(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17086A049 | | | number = ML17086A049 |
| | issue date = 03/27/2017 | | | issue date = 03/27/2017 |
| | title = Callaway, Final Safety Analysis Report, Revision OL-22, Chapter 14, Initial Test Program | | | title = Final Safety Analysis Report, Revision OL-22, Chapter 14, Initial Test Program |
| | author name = Klos L J | | | author name = Klos L |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = Diya F | | | addressee name = Diya F |
Line 9: |
Line 9: |
| | docket = 05000483 | | | docket = 05000483 |
| | license number = NPF-030 | | | license number = NPF-030 |
| | contact person = Klos L J | | | contact person = Klos L |
| | document type = Final Safety Analysis Report (FSAR) | | | document type = Final Safety Analysis Report (FSAR) |
| | page count = 4 | | | page count = 4 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:CALLAWAY - SP14.0-iTABLE OF CONTENTSCHAPTER 14.0INITIALTESTPROGRAMSectionPage14.1SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS..................................................................................14.1-114.2INITIAL TEST PROGRAM............................................................................14.2-1 | | {{#Wiki_filter:CALLAWAY - SP TABLE OF CONTENTS CHAPTER 14.0 INITIAL TEST PROGRAM Section Page 14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS .................................................................................. 14.1-1 14.2 INITIAL TEST PROGRAM ............................................................................ 14.2-1 |
|
| |
|
| ==14.3REFERENCES== | | ==14.3 REFERENCES== |
| ..............................................................................................14.3-1 CALLAWAY - SP14.1-1Rev. OL-135/03CHAPTER14.0INITIALTESTPROGRAM14.1SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS This section is not applicable to an FSAR. | | .............................................................................................. 14.3-1 14.0-i |
| CALLAWAY - SP14.2-1Rev. OL-135/0314.2INITIAL TEST PROGRAMThe selections describing the Callaway Initial Test Program have been deleted. The deleted sections are contained in the FSAR on record as of the receipt of the Callaway Operating License No. NPF-30 on October 18, 1984. In addition, the referenced letters in Section 14.3 contain program revisions implemented subsequent to receipt of the Operating License but not incorporated into the FSAR. This information will not be reproduced in later revisions to the FSAR due to the historical status of the content. This information may be provided, however, upon request from the Union Electric Nuclear Licensing Department.
| |
| CALLAWAY - SP14.3-1Rev. OL-135/03
| |
|
| |
|
| ==14.3REFERENCES== | | CALLAWAY - SP CHAPTER 14.0 INITIAL TEST PROGRAM 14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS This section is not applicable to an FSAR. |
| 1.ULNRC-834 dated May 29, 1984 to H.R. Denton, signed by D.F.Schnell.2.ULNRC-884 dated July 26, 1984 to H.R. Denton, signed by D.F.Schnell.3.Letter dated August 7, 1984 to D.F. Schnell, signed by B.J.Youngblood.4.ULNRC-986 dated November 27, 1984 to H.R. Denton, signed by D.F.Schnell. | | 14.1-1 Rev. OL-13 5/03 |
| }} | | |
| | CALLAWAY - SP 14.2 INITIAL TEST PROGRAM The selections describing the Callaway Initial Test Program have been deleted. The deleted sections are contained in the FSAR on record as of the receipt of the Callaway Operating License No. NPF-30 on October 18, 1984. In addition, the referenced letters in Section 14.3 contain program revisions implemented subsequent to receipt of the Operating License but not incorporated into the FSAR. This information will not be reproduced in later revisions to the FSAR due to the historical status of the content. This information may be provided, however, upon request from the Union Electric Nuclear Licensing Department. |
| | 14.2-1 Rev. OL-13 5/03 |
| | |
| | CALLAWAY - SP |
| | |
| | ==14.3 REFERENCES== |
| | : 1. ULNRC-834 dated May 29, 1984 to H.R. Denton, signed by D.F. Schnell. |
| | : 2. ULNRC-884 dated July 26, 1984 to H.R. Denton, signed by D.F. Schnell. |
| | : 3. Letter dated August 7, 1984 to D.F. Schnell, signed by B.J. Youngblood. |
| | : 4. ULNRC-986 dated November 27, 1984 to H.R. Denton, signed by D.F. Schnell. |
| | 14.3-1 Rev. OL-13 5/03}} |
|
---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML23318A1082023-12-28028 December 2023 FSAR Chapter 1, Figures Redacted ML23165A2432023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement 2023-06-14
[Table view] |
Text
CALLAWAY - SP TABLE OF CONTENTS CHAPTER 14.0 INITIAL TEST PROGRAM Section Page 14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS .................................................................................. 14.1-1 14.2 INITIAL TEST PROGRAM ............................................................................ 14.2-1
14.3 REFERENCES
.............................................................................................. 14.3-1 14.0-i
CALLAWAY - SP CHAPTER 14.0 INITIAL TEST PROGRAM 14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS This section is not applicable to an FSAR.
14.1-1 Rev. OL-13 5/03
CALLAWAY - SP 14.2 INITIAL TEST PROGRAM The selections describing the Callaway Initial Test Program have been deleted. The deleted sections are contained in the FSAR on record as of the receipt of the Callaway Operating License No. NPF-30 on October 18, 1984. In addition, the referenced letters in Section 14.3 contain program revisions implemented subsequent to receipt of the Operating License but not incorporated into the FSAR. This information will not be reproduced in later revisions to the FSAR due to the historical status of the content. This information may be provided, however, upon request from the Union Electric Nuclear Licensing Department.
14.2-1 Rev. OL-13 5/03
CALLAWAY - SP
14.3 REFERENCES
- 1. ULNRC-834 dated May 29, 1984 to H.R. Denton, signed by D.F. Schnell.
- 2. ULNRC-884 dated July 26, 1984 to H.R. Denton, signed by D.F. Schnell.
- 3. Letter dated August 7, 1984 to D.F. Schnell, signed by B.J. Youngblood.
- 4. ULNRC-986 dated November 27, 1984 to H.R. Denton, signed by D.F. Schnell.
14.3-1 Rev. OL-13 5/03