ML17130A326: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17130A326
| number = ML17130A326
| issue date = 04/06/2017
| issue date = 04/06/2017
| title = Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Appendix O, Emergency Plan and Security Plan
| title = Revision 26 to Updated Final Safety Analysis Report, Appendix O, Emergency Plan and Security Plan
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN TABLE OF CONTENTS SECTION      TITLE 0.1          EMERGENCY PLAN 0.2          SECURITY PLAN APPENDIX O                    O-i              REV. 21, APRIL 2007
PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN 0.1  EMERGENCY PLAN An emergency plan which describes the emergency organization, facilities, and procedures for dealing with nuclear incidents has been developed for the Peach Bottom Atomic Power Station. This plan has been prepared using a variety of sources for guidance.
The basic format of the plan follows that specified in NRC Regulatory Guide 1.101. NUREG-0610 and NUREG-0654 are used as references for content.
APPENDIX O                  O.1-1              REV. 21, APRIL 2007
PBAPS UFSAR 0.2  SECURITY PLAN The security at Peach Bottom Units 2 and 3 is governed by the following four documents which have been approved by the NRC and incorporated into the Operating License:
: 1)  Physical Security Plan.
: 2)  Safeguards Contingency Plan.
: 3)  Plant    Security    Personnel    Training    and Qualification Plan.
: 4)  Cyber Security Plan APPENDIX O                  O.2-1              REV. 25, APRIL 2015}}

Latest revision as of 03:38, 30 October 2019

Revision 26 to Updated Final Safety Analysis Report, Appendix O, Emergency Plan and Security Plan
ML17130A326
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/06/2017
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17130A259 List: ... further results
References
Download: ML17130A326 (3)


Text

PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN TABLE OF CONTENTS SECTION TITLE 0.1 EMERGENCY PLAN 0.2 SECURITY PLAN APPENDIX O O-i REV. 21, APRIL 2007

PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN 0.1 EMERGENCY PLAN An emergency plan which describes the emergency organization, facilities, and procedures for dealing with nuclear incidents has been developed for the Peach Bottom Atomic Power Station. This plan has been prepared using a variety of sources for guidance.

The basic format of the plan follows that specified in NRC Regulatory Guide 1.101. NUREG-0610 and NUREG-0654 are used as references for content.

APPENDIX O O.1-1 REV. 21, APRIL 2007

PBAPS UFSAR 0.2 SECURITY PLAN The security at Peach Bottom Units 2 and 3 is governed by the following four documents which have been approved by the NRC and incorporated into the Operating License:

1) Physical Security Plan.
2) Safeguards Contingency Plan.
3) Plant Security Personnel Training and Qualification Plan.
4) Cyber Security Plan APPENDIX O O.2-1 REV. 25, APRIL 2015