|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Clinton Power Station (CPS)__________ | | {{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Clinton Power Station (CPS)__________ Date of Examination: 1/30 - 2/7/17 Developed by: Written: Facility X NRC // Operating Facility X NRC Task Description (Reference) Chief Examiners Target Date* |
| Date of Examination: 1/30 - 2/7/17 Developed by: Written: | | Initials |
| Facility X NRC // Operating Facility X NRC Target Date* | | -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) CDZ |
| Task Description (Reference) | | -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) CDZ |
| Chief Examiner's Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b)
| | -150 3. Facility contact briefed on security and other requirements (C.2.c) CDZ |
| CDZ -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e)
| | -150 4. Corporate notification letter sent (C.2.d) CDZ |
| CDZ -150 3. Facility contact briefed on security and other requirements (C.2.c) CDZ -150 4. Corporate notification letter sent (C.2.d)
| | [-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) CDZ |
| CDZ [-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3)
| | {-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, CDZ ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) |
| CDZ {-90} 6. Integrated examination outline(s) due, including Forms ES
| | {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee CDZ (C.2.h; C.3.e) |
| -201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) | | {-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as CDZ applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) |
| CDZ {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)
| | -45 9. Written exam and operating test reviews completed. (C.3.f) CDZ |
| CDZ {-60} 8. Proposed examinations (including written, walk
| | -30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) CDZ |
| -through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES | | -21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) CDZ |
| -301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES | | -21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) CDZ |
| -201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) CDZ -45 9. Written exam and operating test reviews completed. (C.3.f) | | -14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) CDZ |
| CDZ -30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES
| | -14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; CDZ C.3.h) |
| -202) CDZ -21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) | | -7 15. Facility licensee management queried regarding the licensees views on the CDZ examination. (C.2 j) |
| CDZ -21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)
| | -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm CDZ qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) |
| CDZ -14 13. Final license applications due and Form ES
| | -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee CDZ (C.3.k) |
| -201-4 prepared (C.1.l; C.2.i; ES | | -7 18. Approved scenarios, job performance measures, and questions distributed to NRC CDZ examiners (C.3.i) |
| -202) CDZ -14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) CDZ -7 15. Facility licensee management queried regarding the licensee's views on the examination. (C.2 j) | | * Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee. [Applies only] {Does not apply} to examinations prepared by the NRC.}} |
| CDZ -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES
| |
| -202, C.2.e; ES | |
| -204) CDZ -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) CDZ -7 18. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) | |
| CDZ
| |
| * Target dates are generally based on facility | |
| -prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case | |
| -by-case basis in coordination with the facility licensee. | |
| [Applies only] {Does not apply} to examinations prepared by the NRC.}} | |
|
---|
Category:License-Operator
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22153A4682022-01-28028 January 2022 ES-301-4 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A3022021-04-13013 April 2021 Administered RO Admin JPM ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2582021-04-13013 April 2021 Scenarios ML21144A2402021-04-13013 April 2021 LTR 75 Day Submittal ML21144A2372021-04-13013 April 2021 ES-301-4 ML21144A2442021-04-13013 April 2021 ES-401-6 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2152021-04-13013 April 2021 ES-401-4 ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21145A0402021-04-13013 April 2021 ES-301-5 ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3022021-04-13013 April 2021 Administered RO Admin JPM ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A2642021-04-13013 April 2021 Sim JPM ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21144A3182021-04-13013 April 2021 ES-301-1 ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline 2024-06-27
[Table view] |
Text
ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Clinton Power Station (CPS)__________ Date of Examination: 1/30 - 2/7/17 Developed by: Written: Facility X NRC // Operating Facility X NRC Task Description (Reference) Chief Examiners Target Date*
Initials
-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) CDZ
-150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) CDZ
-150 3. Facility contact briefed on security and other requirements (C.2.c) CDZ
-150 4. Corporate notification letter sent (C.2.d) CDZ
[-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) CDZ
{-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, CDZ ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)
{-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee CDZ (C.2.h; C.3.e)
{-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as CDZ applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
-45 9. Written exam and operating test reviews completed. (C.3.f) CDZ
-30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) CDZ
-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) CDZ
-21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) CDZ
-14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) CDZ
-14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; CDZ C.3.h)
-7 15. Facility licensee management queried regarding the licensees views on the CDZ examination. (C.2 j)
-7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm CDZ qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)
-7 17. Proctoring/written exam administration guidelines reviewed with facility licensee CDZ (C.3.k)
-7 18. Approved scenarios, job performance measures, and questions distributed to NRC CDZ examiners (C.3.i)
- Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee. [Applies only] {Does not apply} to examinations prepared by the NRC.