ML18011A890: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/01/2018
| issue date = 02/01/2018
| title = Amendment - Issuance of License Amendment No. 108 for the Main Control Room Emergency Habitability System Changes to Satisfy Post Actuation Performance Requirements (LAR 17-001) for Vogtle Electric Generating Plant Unit 3
| title = Amendment - Issuance of License Amendment No. 108 for the Main Control Room Emergency Habitability System Changes to Satisfy Post Actuation Performance Requirements (LAR 17-001) for Vogtle Electric Generating Plant Unit 3
| author name = Patel C P
| author name = Patel C
| author affiliation = NRC/NRO/DNRL/LB4
| author affiliation = NRC/NRO/DNRL/LB4
| addressee name = Whitley B H
| addressee name = Whitley B
| addressee affiliation = Georgia Pacific Corp, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co, Inc
| addressee affiliation = Georgia Pacific Corp, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co, Inc
| docket = 05200025, 05200026
| docket = 05200025, 05200026
Line 15: Line 15:
| page count = 2
| page count = 2
| project = CAC:RP9629, EPID:L-2017-LLA-0145
| project = CAC:RP9629, EPID:L-2017-LLA-0145
| stage = Issuance
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:  
{{#Wiki_filter:SOUTHERN NUCLEAR OPERATING COMPANY, INC.
 
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO. 52-025 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 108 License No. NPF-91
SOUTHERN NUCLEAR OPERATING COMPANY, INC. GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA   VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO. 52-025 AMENDMENT TO FACILITY COMBINED LICENSE   Amendment No. 108 License No. NPF-91 1. The Nuclear Regulatory Commission (the Commission) has found that:
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern Nuclear Operating Company, dated May 9, 2017, as supplemented by letter dated September 15, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.  
A. The application for amendment by Southern Nuclear Operating Company, dated May 9, 2017, as supplemented by letter dated September 15, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I;
- 2 -  2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated May 9, 2017, as supplemented by letter dated September 15, 2017. The license is also amended by changes to Appendix A, Technical Specifications, and Appendix C of the Facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of Facility Combined License No. NPF-91 is hereby amended to read as follows:
B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.
  (8) Incorporation   The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 108, are hereby incorporated into this license. 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e). FOR THE NUCLEAR REGULATORY COMMISSION: /RA/   Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Date of Issuance: February 1, 2018 Attachments:  
: 2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated May 9, 2017, as supplemented by letter dated September 15, 2017. The license is also amended by changes to Appendix A, Technical Specifications, and Appendix C of the Facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of Facility Combined License No. NPF-91 is hereby amended to read as follows:
: 1. Page 7 of the Facility Combined License and affected pages of Appendix A and Appendix C to the Facility Combined License  
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 108, are hereby incorporated into this license.
}}
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).
FOR THE NUCLEAR REGULATORY COMMISSION:
                                              /RA/
Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Date of Issuance: February 1, 2018 Attachments:
: 1. Page 7 of the Facility Combined License and affected pages of Appendix A and Appendix C to the Facility Combined License}}

Latest revision as of 06:07, 22 October 2019

Amendment - Issuance of License Amendment No. 108 for the Main Control Room Emergency Habitability System Changes to Satisfy Post Actuation Performance Requirements (LAR 17-001) for Vogtle Electric Generating Plant Unit 3
ML18011A890
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/01/2018
From: Chandu Patel
NRC/NRO/DNRL/LB4
To: Whitley B
Georgia Pacific Corp, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co
PATEL C/415-3025
Shared Package
ML18011A885 List:
References
CAC RP9629, EPID L-2017-LLA-0145, LAR 17-001
Download: ML18011A890 (2)


Text

SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO.52-025 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 108 License No. NPF-91

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern Nuclear Operating Company, dated May 9, 2017, as supplemented by letter dated September 15, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I;

B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.

2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated May 9, 2017, as supplemented by letter dated September 15, 2017. The license is also amended by changes to Appendix A, Technical Specifications, and Appendix C of the Facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of Facility Combined License No. NPF-91 is hereby amended to read as follows:

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 108, are hereby incorporated into this license.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).

FOR THE NUCLEAR REGULATORY COMMISSION:

/RA/

Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Date of Issuance: February 1, 2018 Attachments:

1. Page 7 of the Facility Combined License and affected pages of Appendix A and Appendix C to the Facility Combined License