ML18176A143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 27, 2018 MEMORANDUM TO:            Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM:                    Robert M. Taylor, Director /RA - A. Bradford for/
Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
 
==SUBJECT:==
ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 13.5, PLANT PROCEDURES By letter dated December 7, 2010, GE-Hitachi Nuclear Energy (GEH) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) requesting renewal of the Advanced Boiling-Water Reactor (ABWR) design certification (DC).
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items associated with Section 13.5, Plant Procedures, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18046A992). This SE supplements the final safety evaluation report for the ABWR DC that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. Unless otherwise stated in the SE, the staffs review was based on Revision 6 of the ABWR design control document. The SE is being provided to support a future meeting of the subcommittee of the ACRS. The ACRS full committee meeting will be held after the subcommittee meeting.
CONTACT: Adrian Muniz, DLSE/LB3 301-415-4093
 
A. Veil                                      The staff concludes that the SE does not contain any information exempt from public disclosure.
However, the NRC will withhold the SE from public disclosure for 10 business days to allow GEH the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in ADAMS.
The staff will inform the ACRS immediately if GEH requests that any of the information in the SE be withheld from public disclosure.
Docket No.: 52-045
 
Package: ML18046B118 Memorandum: ML18176A143 SE - ML18046A992      *via e-mail          NRO-002 OFFICE DLSE:LB3:PM          DLSE:LB3:LA    DLSE:LB3:BC(A)  DLSE:D NAME    AMuniz            SGreen        JRankin          RTaylor (ABradford for)
DATE    6/27/2018          6/25/2018*    6/27/2018        6/27/18}}

Latest revision as of 21:50, 20 October 2019

Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5
ML18176A143
Person / Time
Site: 05200045
Issue date: 06/27/2018
From: Renee Taylor
NRC/NRO/DNRL
To: Andrea Veil
Advisory Committee on Reactor Safeguards
Muniz A
Shared Package
ML18046B118 List:
References
Download: ML18176A143 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 27, 2018 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Robert M. Taylor, Director /RA - A. Bradford for/

Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 13.5, PLANT PROCEDURES By letter dated December 7, 2010, GE-Hitachi Nuclear Energy (GEH) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) requesting renewal of the Advanced Boiling-Water Reactor (ABWR) design certification (DC).

Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items associated with Section 13.5, Plant Procedures, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18046A992). This SE supplements the final safety evaluation report for the ABWR DC that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. Unless otherwise stated in the SE, the staffs review was based on Revision 6 of the ABWR design control document. The SE is being provided to support a future meeting of the subcommittee of the ACRS. The ACRS full committee meeting will be held after the subcommittee meeting.

CONTACT: Adrian Muniz, DLSE/LB3 301-415-4093

A. Veil The staff concludes that the SE does not contain any information exempt from public disclosure.

However, the NRC will withhold the SE from public disclosure for 10 business days to allow GEH the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in ADAMS.

The staff will inform the ACRS immediately if GEH requests that any of the information in the SE be withheld from public disclosure.

Docket No.: 52-045

Package: ML18046B118 Memorandum: ML18176A143 SE - ML18046A992 *via e-mail NRO-002 OFFICE DLSE:LB3:PM DLSE:LB3:LA DLSE:LB3:BC(A) DLSE:D NAME AMuniz SGreen JRankin RTaylor (ABradford for)

DATE 6/27/2018 6/25/2018* 6/27/2018 6/27/18