{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of     )       )
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                           )
ENTERGY NUCLEAR OPERATIONS, INC.   ) Docket No. 50-247-LA  
                                                          )
      )  
ENTERGY NUCLEAR OPERATIONS, INC.                           )       Docket No. 50-247-LA
(Indian Point Nuclear Generating, Unit 2) )  
                                                          )
(Indian Point Nuclear Generating, Unit 2)                 )
COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION Consistent with the Commissions policy on notification of NRC adjudicatory bodies and all parties of information on issues in cases before the Commission, counsel for the U.S.
Nuclear Regulatory Commission staff (Staff) hereby informs the Commission and the parties that, on or about February 23, 2016, the Staff proposes to make a final no significant hazards consideration determination and issue a related license amendment to Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Operations, Inc. (the licensee). This action is being taken in response to Entergys license amendment application dated December 9, 2014,1 as supplemented by additional letters,2 and will modify Facility Operating License No. DPR-26 for the Indian Point Nuclear Generating Unit No. 2 (IP2). Specifically, the license amendment will revise IP2 Technical Specification 5.5.14, Containment Leakage Rate Testing Program, to 1
Letter from Entergy Nuclear Operations, Inc. to the U.S. Nuclear Regulatory Commission, Proposed License Amendment Regarding Extending the Containment Type A Leak Rate Testing Frequency to 15 Years, dated December 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14353A015).
2 Supplemental letters dated May 20, 2015 (ADAMS Accession No. ML15149A137); May 20, 2015 (ADAMS Accession No. ML15149A139); June 8, 2015 (ADAMS Accession No. ML15163A166); and June 29, 2015 (ADAMS Accession No. ML15189A026).


COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION 
extend the frequency of the containment integrated leak rate test from once every 10 years to once every 15 years on a permanent basis.
Final versions of the final no significant hazards consideration determination and license amendment will be available through the Nuclear Regulatory Commissions Agencywide Documents Access and Management System (ADAMS). When final versions of the documents are available, counsel for the NRC Staff will notify the parties and provide them with the ADAMS Accession Numbers for the documents.
Respectfully submitted,
                                                      /Signed (electronically) by/
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland this 22nd day of February, 2016


Consistent with the Commission's policy on notification of NRC adjudicatory bodies and all parties of information on issues in cases before the Commission, counsel for the U.S. Nuclear Regulatory Commission staff (Staff) hereby informs the Commission and the parties that, on or about February 23, 2016, the Staff proposes to make a final no significant hazards consideration determination and issue a related license amendment to Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Operations, Inc. (the licensee). This action is being taken in response to Entergy's license amendment application dated December 9, 2014, 1 as supplemented by additional letters, 2 and will modify Facility Operating License No. DPR-26 for the Indian Point Nuclear Generating Unit No. 2 (IP2). Specifically, the license amendment will revise IP2 Technical Specification 5.5.14, "Containment Leakage Rate Testing Program," to 1 Letter from Entergy Nuclear Operations, Inc. to the U.S. Nuclear Regulatory Commission, "Proposed License Amendment Regarding Extending the Containment Type A Leak Rate Testing Frequency to 15 Years," dated December 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14353A015).
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                     )
2 Supplemental letters dated May 20, 2015 (ADAMS Accession No. ML15149A137); May 20, 2015 (ADAMS Accession No. ML15149A139); June 8, 2015 (ADAMS Accession No. ML15163A166); and June 29, 2015 (ADAMS Accession No. ML15189A026). extend the frequency of the containment integrated leak rate test from once every 10 years to once every 15 years on a permanent basis. Final versions of the final no significant hazards consideration determination and license amendment will be available through the Nuclear Regulatory Commission's Agencywide Documents Access and Management System (ADAMS). When final versions of the documents are available, counsel for the NRC Staff will notify the parties and provide them with the ADAMS Accession Numbers for the documents.
                                                      )
Respectfully submitted,
ENTERGY NUCLEAR OPERATIONS, INC.                     )       Docket No. 50-247-LA
        /Signed (electronically) by/
                                                      )
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel  
(Indian Point Nuclear Generating, Unit 2)             )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION dated February 22, 2016, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 22nd day of February, 2016.
                                                      /Signed (electronically) by/
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland This 22nd day of February, 2016


Mail Stop O15-D21 Washington, DC 20555 Telephone:  (301) 415-4113 E-mail:  Anita.Ghosh@nrc.gov
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                          )
                                                          )
ENTERGY NUCLEAR OPERATIONS, INC.                          )      Docket No. 50-247-LA
                                                          )
(Indian Point Nuclear Generating, Unit 2)                  )
COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION Consistent with the Commissions policy on notification of NRC adjudicatory bodies and all parties of information on issues in cases before the Commission, counsel for the U.S.
Nuclear Regulatory Commission staff (Staff) hereby informs the Commission and the parties that, on or about February 23, 2016, the Staff proposes to make a final no significant hazards consideration determination and issue a related license amendment to Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Operations, Inc. (the licensee). This action is being taken in response to Entergys license amendment application dated December 9, 2014,1 as supplemented by additional letters,2 and will modify Facility Operating License No. DPR-26 for the Indian Point Nuclear Generating Unit No. 2 (IP2). Specifically, the license amendment will revise IP2 Technical Specification 5.5.14, Containment Leakage Rate Testing Program, to 1
Letter from Entergy Nuclear Operations, Inc. to the U.S. Nuclear Regulatory Commission, Proposed License Amendment Regarding Extending the Containment Type A Leak Rate Testing Frequency to 15 Years, dated December 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14353A015).
2 Supplemental letters dated May 20, 2015 (ADAMS Accession No. ML15149A137); May 20, 2015 (ADAMS Accession No. ML15149A139); June 8, 2015 (ADAMS Accession No. ML15163A166); and June 29, 2015 (ADAMS Accession No. ML15189A026).


Dated at Rockville, Maryland  
extend the frequency of the containment integrated leak rate test from once every 10 years to once every 15 years on a permanent basis.
Final versions of the final no significant hazards consideration determination and license amendment will be available through the Nuclear Regulatory Commissions Agencywide Documents Access and Management System (ADAMS). When final versions of the documents are available, counsel for the NRC Staff will notify the parties and provide them with the ADAMS Accession Numbers for the documents.
Respectfully submitted,
                                                      /Signed (electronically) by/
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland this 22nd day of February, 2016


this 22nd day of February, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of     )
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                     )
      )
                                                      )
ENTERGY NUCLEAR OPERATIONS, INC.    )  Docket No. 50-247-LA        ) (Indian Point Nuclear Generating, Unit 2)  )
ENTERGY NUCLEAR OPERATIONS, INC.                     )       Docket No. 50-247-LA
 
                                                      )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing "COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION" dated February 22, 2016, have been
(Indian Point Nuclear Generating, Unit 2)             )
 
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION dated February 22, 2016, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 22nd day of February, 2016.
filed through the Electronic Information Exchange, the NRC's E-Filing System, in the above-captioned proceeding, this 22 nd day of February, 2016.
                                                      /Signed (electronically) by/
          /Signed (electronically) by/
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland This 22nd day of February, 2016}}
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone:  (301) 415-4113
 
E-mail:  Anita.Ghosh@nrc.gov
 
Dated at Rockville, Maryland
 
This 22nd day of February, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of      )        )
ENTERGY NUCLEAR OPERATIONS, INC.   ) Docket No. 50-247-LA  
      )  
(Indian Point Nuclear Generating, Unit 2) )  
 
COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION 
 
Consistent with the Commission's policy on notification of NRC adjudicatory bodies and all parties of information on issues in cases before the Commission, counsel for the U.S. Nuclear Regulatory Commission staff (Staff) hereby informs the Commission and the parties that, on or about February 23, 2016, the Staff proposes to make a final no significant hazards consideration determination and issue a related license amendment to Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Operations, Inc. (the licensee). This action is being taken in response to Entergy's license amendment application dated December 9, 2014, 1 as supplemented by additional letters, 2 and will modify Facility Operating License No. DPR-26 for the Indian Point Nuclear Generating Unit No. 2 (IP2). Specifically, the license amendment will revise IP2 Technical Specification 5.5.14, "Containment Leakage Rate Testing Program," to 1 Letter from Entergy Nuclear Operations, Inc. to the U.S. Nuclear Regulatory Commission, "Proposed License Amendment Regarding Extending the Containment Type A Leak Rate Testing Frequency to 15 Years," dated December 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14353A015).
2 Supplemental letters dated May 20, 2015 (ADAMS Accession No. ML15149A137); May 20, 2015 (ADAMS Accession No. ML15149A139); June 8, 2015 (ADAMS Accession No. ML15163A166); and June 29, 2015 (ADAMS Accession No. ML15189A026). extend the frequency of the containment integrated leak rate test from once every 10 years to once every 15 years on a permanent basis. Final versions of the final no significant hazards consideration determination and license amendment will be available through the Nuclear Regulatory Commission's Agencywide Documents Access and Management System (ADAMS). When final versions of the documents are available, counsel for the NRC Staff will notify the parties and provide them with the ADAMS Accession Numbers for the documents.
Respectfully submitted,
        /Signed (electronically) by/
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel
 
Mail Stop O15-D21 Washington, DC 20555 Telephone:  (301) 415-4113 E-mail:  Anita.Ghosh@nrc.gov
 
Dated at Rockville, Maryland
 
this 22nd day of February, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of      )
      )
ENTERGY NUCLEAR OPERATIONS, INC.    )  Docket No. 50-247-LA        ) (Indian Point Nuclear Generating, Unit 2)  )
 
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing "COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION" dated February 22, 2016, have been  
 
filed through the Electronic Information Exchange, the NRC's E-Filing System, in the above-captioned proceeding, this 22 nd day of February, 2016.  
          /Signed (electronically) by/
Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113  
 
E-mail: Anita.Ghosh@nrc.gov  
 
Dated at Rockville, Maryland  
 
This 22nd day of February, 2016}}

Latest revision as of 23:33, 30 October 2019

NYS Exhibit 12 on Commission Notification of Significant Licensing Action
ML16057A549
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/22/2016
From:
State of NY, Office of the Attorney General
To:
NRC/OCM
SECY RAS
Shared Package
ML16057A531 List:
References
RAS 50964, ASLBP 15-942-06-LA-BD01, 50-247-LA
Download: ML16057A549 (3)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LA

)

(Indian Point Nuclear Generating, Unit 2) )

COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION Consistent with the Commissions policy on notification of NRC adjudicatory bodies and all parties of information on issues in cases before the Commission, counsel for the U.S.

Nuclear Regulatory Commission staff (Staff) hereby informs the Commission and the parties that, on or about February 23, 2016, the Staff proposes to make a final no significant hazards consideration determination and issue a related license amendment to Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Operations, Inc. (the licensee). This action is being taken in response to Entergys license amendment application dated December 9, 2014,1 as supplemented by additional letters,2 and will modify Facility Operating License No. DPR-26 for the Indian Point Nuclear Generating Unit No. 2 (IP2). Specifically, the license amendment will revise IP2 Technical Specification 5.5.14, Containment Leakage Rate Testing Program, to 1

Letter from Entergy Nuclear Operations, Inc. to the U.S. Nuclear Regulatory Commission, Proposed License Amendment Regarding Extending the Containment Type A Leak Rate Testing Frequency to 15 Years, dated December 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14353A015).

2 Supplemental letters dated May 20, 2015 (ADAMS Accession No. ML15149A137); May 20, 2015 (ADAMS Accession No. ML15149A139); June 8, 2015 (ADAMS Accession No. ML15163A166); and June 29, 2015 (ADAMS Accession No. ML15189A026).

extend the frequency of the containment integrated leak rate test from once every 10 years to once every 15 years on a permanent basis.

Final versions of the final no significant hazards consideration determination and license amendment will be available through the Nuclear Regulatory Commissions Agencywide Documents Access and Management System (ADAMS). When final versions of the documents are available, counsel for the NRC Staff will notify the parties and provide them with the ADAMS Accession Numbers for the documents.

Respectfully submitted,

/Signed (electronically) by/

Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland this 22nd day of February, 2016

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LA

)

(Indian Point Nuclear Generating, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION dated February 22, 2016, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 22nd day of February, 2016.

/Signed (electronically) by/

Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland This 22nd day of February, 2016

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LA

)

(Indian Point Nuclear Generating, Unit 2) )

COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION Consistent with the Commissions policy on notification of NRC adjudicatory bodies and all parties of information on issues in cases before the Commission, counsel for the U.S.

Nuclear Regulatory Commission staff (Staff) hereby informs the Commission and the parties that, on or about February 23, 2016, the Staff proposes to make a final no significant hazards consideration determination and issue a related license amendment to Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Operations, Inc. (the licensee). This action is being taken in response to Entergys license amendment application dated December 9, 2014,1 as supplemented by additional letters,2 and will modify Facility Operating License No. DPR-26 for the Indian Point Nuclear Generating Unit No. 2 (IP2). Specifically, the license amendment will revise IP2 Technical Specification 5.5.14, Containment Leakage Rate Testing Program, to 1

Letter from Entergy Nuclear Operations, Inc. to the U.S. Nuclear Regulatory Commission, Proposed License Amendment Regarding Extending the Containment Type A Leak Rate Testing Frequency to 15 Years, dated December 9, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14353A015).

2 Supplemental letters dated May 20, 2015 (ADAMS Accession No. ML15149A137); May 20, 2015 (ADAMS Accession No. ML15149A139); June 8, 2015 (ADAMS Accession No. ML15163A166); and June 29, 2015 (ADAMS Accession No. ML15189A026).

extend the frequency of the containment integrated leak rate test from once every 10 years to once every 15 years on a permanent basis.

Final versions of the final no significant hazards consideration determination and license amendment will be available through the Nuclear Regulatory Commissions Agencywide Documents Access and Management System (ADAMS). When final versions of the documents are available, counsel for the NRC Staff will notify the parties and provide them with the ADAMS Accession Numbers for the documents.

Respectfully submitted,

/Signed (electronically) by/

Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland this 22nd day of February, 2016

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LA

)

(Indian Point Nuclear Generating, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing COMMISSION NOTIFICATION OF SIGNIFICANT LICENSING ACTION dated February 22, 2016, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 22nd day of February, 2016.

/Signed (electronically) by/

Anita Ghosh Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: Anita.Ghosh@nrc.gov Dated at Rockville, Maryland This 22nd day of February, 2016