{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2018 MEMORANDUM TO: Yoira Diaz-Sanabria, Acting Deputy Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM:                    Jose R. Cuadrado, Project Manager          /RA/
Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards
 
==SUBJECT:==
 
==SUMMARY==
OF OCTOBER 23, 2018, PARTIALLY CLOSED MEETING WITH HOLTEC INTERNATIONAL TO DISCUSS HOLTECS MAY 24, AND JULY 27, 2018, RESPONSES TO NRC STAFFS MARCH 28, 2018, REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LICENSE APPLICATION FOR THE PROPOSED HI-STORE CONSOLIDATED INTERIM STORAGE FACILITY AT LEA COUNTY, NEW MEXICO On October 23, 2018, staff from the Division of Spent Fuel Management held a partially closed meeting with representatives from Holtec International (Holtec), at the U.S. Nuclear Regulatory Commission (NRC) Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss Holtecs May 24 and July 27, 2018, responses to NRC staffs request for additional information (RAI), issued on March 28, 2018, in connection with its review of the license application for the HI-STORE Consolidated Interim Storage (CIS) Facility. NRC staff requested the meeting to discuss issues identified in Holtecs supplemental responses to the staffs RAI related to aircraft hazards (dated July 27, 2018), and issues identified in their responses to the staffs RAI related to the soil stability assessment (dated May 24, 2018) for the proposed HI-STORE CIS facility. No regulatory decisions were made nor requested at this meeting.
During the first part of the meeting, NRC staff made a presentation (ADAMS Accession No ML18295A169) discussing the specific issues identified in Holtecs July 27, 2018 supplemental response to RAI 2-1 (issued by NRC staff on March 28, 2018). In its March 28, 2018, RAI, NRC staff requested that Holtec provide an assessment of any potential aircraft hazards at the proposed site. Holtec submitted its responses to the RAI on May 24, 2018. The NRC identified several issues with Holtecs response, which NRC staff identified and discussed with Holtec in a public meeting held on June 19, 2018 (ADAMS Accession No. ML18200A106). In response to CONTACT:        Jose Cuadrado, NMSS/DSFM (301) 415-0606
 
Y. Diaz-Sanabria                              2 the issues identified by staff during the June 19 meeting, Holtec submitted supplemental responses on July 27, 2018. During the October 23 meeting, NRC staff provided a detailed discussion of the remaining issues with the July 27 response and provided additional guidance to Holtec for addressing these in a revised response. NRC staff also requested that Holtec notify NRC staff prior to the submission of supplemental information and offered to conduct a pre-submission audit or another public meeting to discuss that revised responses prior to submission.
During the closed portion of the meeting, NRC staff held a discussion of Holtecs responses to RAI 2-2 (issued by NRC staff on March 28, 2018), which contained proprietary information. In its March 28, 2018, RAI, NRC staff requested that Holtec provide an assessment of the soil stability properties at the proposed site. Holtec submitted its responses to the RAI on May 24, 2018. Prior to the closed discussion, NRC staff provided a public overview of the issues identified in Holtecs RAI 2-2 response (ADAMS Accession No. ML18295A170). During the closed portion of the meeting, NRC staff identified the issues it found with Holtecs geotechnical stability assessment provided in its RAI response and answered clarification questions from Holtec for addressing these. Holtec stated that it would review the information provided and notify NRC staff of a proposed response schedule at a future date. Following the meeting, Holtec confirmed that the detailed slides used during the closed portion of the meeting did not contain proprietary information and could be publicly released. Accordingly, the slides for the closed portion are enclosed.
Before adjourning, NRC staff reminded Holtec that a timely completion of NRCs safety review requires timely and high-quality responses to the NRC staffs questions and emphasized the importance of early engagement and communication with NRC staff in its preparation of RAI responses.
After the open portion of the meeting, several members of the public participating by phone asked questions and provided comments to NRC staff. The questions made by the public sought clarification regarding the scope of the aircraft hazards assessment and the types of military aircraft to be considered in the assessment.
The attendance list (Enclosure 1) and slides for the meeting (Enclosure 2) are enclosed.
Docket No.: 72-1051
 
==Enclosures:==
: 1. Attendance List
: 2. Meeting Slides
 
Y. Diaz-Sanabria                          3
 
==SUBJECT:==
 
==SUMMARY==
OF OCTOBER 23, 2018, PARTIALLY CLOSED MEETING WITH HOLTEC INTERNATIONAL TO DISCUSS HOLTECS MAY 24, AND JULY 27, 2018, RESPONSES TO NRC STAFFS MARCH 28, 2018, REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LICENSE APPLICATION FOR THE PROPOSED HI-STORE CONSOLIDATED INTERIM STORAGE FACILITY AT LEA COUNTY, NEW MEXICO, DOCUMENT DATE: November 21, 2018 DISTRIBUTION:
DSFM r/f NRC attendees Summary: G:/SFST/Cuadrado/Holtec/Holtec ICSF/Meeting Documents/Meeting Summary 10-23-18.docx Slides: G:/SFST/Cuadrado/Holtec/Holtec ICSF/Meeting Documents/Meeting Slides 10-23 Geotechnical Analysis RAI.pdf ADAMS Package No. ML18330A078          Memo: ML18330A080 Slides: ML18330A079 OFC:              DSFM                    DSFM                    DSFM NAME:                                      SFigueroa JCuadrado                  for                  JMcKirgan WWheatley DATE:              11/20/18                11/21/18                11/21/18 OFFICIAL RECORD COPY
 
October 23, 2018 ATTENDANCE LIST Name                                      Affiliation Jose Cuadrado                              NRC/DSFM John McKirgan                              NRC/DSFM David Brown                                NRC/DSFM Ricardo Rodriguez                          NRC/DSFM Antonio Rigato                            NRC/DSFM David Tang                                NRC/DSFM Jill Caverly                              NRC/FCSE Stacey Imboden                            NRC/FCSE Amitava Ghosh                              NRC/NRO Michael Dudek                              NRC/NRO Robert Taylor                              NRC/NRO Chris Hair                                NRC/OGC Alana Wase                                NRC/OGC Joe Gillespie                              NRC/OGC Marla Morales                              CNWRA Ed Mayer                                  Holtec Kimberly Manzione                          Holtec Ben Zwierlein                              Holtec Paul Angelucci                            Holtec Jack Boshoven                              Public Mike Callahan                              GSI (Participating by phone)
Ace Hoffman Michael Keegan Enclosure 1
 
ENCLOSURE 2: Presentation Slides Holtec HI-STORE CISF Review - Discussion of 5/24/18 RAI Responses on Geotechnical Stability Assessment Enclosure 2}}

Revision as of 11:20, 20 October 2019

10/23/2018 Summary of Partially Closed Meeting with Holtec International to Discuss Holtec'S May 24, 2018, and July 27, 2018, Response to NRC Staff'S March 28, 2018, RAI for Review of License Application for Proposed HI-Store Consolidated I
ML18330A080
Person / Time
Site: HI-STORE
Issue date: 11/21/2018
From: Cuadrado J
Spent Fuel Licensing Branch
To: Yoira Diaz-Sanabria
Division of Spent Fuel Management
Cuadrado J
Shared Package
ML18330A078 List:
References
Download: ML18330A080 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2018 MEMORANDUM TO: Yoira Diaz-Sanabria, Acting Deputy Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Jose R. Cuadrado, Project Manager /RA/

Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF OCTOBER 23, 2018, PARTIALLY CLOSED MEETING WITH HOLTEC INTERNATIONAL TO DISCUSS HOLTECS MAY 24, AND JULY 27, 2018, RESPONSES TO NRC STAFFS MARCH 28, 2018, REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LICENSE APPLICATION FOR THE PROPOSED HI-STORE CONSOLIDATED INTERIM STORAGE FACILITY AT LEA COUNTY, NEW MEXICO On October 23, 2018, staff from the Division of Spent Fuel Management held a partially closed meeting with representatives from Holtec International (Holtec), at the U.S. Nuclear Regulatory Commission (NRC) Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss Holtecs May 24 and July 27, 2018, responses to NRC staffs request for additional information (RAI), issued on March 28, 2018, in connection with its review of the license application for the HI-STORE Consolidated Interim Storage (CIS) Facility. NRC staff requested the meeting to discuss issues identified in Holtecs supplemental responses to the staffs RAI related to aircraft hazards (dated July 27, 2018), and issues identified in their responses to the staffs RAI related to the soil stability assessment (dated May 24, 2018) for the proposed HI-STORE CIS facility. No regulatory decisions were made nor requested at this meeting.

During the first part of the meeting, NRC staff made a presentation (ADAMS Accession No ML18295A169) discussing the specific issues identified in Holtecs July 27, 2018 supplemental response to RAI 2-1 (issued by NRC staff on March 28, 2018). In its March 28, 2018, RAI, NRC staff requested that Holtec provide an assessment of any potential aircraft hazards at the proposed site. Holtec submitted its responses to the RAI on May 24, 2018. The NRC identified several issues with Holtecs response, which NRC staff identified and discussed with Holtec in a public meeting held on June 19, 2018 (ADAMS Accession No. ML18200A106). In response to CONTACT: Jose Cuadrado, NMSS/DSFM (301) 415-0606

Y. Diaz-Sanabria 2 the issues identified by staff during the June 19 meeting, Holtec submitted supplemental responses on July 27, 2018. During the October 23 meeting, NRC staff provided a detailed discussion of the remaining issues with the July 27 response and provided additional guidance to Holtec for addressing these in a revised response. NRC staff also requested that Holtec notify NRC staff prior to the submission of supplemental information and offered to conduct a pre-submission audit or another public meeting to discuss that revised responses prior to submission.

During the closed portion of the meeting, NRC staff held a discussion of Holtecs responses to RAI 2-2 (issued by NRC staff on March 28, 2018), which contained proprietary information. In its March 28, 2018, RAI, NRC staff requested that Holtec provide an assessment of the soil stability properties at the proposed site. Holtec submitted its responses to the RAI on May 24, 2018. Prior to the closed discussion, NRC staff provided a public overview of the issues identified in Holtecs RAI 2-2 response (ADAMS Accession No. ML18295A170). During the closed portion of the meeting, NRC staff identified the issues it found with Holtecs geotechnical stability assessment provided in its RAI response and answered clarification questions from Holtec for addressing these. Holtec stated that it would review the information provided and notify NRC staff of a proposed response schedule at a future date. Following the meeting, Holtec confirmed that the detailed slides used during the closed portion of the meeting did not contain proprietary information and could be publicly released. Accordingly, the slides for the closed portion are enclosed.

Before adjourning, NRC staff reminded Holtec that a timely completion of NRCs safety review requires timely and high-quality responses to the NRC staffs questions and emphasized the importance of early engagement and communication with NRC staff in its preparation of RAI responses.

After the open portion of the meeting, several members of the public participating by phone asked questions and provided comments to NRC staff. The questions made by the public sought clarification regarding the scope of the aircraft hazards assessment and the types of military aircraft to be considered in the assessment.

The attendance list (Enclosure 1) and slides for the meeting (Enclosure 2) are enclosed.

Docket No.: 72-1051

Enclosures:

1. Attendance List
2. Meeting Slides

Y. Diaz-Sanabria 3

SUBJECT:

SUMMARY

OF OCTOBER 23, 2018, PARTIALLY CLOSED MEETING WITH HOLTEC INTERNATIONAL TO DISCUSS HOLTECS MAY 24, AND JULY 27, 2018, RESPONSES TO NRC STAFFS MARCH 28, 2018, REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LICENSE APPLICATION FOR THE PROPOSED HI-STORE CONSOLIDATED INTERIM STORAGE FACILITY AT LEA COUNTY, NEW MEXICO, DOCUMENT DATE: November 21, 2018 DISTRIBUTION:

DSFM r/f NRC attendees Summary: G:/SFST/Cuadrado/Holtec/Holtec ICSF/Meeting Documents/Meeting Summary 10-23-18.docx Slides: G:/SFST/Cuadrado/Holtec/Holtec ICSF/Meeting Documents/Meeting Slides 10-23 Geotechnical Analysis RAI.pdf ADAMS Package No. ML18330A078 Memo: ML18330A080 Slides: ML18330A079 OFC: DSFM DSFM DSFM NAME: SFigueroa JCuadrado for JMcKirgan WWheatley DATE: 11/20/18 11/21/18 11/21/18 OFFICIAL RECORD COPY

October 23, 2018 ATTENDANCE LIST Name Affiliation Jose Cuadrado NRC/DSFM John McKirgan NRC/DSFM David Brown NRC/DSFM Ricardo Rodriguez NRC/DSFM Antonio Rigato NRC/DSFM David Tang NRC/DSFM Jill Caverly NRC/FCSE Stacey Imboden NRC/FCSE Amitava Ghosh NRC/NRO Michael Dudek NRC/NRO Robert Taylor NRC/NRO Chris Hair NRC/OGC Alana Wase NRC/OGC Joe Gillespie NRC/OGC Marla Morales CNWRA Ed Mayer Holtec Kimberly Manzione Holtec Ben Zwierlein Holtec Paul Angelucci Holtec Jack Boshoven Public Mike Callahan GSI (Participating by phone)

Ace Hoffman Michael Keegan Enclosure 1

ENCLOSURE 2: Presentation Slides Holtec HI-STORE CISF Review - Discussion of 5/24/18 RAI Responses on Geotechnical Stability Assessment Enclosure 2