| number = ML17130A326 | | number = ML17130A326 | ||
| issue date = 04/06/2017 | | issue date = 04/06/2017 | ||
| title = | | title = Revision 26 to Updated Final Safety Analysis Report, Appendix O, Emergency Plan and Security Plan | ||
| author name = | | author name = | ||
| author affiliation = Exelon Generation Co, LLC | | author affiliation = Exelon Generation Co, LLC | ||
Line 14: | Line 14: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN TABLE OF CONTENTS SECTION TITLE 0.1 EMERGENCY PLAN 0.2 SECURITY PLAN APPENDIX O O-i REV. 21, APRIL 2007 | |||
PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN 0.1 EMERGENCY PLAN An emergency plan which describes the emergency organization, facilities, and procedures for dealing with nuclear incidents has been developed for the Peach Bottom Atomic Power Station. This plan has been prepared using a variety of sources for guidance. | |||
The basic format of the plan follows that specified in NRC Regulatory Guide 1.101. NUREG-0610 and NUREG-0654 are used as references for content. | |||
APPENDIX O O.1-1 REV. 21, APRIL 2007 | |||
PBAPS UFSAR 0.2 SECURITY PLAN The security at Peach Bottom Units 2 and 3 is governed by the following four documents which have been approved by the NRC and incorporated into the Operating License: | |||
: 1) Physical Security Plan. | |||
: 2) Safeguards Contingency Plan. | |||
: 3) Plant Security Personnel Training and Qualification Plan. | |||
: 4) Cyber Security Plan APPENDIX O O.2-1 REV. 25, APRIL 2015}} |
Latest revision as of 03:38, 30 October 2019
Text
PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN TABLE OF CONTENTS SECTION TITLE 0.1 EMERGENCY PLAN 0.2 SECURITY PLAN APPENDIX O O-i REV. 21, APRIL 2007
PBAPS UFSAR APPENDIX O - EMERGENCY PLAN AND SECURITY PLAN 0.1 EMERGENCY PLAN An emergency plan which describes the emergency organization, facilities, and procedures for dealing with nuclear incidents has been developed for the Peach Bottom Atomic Power Station. This plan has been prepared using a variety of sources for guidance.
The basic format of the plan follows that specified in NRC Regulatory Guide 1.101. NUREG-0610 and NUREG-0654 are used as references for content.
APPENDIX O O.1-1 REV. 21, APRIL 2007
PBAPS UFSAR 0.2 SECURITY PLAN The security at Peach Bottom Units 2 and 3 is governed by the following four documents which have been approved by the NRC and incorporated into the Operating License:
- 1) Physical Security Plan.
- 3) Plant Security Personnel Training and Qualification Plan.
- 4) Cyber Security Plan APPENDIX O O.2-1 REV. 25, APRIL 2015