ML18044A075: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Comar M
| author name = Comar M
| author affiliation = NRC/NRO/DNRL/LB4
| author affiliation = NRC/NRO/DNRL/LB4
| addressee name = Whitley B H
| addressee name = Whitley B
| addressee affiliation = NRC/NRO/DNRL/LB4
| addressee affiliation = NRC/NRO/DNRL/LB4
| docket = 05200025, 05200026
| docket = 05200025, 05200026
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:SOUTHERN NUCLEAR OPERATING COMPANY, INC.
{{#Wiki_filter:SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO. 52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 115 License No. NPF-92  
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO. 52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 115 License No. NPF-92
: 1. The Nuclear Regulatory Commission (the Commission) has found that:  
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
 
A. The application for amendment by Southern Nuclear Operating Company (licensee), dated September 29, 2017, and supplemented by letter dated January 31, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
A. The application for amendment by Southern Nuclear Operating Company (licensee), dated September 29, 2017, and supplemented by letter dated January 31, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set  
: 2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated September 29, 2017, and supplemented by letter dated January 31, 2018. Paragraph 2.D(8) of Facility Combined License No. NPF-92 is hereby amended to read as follows:
 
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 115, are hereby incorporated into this license.
forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.  
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).
: 2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated September 29, 2017, and supplemented by letter dated January 31, 2018. Paragraph 2.D(8) of Facility Combined License No. NPF-92 is hereby amended to read as follows:  
FOR THE NUCLEAR REGULATORY COMMISSION:
 
                                              /RA/
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 115, are hereby incorporated into this license.  
Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Date of Issuance: March 22, 2018
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).  
 
FOR THE NUCLEAR REGULATORY COMMISSION:  
/RA/   Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors  
 
Date of Issuance: March 22, 2018  


==Attachment:==
==Attachment:==


Page 7 of the Facility Combined License}}
Page 7 of the Facility Combined License}}

Latest revision as of 21:13, 21 October 2019

Amendment No. 115 (LAR-17-030)
ML18044A075
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/22/2018
From: Manny Comar
NRC/NRO/DNRL/LB4
To: Whitley B
NRC/NRO/DNRL/LB4
comar m/415-3863
Shared Package
ML18044A071 List:
References
LAR-17-030, EPID L-2017-LLA-0099
Download: ML18044A075 (3)


Text

SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO.52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 115 License No. NPF-92

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern Nuclear Operating Company (licensee), dated September 29, 2017, and supplemented by letter dated January 31, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated September 29, 2017, and supplemented by letter dated January 31, 2018. Paragraph 2.D(8) of Facility Combined License No. NPF-92 is hereby amended to read as follows:

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 115, are hereby incorporated into this license.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).

FOR THE NUCLEAR REGULATORY COMMISSION:

/RA/

Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Date of Issuance: March 22, 2018

Attachment:

Page 7 of the Facility Combined License