ATTACHMENT TO LICENSE AMENDMENT NO. 129 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-92 REMOVE INSERT 7
7 Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-176 C-176
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 129, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 129
C-176 Amendment No. 129 Table 2.2.5-5 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Design Commitment Inspections, Tests, Analyses Acceptance Criteria 253 2.2.05.02a 2.a) The components identified in Table 2.2.5-1 as ASME Code Section III are designed and constructed in accordance with ASME Code Section III requirements.
2.b) The piping identified in Table 2.2.5-2 as ASME Code Section III is designed and constructed in accordance with ASME Code Section III requirements.
Inspection will be conducted of the as-built components and piping as documented in the ASME design reports.
The ASME Code Section III design reports exist for the as-built components and piping identified in Tables 2.2.5-1 and 2.2.5-2 as ASME Code Section III.
3.a) Pressure boundary welds in components identified in Table 2.2.5-1 as ASME Code Section III meet ASME Code Section III requirements.
3.b) Pressure boundary welds in piping identified in Table 2.2.5-2 as ASME Code Section III meet ASME Code Section III requirements.
Inspection of the as-built pressure boundary welds will be performed in accordance with the ASME Code Section III.
A report exists and concludes that the ASME Code Section III requirements are met for non-destructive examination of pressure boundary welds.
4.a) The components identified in Table 2.2.5-1 as ASME Code Section III retain their pressure boundary integrity at their design pressure.
4.b) The piping identified in Table 2.2.5-2 as ASME Code Section III retains its pressure boundary integrity at its design pressure.
A pressure test will be performed on the components and piping required by the ASME Code Section III to be pressure tested.
A report exists and concludes that the results of the pressure test of the components and piping identified in Tables 2.2.5-1 and 2.2.5-2 as ASME Code Section III conform with the requirements of the ASME Code Section III.
5.b) Each of the lines identified in Table 2.2.5-2 for which functional capability is required is designed to withstand combined normal and seismic design basis loads without a loss of its functional capability.
Inspection will be performed for the existence of a report verifying that the as-built piping meets the requirements for functional capability.
A report exists and concludes that each of the as-built lines identified in Table 2.2.5-2 for which functional capability is required meets the requirements for functional capability.
254 2.2.05.02b Not used per Amendment No. 84 255 2.2.05.03a Not used per Amendment No. 84 256 2.2.05.03b Not used per Amendment No. 84 257 2.2.05.04a Not used per Amendment No. 84 258 2.2.05.04b Not used per Amendment No. 84