| issue date = 07/11/2016
| issue date = 07/11/2016
| title = Senior Reactor and Reactor Operator Initial License Examinations- Salem Nuclear Generating Station Units 1 and 2
| title = Senior Reactor and Reactor Operator Initial License Examinations- Salem Nuclear Generating Station Units 1 and 2
| author name = Jackson D E
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Sena P P
| addressee name = Sena P
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000272, 05000311
| docket = 05000272, 05000311
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713 July 11, 2016 Mr. Peter P. Sena Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 July 11, 2016 Mr. Peter P. Sena Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038


==SUBJECT:==
==SUBJECT:==
SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE   EXAMINATIONS - SALEM NUCLEAR GENERATING STATION UNITS 1 AND 2  
SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - SALEM NUCLEAR GENERATING STATION UNITS 1 AND 2


==Dear Mr. Sena:==
==Dear Mr. Sena:==


In a telephone conversation on June 30, 2016, between Mr. Joseph M. D'Antonio, Senior Operations Engineer, and Mr. Gerry Gauding, Exam Developer, arrangements were made for the administration of licensing examinations at the Salem Nuclear Generating Station during the weeks of December 12 and 19, 2016. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 14, 2016. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 12, 2016. The written examinations, operating tests, and the supporting reference materials requested by Mr. D'Antonio will be due by October 10, 2016. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
In a telephone conversation on June 30, 2016, between Mr. Joseph M. DAntonio, Senior Operations Engineer, and Mr. Gerry Gauding, Exam Developer, arrangements were made for the administration of licensing examinations at the Salem Nuclear Generating Station during the weeks of December 12 and 19, 2016. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 14, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 12, 2016. The written examinations, operating tests, and the supporting reference materials requested by Mr. DAntonio will be due by October 10, 2016. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.


P. Sena To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
P. Sena                                       To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.  
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.


This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC  20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.
P. Sena                                       Thank you for your cooperation in this matter. Mr. Gauding has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5306.
P. Sena Thank you for your cooperation in this matter. Mr. Gauding has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me at (610) 337-5306.
Sincerely,
Sincerely,         /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc: Distribution via ListServ
                                                /RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc: Distribution via ListServ


P. Sena Thank you for your cooperation in this matter. Mr. Gauding has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me at (610) 337-5306.
P. Sena                                               Thank you for your cooperation in this matter. Mr. Gauding has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5306.
Sincerely,         /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
Sincerely,
                                                        /RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc: Distribution via ListServ Distribution w/enclosure (via e-mail)
DDorman, RA                                                  AZiedonis, DRP RI DLew, DRA                                                    COtt, DRP, AA MScott, DRP                                                  JBowen, RI, OEDO DPelton, DRP                                                RidsNrrPMSalem Resource RLorson, DRS                                                RidsNrrDorlLpl1-2 Resource PKrohn, DRS                                                  ROPreports Resource FBower, DRP                                                  DJackson, DRS RBarkley, DRP                                                JDAntonio, DRS MDraxton, DRP                                                DRS Master Exam File (C. Bixler)
RVadella, DRP                                                (w/concurrences)
PFinney, DRP, SRI


Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc:  Distribution via ListServ
DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Exam 16 Salem Dec 2016\150dayexamltrSALEM.docx ADAMS PKG: ML.16076A441                                         ADAMS ACCESSION NO.:ML16193A633 SUNSI Review                           Non-Sensitive                   Publicly Available OFFICE             RI/DRS/OB           RI/DRS/OB NAME               JM DAntonio/dej for DEJackson/dej DATE               07/11 /16           07/11/16 OFFICIAL RECORD COPY}}
 
Distribution w/enclosure (via e-mail)  DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS PKrohn, DRS FBower, DRP RBarkley, DRP MDraxton, DRP  RVadella, DRP  PFinney, DRP, SRI  AZiedonis, DRP RI COtt, DRP, AA JBowen, RI, OEDO RidsNrrPMSalem Resource  RidsNrrDorlLpl1-2 Resource  ROPreports Resource DJackson, DRS JDAntonio, DRS DRS Master Exam File (C. Bixler) (w/concurrences)  DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Exam 16 Salem Dec 2016\150dayexamltrSALEM.docx ADAMS PKG: ML.16076A441     ADAMS ACCESSION NO.:ML16193A633   SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB   NAME JM DAntonio/dej for DEJackson/dej   DATE 07/11 /16 07/11/16   OFFICIAL RECORD COPY  
}}

Latest revision as of 16:54, 30 October 2019

Senior Reactor and Reactor Operator Initial License Examinations- Salem Nuclear Generating Station Units 1 and 2
ML16193A633
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/11/2016
From: Diane Jackson
Operations Branch I
To: Sena P
Public Service Enterprise Group
Shared Package
ML16076A441 List:
References
Download: ML16193A633 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 July 11, 2016 Mr. Peter P. Sena Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - SALEM NUCLEAR GENERATING STATION UNITS 1 AND 2

Dear Mr. Sena:

In a telephone conversation on June 30, 2016, between Mr. Joseph M. DAntonio, Senior Operations Engineer, and Mr. Gerry Gauding, Exam Developer, arrangements were made for the administration of licensing examinations at the Salem Nuclear Generating Station during the weeks of December 12 and 19, 2016. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 14, 2016.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 12, 2016. The written examinations, operating tests, and the supporting reference materials requested by Mr. DAntonio will be due by October 10, 2016. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

P. Sena To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.

P. Sena Thank you for your cooperation in this matter. Mr. Gauding has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc: Distribution via ListServ

P. Sena Thank you for your cooperation in this matter. Mr. Gauding has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc: Distribution via ListServ Distribution w/enclosure (via e-mail)

DDorman, RA AZiedonis, DRP RI DLew, DRA COtt, DRP, AA MScott, DRP JBowen, RI, OEDO DPelton, DRP RidsNrrPMSalem Resource RLorson, DRS RidsNrrDorlLpl1-2 Resource PKrohn, DRS ROPreports Resource FBower, DRP DJackson, DRS RBarkley, DRP JDAntonio, DRS MDraxton, DRP DRS Master Exam File (C. Bixler)

RVadella, DRP (w/concurrences)

PFinney, DRP, SRI

DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Exam 16 Salem Dec 2016\150dayexamltrSALEM.docx ADAMS PKG: ML.16076A441 ADAMS ACCESSION NO.:ML16193A633 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME JM DAntonio/dej for DEJackson/dej DATE 07/11 /16 07/11/16 OFFICIAL RECORD COPY