{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 February 11, 2016 Mr. Joel Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 | ||
Nuclear Generation Group One Cook Place Bridgman, MI | |||
==SUBJECT:== | ==SUBJECT:== | ||
Line 25: | Line 23: | ||
==Dear Mr. Gebbie:== | ==Dear Mr. Gebbie:== | ||
This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning April 25, 2016 at D.C. Cook, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. | This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning April 25, 2016 at D.C. Cook, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. | ||
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. This information request may be provided in either electronic or hard copy format and should be ready for NRC review by March 28, 2016. Mr. Bruce Bartlett, the Lead Inspector, will contact your staff to determine the best method of providing the requested information. | In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. | ||
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. This information request may be provided in either electronic or hard copy format and should be ready for NRC review by March 28, 2016. Mr. Bruce Bartlett, the Lead Inspector, will contact your staff to determine the best method of providing the requested information. | |||
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Bruce Bartlett at 630-829-9753 or bruce.bartlett@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. | If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Bruce Bartlett at 630-829-9753 or bruce.bartlett@nrc.gov. | ||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). | ||
Sincerely, | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | /RA/ | ||
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support Temporary Instruction 191 | Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV | ||
IR 05000315-2016007; | |||
REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION INSPECTION REPORT 05000315-05000316/2016007 Please provide the information on a compact disc or another form of electronic media, if possible. For requested lists please provide the information, if possible, in a sortable Excel spreadsheet format. For the purposes of this document request FLEX will mean any item, SSC, procedure, calculation or document that was part of the implementation of Mitigating Strategies, Spent Fuel Pool instrumentation orders and emergency preparedness communications/staffing and multi-unit dose assessment. | |||
In addition, the inspectors will require computer access to the corrective action program (CAP) database while on site. | In addition, the inspectors will require computer access to the corrective action program (CAP) database while on site. | ||
: 1. A current copy of administrative procedure(s) for the CAP, modification program , maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If Flex related procedures such as FSGs or the Final Integrated Plan (FIP) are maintained under a different process please include copies of those procedures. | : 1. A current copy of administrative procedure(s) for the CAP, modification program , | ||
: 2. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and | maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If Flex related procedures such as FSGs or the Final Integrated Plan (FIP) are maintained under a different process please include copies of those procedures. | ||
: 2. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and Flex Support Guidelines. Please have available the annunicator response procedures. Also include Station Blackout related procedures if they are separate from the above. | |||
procedures if they are separate from the above. | : 3. A current copy of the FIP and any documentation to or from the NRC related to the FIP. | ||
: 3. A current copy of the FIP and any documentation to or from the NRC related to the FIP. Please include any changes to the FIP since submittal to the NRC. | Please include any changes to the FIP since submittal to the NRC. | ||
: 4. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report. | : 4. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report. | ||
: 5. A listing of CAP items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX. | : 5. A listing of CAP items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX. | ||
: 6. A current copy of the SAFER response plan. | : 6. A current copy of the SAFER response plan. | ||
: 7. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX. | : 7. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX. | ||
: 8. A current copy of your outage planning procedures including forced outage planning procedures. | : 8. A current copy of your outage planning procedures including forced outage planning procedures. | ||
: 9. Flex related training documents, aids, and records, including presentations and videos. | : 9. Flex related training documents, aids, and records, including presentations and videos. | ||
: 10. A listing of plant modifications related to FLEX. | : 10. A listing of plant modifications related to FLEX. | ||
: 11. A listing of calculations, evaluations, and 50.59 reviews related to FLEX. | : 11. A listing of calculations, evaluations, and 50.59 reviews related to FLEX. | ||
: 12. A copy of the current FLEX strategy basis document. | : 12. A copy of the current FLEX strategy basis document. | ||
Enclosure | |||
: 14. Documents and procedures related to | : 13. A copy of the FLEX strategies time validation study and the full staffing analysis. | ||
: 14. Documents and procedures related to your multi-unit dose assessment capability. | |||
: 15. A copy of the UFSAR, Technical Specifications and TS bases documents. | : 15. A copy of the UFSAR, Technical Specifications and TS bases documents. | ||
OTHER: | OTHER: | ||
On the first day of the inspection, please provide the inspection team a briefing of your FIP and overall strategy. | |||
2 | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). | ||
Sincerely, | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | /RA/ | ||
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support Temporary Instruction 191 | Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV DISTRIBUTION: | ||
Kimyata MorganButler Allan Barker RidsNrrDorlLpl3-1 Resource Carole Ariano RidsNrrPMDCCook Resource Linda Linn RidsNrrDirsIrib Resource DRPIII Cynthia Pederson DRSIII Darrell Roberts Jim Clay Richard Skokowski Carmen Olteanu ROPreports.Resource@nrc.gov ADAMS Accession Number ML16042A598 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII RIII NAME BBartlett:bw KRiemer DATE 02/11/16 02/11/16 OFFICIAL RECORD COPY | |||
IR 05000315-2016007; | |||
RidsNrrDirsIrib Resource Cynthia Pederson | |||
Darrell Roberts | |||
Richard Skokowski | |||
ADAMS Accession Number ML16042A598 | |||
Nuclear Generation Group One Cook Place Bridgman, MI | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 February 11, 2016 Mr. Joel Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Line 95: | Line 82: | ||
==Dear Mr. Gebbie:== | ==Dear Mr. Gebbie:== | ||
This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning April 25, 2016 at D.C. Cook, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. | This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning April 25, 2016 at D.C. Cook, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. | ||
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. This information request may be provided in either electronic or hard copy format and should be ready for NRC review by March 28, 2016. Mr. Bruce Bartlett, the Lead Inspector, will contact your staff to determine the best method of providing the requested information. | In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. | ||
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. This information request may be provided in either electronic or hard copy format and should be ready for NRC review by March 28, 2016. Mr. Bruce Bartlett, the Lead Inspector, will contact your staff to determine the best method of providing the requested information. | |||
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Bruce Bartlett at 630-829-9753 or bruce.bartlett@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. | If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Bruce Bartlett at 630-829-9753 or bruce.bartlett@nrc.gov. | ||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). | ||
Sincerely, | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | /RA/ | ||
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support Temporary Instruction 191 | Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV | ||
IR 05000315-2016007; | |||
REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION INSPECTION REPORT 05000315-05000316/2016007 Please provide the information on a compact disc or another form of electronic media, if possible. For requested lists please provide the information, if possible, in a sortable Excel spreadsheet format. For the purposes of this document request FLEX will mean any item, SSC, procedure, calculation or document that was part of the implementation of Mitigating Strategies, Spent Fuel Pool instrumentation orders and emergency preparedness communications/staffing and multi-unit dose assessment. | |||
In addition, the inspectors will require computer access to the corrective action program (CAP) database while on site. | In addition, the inspectors will require computer access to the corrective action program (CAP) database while on site. | ||
: 1. A current copy of administrative procedure(s) for the CAP, modification program , maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If Flex related procedures such as FSGs or the Final Integrated Plan (FIP) are maintained under a different process please include copies of those procedures. | : 1. A current copy of administrative procedure(s) for the CAP, modification program , | ||
: 2. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and | maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If Flex related procedures such as FSGs or the Final Integrated Plan (FIP) are maintained under a different process please include copies of those procedures. | ||
: 2. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and Flex Support Guidelines. Please have available the annunicator response procedures. Also include Station Blackout related procedures if they are separate from the above. | |||
procedures if they are separate from the above. | : 3. A current copy of the FIP and any documentation to or from the NRC related to the FIP. | ||
: 3. A current copy of the FIP and any documentation to or from the NRC related to the FIP. Please include any changes to the FIP since submittal to the NRC. | Please include any changes to the FIP since submittal to the NRC. | ||
: 4. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report. | : 4. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report. | ||
: 5. A listing of CAP items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX. | : 5. A listing of CAP items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX. | ||
: 6. A current copy of the SAFER response plan. | : 6. A current copy of the SAFER response plan. | ||
: 7. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX. | : 7. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX. | ||
: 8. A current copy of your outage planning procedures including forced outage planning procedures. | : 8. A current copy of your outage planning procedures including forced outage planning procedures. | ||
: 9. Flex related training documents, aids, and records, including presentations and videos. | : 9. Flex related training documents, aids, and records, including presentations and videos. | ||
: 10. A listing of plant modifications related to FLEX. | : 10. A listing of plant modifications related to FLEX. | ||
: 11. A listing of calculations, evaluations, and 50.59 reviews related to FLEX. | : 11. A listing of calculations, evaluations, and 50.59 reviews related to FLEX. | ||
: 12. A copy of the current FLEX strategy basis document. | : 12. A copy of the current FLEX strategy basis document. | ||
Enclosure | |||
: 14. Documents and procedures related to | : 13. A copy of the FLEX strategies time validation study and the full staffing analysis. | ||
: 14. Documents and procedures related to your multi-unit dose assessment capability. | |||
: 15. A copy of the UFSAR, Technical Specifications and TS bases documents. | : 15. A copy of the UFSAR, Technical Specifications and TS bases documents. | ||
OTHER: | OTHER: | ||
On the first day of the inspection, please provide the inspection team a briefing of your FIP and overall strategy. | |||
2 | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). | ||
Sincerely, | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | /RA/ | ||
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support Temporary Instruction 191 | Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV DISTRIBUTION: | ||
Kimyata MorganButler Allan Barker RidsNrrDorlLpl3-1 Resource Carole Ariano RidsNrrPMDCCook Resource Linda Linn RidsNrrDirsIrib Resource DRPIII Cynthia Pederson DRSIII Darrell Roberts Jim Clay Richard Skokowski Carmen Olteanu ROPreports.Resource@nrc.gov ADAMS Accession Number ML16042A598 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII RIII NAME BBartlett:bw KRiemer DATE 02/11/16 02/11/16 OFFICIAL RECORD COPY}} | |||
IR 05000315-2016007; | |||
RidsNrrDirsIrib Resource Cynthia Pederson | |||
Darrell Roberts | |||
Richard Skokowski | |||
ADAMS Accession Number ML16042A598 |
Latest revision as of 23:36, 30 October 2019
ML16042A598 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 02/11/2016 |
From: | Kenneth Riemer NRC/RGN-III/DRP/B2 |
To: | Gebbie J Indiana Michigan Power Co |
References | |
IR 2016007 | |
Download: ML16042A598 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 February 11, 2016 Mr. Joel Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 191 INSPECTION AT D.C. COOK, UNITS 1 AND 2
Dear Mr. Gebbie:
This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning April 25, 2016 at D.C. Cook, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191.
In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection.
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. This information request may be provided in either electronic or hard copy format and should be ready for NRC review by March 28, 2016. Mr. Bruce Bartlett, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Bruce Bartlett at 630-829-9753 or bruce.bartlett@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV
REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION INSPECTION REPORT 05000315-05000316/2016007 Please provide the information on a compact disc or another form of electronic media, if possible. For requested lists please provide the information, if possible, in a sortable Excel spreadsheet format. For the purposes of this document request FLEX will mean any item, SSC, procedure, calculation or document that was part of the implementation of Mitigating Strategies, Spent Fuel Pool instrumentation orders and emergency preparedness communications/staffing and multi-unit dose assessment.
In addition, the inspectors will require computer access to the corrective action program (CAP) database while on site.
- 1. A current copy of administrative procedure(s) for the CAP, modification program ,
maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If Flex related procedures such as FSGs or the Final Integrated Plan (FIP) are maintained under a different process please include copies of those procedures.
- 2. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and Flex Support Guidelines. Please have available the annunicator response procedures. Also include Station Blackout related procedures if they are separate from the above.
Please include any changes to the FIP since submittal to the NRC.
- 4. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report.
- 5. A listing of CAP items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX.
- 6. A current copy of the SAFER response plan.
- 7. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX.
- 8. A current copy of your outage planning procedures including forced outage planning procedures.
- 9. Flex related training documents, aids, and records, including presentations and videos.
- 10. A listing of plant modifications related to FLEX.
- 11. A listing of calculations, evaluations, and 50.59 reviews related to FLEX.
- 12. A copy of the current FLEX strategy basis document.
Enclosure
- 13. A copy of the FLEX strategies time validation study and the full staffing analysis.
- 14. Documents and procedures related to your multi-unit dose assessment capability.
- 15. A copy of the UFSAR, Technical Specifications and TS bases documents.
OTHER:
On the first day of the inspection, please provide the inspection team a briefing of your FIP and overall strategy.
2
J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV DISTRIBUTION:
Kimyata MorganButler Allan Barker RidsNrrDorlLpl3-1 Resource Carole Ariano RidsNrrPMDCCook Resource Linda Linn RidsNrrDirsIrib Resource DRPIII Cynthia Pederson DRSIII Darrell Roberts Jim Clay Richard Skokowski Carmen Olteanu ROPreports.Resource@nrc.gov ADAMS Accession Number ML16042A598 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII RIII NAME BBartlett:bw KRiemer DATE 02/11/16 02/11/16 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 February 11, 2016 Mr. Joel Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 191 INSPECTION AT D.C. COOK, UNITS 1 AND 2
Dear Mr. Gebbie:
This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning April 25, 2016 at D.C. Cook, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191.
In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection.
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. This information request may be provided in either electronic or hard copy format and should be ready for NRC review by March 28, 2016. Mr. Bruce Bartlett, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Bruce Bartlett at 630-829-9753 or bruce.bartlett@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV
REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION INSPECTION REPORT 05000315-05000316/2016007 Please provide the information on a compact disc or another form of electronic media, if possible. For requested lists please provide the information, if possible, in a sortable Excel spreadsheet format. For the purposes of this document request FLEX will mean any item, SSC, procedure, calculation or document that was part of the implementation of Mitigating Strategies, Spent Fuel Pool instrumentation orders and emergency preparedness communications/staffing and multi-unit dose assessment.
In addition, the inspectors will require computer access to the corrective action program (CAP) database while on site.
- 1. A current copy of administrative procedure(s) for the CAP, modification program ,
maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If Flex related procedures such as FSGs or the Final Integrated Plan (FIP) are maintained under a different process please include copies of those procedures.
- 2. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and Flex Support Guidelines. Please have available the annunicator response procedures. Also include Station Blackout related procedures if they are separate from the above.
Please include any changes to the FIP since submittal to the NRC.
- 4. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report.
- 5. A listing of CAP items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX.
- 6. A current copy of the SAFER response plan.
- 7. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX.
- 8. A current copy of your outage planning procedures including forced outage planning procedures.
- 9. Flex related training documents, aids, and records, including presentations and videos.
- 10. A listing of plant modifications related to FLEX.
- 11. A listing of calculations, evaluations, and 50.59 reviews related to FLEX.
- 12. A copy of the current FLEX strategy basis document.
Enclosure
- 13. A copy of the FLEX strategies time validation study and the full staffing analysis.
- 14. Documents and procedures related to your multi-unit dose assessment capability.
- 15. A copy of the UFSAR, Technical Specifications and TS bases documents.
OTHER:
On the first day of the inspection, please provide the inspection team a briefing of your FIP and overall strategy.
2
J. Gebbie In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
Requested Information to Support Temporary Instruction 191 IR 05000315-2016007; 05000316-2016007 cc: Distribution via LISTSERV DISTRIBUTION:
Kimyata MorganButler Allan Barker RidsNrrDorlLpl3-1 Resource Carole Ariano RidsNrrPMDCCook Resource Linda Linn RidsNrrDirsIrib Resource DRPIII Cynthia Pederson DRSIII Darrell Roberts Jim Clay Richard Skokowski Carmen Olteanu ROPreports.Resource@nrc.gov ADAMS Accession Number ML16042A598 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII RIII NAME BBartlett:bw KRiemer DATE 02/11/16 02/11/16 OFFICIAL RECORD COPY