ML062220500: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML062220500
| number = ML062220500
| issue date = 08/09/2006
| issue date = 08/09/2006
| title = Cooper, Danger Will Robinson: If You Change Cell Locations You May Break the V
| title = Danger Will Robinson: If You Change Cell Locations You May Break the V
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation

Revision as of 14:23, 13 July 2019

Danger Will Robinson: If You Change Cell Locations You May Break the V
ML062220500
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/09/2006
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0007
Download: ML062220500 (2)


Text

Cooper SealType 0 tBatt 4.00 tCoreUncovery 0.50 tDGR50 4.00 tEPFail 0.00 tLong 4.00 tShort 0.00 LOOPClass(1)

TRUE LOOPClass(2)

TRUE LOOPClass(3)

TRUE LOOPCIass(4)

TRUE NUREG/CR-5496 LOOPFreq 5.32E-06 PNRLOOPST 1.00E+00 PNREPBD 6.81 E-02 PSLOCA N/A PNREPSL N/A PNREPNSL N/A.-JPDGRunTime 14.00 NUREG-1032 LOOPFreq 1.10E-05 PNRLOOPST 1.00E+00 PNREPBD 2.25E-02 PSLOCA N/A PNREPSL N/A PNREPNSL N/A DGRunTime 2.27 4 e 4 1-gBI-~ C~ ~'Danger Will Roblnson:

If you change cell locations you may break the V Reactor coolant pump seal type Battery depletion time (not used in the current formulation

-tLong i: Core uncovery time Median diesel generator repair time Emergency power failure time (generally assumed to be 0.)Long-term recovery time (this will generally be the battery depletior Short-term recovery time Plant centered LOOP Grid-related LOOP Severe weather related LOOP Extreme weather LOOP (1032 only, 5496 does not model this clas LOOP Frequency (per hour)P(EP Not Recovered in Short Term)P(EP Not Recovered in Long Term) -BWR Only P(Seal LOCA)P(EP No Rec Long I Seal LOCA)P(EP No Rec Long I No Seal LOCA)Diesel Generator Mission Time LOOP Frequency (per hour)P(EP Not Recovered in Short Term)P(EP Not Recovered in Long Term) -BWR Only P(Seal LOCA)P(EP No Rec Long I Seal LOCA)P(EP No Rec Long I No Seal LOCA)Diesel Generator Mission Time z,-e4&Q (Qcl!g P, /0 B code!s what is actually used)n time!)s)Instructions:

Alt+F1 1 will show you the VBA code Alt+F8 will show you the VBA routines you must run to update probabilities on this page