Attachment - Vogtle Electric Generating Plant Unit 4 (LAR 17-044)
ML18156A148
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/10/2018
From: Manny Comar
NRC/NRO/DNRL/LB4
To: Whitley B
Southern Nuclear Operating Co
comar m/415-3863
Shared Package
ML18156A141 List:
References
EPID L-2017-LLA-0422
Download: ML18156A148 (3)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 129 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-92 REMOVE INSERT 7 7 Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-176 C-176

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 129, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 129

Table 2.2.5-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Design Commitment Inspections, Tests, Analyses Acceptance Criteria 253 2.2.05.02a 2.a) The components identified in Inspection will be conducted of The ASME Code Section III Table 2.2.5-1 as ASME Code Section the as-built components and design reports exist for the as-III are designed and constructed in piping as documented in the built components and piping accordance with ASME Code Section ASME design reports. identified in Tables 2.2.5-1 III requirements. and 2.2.5-2 as ASME Code 2.b) The piping identified in Table Section III.

2.2.5-2 as ASME Code Section III is designed and constructed in accordance with ASME Code Section III requirements.

3.a) Pressure boundary welds in Inspection of the as-built A report exists and concludes components identified in Table 2.2.5-1 pressure boundary welds will be that the ASME Code Section as ASME Code Section III meet ASME performed in accordance with III requirements are met for Code Section III requirements. the ASME Code Section III. non-destructive examination 3.b) Pressure boundary welds in piping of pressure boundary welds.

identified in Table 2.2.5-2 as ASME Code Section III meet ASME Code Section III requirements.

4.a) The components identified in A pressure test will be performed A report exists and concludes Table 2.2.5-1 as ASME Code Section on the components and piping that the results of the pressure III retain their pressure boundary required by the ASME Code test of the components and integrity at their design pressure. Section III to be pressure tested. piping identified in Tables 4.b) The piping identified in Table 2.2.5-1 and 2.2.5-2 as ASME 2.2.5-2 as ASME Code Section III Code Section III conform with retains its pressure boundary integrity at the requirements of the ASME its design pressure. Code Section III.

5.b) Each of the lines identified in Inspection will be performed for A report exists and concludes Table 2.2.5-2 for which functional the existence of a report that each of the as-built lines capability is required is designed to verifying that the as-built piping identified in Table 2.2.5-2 for withstand combined normal and seismic meets the requirements for which functional capability is design basis loads without a loss of its functional capability. required meets the functional capability. requirements for functional capability.

254 2.2.05.02b Not used per Amendment No. 84 255 2.2.05.03a Not used per Amendment No. 84 256 2.2.05.03b Not used per Amendment No. 84 257 2.2.05.04a Not used per Amendment No. 84 258 2.2.05.04b Not used per Amendment No. 84 C-176 Amendment No. 129