|
---|
Category:Preliminary Safety Analysis Report (PSAR)
MONTHYEARML15258A3692015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility ML15258A5322015-08-27027 August 2015 Enclosure 1, Attachment 1 - Preliminary Safety Analysis Report Changes Markups ML15258A5332015-08-27027 August 2015 Enclosure 1 - Update to the Evaluation of Aircraft Hazard and the Evaluation of Chemical Hazards Provided in the Preliminary Safety Analysis Report ML15258A5972015-08-27027 August 2015 Enclosure 2, Attachment 2 - Preliminary Safety Analysis Report Changes (Markup) ML15258A3892015-08-27027 August 2015 Shine Medical Technologies V. 0 - PSAR Master Table of Contents ML15258A4302015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.5.2-006 Through 19.5.2-009 ML15258A4292015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.5.2-001 Through 19.5.2-005 ML15258A4282015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.4.1-001 Through 19.4.13-001 ML15258A4262015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.4-001 Through 19.3.4-008 ML15258A4242015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.3-001 Through 19.3.3-007 ML15258A4232015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.2-001 Through 19.3.2-036 ML15258A4222015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.1-007 Through 19.3.1-009 ML15258A4202015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.2.1-001 Through 19.2.3-001 ML15258A4182015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.07 - References ML15258A4172015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.06 - Conclusions ML15258A4162015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.05 - Alternatives ML15258A4152015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.04 - Impacts of Proposed Construction, Operations, and Decommissioning ML15258A4142015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.03 - Description of the Affected Environment ML15258A4132015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.02 - Proposed Action ML15258A4122015-08-27027 August 2015 Shine Medical Technologies V. 0 - Section 19.01 - Introduction to the Environmental Report ML15258A4192015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 19 - Environmental Review ML15258A4112015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 12 - Figure 12.1-001 ML15258A4102015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 11 - Figures 11.1-001 and 11.1-003 ML15258A4092015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 09 - Figures 9b.2-001 Through 9b.7-008 ML15258A4082015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 09 - Figures 9a2.1-001 Through 9a2.7-001 ML15258A4072015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 08 - Figure 8a2.2-001 ML15258A4062015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 08 - Figure 8a2.1-001 ML15258A4052015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 07 - Figure 7b.2-001 ML15258A4032015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 05 - Figures 5a2.1-001 Through 5a2.4-001 ML15258A3702015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 02 - Site Characteristics ML15258A3902015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 01 - Figures 1.3-001 Through 1.3-006 ML15258A3912015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.1-001 Through 2.1-026 ML15258A4042015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 07 - Figures 7a2.1-001 Through 7a2.6-002 ML15258A3922015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.2-001 Through 2.2-002 ML15258A3932015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.3-001 Through 2.3-036 ML15258A3982015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.5-007 Through 2.5-023 ML15258A3712015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 03 - Design of Structures, Systems, and Components ML15258A3722015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 04 - Irradiation Unit and Radioisotope Production Facility Description ML15258A3732015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 05 - Cooling Systems ML15258A3742015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 06 - Engineered Safety Features ML15258A3752015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 07 - Instrument and Control Systems ML15258A3782015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 08 - Electrical Power Systems ML15258A3802015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 10 - Experimental Facilities ML15258A4022015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 04 - Figures 4b.3-001 Through 4b.4-007 ML15258A4002015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 04 - Figures 4a2.1-001 Through 4a2.8-002 ML15258A3792015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 09 - Auxiliary Systems ML15258A3992015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 03 - Figures 3.4-001 Through 3.4-014 ML15258A3882015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 18 - Highly Enriched to Low Enriched Uranium Conversion ML15258A3872015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 17 - Decommissioning and Possession-Only License Amendments ML15258A3852015-08-27027 August 2015 Shine Medical Technologies V. 0 - Chapter 15 - Financial Qualifications 2015-08-27
[Table view] |
Text
ENCLOSURE 1 SHINE MEDICAL TECHNOLOGIES, INC.
SHINE MEDICAL TECHNOLOGIES, INC. APPLICATION FOR CONSTRUCTION PERMIT PRELIMINARY SAFETY ANALYSIS REPORT REVISIONS UPDATE TO THE EVALUATION OF AIRCRAFT HAZARD AND THE EVALUATION OF CHEMICAL HAZARDS PROVIDED IN THE PRELIMINARY SAFETY ANALYSIS REPORT Evaluation of Aircraft Hazard SHINE has determined that Figure 2.2-2 of the PSAR did not contain all low altitude airways within 10 miles of the SHINE facility. SHINE has revised Figure 2.2-2 to include those low altitude airways within 10 miles of the SHINE facility previously omitted from Figure 2.2-2.
Additionally, descriptions and references to airways in Subsection 2.2.1, Subsection 2.2.2.2, and Table 2.2-6 of the PSAR have been revised to be consistent with the revised Figure 2.2-2.
A mark-up of the PSAR changes is provided in Attachment 1. The non-public (proprietary) version of the PSAR, incorporating the changes provided in Attachment 1, is provided in . The public (non-proprietary) version of the PSAR, incorporating the changes provided in Attachment 1, is provided in Enclosure 4.
Subsection 2.2.2.5.1 of the PSAR contains the aircraft hazard evaluation associated with airways. Subsection 2.2.2.5.1 does not require revision because the methodology used is based on DOE-STD-3014-96, and uses crash rates for average non-airport operations instead of estimating a hazard probability associated with each airway individually. Therefore, revising Figure 2.2-2 to include all low altitude airways within 10 miles of the SHINE facility does not affect the description or results of the aircraft hazard evaluation provided in Subsection 2.2.2.5 of the PSAR.
Evaluation of On-Site Chemical Hazards SHINE has determined that electric folklifts will be used at the SHINE facility, in lieu of propane-powered forklifts. There will be no on-site storage of propane at the SHINE site.
SHINE has revised Subsection 2.2.3.1.1.4 and Subsection 2.2.3.1.2.4 of the PSAR to remove references to the on-site storage of propane and its analysis as a potential on-site explosive hazard and a potential flammable vapor cloud explosion, respectively. SHINE has also removed on-site sources of propane from the analysis results provided in Tables 2.2-16, 2.2-17, and 2.2-18 of the PSAR. A mark-up of the PSAR changes is provided in Attachment 1. The non-public (proprietary) version of the PSAR, incorporating the changes provided in , is provided in Enclosure 3. The public (non-proprietary) version of the PSAR, incorporating the changes provided in Attachment 1, is provided in Enclosure 4.
The revision described above does not impact the hazard analyses of off-site sources of propane, such as those described in Subsection 2.2.3.1.1.3 and Subsection 2.2.3.1.2.3 of the PSAR.
Page 1 of 1