| number = ML16092A021
| number = ML16092A021
| issue date = 04/12/2016
| issue date = 04/12/2016
| title = River Bend Station, Unit 1 - Security Baseline Inspection Report 05000458/2016201
| title = Security Baseline Inspection Report 05000458/2016201
| author name = Cardenas D
| author name = Cardenas D
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| addressee name = Olson E W
| addressee name = Olson E
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000458/2016201]]
See also: [[see also::IR 05000458/2016201]]


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION  
{{#Wiki_filter:SAFEGUARDS INFORMATION
  SAFEGUARDS INFORMATION
                                              April 12, 2016
Mr. Eric W. Olson, Site Vice President
April 12, 2016  
Entergy Operations, Inc.
 
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
Mr. Eric W. Olson, Site Vice President  
SUBJECT:        RIVER BEND STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT
Entergy Operations, Inc. River Bend Station  
                05000458/2016201
5485 US Highway 61N  
Dear Mr. Olson:
St. Francisville, LA 70775  
On February 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security
inspection at your River Bend Station, Unit 1. On March 7, 2016, the inspectors discussed the
results of this inspection with Mr. Robin Cook, Site Security Manager, and other members of the
staff. Inspectors documented the results of this inspection in the enclosure inspection report.
NRC inspectors documented one finding of very low security significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest this violation or the significance of this NCV, you should provide a response
within 30 days of the date of this inspection report, with the basis for your denial, to the
U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington
DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of
Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at River
Bend Station, Unit 1.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a
regulatory requirement in this report, you should provide a response within 30 days of the date
of this inspection report, with the basis for your disagreement, to the Regional Administrator,
Region IV, the Director, Office of Nuclear Security and Incident Response and the NRC resident
inspector at River Bend Station, Unit 1.
    The enclosure transmitted herewith contains Safeguards Information. When separated from
                      the enclosure, this transmittal document is decontrolled.
                                  SAFEGUARDS INFORMATION


                                    SAFEGUARDS INFORMATION
SUBJECT: RIVER BEND STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT
E. Olson                                            -2-
05000458/2016201  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Request for Withholding, of the NRCs Rules of Practice, a copy of
Dear Mr. Olson:  
this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21,
Protection of Safeguards Information: Performance Requirements, and its disclosure to
unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as
amended. Therefore, the material in the enclosure will not be made available electronically for
public inspection in the NRC Public Document Room or from the PARS component of NRCs
ADAMS. If you choose to provide a response and Safeguards Information is necessary to
provide an acceptable response, please provide the level of protection described in
10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an
acceptable response, please mark your entire response Security-Related Information -
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
                                                  Sincerely,
                                                  /RA/
                                                  Daniel Cardenas, Chief (Acting)
                                                  Security Performance Evaluation Branch
                                                  Division of Security Operations
                                                  Office of Nuclear Security and Incident Response
Docket No. 50-458
License No. NPF-47
Nonpublic Enclosure: Inspection Report 05000458/2016201
                          w/Attachments: Supplemental Information
cc w/o encl: Timothy Mitchell, Executive Vice President (Acting)
cc w/encl: Robin Cook, Site Security Manager
            Jonathan Laplante, Corporate Security Manager
                                    SAFEGUARDS INFORMATION


On February 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your River Bend Station, Unit 1.  On March 7, 2016, the inspectors discussed the
results of this inspection with Mr. Robin Cook , Site Security Manager, and other members of the staff.  Inspectors documented the results of this inspection in the enclosure inspection report.


   
  ML
NRC inspectors documented one finding of very low security significance (Green) in this report.  This finding involved a violation of NRC requirements.  The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
  OFFICE     NSIR/DSO/SPEB     NSIR/DSO      NSIR/DSO/SPEB      RIV              NSIR/DSO/SPEB
 
  NAME       A. Woyansky       J. Clark     J. Willis           M. Haire         D. Cardenas
  DATE       03/21/16           3/31/16       4/5/16             4/5/16 *via email 4 / 5 /16
If you contest this violation or the significance of this NCV , you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of
Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at River
 
Bend Station, Unit 1.
 
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date
of this inspection report, with the basis for your disagreement, to the Regional Administrator,
Region IV, the Director, Office of Nuclear Security and Incident Response and the NRC resident
inspector at River Bend Station, Unit 1.
  The enclosure transmitted herewith contains Safeguards Information. When separated from the enclosure, this transmittal document is decontrolled. 
SAFEGUARDS INFORMATION E. Olson - 2 -
  SAFEGUARDS INFORMATION In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding,"
of the NRC's "Rules of Practice," a copy of
this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management
System (ADAMS).  ADAMS
is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21,
"Protection of Safeguards Information: Performance Requirements," and its disclosure to
unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as
amended.  Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.  If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in
10 CFR 73.21.  Otherwise, if Security-Related Information is necessary to provide an
acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  In accordance with
 
10 CFR 2.390(b)(1)(ii), the NRC is waiving the
affidavit requirements for your response.
Sincerely,
/RA/ 
Daniel Cardenas, Chief (Acting)
 
Security Performance Evaluation Branch
Division of Security Operations Office of Nuclear Security and Incident Response
Docket No. 50-458
License No. NPF-47
 
Nonpublic Enclosure: Inspection Report 05000458/2016201  w/Attachments:  Supplemental Information
cc w/o encl: Timothy Mitchell, Executive Vice President (Acting) 
 
cc w/encl: Robin Cook, Site Security Manager  Jonathan Laplante, Corporate Security Manager 
 
 
 
 
  ML OFFICE NSIR/DSO/SPEB NSIR/DSONSIR/DSO/SPEBRIV NSIR/DSO/SPEB NAME A. Woyansky J. Clark J. Willis M. Haire D. Cardenas DATE 03/21/16 3/31/16 4/5/16 4/5/16 *via email 4 / 5 /16
}}
}}

Latest revision as of 21:17, 30 October 2019

Security Baseline Inspection Report 05000458/2016201
ML16092A021
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/12/2016
From: Cardenas D
NRC/NSIR/DSO/DDSO/SPEB
To: Olson E
Entergy Operations
A Woyanski 287.3650
References
IR 2016201
Download: ML16092A021 (3)


See also: IR 05000458/2016201

Text

SAFEGUARDS INFORMATION

April 12, 2016

Mr. Eric W. Olson, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT

05000458/2016201

Dear Mr. Olson:

On February 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your River Bend Station, Unit 1. On March 7, 2016, the inspectors discussed the

results of this inspection with Mr. Robin Cook, Site Security Manager, and other members of the

staff. Inspectors documented the results of this inspection in the enclosure inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a

non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the

U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington

DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of

Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear

Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at River

Bend Station, Unit 1.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a

regulatory requirement in this report, you should provide a response within 30 days of the date

of this inspection report, with the basis for your disagreement, to the Regional Administrator,

Region IV, the Director, Office of Nuclear Security and Incident Response and the NRC resident

inspector at River Bend Station, Unit 1.

The enclosure transmitted herewith contains Safeguards Information. When separated from

the enclosure, this transmittal document is decontrolled.

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

E. Olson -2-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Request for Withholding, of the NRCs Rules of Practice, a copy of

this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21,

Protection of Safeguards Information: Performance Requirements, and its disclosure to

unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as

amended. Therefore, the material in the enclosure will not be made available electronically for

public inspection in the NRC Public Document Room or from the PARS component of NRCs

ADAMS. If you choose to provide a response and Safeguards Information is necessary to

provide an acceptable response, please provide the level of protection described in

10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an

acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Daniel Cardenas, Chief (Acting)

Security Performance Evaluation Branch

Division of Security Operations

Office of Nuclear Security and Incident Response

Docket No. 50-458

License No. NPF-47

Nonpublic Enclosure: Inspection Report 05000458/2016201

w/Attachments: Supplemental Information

cc w/o encl: Timothy Mitchell, Executive Vice President (Acting)

cc w/encl: Robin Cook, Site Security Manager

Jonathan Laplante, Corporate Security Manager

SAFEGUARDS INFORMATION

ML

OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RIV NSIR/DSO/SPEB

NAME A. Woyansky J. Clark J. Willis M. Haire D. Cardenas

DATE 03/21/16 3/31/16 4/5/16 4/5/16 *via email 4 / 5 /16