.1        FACILITY AND PROCESS DESCRIPTION ............................................................ 4b-2 4b.2        RADIOISOTOPE PRODUCTION FACILITY BIOLOGICAL SHIELD....................... 4b-13 4b.3        RADIOISOTOPE EXTRACTION SYSTEM ............................................................. 4b-18 4b.4        SPECIAL NUCLEAR MATERIAL PROCESSING AND STORAGE ........................ 4b-27 4b.5        REFERENCES ........................................................................................................ 4b-56 CHAPTER 5 COOLING SYSTEMS 5a1          HETEROGENEOUS REACTOR COOLING SYSTEMS.......................................... 5a1-1 5a2          IRRADIATION UNIT COOLING SYSTEMS............................................................. 5a2-1 5a2.1      


==SUMMARY==
==SUMMARY==
DESCRIPTION.....................................................................................5a2-25a2.2PRIMARY COOLING SYSTEM...............................................................................5a2-45a2.3SECONDARY COOLING SYSTEM.........................................................................5a2-135a2.4PRIMARY COOLANT CLEANUP............................................................................5a2-20 5a2.5PRIMARY COOLANT MAKEUP WATER SYSTEM................................................5a2-225a2.6NITROGEN-16 CONTROL......................................................................................5a2-255a2.7AUXILIARY SYSTEMS USING PRIMARY COOLANT............................................5a2-265a
DESCRIPTION ..................................................................................... 5a2-2 5a2.2        PRIMARY COOLING SYSTEM ............................................................................... 5a2-4 5a2.3        SECONDARY COOLING SYSTEM......................................................................... 5a2-13 5a2.4        PRIMARY COOLANT CLEANUP ............................................................................ 5a2-20 5a2.5        PRIMARY COOLANT MAKEUP WATER SYSTEM ................................................ 5a2-22 5a2.6        NITROGEN-16 CONTROL ...................................................................................... 5a2-25 5a2.7        AUXILIARY SYSTEMS USING PRIMARY COOLANT............................................ 5a2-26 5a


==2.8REFERENCES==
==2.8        REFERENCES==
........................................................................................................5a2-275bRADIOISOTOPE PRODUCTION FACILITY COOLING SYSTEMS........................5b-1 CHAPTER 6ENGINEERED SAFETY FEATURES6a1HETEROGENEOUS REACTOR ENGINEERED SAFETY FEATURES................6a1-16a2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES..........................6a2-16a2.1
........................................................................................................ 5a2-27 5b          RADIOISOTOPE PRODUCTION FACILITY COOLING SYSTEMS........................ 5b-1 CHAPTER 6 ENGINEERED SAFETY FEATURES 6a1          HETEROGENEOUS REACTOR ENGINEERED SAFETY FEATURES................ 6a1-1 6a2          IRRADIATION FACILITY ENGINEERED SAFETY FEATURES .......................... 6a2-1 6a2.1      


==SUMMARY==
==SUMMARY==
DESCRIPTION............................................................................6a2-26a2.2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES DETAILED DESCRIPTION6a2-46a2.3EMERGENCY COOLING SYSTEM........................................................................6a2-106a2.4IRRADIATION FACILITY ENGINEERED SAFETY FEATURESTECHNICAL SPECIFICATIONS..............................................................................6a2-116a
DESCRIPTION ............................................................................ 6a2-2 6a2.2        IRRADIATION FACILITY ENGINEERED SAFETY FEATURES DETAILED DESCRIPTION6a2-4 6a2.3        EMERGENCY COOLING SYSTEM ........................................................................ 6a2-10 6a2.4        IRRADIATION FACILITY ENGINEERED SAFETY FEATURES TECHNICAL SPECIFICATIONS.............................................................................. 6a2-11 6a


==2.5REFERENCES==
==2.5        REFERENCES==
........................................................................................................6a2-126bRADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-16b.1
........................................................................................................ 6a2-12 6b          RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETY FEATURES.............................................................................................................. 6b-1 6b.1        


==SUMMARY==
==SUMMARY==
DESCRIPTION ENGINEERED SAFETY FEATURES.........................6b-16b.2RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-36b.3NUCLEAR CRITICALITY CONTROL......................................................................6b-116b.4REFERENCES.............................................................................................6b-23 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiiRev. 0 CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS7a1HETEROGENEOUS REACTOR INSTRUMENT & CONTROLSYSTEMS................................................................................................................7a1-17a2IRRADIATION FACILITY INSTRUMENT & CONTROL SYSTEMS........................7a2-17a2.1
DESCRIPTION ENGINEERED SAFETY FEATURES ......................... 6b-1 6b.2        RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETY FEATURES.............................................................................................................. 6b-3 6b.3        NUCLEAR CRITICALITY CONTROL ...................................................................... 6b-11 6b.4        REFERENCES ............................................................................................. 6b-23 SHINE Medical Technologies                                    ii                                                                      Rev. 1
 
Preliminary Safety Analysis Report                                                                     Master Table of Contents CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS 7a1          HETEROGENEOUS REACTOR INSTRUMENT & CONTROL SYSTEMS................................................................................................................ 7a1-1 7a2          IRRADIATION FACILITY INSTRUMENT & CONTROL SYSTEMS ........................ 7a2-1 7a2.1      


==SUMMARY==
==SUMMARY==
DESCRIPTION.....................................................................................7a2-17a2.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7a2-37a2.3TSV PROCESS CONTROL DESCRIPTION...........................................................7a2-31 7a2.4TSV REACTIVITY PROTECTION SYSTEM...........................................................7a2-337a2.5ENGINEERED SAFETY FEATURES ACTUATION SYSTEM................................7a2-377a2.6CONTROL CONSOLE AND DISPLAY INFORMATION...............
DESCRIPTION..................................................................................... 7a2-1 7a2.2        DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS ............................ 7a2-3 7a2.3        TSV PROCESS CONTROL DESCRIPTION ........................................................... 7a2-31 7a2.4        TSV REACTIVITY PROTECTION SYSTEM ........................................................... 7a2-33 7a2.5        ENGINEERED SAFETY FEATURES ACTUATION SYSTEM ................................ 7a2-37 7a2.6        CONTROL CONSOLE AND DISPLAY INFORMATION.......................................... 7a2-40 7a2.7        RADIATION MONITORING SYSTEMS................................................................... 7a2-43 7a
...........................7a2-407a2.7RADIATION MONITORING SYSTEMS...................................................................7a2-437a


==2.8REFERENCES==
==2.8        REFERENCES==
........................................................................................................7a2-47 7bRADIOISOTOPE PRODUCTION FACILITY INSTRUMENT &CONTROL SYSTEM...............................................................................................7b-17b.1
........................................................................................................ 7a2-47 7b          RADIOISOTOPE PRODUCTION FACILITY INSTRUMENT &
CONTROL SYSTEM ............................................................................................... 7b-1 7b.1        


==SUMMARY==
==SUMMARY==
DESCRIPTION.....................................................................................7b-17b.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7b-27b.3PRODUCTION FACILITY PROCESS CONTROL SYSTEMS................................7b-297b.4ENGINEERED SAFETY FEATURE AND ALARMING............................................7b-317b.5CONTROL CONSOLE AND DISPLAY INSTRUMENTATION................................7b-35 7b.6RADIATION MONITORING SYSTEMS...................................................................7b-377b.7REFERENCES........................................................................................................7b-38 CHAPTER 8ELECTRIC POWER SYSTEMS8a1HETEROGENEOUS REACTOR ELECTRICAL POWER SYSTEMS.....................8a1-18a2IRRADIATION UNIT ELECTRICAL POWER SYSTEMS........................................8a2-18a2.1NORMAL ELECTRICAL POWER SYSTEMS.........................................................8a2-18a2.2EMERGENCY ELECTRICAL POWER SYSTEMS..................................................8a2-98a2.3IRRADIATION FACILITY ELECTRICAL POWER SYSTEMSTECHNICAL SPECIFICATIONS.............................................................................8a2-158a
DESCRIPTION..................................................................................... 7b-1 7b.2        DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS ............................ 7b-2 7b.3        PRODUCTION FACILITY PROCESS CONTROL SYSTEMS ................................ 7b-29 7b.4        ENGINEERED SAFETY FEATURE AND ALARMING............................................ 7b-31 7b.5        CONTROL CONSOLE AND DISPLAY INSTRUMENTATION ................................ 7b-35 7b.6        RADIATION MONITORING SYSTEMS................................................................... 7b-37 7b.7        REFERENCES ........................................................................................................ 7b-38 CHAPTER 8 ELECTRIC POWER SYSTEMS 8a1          HETEROGENEOUS REACTOR ELECTRICAL POWER SYSTEMS ..................... 8a1-1 8a2          IRRADIATION UNIT ELECTRICAL POWER SYSTEMS ........................................ 8a2-1 8a2.1        NORMAL ELECTRICAL POWER SYSTEMS ......................................................... 8a2-1 8a2.2        EMERGENCY ELECTRICAL POWER SYSTEMS.................................................. 8a2-9 8a2.3        IRRADIATION FACILITY ELECTRICAL POWER SYSTEMS TECHNICAL SPECIFICATIONS ............................................................................. 8a2-15 8a
 
==2.4        REFERENCES==
........................................................................................................ 8a2-16 8b          RADIOISOTOPE PRODUCTION FACILITY ELECTRICAL POWER SYSTEMS ................................................................................................. 8b-1 8b.1        NORMAL ELECTRICAL POWER SYSTEMS ......................................................... 8b-1 8b.2        EMERGENCY ELECTRICAL POWER SYSTEMS.................................................. 8b-2 8b.3        RADIOISOTOPE PRODUCTION FACILITY ELECTRICAL POWER SYSTEMS TECHNICAL SPECIFICATIONS............................................. 8b-3 CHAPTER 9 AUXILIARY SYSTEMS 9a1          HETEROGENEOUS REACTOR AUXILIARY SYSTEMS ....................................... 9a1-1 9a2          IRRADIATION FACILITY AUXILIARY SYSTEMS................................................... 9a2-1 9a2.1        HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS......................... 9a2-1 9a2.2        HANDLING & STORAGE OF TARGET SOLUTION ............................................... 9a2-13 9a2.3        FIRE PROTECTION SYSTEMS AND PROGRAMS ............................................... 9a2-16 SHINE Medical Technologies                                    iii                                                                    Rev. 0


==2.4REFERENCES==
Preliminary Safety Analysis Report                                                                     Master Table of Contents 9a2.4        COMMUNICATIONS SYSTEMS ............................................................................. 9a2-46 9a2.5        POSSESSION & USE OF BYPRODUCT, SOURCE AND SPECIAL NUCLEAR MATERIAL............................................................................................. 9a2-48 9a2.6        COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS .............. 9a2-50 9a2.7        OTHER AUXILIARY SYSTEMS .............................................................................. 9a2-51 9a2.8        IRRADIATION FACILITY AUXILIARY SYSTEMS TECHNICAL SPECIFICATIONS................................................................................................... 9a2-60 9a
........................................................................................................8a2-168bRADIOISOTOPE PRODUCTION FACILITY ELECTRICALPOWER SYSTEMS.................................................................................................8b-18b.1NORMAL ELECTRICAL POWER SYSTEMS.........................................................8b-1 8b.2EMERGENCY ELECTRICAL POWER SYSTEMS..................................................8b-28b.3RADIOISOTOPE PRODUCTION FACILITY ELECTRICALPOWER SYSTEMS TECHNICAL SPECIFICATIONS.............................................8b-3 CHAPTER 9AUXILIARY SYSTEMS9a1HETEROGENEOUS REACTOR AUXILIARY SYSTEMS.......................................9a1-19a2IRRADIATION FACILITY AUXILIARY SYSTEMS...................................................9a2-19a2.1HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.........................9a2-19a2.2HANDLING & STORAGE OF TARGET SOLUTION...............................................9a2-13 9a2.3FIRE PROTECTION SYSTEMS AND PROGRAMS...............................................9a2-16 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesivRev. 09a2.4COMMUNICATIONS SYSTEMS.............................................................................9a2-469a2.5POSSESSION & USE OF BYPRODUCT, SOURCE AND SPECIALNUCLEAR MATERIAL.............................................................................................9a2-489a2.6COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS..............9a2-509a2.7OTHER AUXILIARY SYSTEMS..............................................................................9a2-519a2.8IRRADIATION FACILITY AUXILIARY SYSTEMS TECHNICALSPECIFICATIONS...................................................................................................9a2-609a


==2.9REFERENCES==
==2.9        REFERENCES==
........................................................................................................9a2-619bRADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS.....................9b-19b.1HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.........................9b-19b.2HANDLING & STORAGE OF TARGET SOLUTION...............................................9b-29b.3FIRE PROTECTION SYSTEMS AND PROGRAMS...............................................9b-69b.4COMMUNICATION SYSTEMS...............................................................................9b-79b.5POSSESSION AND USE OF BYPRODUCT, SOURCE AND SPECIALNUCLEAR MATERIAL.............................................................................................9b-89b.6COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS..............9b-159b.7OTHER AUXILIARY SYSTEMS..............................................................................9b-259b.8RADIOISOTOPE PRODUCTION FACILITY AUXILIARYSYSTEMS TECHNICAL SPECIFICATIONS...........................................................9b-539b.6REFERENCES........................................................................................................9b-54CHAPTER 10 EXPERIMENTAL FACILITIES10.1
........................................................................................................ 9a2-61 9b          RADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS ..................... 9b-1 9b.1        HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS......................... 9b-1 9b.2        HANDLING & STORAGE OF TARGET SOLUTION ............................................... 9b-2 9b.3        FIRE PROTECTION SYSTEMS AND PROGRAMS ............................................... 9b-6 9b.4        COMMUNICATION SYSTEMS ............................................................................... 9b-7 9b.5        POSSESSION AND USE OF BYPRODUCT, SOURCE AND SPECIAL NUCLEAR MATERIAL............................................................................................. 9b-8 9b.6        COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS .............. 9b-15 9b.7        OTHER AUXILIARY SYSTEMS .............................................................................. 9b-25 9b.8        RADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS TECHNICAL SPECIFICATIONS ........................................................... 9b-53 9b.6        REFERENCES ........................................................................................................ 9b-54 CHAPTER 10 EXPERIMENTAL FACILITIES 10.1        


==SUMMARY==
==SUMMARY==
DESCRIPTION.....................................................................................10-1CHAPTER 11RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT11.1RADIATION PROTECTION.....................................................................................11-111.2RADIOACTIVE WASTE MANAGEMENT................................................................11-4211.3RESPIRATORY PROTECTION PROGRAM...........................................................11-5711.4RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENTTECHNICAL SPECIFICATIONS.............................................................................11-59
DESCRIPTION..................................................................................... 10-1 CHAPTER 11 RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT 11.1        RADIATION PROTECTION..................................................................................... 11-1 11.2        RADIOACTIVE WASTE MANAGEMENT................................................................ 11-42 11.3        RESPIRATORY PROTECTION PROGRAM ........................................................... 11-57 11.4        RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT TECHNICAL SPECIFICATIONS ............................................................................. 11-59
 
==11.5        REFERENCES==
........................................................................................................ 11-60 CHAPTER 12 CONDUCT OF OPERATIONS 12.1        ORGANIZATION ..................................................................................................... 12-1 12.2        REVIEW AND AUDIT ACTIVITIES.......................................................................... 12-5 12.3        PROCEDURES ....................................................................................................... 12-7 12.4        REQUIRED ACTIONS............................................................................................. 12-8 12.5        REPORTS ............................................................................................................... 12-9 12.6        RECORDS............................................................................................................... 12-10 12.7        EMERGENCY PLANNING ...................................................................................... 12-11 12.8        SECURITY PLANNING ........................................................................................... 12-12 12.9        QUALITY ASSURANCE .......................................................................................... 12-13 12.10        OPERATOR TRAINING AND REQUALIFICATION ................................................ 12-14 SHINE Medical Technologies                                    iv                                                                      Rev. 0


==11.5REFERENCES==
Preliminary Safety Analysis Report                                                                      Master Table of Contents 12.10a      REACTOR OPERATOR TRAINING AND REQUALIFICATION.............................. 12-14 12.10b      PRODUCTION FACILITY OPERATOR TRAINING AND REQUALIFICATION ................................................................................................ 12-15 12.11        STARTUP PLAN...................................................................................................... 12-16 12.12        VACATED................................................................................................................ 12-17 12.13        MATERIAL CONTROL AND ACCOUNTABILITY PROGRAM ................................ 12-18 12.14        REFERENCES ........................................................................................................ 12-19 APPENDIX 12A      EMERGENCY PLAN...................................................................................... 12A-1 APPENDIX 12B      SECURITY PLAN........................................................................................... 12B-1 APPENDIX 12C      QUALITY ASSURANCE PROGRAM DESCRIPTION ................................... 12C-1 APPENDIX 12D      CONDUCT OF OPERATIONS PROGRAM DESCRIPTION ......................... 12D-1 CHAPTER 13 ACCIDENT ANALYSIS 13a1        HETEROGENEOUS REACTOR ACCIDENT ANALYSIS ....................................... 13a1-1 13a2        IRRADIATION FACILITY ACCIDENT ANALYSIS................................................... 13a2-1 13a2.1      ACCIDENT-INITIATING EVENTS AND SCENARIOS ............................................ 13a2-1 13a2.2      ACCIDENT ANALYSIS AND DETERMINATION OF CONSEQUENCES .................................................................................................. 13a2-36 13a3       
........................................................................................................11-60CHAPTER 12CONDUCT OF OPERATIONS12.1ORGANIZATION.....................................................................................................12-112.2REVIEW AND AUDIT ACTIVITIES..........................................................................12-5 12.3PROCEDURES.......................................................................................................12-712.4REQUIRED ACTIONS.............................................................................................12-812.5REPORTS...............................................................................................................12-912.6RECORDS...............................................................................................................12-1012.7EMERGENCY PLANNING......................................................................................12-11 12.8SECURITY PLANNING...........................................................................................12-1212.9QUALITY ASSURANCE..........................................................................................12-1312.10OPERATOR TRAINING AND REQUALIFICATION................................................12-14 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesvRev. 112.10aREACTOR OPERATOR TRAINING AND REQUALIFICATION..........
....................12-1412.10bPRODUCTION FACILITY OPERATOR TRAINING ANDREQUALIFICATION................................................................................................12-1512.11STARTUP PLAN......................................................................................................12-1612.12VACATED................................................................................................................12-1712.13MATERIAL CONTROL AND ACCOUNTABILITY PROGRAM................................12-1812.14REFERENCES........................................................................................................12-19 APPENDIX 12AEMERGENCY PLAN......................................................................................12A-1APPENDIX 12BSECURITY PLAN...........................................................................................12B-1APPENDIX 12CQUALITY ASSURANCE PROGRAM DESCRIPTION...................................12C-1APPENDIX 12DCONDUCT OF OPERATIONS PROGRAM DESCRIPTION.........................12D-1CHAPTER 13ACCIDENT ANALYSIS13a1HETEROGENEOUS REACTOR ACCIDENT ANALYSIS.......................................13a1-113a2IRRADIATION FACILITY ACCIDENT ANALYSIS...................................................13a2-113a2.1ACCIDENT-INITIATING EVENTS AND SCENARIOS............................................13a2-1 13a2.2ACCIDENT ANALYSIS AND DETERMINATION OFCONSEQUENCES..................................................................................................13a2-3613a3


==SUMMARY==
==SUMMARY==
AND CONCLUSIONS..........................................................................13a3-113a4REFERENCES........................................................................................................13a4-113bRADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSES....................13b-1 13b.1RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSISMETHODOLOGY....................................................................................................13b-113b.2ANALYSES OF ACCIDENTS WITH RADIOLOGICALCONSEQUENCES..................................................................................................13b-413b.3ANALYSIS OF ACCIDENTS WITH HAZARDOUS CHEMICALSPRODUCED FROM LICENSED MATERIAL...........................................................13b-3713b.4REFERENCES........................................................................................................13b-51CHAPTER 14TECHNICAL SPECIFICATIONS14a1HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS.........................14a1-114a2IRRADIATION FACILITY TECHNICAL SPECIFICATIONS....................................14a2-114a
AND CONCLUSIONS .......................................................................... 13a3-1 13a4        REFERENCES ........................................................................................................ 13a4-1 13b          RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSES .................... 13b-1 13b.1        RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSIS METHODOLOGY .................................................................................................... 13b-1 13b.2        ANALYSES OF ACCIDENTS WITH RADIOLOGICAL CONSEQUENCES .................................................................................................. 13b-4 13b.3        ANALYSIS OF ACCIDENTS WITH HAZARDOUS CHEMICALS PRODUCED FROM LICENSED MATERIAL........................................................... 13b-37 13b.4        REFERENCES ........................................................................................................ 13b-51 CHAPTER 14 TECHNICAL SPECIFICATIONS 14a1        HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS......................... 14a1-1 14a2        IRRADIATION FACILITY TECHNICAL SPECIFICATIONS .................................... 14a2-1 14a
 
==2.1      INTRODUCTION==
..................................................................................................... 14a2-2 14a2.2      SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS ........................... 14a2-3 14a2.3      LIMITING CONDITIONS FOR OPERATION........................................................... 14a2-4 14a2.4      SURVEILLANCE REQUIREMENTS ....................................................................... 14a2-5 14a2.5      DESIGN FEATURES............................................................................................... 14a2-6 14a2.6      ADMINISTRATIVE CONTROLS.............................................................................. 14a2-7 14a
 
==2.7      REFERENCES==
........................................................................................................ 14a2-18 14b          TECHNICAL SPECIFICATIONS OF PROCESSES OUTSIDE THE IRRADIATION FACILITY......................................................................................... 14b-1 14b.1        INTRODUCTION ..................................................................................................... 14b-1 14b.2        SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS ........................... 14b-2 14b.3        LIMITING CONDITIONS FOR OPERATION........................................................... 14b-3 14b.4        SURVEILLANCE REQUIREMENTS ....................................................................... 14b-4 SHINE Medical Technologies                                    v                                                                      Rev. 1


==2.1INTRODUCTION==
Preliminary Safety Analysis Report                                                                  Master Table of Contents 14b.5        DESIGN FEATURES............................................................................................... 14b-5 14b.6        ADMINISTRATIVE CONTROLS.............................................................................. 14b-6 14b.7        REFERENCES ........................................................................................................ 14b-7 CHAPTER 15 FINANCIAL QUALIFICATIONS 15.1        FINANCIAL ABILITY TO CONSTRUCT THE SHINE FACILITY .......................... 15-1 15.2        FINANCIAL ABILITY TO OPERATE THE SHINE FACILITY ............................... 15-3 15.3        FINANCIAL ABILITY TO DECOMMISSION THE SHINE FACILITY ..................... 15-5 15.4        FOREIGN OWNERSHIP, CONTROL, OR DOMINATION .................................. 15-6
.....................................................................................................14a2-214a2.2SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS...........................14a2-314a2.3LIMITING CONDITIONS FOR OPERATION...........................................................14a2-4 14a2.4SURVEILLANCE REQUIREMENTS.......................................................................14a2-514a2.5DESIGN FEATURES...............................................................................................14a2-614a2.6ADMINISTRATIVE CONTROLS..............................................................................14a2-714a


==2.7REFERENCES==
==15.5        NUCLEAR INSURANCE==
........................................................................................................14a2-1814bTECHNICAL SPECIFICATIONS OF PROCESSES OUTSIDE THEIRRADIATION FACILITY.........................................................................................14b-114b.1INTRODUCTION.....................................................................................................14b-1 14b.2SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS...........................14b-214b.3LIMITING CONDITIONS FOR OPERATION...........................................................14b-314b.4SURVEILLANCE REQUIREMENTS.......................................................................14b-4 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesviRev. 014b.5DESIGN FEATURES...............................................................................................14b-514b.6ADMINISTRATIVE CONTROLS..............................................................................14b-6 14b.7REFERENCES........................................................................................................14b-7CHAPTER 15FINANCIAL QUALIFICATIONS15.1FINANCIAL ABILITY TO CONSTRUCT THE SHINE FACILITY..........................15-115.2FINANCIAL ABILITY TO OPERATE THE SHINE FACILITY...............................15-315.3FINANCIAL ABILITY TO DECOMMISSION THE SHINE FACILITY.....................15-5 15.4FOREIGN OWNERSHIP, CONTROL, OR DOMINATION..................................15-6
AND INDEMNITY ............................................................ 15-7


==15.5NUCLEAR INSURANCE==
==15.6        REFERENCES==
AND INDEMNITY............................................................15-7
............................................................................................. 15-8 CHAPTER 16 OTHER LICENSE CONSIDERATIONS 16.1        PRIOR USE OF FACILITY COMPONENTS ..................................................... 16-1 16.2        MEDICAL USE OF THE FACILITY .................................................................. 16-2 CHAPTER 17 DECOMMISSIONING AND POSSESSION-ONLY LICENSE AMENDMENTS 17.1        DECOMMISSIONING.............................................................................................. 17-1 17.2        POSSESSION-ONLY LICENSE AMENDMENTS ................................................... 17-2 CHAPTER 18 HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION 18.1        HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION.................. 18-1 CHAPTER 19 ENVIRONMENTAL REVIEW


==15.6REFERENCES==
==19.1        INTRODUCTION==
.............................................................................................15-8CHAPTER 16 OTHER LICENSE CONSIDERATIONS16.1PRIOR USE OF FACILITY COMPONENTS.....................................................16-116.2MEDICAL USE OF THE FACILITY..................................................................16-2CHAPTER 17 DECOMMISSIONING AND POSSESSION-ONLY LICENSE AMENDMENTS17.1DECOMMISSIONING..............................................................................................17-117.2POSSESSION-ONLY LICENSE AMENDMENTS...................................................17-2CHAPTER 18HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION18.1HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION
OF THE ENVIRONMENTAL REPORT ....................................... 19.1-1 19.2        PROPOSED ACTION.............................................................................................. 19.2-1
..................18-1CHAPTER 19ENVIRONMENTAL REVIEW


==19.1INTRODUCTION==
==19.3        DESCRIPTION==
OF THE ENVIRONMENTAL REPORT.......................................19.1-119.2PROPOSED ACTION..............................................................................................19.2-1 19.3DESCRIPTION OF THE AFFECTED ENVIRONMENT..........................................19.3-119.4IMPACTS OF PROPOSED CONSTRUCTION, OPERATIONS, ANDDECOMMISSIONING..............................................................................................19.4-119.5ALTERNATIVES......................................................................................................19.5-1
OF THE AFFECTED ENVIRONMENT .......................................... 19.3-1 19.4        IMPACTS OF PROPOSED CONSTRUCTION, OPERATIONS, AND DECOMMISSIONING.............................................................................................. 19.4-1 19.5        ALTERNATIVES...................................................................................................... 19.5-1


==19.6CONCLUSION==
==19.6        CONCLUSION==
S......................................................................................................19.6-1
S ...................................................................................................... 19.6-1


==19.7REFERENCES==
==19.7        REFERENCES==
........................................................................................................19.7-1}}
........................................................................................................ 19.7-1 SHINE Medical Technologies                                vi                                                                      Rev. 0}}

Latest revision as of 07:42, 31 October 2019

Shine Medical Technologies V. 0 - PSAR Master Table of Contents
ML15258A389
Person / Time
Site: SHINE Medical Technologies
Issue date: 08/27/2015
From: Bynum R
Shine Medical Technologies
To:
Office of Nuclear Reactor Regulation
Lynch S
References
SHINE, SHINE.SUBMISSION.22, SHN.PSAR.P, SHN.PSAR.P.10
Download: ML15258A389 (6)


Text

Preliminary Safety Analysis Report Master Table of Contents Master Table of Contents Section Title Page CHAPTER 1 THE FACILITY

1.1 INTRODUCTION

..................................................................................................... 1-1 1.2

SUMMARY

AND CONCLUSIONS ON PRINCIPAL SAFETY CONSIDERATIONS................................................................................................. 1-2 1.3 GENERAL DESCRIPTION OF THE FACILITY ....................................................... 1-8 1.4 SHARED FACILITIES AND EQUIPMENT............................................................... 1-13 1.5 COMPARISON WITH SIMILAR FACILITIES........................................................... 1-14 1.6

SUMMARY

OF OPERATIONS ................................................................................ 1-18 1.7 COMPLIANCE WITH THE NUCLEAR WASTE POLICY ACT OF 1982 ................. 1-19 1.8 FACILITY MODIFICATIONS AND HISTORY.......................................................... 1-20

1.9 REFERENCES

........................................................................................................ 1-21 CHAPTER 2 SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY ...................................................................... 2.1-1 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES.............................................................................................................. 2.2-1 2.3 METEOROLOGY..................................................................................................... 2.3-1 2.4 HYDROLOGY.......................................................................................................... 2.4-1 2.5 GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING.................... 2.5-1

2.6 REFERENCES

........................................................................................................ 2.6-1 CHAPTER 3 DESIGN OF STRUCTURES, SYSTEMS, AND COMPONENTS 3.1 DESIGN CRITERIA ................................................................................................. 3-1 3.2 METEOROLOGICAL DAMAGE .............................................................................. 3-19 3.3 WATER DAMAGE ................................................................................................... 3-22 3.4 SEISMIC DAMAGE ................................................................................................. 3-25 3.5 SYSTEMS AND COMPONMENTS ......................................................................... 3-45 3.5a IRRADIATION FACILITY......................................................................................... 3-57 3.5b RADIOISOTPE PRODUCTION FACILITY .............................................................. 3-94

3.6 REFERENCES

........................................................................................................ 3-107 CHAPTER 4 IRRADIATION UNIT AND RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION 4a1 HETEROGENEOUS REACTOR DESCRIPTION .............................................. 4a1-1 4a2 IRRADIATION FACILITY DESCRIPTION ......................................................... 4a2-1 4a2.1

SUMMARY

DESCRIPTION ............................................................................ 4a2-2 4a2.2 SUBCRITICAL ASSEMBLY .......................................................................... 4a2-6 SHINE Medical Technologies i Rev. 0

Preliminary Safety Analysis Report Master Table of Contents 4a2.3 NEUTRON DRIVER ..................................................................................... 4a2-20 4a2.4 TARGET SOLUTION VESSEL AND LIGHT WATER POOL ............................... 4a2-26 4a2.5 IRRADIATION FACILITY BIOLOGICAL SHIELD .................................................... 4a2-32 4a2.6 NUCLEAR DESIGN................................................................................................. 4a2-37 4a2.7 THERMAL HYDRAULIC DESIGN ........................................................................... 4a2-51 4a2.8 GAS MANAGEMENT SYSTEM............................................................................... 4a2-56 4a

2.9 REFERENCES

........................................................................................................ 4a2-62 4b RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION.................................. 4b-1 4b.1 FACILITY AND PROCESS DESCRIPTION ............................................................ 4b-2 4b.2 RADIOISOTOPE PRODUCTION FACILITY BIOLOGICAL SHIELD....................... 4b-13 4b.3 RADIOISOTOPE EXTRACTION SYSTEM ............................................................. 4b-18 4b.4 SPECIAL NUCLEAR MATERIAL PROCESSING AND STORAGE ........................ 4b-27 4b.5 REFERENCES ........................................................................................................ 4b-56 CHAPTER 5 COOLING SYSTEMS 5a1 HETEROGENEOUS REACTOR COOLING SYSTEMS.......................................... 5a1-1 5a2 IRRADIATION UNIT COOLING SYSTEMS............................................................. 5a2-1 5a2.1

SUMMARY

DESCRIPTION ..................................................................................... 5a2-2 5a2.2 PRIMARY COOLING SYSTEM ............................................................................... 5a2-4 5a2.3 SECONDARY COOLING SYSTEM......................................................................... 5a2-13 5a2.4 PRIMARY COOLANT CLEANUP ............................................................................ 5a2-20 5a2.5 PRIMARY COOLANT MAKEUP WATER SYSTEM ................................................ 5a2-22 5a2.6 NITROGEN-16 CONTROL ...................................................................................... 5a2-25 5a2.7 AUXILIARY SYSTEMS USING PRIMARY COOLANT............................................ 5a2-26 5a

2.8 REFERENCES

........................................................................................................ 5a2-27 5b RADIOISOTOPE PRODUCTION FACILITY COOLING SYSTEMS........................ 5b-1 CHAPTER 6 ENGINEERED SAFETY FEATURES 6a1 HETEROGENEOUS REACTOR ENGINEERED SAFETY FEATURES................ 6a1-1 6a2 IRRADIATION FACILITY ENGINEERED SAFETY FEATURES .......................... 6a2-1 6a2.1

SUMMARY

DESCRIPTION ............................................................................ 6a2-2 6a2.2 IRRADIATION FACILITY ENGINEERED SAFETY FEATURES DETAILED DESCRIPTION6a2-4 6a2.3 EMERGENCY COOLING SYSTEM ........................................................................ 6a2-10 6a2.4 IRRADIATION FACILITY ENGINEERED SAFETY FEATURES TECHNICAL SPECIFICATIONS.............................................................................. 6a2-11 6a

2.5 REFERENCES

........................................................................................................ 6a2-12 6b RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETY FEATURES.............................................................................................................. 6b-1 6b.1

SUMMARY

DESCRIPTION ENGINEERED SAFETY FEATURES ......................... 6b-1 6b.2 RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETY FEATURES.............................................................................................................. 6b-3 6b.3 NUCLEAR CRITICALITY CONTROL ...................................................................... 6b-11 6b.4 REFERENCES ............................................................................................. 6b-23 SHINE Medical Technologies ii Rev. 1

Preliminary Safety Analysis Report Master Table of Contents CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS 7a1 HETEROGENEOUS REACTOR INSTRUMENT & CONTROL SYSTEMS................................................................................................................ 7a1-1 7a2 IRRADIATION FACILITY INSTRUMENT & CONTROL SYSTEMS ........................ 7a2-1 7a2.1

SUMMARY

DESCRIPTION..................................................................................... 7a2-1 7a2.2 DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS ............................ 7a2-3 7a2.3 TSV PROCESS CONTROL DESCRIPTION ........................................................... 7a2-31 7a2.4 TSV REACTIVITY PROTECTION SYSTEM ........................................................... 7a2-33 7a2.5 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM ................................ 7a2-37 7a2.6 CONTROL CONSOLE AND DISPLAY INFORMATION.......................................... 7a2-40 7a2.7 RADIATION MONITORING SYSTEMS................................................................... 7a2-43 7a

2.8 REFERENCES

........................................................................................................ 7a2-47 7b RADIOISOTOPE PRODUCTION FACILITY INSTRUMENT &

CONTROL SYSTEM ............................................................................................... 7b-1 7b.1

SUMMARY

DESCRIPTION..................................................................................... 7b-1 7b.2 DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS ............................ 7b-2 7b.3 PRODUCTION FACILITY PROCESS CONTROL SYSTEMS ................................ 7b-29 7b.4 ENGINEERED SAFETY FEATURE AND ALARMING............................................ 7b-31 7b.5 CONTROL CONSOLE AND DISPLAY INSTRUMENTATION ................................ 7b-35 7b.6 RADIATION MONITORING SYSTEMS................................................................... 7b-37 7b.7 REFERENCES ........................................................................................................ 7b-38 CHAPTER 8 ELECTRIC POWER SYSTEMS 8a1 HETEROGENEOUS REACTOR ELECTRICAL POWER SYSTEMS ..................... 8a1-1 8a2 IRRADIATION UNIT ELECTRICAL POWER SYSTEMS ........................................ 8a2-1 8a2.1 NORMAL ELECTRICAL POWER SYSTEMS ......................................................... 8a2-1 8a2.2 EMERGENCY ELECTRICAL POWER SYSTEMS.................................................. 8a2-9 8a2.3 IRRADIATION FACILITY ELECTRICAL POWER SYSTEMS TECHNICAL SPECIFICATIONS ............................................................................. 8a2-15 8a

2.4 REFERENCES

........................................................................................................ 8a2-16 8b RADIOISOTOPE PRODUCTION FACILITY ELECTRICAL POWER SYSTEMS ................................................................................................. 8b-1 8b.1 NORMAL ELECTRICAL POWER SYSTEMS ......................................................... 8b-1 8b.2 EMERGENCY ELECTRICAL POWER SYSTEMS.................................................. 8b-2 8b.3 RADIOISOTOPE PRODUCTION FACILITY ELECTRICAL POWER SYSTEMS TECHNICAL SPECIFICATIONS............................................. 8b-3 CHAPTER 9 AUXILIARY SYSTEMS 9a1 HETEROGENEOUS REACTOR AUXILIARY SYSTEMS ....................................... 9a1-1 9a2 IRRADIATION FACILITY AUXILIARY SYSTEMS................................................... 9a2-1 9a2.1 HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS......................... 9a2-1 9a2.2 HANDLING & STORAGE OF TARGET SOLUTION ............................................... 9a2-13 9a2.3 FIRE PROTECTION SYSTEMS AND PROGRAMS ............................................... 9a2-16 SHINE Medical Technologies iii Rev. 0

Preliminary Safety Analysis Report Master Table of Contents 9a2.4 COMMUNICATIONS SYSTEMS ............................................................................. 9a2-46 9a2.5 POSSESSION & USE OF BYPRODUCT, SOURCE AND SPECIAL NUCLEAR MATERIAL............................................................................................. 9a2-48 9a2.6 COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS .............. 9a2-50 9a2.7 OTHER AUXILIARY SYSTEMS .............................................................................. 9a2-51 9a2.8 IRRADIATION FACILITY AUXILIARY SYSTEMS TECHNICAL SPECIFICATIONS................................................................................................... 9a2-60 9a

2.9 REFERENCES

........................................................................................................ 9a2-61 9b RADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS ..................... 9b-1 9b.1 HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS......................... 9b-1 9b.2 HANDLING & STORAGE OF TARGET SOLUTION ............................................... 9b-2 9b.3 FIRE PROTECTION SYSTEMS AND PROGRAMS ............................................... 9b-6 9b.4 COMMUNICATION SYSTEMS ............................................................................... 9b-7 9b.5 POSSESSION AND USE OF BYPRODUCT, SOURCE AND SPECIAL NUCLEAR MATERIAL............................................................................................. 9b-8 9b.6 COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS .............. 9b-15 9b.7 OTHER AUXILIARY SYSTEMS .............................................................................. 9b-25 9b.8 RADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS TECHNICAL SPECIFICATIONS ........................................................... 9b-53 9b.6 REFERENCES ........................................................................................................ 9b-54 CHAPTER 10 EXPERIMENTAL FACILITIES 10.1

SUMMARY

DESCRIPTION..................................................................................... 10-1 CHAPTER 11 RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT 11.1 RADIATION PROTECTION..................................................................................... 11-1 11.2 RADIOACTIVE WASTE MANAGEMENT................................................................ 11-42 11.3 RESPIRATORY PROTECTION PROGRAM ........................................................... 11-57 11.4 RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT TECHNICAL SPECIFICATIONS ............................................................................. 11-59

11.5 REFERENCES

........................................................................................................ 11-60 CHAPTER 12 CONDUCT OF OPERATIONS 12.1 ORGANIZATION ..................................................................................................... 12-1 12.2 REVIEW AND AUDIT ACTIVITIES.......................................................................... 12-5 12.3 PROCEDURES ....................................................................................................... 12-7 12.4 REQUIRED ACTIONS............................................................................................. 12-8 12.5 REPORTS ............................................................................................................... 12-9 12.6 RECORDS............................................................................................................... 12-10 12.7 EMERGENCY PLANNING ...................................................................................... 12-11 12.8 SECURITY PLANNING ........................................................................................... 12-12 12.9 QUALITY ASSURANCE .......................................................................................... 12-13 12.10 OPERATOR TRAINING AND REQUALIFICATION ................................................ 12-14 SHINE Medical Technologies iv Rev. 0

Preliminary Safety Analysis Report Master Table of Contents 12.10a REACTOR OPERATOR TRAINING AND REQUALIFICATION.............................. 12-14 12.10b PRODUCTION FACILITY OPERATOR TRAINING AND REQUALIFICATION ................................................................................................ 12-15 12.11 STARTUP PLAN...................................................................................................... 12-16 12.12 VACATED................................................................................................................ 12-17 12.13 MATERIAL CONTROL AND ACCOUNTABILITY PROGRAM ................................ 12-18 12.14 REFERENCES ........................................................................................................ 12-19 APPENDIX 12A EMERGENCY PLAN...................................................................................... 12A-1 APPENDIX 12B SECURITY PLAN........................................................................................... 12B-1 APPENDIX 12C QUALITY ASSURANCE PROGRAM DESCRIPTION ................................... 12C-1 APPENDIX 12D CONDUCT OF OPERATIONS PROGRAM DESCRIPTION ......................... 12D-1 CHAPTER 13 ACCIDENT ANALYSIS 13a1 HETEROGENEOUS REACTOR ACCIDENT ANALYSIS ....................................... 13a1-1 13a2 IRRADIATION FACILITY ACCIDENT ANALYSIS................................................... 13a2-1 13a2.1 ACCIDENT-INITIATING EVENTS AND SCENARIOS ............................................ 13a2-1 13a2.2 ACCIDENT ANALYSIS AND DETERMINATION OF CONSEQUENCES .................................................................................................. 13a2-36 13a3

SUMMARY

AND CONCLUSIONS .......................................................................... 13a3-1 13a4 REFERENCES ........................................................................................................ 13a4-1 13b RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSES .................... 13b-1 13b.1 RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSIS METHODOLOGY .................................................................................................... 13b-1 13b.2 ANALYSES OF ACCIDENTS WITH RADIOLOGICAL CONSEQUENCES .................................................................................................. 13b-4 13b.3 ANALYSIS OF ACCIDENTS WITH HAZARDOUS CHEMICALS PRODUCED FROM LICENSED MATERIAL........................................................... 13b-37 13b.4 REFERENCES ........................................................................................................ 13b-51 CHAPTER 14 TECHNICAL SPECIFICATIONS 14a1 HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS......................... 14a1-1 14a2 IRRADIATION FACILITY TECHNICAL SPECIFICATIONS .................................... 14a2-1 14a

2.1 INTRODUCTION

..................................................................................................... 14a2-2 14a2.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS ........................... 14a2-3 14a2.3 LIMITING CONDITIONS FOR OPERATION........................................................... 14a2-4 14a2.4 SURVEILLANCE REQUIREMENTS ....................................................................... 14a2-5 14a2.5 DESIGN FEATURES............................................................................................... 14a2-6 14a2.6 ADMINISTRATIVE CONTROLS.............................................................................. 14a2-7 14a

2.7 REFERENCES

........................................................................................................ 14a2-18 14b TECHNICAL SPECIFICATIONS OF PROCESSES OUTSIDE THE IRRADIATION FACILITY......................................................................................... 14b-1 14b.1 INTRODUCTION ..................................................................................................... 14b-1 14b.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS ........................... 14b-2 14b.3 LIMITING CONDITIONS FOR OPERATION........................................................... 14b-3 14b.4 SURVEILLANCE REQUIREMENTS ....................................................................... 14b-4 SHINE Medical Technologies v Rev. 1

Preliminary Safety Analysis Report Master Table of Contents 14b.5 DESIGN FEATURES............................................................................................... 14b-5 14b.6 ADMINISTRATIVE CONTROLS.............................................................................. 14b-6 14b.7 REFERENCES ........................................................................................................ 14b-7 CHAPTER 15 FINANCIAL QUALIFICATIONS 15.1 FINANCIAL ABILITY TO CONSTRUCT THE SHINE FACILITY .......................... 15-1 15.2 FINANCIAL ABILITY TO OPERATE THE SHINE FACILITY ............................... 15-3 15.3 FINANCIAL ABILITY TO DECOMMISSION THE SHINE FACILITY ..................... 15-5 15.4 FOREIGN OWNERSHIP, CONTROL, OR DOMINATION .................................. 15-6

15.5 NUCLEAR INSURANCE

AND INDEMNITY ............................................................ 15-7

15.6 REFERENCES

............................................................................................. 15-8 CHAPTER 16 OTHER LICENSE CONSIDERATIONS 16.1 PRIOR USE OF FACILITY COMPONENTS ..................................................... 16-1 16.2 MEDICAL USE OF THE FACILITY .................................................................. 16-2 CHAPTER 17 DECOMMISSIONING AND POSSESSION-ONLY LICENSE AMENDMENTS 17.1 DECOMMISSIONING.............................................................................................. 17-1 17.2 POSSESSION-ONLY LICENSE AMENDMENTS ................................................... 17-2 CHAPTER 18 HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION 18.1 HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION.................. 18-1 CHAPTER 19 ENVIRONMENTAL REVIEW

19.1 INTRODUCTION

OF THE ENVIRONMENTAL REPORT ....................................... 19.1-1 19.2 PROPOSED ACTION.............................................................................................. 19.2-1

19.3 DESCRIPTION

OF THE AFFECTED ENVIRONMENT .......................................... 19.3-1 19.4 IMPACTS OF PROPOSED CONSTRUCTION, OPERATIONS, AND DECOMMISSIONING.............................................................................................. 19.4-1 19.5 ALTERNATIVES...................................................................................................... 19.5-1

19.6 CONCLUSION

S ...................................................................................................... 19.6-1

19.7 REFERENCES

........................................................................................................ 19.7-1 SHINE Medical Technologies vi Rev. 0