| =Text= | | =Text= |
| {{#Wiki_filter:C. Román UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 | | {{#Wiki_filter:C. Román UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 13, 2019 MEMORANDUM TO: Cinthya I. Román, Chief Environmental Review Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: Stacey Imboden, Sr. Project Manager /RA/ |
| -0001 June 13, 2019 MEMORANDUM TO: | | Environmental Review Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards |
| Cinthya I. Román, Chief Environmental Review Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: Stacey Imboden, Sr. Project Manager | |
| /RA/ Environmental Review Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 25: |
Line 23: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| REPORT RELATED TO THE ENVIRONMENTAL SCOPING PROCESS FOR THE HOLTEC CONSOLIDATED INTERIM STORAGE FACILITY APPLICATION (DOCKET NUMBER: 72 | | REPORT RELATED TO THE ENVIRONMENTAL SCOPING PROCESS FOR THE HOLTEC CONSOLIDATED INTERIM STORAGE FACILITY APPLICATION (DOCKET NUMBER: 72-1051) |
| -1051) The staff of the U.S. Nuclear Regulatory Commission (NRC) conducted a scoping process from March 30, 2018, through July 30, 2018, to determine the scope of the NRC staff's environmental review of an application from Holtec International for a consolidated interim storage facility to be located in Lea County, New Mexico. As part of the scoping process, the NRC staff held a public scoping meeting and webinar at the NRC headquarters in Rockville, MD, on April 25, 2018, and five public in | | The staff of the U.S. Nuclear Regulatory Commission (NRC) conducted a scoping process from March 30, 2018, through July 30, 2018, to determine the scope of the NRC staffs environmental review of an application from Holtec International for a consolidated interim storage facility to be located in Lea County, New Mexico. As part of the scoping process, the NRC staff held a public scoping meeting and webinar at the NRC headquarters in Rockville, MD, on April 25, 2018, and five public in-person public scoping meetings in New Mexico. The dates and locations for these New Mexico meetings were: (1) April 30, 2018, in Roswell; (2) May 1, 2018, in Hobbs; (3) May 3, 2018, in Carlsbad; (4) May 21, 2018, in Gallup; and (5) May 22, 2018, in Albuquerque. The meetings were held to solicit public input regarding the scope of the environmental review. Transcripts from the webinar and each meeting along with digital versions of the handouts and the NRC presentations can be found on the NRC website: |
| -person public scoping meetings in New Mexico. The dates and locations for these New Mexico meetings were: (1) April 30, 2018, in Roswell; (2) May 1, 2018, in Hobbs; (3) May 3, 2018, in Carlsbad; (4) May 21, 2018, in Gallup; and (5) May 22, 2018, in Albuquerque. The meetings were held to solicit public input regarding the scope of the environmental review. Transcripts from the webinar and each meeting along with digital versions of the handouts and the NRC presentations can be found on the NRC website: | | (https://www.nrc.gov/waste/spent-fuel-storage/cis/hi/public-meetings.html). |
| (https://www.nrc.gov/waste/spent | | CONTACT: Stacey Imboden, NMSS/FCSE 301-415-2462 |
| -fuel-storage/cis/hi/public | | |
| -meetings.html). CONTACT: Stacey Imboden, NMSS/FCSE 301-415-2462 C. Román 2 The NRC staff has prepared the enclosed scoping summary report, which identifies comments either received at the public scoping meetings, by letter, through www.regulations.gov, or by electronic mail and provides responses to those comments. | | C. Román 2 The NRC staff has prepared the enclosed scoping summary report, which identifies comments either received at the public scoping meetings, by letter, through www.regulations.gov, or by electronic mail and provides responses to those comments. All participants of the scoping process (who have provided mailing information) will receive notification of issuance of the scoping summary report. The next step in the environmental review process is the issuance of the draft Environmental Impact Statement (DEIS). Notice of the availability of the DEIS and the procedures for providing comments will be published in the Federal Register. |
| All participants of the scoping process (who have provided mailing information) will receive notification of issuance of the scoping summary report. The next step in the environmental review process is the issuance of the draft Environmental Impact Statement (DEIS). Notice of the availability of the DEIS and the procedures for providing comments will be published in the Federal Register. Docket No. 72 | | Docket No. 72-1051 |
| -1051 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| Scoping Summary Report cc: See next page | | Scoping Summary Report cc: See next page |
|
| |
|
| ML19121A295 (Pkg) | | ML19121A295 (Pkg) ML19121A297 (Ltr) *via email OFFICE NMSS/FCSE NMSS/FCSE NMSS/FCSE NMSS/FCSE OGC NMSS/FCSE NAME SImboden JCaverly AWalker-Smith CRomán *EHouseman SImboden DATE 05/02/2019 05/06/2019 05/07/2019 06/13/2019 05/21/2019 06/13/2019}} |
| ML19121A297 (Ltr | |
| ) *via email OFFICE NMSS/FCSE NMSS/FCSE NMSS/FCSE NMSS/FCSE OGC NMSS/FCSE NAME SImboden JCaverly AWalker-Smith CRomán *EHouseman SImboden DATE 05/02/2019 05/06/2019 05/07/2019 06/13/2019 05/21/2019 06/13/2019}} | |
|
---|
Category:Memoranda
MONTHYEARML21257A4732021-09-0707 September 2021 Aug 2, 3, and 4, 2021, Summary of Public Meetings with Holtec International to Discuss Proposed Responses to NRC Second Requests for Additional Information for the Review of the License Application for the Proposed Hi-Store Consolidated Int ML20273A0602020-09-29029 September 2020 Summary of August and September 2020 Draft Environmental Impact Statement Public Comment Meetings for Holtec International'S Proposed Consolidated Interim Storage Facility, Lea County, New Mexico (Docket Number 72-1051) ML20055E1022020-02-13013 February 2020 Redacted Version - Summary of Site Visit for Holtec CISF Project Cultural Resources Tribal Consultation ML19121A2972019-06-13013 June 2019 Memo to C. Roman from S. Imboden Issuing Holtec Scoping Summary Report ML18330A0802018-11-21021 November 2018 Summary of Partially Closed Meeting with Holtec International to Discuss Holtec'S May 24, 2018, and July 27, 2018, Response to NRC Staff'S March 28, 2018, RAI for Review of License Application for Proposed HI-Store Consolidated Interim. ML18200A1062018-07-19019 July 2018 Memorandum to M. Layton Summary of June 19, 2018, Public Meeting with Holtec International to Discuss Holtec'S Response to Nrc'S RAI for the Review of License Application for the Proposed HI-STORE Cisf at Lea County, Nm (W/Enclosure 1) ML18164A2182018-06-21021 June 2018 Memo to C. Roman, Chief, ERB; Re., Holtec Site Visit and Information Gathering Report ML18157A1722018-06-19019 June 2018 May 21-22 2018, Summary of Public Scoping Meetings for Holtec International'S Proposed Consolidated Interim Storage Facility, Lea County, Nm ML18141A2312018-05-24024 May 2018 April 25, April 30, May 1, and May 3, 2018, EIS Scoping Meeting Summary Rev 1 2021-09-07
[Table view] Category:Report
MONTHYEARML24257A0782024-09-10010 September 2024 Letter -E.C. Allison to J Lubinski, 09-10-24 (Full Report Version) ML24257A1782024-09-10010 September 2024 Letter - E.C. Allison to Helton, 09-10-24 (Short Version) ML24257A1792024-09-10010 September 2024 Letter - E.C. Allison to Helton 9-10-24 (Full Report Version) ML24295A0752024-09-10010 September 2024 Letter - E.C. Allison to R Lewis, 09-10-2024 (Short Version) ML24260A1162024-09-10010 September 2024 Letter - E.C. Allison to K. Morgan-Butler, 09-10-2024 (Short Version) ML24260A1172024-09-10010 September 2024 Letter - E.C. Allison to C. Roman, 09-10-24 (Short Version) ML24299A2562024-09-0909 September 2024 (External) Holtec Rpt. Final Report v2. 090924 - Sent to R Lewis 09-10-2024 from E.C. Allison (Flashdrive) ML24268A1252024-09-0909 September 2024 (External) Holtec Rpt. Final Report v2. 090924 - Sent to KMorgan-Butler 09-10-2024 from E.C. Allison (Flashdrive) ML24268A1242024-09-0909 September 2024 (External) Holtec Rpt. Final Report v2. 090924 - Sent to C Roman 09-10-2024 from E.C. Allison (Flashdrive) ML24257A1812024-09-0303 September 2024 Letter - E.C. Allison to Helton 9-03-24 (Full Report Version) ML24260A1152024-09-0303 September 2024 Letter - E.C. Allison to K. Morgan-Butler, 09-03-24 (Short Version) ML24268A1272024-09-0303 September 2024 (External) Holtec Rpt. Final Report. 090324 - Sent to Helton 09-03-2024 from E.C. Allison (Flashdrive) ML24268A1262024-09-0303 September 2024 (External) Holtec Rpt. Final Report. 090324 - Sent to KMorgan-Butler 09-03-2024 from E.C. Allison (Flashdrive) ML23206A1802023-07-25025 July 2023 Attachment 2: HI-STORE SAR Rev 1 - Non-Proprietary ML23097A1712023-05-0808 May 2023 Review of New and Potentially Significant Information for the Holtec Environmental Impact Statement for a Consolidated Interim Storage Facility for Spent Nuclear Fuel in Lea County, New Mexico ML23025A1122023-01-20020 January 2023 Redacted - Attachment 3 - HI-2167374, Rev 0T, Licensing Report on the HI-STORE Cis Facility ML23020A1302023-01-20020 January 2023 Attachment 1 - Summary of Action Items - January 2023 ML23025A0972022-12-23023 December 2022 Redacted - Attachment 2 - HI-2167374, Licensing Report on the HI-STORE Cis Facility ML23023A2522022-11-23023 November 2022 Redacted - Attachment 4 - HI-2167374, Safety Analysis Report, Revision 0R ML22331A0152022-11-17017 November 2022 Attachment 12 - HI-2177535, Holtec International & Eddy Lea Energy Alliance (Elea) Underground Consolidated Interim Storage Facility - Emergency Response Plan ML22331A0122022-11-16016 November 2022 Attachment 9 - HI-2177565, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan ML22257A2432022-08-15015 August 2022 Redacted - Attachment 4: Safety Analysis Report Licensing Report HI-2167374 on the HI-Store Cis Facility ML22331A0082022-08-0909 August 2022 Attachment 5 - HI-2177593, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates ML22124A3212022-05-0404 May 2022 Redacted - Attachment 5: Report HI-2167374, Licensing Report on the HI-STORE Cis Facility SAR ML22331A0112022-03-18018 March 2022 Attachment 8 - HI-2177553, Thermal Analysis of HI-TRAC CS Transfer Cask ML22331A0092021-09-27027 September 2021 Attachment 6 - HI-2177591, Thermal Evaluations of HI-STORM Umax at HI-STORE Cis Facility ML21280A3352021-08-16016 August 2021 Redacted - HI-2167374, Revision 0O, Licensing Report on the HI-Store Cis Facility ML22331A0102021-08-13013 August 2021 Attachment 7 - HI-2177597, HI-STORE CTF Thermal Evaluation ML21224A0932021-06-30030 June 2021 International, HI-2167374, Revision 0N, Licensing Report on HI-Store Cis Facility, Part 2 of 2 ML21272A3682021-06-30030 June 2021 Redacted - Holtec International, HI-2167374, Revision 0N, Licensing Report on HI-Store Cis Facility, Part 1 of 2 ML21155A2292021-04-0101 April 2021 CISF EIS - Jurisdictional Determination ML21158A2042021-03-15015 March 2021 Demographic Report for Andrews Co, Tx; Gaines Co. Tx; Lea Co, Nm ML21064A5302021-03-0505 March 2021 Redacted - Attachment 3 - HI-2167374, Licensing Report on the HI-STORE Cis Facility ML21158A1922021-02-19019 February 2021 Socioeconomic Trends Report for the Holtec CISF EIS ML22126A0312020-12-31031 December 2020 Transition Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 for Intrepid Potash, Inc ML20353A4202020-12-18018 December 2020 Redacted - Attachment 5 - HI-2167374, Revision 0L, Licensing Report on the HI-STORE Cis Facility ML20297A4052020-10-23023 October 2020 Redacted - Attachment 5: HI-2167374, Licensing Report on the HI-STORE Cis Facility ML20295A2962020-10-21021 October 2020 Redacted - Holtec International, Supplemental Archeological Information on the HI-STORE CISF ML20295A4282020-10-21021 October 2020 Redacted - Attachment 3: HI-2167374, Revision 0J, Licensing Report on the HI-STORE Cis Facility ML20294A4982020-10-20020 October 2020 Redacted - Licensing Report on the HI-STORE Cis Facility ML20065K0312019-12-16016 December 2019 New Mexico Environment Department Comments Regarding Draft EIS for Holtec CISF ML19121A2972019-06-13013 June 2019 Memo to C. Roman from S. Imboden Issuing Holtec Scoping Summary Report ML19121A2962019-06-0101 June 2019 Holtec Environmental Impact Statement Scoping Summary Report ML21195A3872019-04-24024 April 2019 New Mexico Department of Game and Fish, 2019 Nmert 203 Holtec Project Report ML22138A3572018-12-31031 December 2018 2018 Pronghorn Harvest Report New Mexico Department of Game and Fish ML21228A2192018-02-28028 February 2018 Attachment 17 - CIS-RP-001-01, Revision 1, Geotechnical Data Report HI-STORE CISF Phase 1 Site Characterization ML22138A3542018-01-31031 January 2018 2018 Deer Harvest Report - New Mexico Department of Game and Fish 2024-09-09
[Table view] Category:Administrative
MONTHYEARML19121A2972019-06-13013 June 2019 Memo to C. Roman from S. Imboden Issuing Holtec Scoping Summary Report ML19121A2962019-06-0101 June 2019 Holtec Environmental Impact Statement Scoping Summary Report 2019-06-13
[Table view] |
Text
C. Román UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 13, 2019 MEMORANDUM TO: Cinthya I. Román, Chief Environmental Review Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: Stacey Imboden, Sr. Project Manager /RA/
Environmental Review Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards
SUBJECT:
SCOPING
SUMMARY
REPORT RELATED TO THE ENVIRONMENTAL SCOPING PROCESS FOR THE HOLTEC CONSOLIDATED INTERIM STORAGE FACILITY APPLICATION (DOCKET NUMBER: 72-1051)
The staff of the U.S. Nuclear Regulatory Commission (NRC) conducted a scoping process from March 30, 2018, through July 30, 2018, to determine the scope of the NRC staffs environmental review of an application from Holtec International for a consolidated interim storage facility to be located in Lea County, New Mexico. As part of the scoping process, the NRC staff held a public scoping meeting and webinar at the NRC headquarters in Rockville, MD, on April 25, 2018, and five public in-person public scoping meetings in New Mexico. The dates and locations for these New Mexico meetings were: (1) April 30, 2018, in Roswell; (2) May 1, 2018, in Hobbs; (3) May 3, 2018, in Carlsbad; (4) May 21, 2018, in Gallup; and (5) May 22, 2018, in Albuquerque. The meetings were held to solicit public input regarding the scope of the environmental review. Transcripts from the webinar and each meeting along with digital versions of the handouts and the NRC presentations can be found on the NRC website:
(https://www.nrc.gov/waste/spent-fuel-storage/cis/hi/public-meetings.html).
CONTACT: Stacey Imboden, NMSS/FCSE 301-415-2462
C. Román 2 The NRC staff has prepared the enclosed scoping summary report, which identifies comments either received at the public scoping meetings, by letter, through www.regulations.gov, or by electronic mail and provides responses to those comments. All participants of the scoping process (who have provided mailing information) will receive notification of issuance of the scoping summary report. The next step in the environmental review process is the issuance of the draft Environmental Impact Statement (DEIS). Notice of the availability of the DEIS and the procedures for providing comments will be published in the Federal Register.
Docket No. 72-1051
Enclosure:
Scoping Summary Report cc: See next page
ML19121A295 (Pkg) ML19121A297 (Ltr) *via email OFFICE NMSS/FCSE NMSS/FCSE NMSS/FCSE NMSS/FCSE OGC NMSS/FCSE NAME SImboden JCaverly AWalker-Smith CRomán *EHouseman SImboden DATE 05/02/2019 05/06/2019 05/07/2019 06/13/2019 05/21/2019 06/13/2019