| number = ML18200A170
| number = ML18200A170
| issue date = 07/18/2018
| issue date = 07/18/2018
| title = and 3 - Notification of NRC Retake Operator Licensing Examination Approval 05000528/2018302; 05000529/2018302; 05000530/2018302
| title = Notification of NRC Retake Operator Licensing Examination Approval 05000528/2018302; 05000529/2018302; 05000530/2018302
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
| addressee name = Bement R S
| addressee name = Bement R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000528/2018302]]
See also: [[see also::IR 05000528/2018302]]


=Text=
=Text=
{{#Wiki_filter:July 18, 2018
{{#Wiki_filter:UNITED STATES
 
                              NUCLEAR REGULATORY COMMISSION
                                                REGION IV
                                      1600 EAST LAMAR BOULEVARD
                                      ARLINGTON, TEXAS 76011-4511
                                            July 18, 2018
Mr. Robert S. Bement
Mr. Robert S. Bement
Executive Vice President Nuclear/
Executive Vice President Nuclear/
Chief Nuclear Officer
Chief Nuclear Officer
Arizona Public Service Company
Arizona Public Service Company
P.O. Box 52034, MS 7602
P.O. Box 52034, MS 7602
Phoenix, AZ 85072-2034
Phoenix, AZ 85072
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
-2034
            NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION APPROVAL 05000528/2018
            APPROVAL 05000528/2018302; 05000529/2018302; 05000530/2018302
302; 05000529/2018
Dear Mr. Bement:
302; 05000530/2018
In a telephone conversation on July 11, 2018, between John Rodgers, Senior Operations
302 
Training Instructor, and Daniel Bacon, Chief Examiner, arrangements were made for the
Dear Mr. Bement: In a telephone conversation
administration of a retake licensing examination at Palo Verde Nuclear Generating Station,
on July 11, 2018, between John Rodgers, Senior Operations Training Instructor, and Daniel Bacon , Chief Examiner, arrangements were made for the administration of a retake licensing examination at
Units 1, 2, and 3 during the week of September 24, 2018.
Palo Verde Nuclear Generating Station, Units 1, 2, and 3
As agreed during the telephone conversation, your staff will prepare the retake examination
during the week
(operating examination for two senior reactor operator applicants) based on the guidelines in
of September 24, 2018.
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11,
As agreed during the telephone conversation, your staff
and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,
will prepare the retake examination  
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes
(operating examination for two senior reactor operator applicants)
that might be necessary before the examination is administered.
based on the guidelines in  
To meet the above schedule, it will be necessary for your staff to furnish the operating
NUR EG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.
examination outline by July 27, 2018. The operating examination and supporting reference
  The NRC's regional office will discuss with your staff any changes that might be necessary before the examination
materials identified in Attachment 3 to ES-201 will be due by August 17, 2018. Pursuant to Title
is administered.
 
To meet the above schedule, it will be necessary for your staff to furnish the operating examination
outline by July 27, 2018
. The operating examination and supporting reference
materials identified in Attachment 3 to ES-201 will be due by August 17, 2018. Pursuant to Title  
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline
representative of the facility licensee shall approve the outline and examination before they are
and examination
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
before they are submitted to the NRC for review and approval. All materials shall be complete
use. We request that any personal, proprietary, sensitive unclassified, or safeguards
and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination
information in your response be contained in a separate enclosure and appropriately marked.
and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination
Any delay in receiving the required examination and reference materials, or the submittal of
to be rescheduled.
inadequate or incomplete materials, may cause the examination to be rescheduled.
  In order to conduct the requested operating examination, it will be necessary
In order to conduct the requested operating examination, it will be necessary for your staff to
for your staff to provide adequate space and accommodations in accordance with ES-302. In addition, Appendix E to NUREG
provide adequate space and accommodations in accordance with ES-302. In addition,
-1021 contains a number of NRC policies and guidelines that will be
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
in effect while the written examination  
effect while the written examination is being administered.
is being administered.
 
  UNITED STATES NUCLEAR REGULATORY
COMMISSION
REGION IV 1600 EAST LAMAR BOULEVARD
ARLINGTON, TEXAS 76011-4511 
R. Bement 2 To permit timely NRC review and evaluation, your staff should submit
signed applications certifying that all training has been completed
by September 10, 2018.  If the final signed applications are not received by that date, a postponement may be necessary.  This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under
approval number 3150-0018 , which expires on June 30, 2019.  The public reporting burden for
this collection of information is estimated to average
50 hours per response, including
the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T
-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
  In accordance with Title 10 of the Code of Federal Regulations
(CFR) 2.390 of the NRC's
"Agency Rules of Practice
and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible
from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html
.  Thank you for your cooperation in this matter.
Mr. Rodgers has been advised of the policies
and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Daniel Bacon
at 404-997-4518, or myself at 817
-200-1 159.  Sincerely,    /RA/    Vince nt G. Gaddy, Chief  Operations Branch
  Division of Reactor Safety
  Docket Nos.
50-528, 50-529, and 50
-530 License Nos.
  NPF-41, NPF-51, and NPF
-74           


 
R. Bement                                        2
ML18200A170  SUNSI Review:
To permit timely NRC review and evaluation, your staff should submit signed applications
ADAMS:   Non-Publicly Available
certifying that all training has been completed by September 10, 2018. If the final signed
  Non-Sensitive Keyword: By: VGaddy   Yes     No   Publicly Available
applications are not received by that date, a postponement may be necessary.
  Sensitive  
This letter contains information collections that are subject to the Paperwork Reduction Act of
RGN-002 OFFICE OE:OB SOE:OB C:OB   NAME MDoyle DBacon VGaddy   SIGNATURE /RA/ /RA by email/ /RA/   DATE 07/17/18 07/1 7/1 8 07/18/18
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs
Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for
public inspection in the NRCs Public Document Room or from the Publicly Available Records
(PARS) component of the NRCs Agencywide Documents Access and Management System
(ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public
Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Rodgers has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Daniel Bacon at 404-997-4518, or
myself at 817-200-1159.
                                                Sincerely,
                                                /RA/
                                                Vincent G. Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket Nos. 50-528, 50-529, and 50-530
License Nos. NPF-41, NPF-51, and NPF-74
 
 
ML18200A170
  SUNSI Review:         ADAMS:           Non-Publicly Available Non-Sensitive Keyword:
  By: VGaddy             Yes No       Publicly Available     Sensitive     RGN-002
OFFICE         OE:OB         SOE:OB         C:OB
NAME           MDoyle         DBacon         VGaddy
SIGNATURE     /RA/           /RA by email/ /RA/
DATE           07/17/18       07/17/18      07/18/18
}}
}}

Latest revision as of 21:00, 20 October 2019

Notification of NRC Retake Operator Licensing Examination Approval 05000528/2018302; 05000529/2018302; 05000530/2018302
ML18200A170
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/18/2018
From: Vincent Gaddy
NRC Region 4
To: Bement R
Arizona Public Service Co
References
IR 2018302
Download: ML18200A170 (3)


See also: IR 05000528/2018302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 EAST LAMAR BOULEVARD

ARLINGTON, TEXAS 76011-4511

July 18, 2018

Mr. Robert S. Bement

Executive Vice President Nuclear/

Chief Nuclear Officer

Arizona Public Service Company

P.O. Box 52034, MS 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION

APPROVAL 05000528/2018302; 05000529/2018302; 05000530/2018302

Dear Mr. Bement:

In a telephone conversation on July 11, 2018, between John Rodgers, Senior Operations

Training Instructor, and Daniel Bacon, Chief Examiner, arrangements were made for the

administration of a retake licensing examination at Palo Verde Nuclear Generating Station,

Units 1, 2, and 3 during the week of September 24, 2018.

As agreed during the telephone conversation, your staff will prepare the retake examination

(operating examination for two senior reactor operator applicants) based on the guidelines in

NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11,

and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,

Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes

that might be necessary before the examination is administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating

examination outline by July 27, 2018. The operating examination and supporting reference

materials identified in Attachment 3 to ES-201 will be due by August 17, 2018. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline and examination before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examination to be rescheduled.

In order to conduct the requested operating examination, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-302. In addition,

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

R. Bement 2

To permit timely NRC review and evaluation, your staff should submit signed applications

certifying that all training has been completed by September 10, 2018. If the final signed

applications are not received by that date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs

Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for

public inspection in the NRCs Public Document Room or from the Publicly Available Records

(PARS) component of the NRCs Agencywide Documents Access and Management System

(ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public

Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Rodgers has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Daniel Bacon at 404-997-4518, or

myself at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-528, 50-529, and 50-530

License Nos. NPF-41, NPF-51, and NPF-74

ML18200A170

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: VGaddy Yes No Publicly Available Sensitive RGN-002

OFFICE OE:OB SOE:OB C:OB

NAME MDoyle DBacon VGaddy

SIGNATURE /RA/ /RA by email/ /RA/

DATE 07/17/18 07/17/18 07/18/18