ML19050A485: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000397/2019301]]
{{Adams
| number = ML19050A485
| issue date = 02/19/2019
| title = NRC Initial Operator Licensing Examination Approval 05000397/2019301
| author name = Werner G
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Sawatzke B
| addressee affiliation = Energy Northwest
| docket = 05000397
| license number = NPF-021
| contact person =
| case reference number = 50-397/19-01
| document report number = 50-397/OL-19
| document type = Letter, License-Operator License Exam, Draft
| page count = 3
}}
See also: [[see also::IR 05000397/2019301]]
 
=Text=
{{#Wiki_filter:February 19, 2019
Mr. Brad Sawatzke, Chief Executive Officer
Energy Northwest
MD 1023
P.O. Box 968
Richland, WA 99352
SUBJECT:        COLUMBIA GENERATING STATION - NRC INITIAL OPERATOR LICENSING
                EXAMINATION APPROVAL 05000397/2019301
Dear Mr. Sawatzke:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at Columbia Generating Station.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Dave Crawford,
Exam Writer. Note that any examination waivers and application denials have been addressed
in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors," Revision 11, on March 7, 2019. The NRC staff will administer
the operating tests during the week of February 25, 2019. This examination has undergone
extensive review by NRC staff and representatives responsible for licensed operator training at
your facility. Based on this review, I have concluded that the examination meets the guidelines
of NUREG-1021 for content, operational, and discrimination validity. By administering this
examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for
measuring the qualifications of licensed operator applicants at your facility. If you determine
that this examination is not appropriate for licensing operators at your facility, do not administer
the examination and contact me at 817-200-1159.
 
B. Sawatzke                                    2
Please contact your chief examiner, Mahdi Hayes, at 817-200-1508, if you have any questions
or identify any errors or changes in the license level (reactor operator or senior reactor operator)
or type of examination (partial or complete written examination and/or operating test) specified
for each applicant approved to take the examination.
                                                Sincerely,
                                                /RA/
                                                Gregory E. Werner, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket No. 55-397
License No. NPF-21
cc:
Electronic Distribution for
  Columbia Generating Station
 
 
ML19050A485
x SUNSI Review:        ADAMS:            Non-Publicly Available x Non-Sensitive Keyword:
  By: MOH              x Yes  No      x Publicly Available      Sensitive
OFFICE        OB:OE        OB:BC
NAME          MHayes        GWerner
SIGNATURE      /RA/          /RA/
DATE          02/16/2019    02/19/2019
}}

Latest revision as of 00:35, 20 October 2019

NRC Initial Operator Licensing Examination Approval 05000397/2019301
ML19050A485
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/19/2019
From: Greg Werner
Operations Branch IV
To: Sawatzke B
Energy Northwest
References
50-397/19-01 50-397/OL-19
Download: ML19050A485 (3)


See also: IR 05000397/2019301

Text

February 19, 2019

Mr. Brad Sawatzke, Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT: COLUMBIA GENERATING STATION - NRC INITIAL OPERATOR LICENSING

EXAMINATION APPROVAL 05000397/2019301

Dear Mr. Sawatzke:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at Columbia Generating Station.

The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to Dave Crawford,

Exam Writer. Note that any examination waivers and application denials have been addressed

in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the

written examination in accordance with NUREG-1021, "Operator Licensing Examination

Standards for Power Reactors," Revision 11, on March 7, 2019. The NRC staff will administer

the operating tests during the week of February 25, 2019. This examination has undergone

extensive review by NRC staff and representatives responsible for licensed operator training at

your facility. Based on this review, I have concluded that the examination meets the guidelines

of NUREG-1021 for content, operational, and discrimination validity. By administering this

examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for

measuring the qualifications of licensed operator applicants at your facility. If you determine

that this examination is not appropriate for licensing operators at your facility, do not administer

the examination and contact me at 817-200-1159.

B. Sawatzke 2

Please contact your chief examiner, Mahdi Hayes, at 817-200-1508, if you have any questions

or identify any errors or changes in the license level (reactor operator or senior reactor operator)

or type of examination (partial or complete written examination and/or operating test) specified

for each applicant approved to take the examination.

Sincerely,

/RA/

Gregory E. Werner, Chief

Operations Branch

Division of Reactor Safety

Docket No. 55-397

License No. NPF-21

cc:

Electronic Distribution for

Columbia Generating Station

ML19050A485

x SUNSI Review: ADAMS: Non-Publicly Available x Non-Sensitive Keyword:

By: MOH x Yes No x Publicly Available Sensitive

OFFICE OB:OE OB:BC

NAME MHayes GWerner

SIGNATURE /RA/ /RA/

DATE 02/16/2019 02/19/2019