GNRO-2018/00011, Formal Request for Review and Approval of Grand Gulf Nuclear Station'S Steam Dryer'S Long-term Inspection Plan and Baseline Results: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/27/2018
| issue date = 03/27/2018
| title = Formal Request for Review and Approval of Grand Gulf Nuclear Station'S Steam Dryer'S Long-term Inspection Plan and Baseline Results
| title = Formal Request for Review and Approval of Grand Gulf Nuclear Station'S Steam Dryer'S Long-term Inspection Plan and Baseline Results
| author name = Larson E A
| author name = Larson E
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:** -==~Entergy GN R0-2018/00011 March 27, 2018 Entergy Operations, Inc. P. 0. Box756 Port Gibson, MS 39150 Tel: 601-437-7500 Eric A. Larson Vice President, Operations Grand Gulf Nuclear Station License Condition 2.C(46)(g)
{{#Wiki_filter:**
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Two White Flint North 11545 Rockville Pike Rockville, MD 20852  
-==~Entergy Entergy Operations, Inc.
P. 0. Box756 Port Gibson, MS 39150 Tel: 601-437-7500 Eric A. Larson Vice President, Operations Grand Gulf Nuclear Station License Condition 2.C(46)(g)
GN R0-2018/00011 March 27, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Two White Flint North 11545 Rockville Pike Rockville, MD 20852


==SUBJECT:==
==SUBJECT:==
Formal Request for Review and Approval of Grand Gulf Nuclear Station's Steam Dryer's Long-term Inspection Plan and Baseline Results Grand Gulf Nuclear Station '
Docket No. 50-416 License No. NPF-29


==REFERENCE:==
==REFERENCE:==
: 1. Entergy letter to NRC, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages, dated June 30, 2017 (GNR0-2017/00039 Accession Number ML17186A023)
: 2. Entergy letter to NRC, Grand Gulf Nuclear Station (GGNS)
Recommendations for Future *inspection Replacement Steam Dryer, dated October 17, 2017 (GNR0-2017/00067. Accession Number ML172908137)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Formal Request for Review and Approval of Grand Gulf Nuclear Station's Steam Dryer's Long-term Inspection Plan and Baseline Results Grand Gulf Nuclear Station ' Docket No. 50-416 License No. NPF-29 1. Entergy letter to NRC, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages, dated June 30, 2017 (GNR0-2017/00039 Accession Number ML 17186A023)
 
: 2. Entergy letter to NRC, Grand Gulf Nuclear Station (GGNS) Recommendations for Future *inspection Replacement Steam Dryer, dated October 17, 2017 (GNR0-2017/00067.
  *The purpose of this-letter-is to formally request review and approval for Grand GulfNuclear Station's long-term steam dryer inspection plan along with the baseline inspection results, in order to satisfy License Condition 2.C(46)(g):
Accession Number ML 172908137)
*The purpose of this-letter-is to formally request review and approval for Grand GulfNuclear Station's long-term steam dryer inspection plan along with the baseline inspection results, in order to satisfy License Condition 2.C(46)(g):
At the end o~ the second refueling outage following the implementation of the EPU, the licensee shall submit a long-term steam dryer inspection plan based on industry operating experience along with the baseline inspection results for NRG review and approval.
At the end o~ the second refueling outage following the implementation of the EPU, the licensee shall submit a long-term steam dryer inspection plan based on industry operating experience along with the baseline inspection results for NRG review and approval.
The baseline inspection results were previously submitted via Reference
The baseline inspection results were previously submitted via Reference 1. The inspection plan is specified in paragraphs 2.6.1 and 2.6.2 of the GEH Proprietary document 000-0125~6316-R2-P "Grand Gulf Nuclear Station (GGNS) Recommendations for Future Inspection - Replacement Steam Dryer" that was submitted to the NRC via Reference 2 .
: 1. The inspection plan is specified in paragraphs 2.6.1 and 2.6.2 of the GEH Proprietary document 000-0125~6316-R2-P "Grand Gulf Nuclear Station (GGNS) Recommendations for Future Inspection  
                                                  .r
-Replacement Steam Dryer" that was submitted to the NRC via Reference 2 . . r
 
-GNRQ.;;2Qt8/00011 Page 2 of 3 This letter contains no new commitments.
-GNRQ.;;2Qt8/00011 Page 2 of 3 This letter contains no new commitments. If you have any questions or require additional information,' please contact Douglas Neve at 601-437-2103.
If you have any questions or require additional information,'
Sincerely, Eric A Larson Site Vice President EAL/jw
please contact Douglas Neve at 601-437-2103.
 
Sincerely, Eric A Larson Site Vice President EAL/jw GNR0-2018/00011 Page 3 of 3 WITHOUT ATTACHMENTS cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr'. Kriss Kennedy Regional Administrator Region IV 1600 East Lamar Boulevard Arlington, TX 76011 ~4511}}
GNR0-2018/00011 Page 3 of 3 WITHOUT ATTACHMENTS cc:         NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr'. Kriss Kennedy Regional Administrator Region IV 1600 East Lamar Boulevard Arlington, TX 76011 ~4511}}

Latest revision as of 13:56, 21 October 2019

Formal Request for Review and Approval of Grand Gulf Nuclear Station'S Steam Dryer'S Long-term Inspection Plan and Baseline Results
ML18088A044
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/27/2018
From: Emily Larson
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2018/00011
Download: ML18088A044 (3)


Text

-==~Entergy Entergy Operations, Inc.

P. 0. Box756 Port Gibson, MS 39150 Tel: 601-437-7500 Eric A. Larson Vice President, Operations Grand Gulf Nuclear Station License Condition 2.C(46)(g)

GN R0-2018/00011 March 27, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Two White Flint North 11545 Rockville Pike Rockville, MD 20852

SUBJECT:

Formal Request for Review and Approval of Grand Gulf Nuclear Station's Steam Dryer's Long-term Inspection Plan and Baseline Results Grand Gulf Nuclear Station '

Docket No. 50-416 License No. NPF-29

REFERENCE:

1. Entergy letter to NRC, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages, dated June 30, 2017 (GNR0-2017/00039 Accession Number ML17186A023)
2. Entergy letter to NRC, Grand Gulf Nuclear Station (GGNS)

Recommendations for Future *inspection Replacement Steam Dryer, dated October 17, 2017 (GNR0-2017/00067. Accession Number ML172908137)

Dear Sir or Madam:

  • The purpose of this-letter-is to formally request review and approval for Grand GulfNuclear Station's long-term steam dryer inspection plan along with the baseline inspection results, in order to satisfy License Condition 2.C(46)(g):

At the end o~ the second refueling outage following the implementation of the EPU, the licensee shall submit a long-term steam dryer inspection plan based on industry operating experience along with the baseline inspection results for NRG review and approval.

The baseline inspection results were previously submitted via Reference 1. The inspection plan is specified in paragraphs 2.6.1 and 2.6.2 of the GEH Proprietary document 000-0125~6316-R2-P "Grand Gulf Nuclear Station (GGNS) Recommendations for Future Inspection - Replacement Steam Dryer" that was submitted to the NRC via Reference 2 .

.r

-GNRQ.;;2Qt8/00011 Page 2 of 3 This letter contains no new commitments. If you have any questions or require additional information,' please contact Douglas Neve at 601-437-2103.

Sincerely, Eric A Larson Site Vice President EAL/jw

GNR0-2018/00011 Page 3 of 3 WITHOUT ATTACHMENTS cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr'. Kriss Kennedy Regional Administrator Region IV 1600 East Lamar Boulevard Arlington, TX 76011 ~4511