ML18173A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT TO LICENSE AMENDMENT NO. 134 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO. 52-026   Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. Facility Combined License No. NPF-92 REMOVE INSERT 7 7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.8.1-3 3.8.1-3 3.8.7-4 3.8.7-4 (7)       Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with     10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, for Changes and SNC shall report the change to the Director of NRO, or the designee, in accordance with 10 CFR 50.59(d). (b) SNC shall report any violation of a requirement in Section 2.D.(3), Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73. (8)       Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 134, are hereby incorporated into this license. (9)       Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g). (10)   Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones: (a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program 1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt  7 Amendment No. 134}}
{{#Wiki_filter:ATTACHMENT TO LICENSE AMENDMENT NO. 134 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO. 52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-92 REMOVE                               INSERT 7                                   7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE                               INSERT 3.8.1-3                             3.8.1-3 3.8.7-4                             3.8.7-4
 
(7)   Reporting Requirements (a)   Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)   SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8)   Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 134, are hereby incorporated into this license.
(9)   Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)     Environmental Qualification Program implemented before initial fuel load; (b)     Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)     Preservice Testing Program implemented before initial fuel load; (d)     Containment Leakage Rate Testing Program implemented before initial fuel load; (e)     Fire Protection Program
: 1.       The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7                                Amendment No. 134
 
Technical Specifications                        DC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                  FREQUENCY SR 3.8.1.2      Verify each battery charger supplies  150 amps at                      24 months greater than or equal to the minimum established float voltage for  8 hours.
OR Verify each battery charger can recharge the battery to the fully charged state within 24 hours while supplying the largest combined demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state.
SR 3.8.1.3      -----------------------------------------------------------------------
                                                - NOTE -
The modified performance discharge test in SR 3.8.7.6 may be performed in lieu of SR 3.8.1.3.
                  -----------------------------------------------------------------------
Verify battery capacity is adequate to supply, and                      24 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
VEGP Units 3 and 4                                3.8.1 - 3                    Amendment No. 135 (Unit 3)
Amendment No. 134 (Unit 4)
 
Technical Specifications                Battery Parameters 3.8.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                    FREQUENCY SR 3.8.7.6      Verify battery capacity is 80% of the manufacturers 60 months or 25%
rating when subjected to a performance discharge      of expected life, test or a modified performance discharge test.        whichever is less AND 12 months when battery shows degradation, or has reached 85%
of the expected life with capacity
                                                                        < 100% of manufacturers rating AND 24 months when battery has reached 85% of the expected life with capacity 100% of manufacturers rating VEGP Units 3 and 4                          3.8.7 - 4            Amendment No. 135 (Unit 3)
Amendment No. 134 (Unit 4)}}

Revision as of 22:52, 20 October 2019

Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 134 (LAR-18-003)
ML18173A306
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/26/2018
From:
NRC/NRO/DNRL/LB4
To: Whitley B
Southern Nuclear Operating Co
Hearn P/415-1189
Shared Package
ML18173A301 List:
References
EPID L-2018-LLA-0017
Download: ML18173A306 (4)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 134 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-92 REMOVE INSERT 7 7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.8.1-3 3.8.1-3 3.8.7-4 3.8.7-4

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 134, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 134

Technical Specifications DC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.2 Verify each battery charger supplies 150 amps at 24 months greater than or equal to the minimum established float voltage for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

OR Verify each battery charger can recharge the battery to the fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying the largest combined demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state.

SR 3.8.1.3 -----------------------------------------------------------------------

- NOTE -

The modified performance discharge test in SR 3.8.7.6 may be performed in lieu of SR 3.8.1.3.


Verify battery capacity is adequate to supply, and 24 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

VEGP Units 3 and 4 3.8.1 - 3 Amendment No. 135 (Unit 3)

Amendment No. 134 (Unit 4)

Technical Specifications Battery Parameters 3.8.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.7.6 Verify battery capacity is 80% of the manufacturers 60 months or 25%

rating when subjected to a performance discharge of expected life, test or a modified performance discharge test. whichever is less AND 12 months when battery shows degradation, or has reached 85%

of the expected life with capacity

< 100% of manufacturers rating AND 24 months when battery has reached 85% of the expected life with capacity 100% of manufacturers rating VEGP Units 3 and 4 3.8.7 - 4 Amendment No. 135 (Unit 3)

Amendment No. 134 (Unit 4)