| number = ML17202G679
| number = ML17202G679
| issue date = 07/17/2017
| issue date = 07/17/2017
| title = Pilgrim - Transmittal of Emergency Plan Implementing Procedure Revisions
| title = Transmittal of Emergency Plan Implementing Procedure Revisions
| author name = Calabrese D
| author name = Calabrese D
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*~Entergx Entergy Nuclear Operations, Inc.
July 17, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 July 17, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
MA 02360


==SUBJECT:==
==SUBJECT:==
Emergency Plan Implementing Procedure Revisions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.053


Emergency Plan Implementing Procedure Revisions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.053
==Dear Sir or Madam:==


==Dear Sir or Madam:==
In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Entergy EP-AD-601. The procedure revisions were reviewed in accordance with 10 CFR 50.54(q). The 50.54(q) review is also provided in the letter attachment.
In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Entergy EP-AD-601.
The procedure revisions were reviewed in accordance with 10 CFR 50.54(q).
The 50.54(q) review is also provided in the letter attachment.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
If you have any questions or require additional information, please contact me at (508) 830-8227.
If you have any questions or require additional information, please contact me at (508) 830-8227.
There are no regulatory commitments contained in this letter. KLS/jc  
There are no regulatory commitments contained in this letter.
KLS/jc


==Attachment:==
==Attachment:==
: 1. EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and *associated 10 CFR 50.54(q)
: 1. EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and
Review.
      *associated 10 CFR 50.54(q) Review.
Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 -Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-881-A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.17.053 Page 2}}
 
Entergy Nuclear Operations, Inc.                   Letter No. 2.17.053 Pilgrim Nuclear Power Station                                   Page 2 cc:
Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-881-A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station}}

Latest revision as of 01:52, 30 October 2019

Transmittal of Emergency Plan Implementing Procedure Revisions
ML17202G679
Person / Time
Site: Pilgrim
Issue date: 07/17/2017
From: Calabrese D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17202G654 List:
References
2.17.053, EP-AD-301, Rev. 8
Download: ML17202G679 (2)


Text

  • ~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 July 17, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Emergency Plan Implementing Procedure Revisions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.053

Dear Sir or Madam:

In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Entergy EP-AD-601. The procedure revisions were reviewed in accordance with 10 CFR 50.54(q). The 50.54(q) review is also provided in the letter attachment.

The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.

If you have any questions or require additional information, please contact me at (508) 830-8227.

There are no regulatory commitments contained in this letter.

KLS/jc

Attachment:

1. EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and

Entergy Nuclear Operations, Inc. Letter No. 2.17.053 Pilgrim Nuclear Power Station Page 2 cc:

Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-881-A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station